01
OBRA
CLIENTE
VENTA
DESCRIPCIÓN PREVISTO ACTUAL I.G.V 19% TOTAL
COSTO
DESCRIPCIÓN PREVISTO ACTUAL I.G.V 19% TOTAL
VENTA 612,447 738,248 2,070,024 0 630,914 568,597 368,675 266,301 0 9,005 3,913,516 18,544 4,243,043
Contractual 612,447 738,248 2,070,024 - 630,914 568,597 368,675 266,301 0 9,005 3,913,516 18,538 4,243,043
Reajustes - - - -
Adicionales y/o obras complementarias - - - - - - - - - - - 1 -
Otros (Premios, Fact. a terceros,etc.) - - - - - - - - - - - 5 -
CONCILIACIÓN - - - -
COSTO 2,195 T Err:522 0 2,095 1,163 782 276 0 9,282 Err:522 18,567 4,243,043
Costo Materiales 1,276 Err:522 Err:522 - 1,107 212 66 105 - 4,325 Err:522 8,605 1,880,575
Costo Mano Obra 494 505 429,806 - 466 269 135 42 - 1,900 432,618 3,613 1,352,507
Costo Subcontratos 243 115 5,307 - 379 616 534 87 - 2,184 9,107 4,706 320,117
Costo de Equipos -
- Propios 0 - 95,324 - 1 - - - - 0 95,325 3 188,563
- Terceros 94 50 50 - 82 18 5 3 - 368 527 612 -
Costo de Fletes -
- Propios - - - - - - - - - - - - 179,354
- Terceros 4 2 19,455 - 5 4 - - - 18 19,482 27 -
Sueldos de empleados 47 48 61,743 - 43 37 37 34 - 349 62,243 753 180,814
Gastos Generales 37 41 33,187 - 11 7 5 4 - 138 33,353 248 141,113
(2) Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 (24) (0)
MARGEN
-0.1% Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 -0.13% 0.0%
COSTO APLICADO 1,909 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 18,567 18,538
RESULTADO PENDIENTE 287 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 - -
ACTIVOS
PROVISIONES
CONTINGENCIAS 287 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 - -
RESULTADO ECONOMICO
FASE 2000: OBRAS PRELIMINARES
AL 30 DE NOVIEMBRE DE 2006 FORMATO No. : RO-00-18
OBRA : INFORME No : 05
CLIENTE : MONEDA: MILES DE NUEVOS SOLES PAGINA No. : 02 DE 24
T/ C Inicial : 3.250 Jul-06 Form.Polinómica (K ) : IMPRESO EL : 4-Dec-06
T/ C Actual : 0.000 Nov-06 T/C Prom.Acum. : 0.000 ELABORADO : 0
Costo Materiales 1 9 35 - 0 0 - - - 11 46 37 32
Costo Mano Obra 1 7 44 - 4 3 2 - - 39 91 108 68
Costo Subcontratos 11 8 53 - 12 12 12 7 3 102 201 209 222
Costo de Equipos
- Propios - - - - - - - - - - - - -
- Terceros 1 0 0 - 0 0 0 0 - 3 4 5 5
Costo de Fletes
- Propios - - - -
- Terceros - - - - - - - - - - - - -
Sueldos de empleados - - - 0 0
Gastos Generales - - 0 0
Costo Materiales 0 0 5 - 2 0 - - - 4 11 11 9
Costo Mano Obra 10 8 33 - 6 1 1 - - 41 82 82 88
Costo Subcontratos 34 27 108 - 3 - - - - 47 158 178 117
Costo de Equipos
- Propios - - - -
- Terceros 0 3 4 - 2 - - - - 37 44 40 72
Costo de Fletes
- Propios - - - -
- Terceros - - - - - - - - - - - -
Sueldos de empleados 0 - - - - - - - - - - 0 0
Gastos Generales - - 0 0
(2) 5 (5) 0 (0) (0) (0) (0) 0 (4) (10) (25) (0)
MARGEN
-8.76% 16.74% -3% -3% -3% -3% -3% -3% -3% -3% -3.36% -8.76% 0.00%
Costo Materiales 466 399 1,041 - 318 9 - - - 1,445 2,813 2,829 2,919
Costo Mano Obra 68 34 106 - 35 18 7 5 - 288 460 460 579
Costo Subcontratos 1 0 0 - - - - - - 2 2 3 3
Costo de Equipos
- Propios - - - - - - - - - - - - -
- Terceros 13 1 12 - 8 6 2 - - 53 81 90 99
Costo de Fletes
- Propios - - - -
- Terceros - - - - - - - - - - - - -
Sueldos de empleados 0 - - - - - - - - - - 0 0
Gastos Generales - - 0 0
Costo Materiales 3 3 12 - 4 2 - - - - 18 15
Costo Mano Obra 7 9 16 - 8 4 4 4 - - 36 35
Costo Subcontratos 12 16 38 - 20 - - - - - 59 59 -
Costo de Equipos
- Propios - - - - - - - - - - - - -
- Terceros 5 - 8 - 8 - - - - 14 30 30
Costo de Fletes
- Propios - - - -
- Terceros - - - -
Sueldos de empleados - - - 0 0
Gastos Generales - - 0 0
0 0 1 0 0 0 0 0 0 2 4 6
MARGEN
4.10% -0.19% 3% 3% 3% 3% 3% 3% 3% 3% 2.69% 4.10%
COSTO 133 156 315 0 163 108 42 2 0 619 1,248 1,214 1,231
12 2 13 0 7 2 1 0 0 23 47 81 0
MARGEN
6.27% 1.15% 4% 4% 4% 4% 4% 4% 4% 4% 3.66% 6.27% 0.00%
VENTA 0 1 1 0 0 19 0 0 0 0 19 19 19
Contractual - - - 19 - - - - 19 19 19
Reajustes - - - -
Adicionales y/o obras complementarias - - - -
Otros (Premios, Fact. a terceros,etc.) 1 1 1 - -
CONCILIACIÓN - - - -
COSTO 18 15 25 0 18 25 5 0 0 0 74 74 19
Costo Materiales - - - -
Costo Mano Obra - - - -
Costo Subcontratos 18 15 25 - 18 25 5 - - - 74 74 19
Costo de Equipos
- Propios - - - -
- Terceros - - - -
Costo de Fletes
- Propios - - - -
- Terceros - - - -
Sueldos de empleados 0 - - - - - - - - - 0 0
Gastos Generales - - 0 0
COSTO APLICADO - 2 - - 72 - - - - 74 74 19
RESULTADO PENDIENTE 18 23 - 18 (47 ) 5 - - - - - -
ACTIVOS - - -
PROVISIONES - - -
CONTINGENCIAS 18 23 - 18 (47 ) 5 - - - - - -
RESULTADO ECONOMICO
FASE 11400: PISOS
AL 30 DE NOVIEMBRE DE 2006 FORMATO No. : RO-00-18
OBRA : INFORME No : 05
CLIENTE : MONEDA: MILES DE NUEVOS SOLES PAGINA No. : 10 DE 25
T/ C Inicial : 3.250 Jul-06 Form.Polinómica (K ) : IMPRESO EL : 4-Dec-06
T/ C Actual : 0.000 Nov-06 T/C Prom.Acum. : 0.000 ELABORADO : 0
VENTA 0 0 0 0 0 0 0 0 0 0 0
Contractual - - - - -
Reajustes - - - -
Adicionales y/o obras complementarias - - - -
Otros (Premios, Fact. a terceros,etc.) - - - -
CONCILIACIÓN - - - -
COSTO 0 0 0 0 0 0 0 0 0 0
Costo Materiales - - - - - - - - - -
Costo Mano Obra - - - - - - - - - - -
Costo Subcontratos - - - - - - - - - - -
Costo de Equipos
- Propios - - - -
- Terceros - - - - - - - - - - - - -
Costo de Fletes
- Propios - - - -
- Terceros - - - -
Sueldos de empleados - - 0 0
Gastos Generales - - 0 0
0 0 0 0 0 0 0 0 0 0 0 0
MARGEN
0.00% 0% 0% 0% 0% 0% 0% 0% 0% 0.00% 0.00%
COSTO APLICADO - - - - - - - - - -
RESULTADO PENDIENTE - - - - - - - - -
ACTIVOS - - -
PROVISIONES - - -
CONTINGENCIAS - - - - - - - - -
RESULTADO ECONOMICO
FASE 11450: ZOCALOS Y CONTRAZOCALOS
AL 30 DE NOVIEMBRE DE 2006 FORMATO No. : RO-00-18
OBRA : INFORME No : 05
CLIENTE : MONEDA: MILES DE NUEVOS SOLES PAGINA No. : 11 DE 25
T/ C Inicial : 3.250 Jul-06 Form.Polinómica (K ) : IMPRESO EL : 4-Dec-06
T/ C Actual : 0.000 Nov-06 T/C Prom.Acum. : 0.000 ELABORADO : 0
VENTA 0 0 0 0 0 0 0 0 0 0 0
Contractual - - - - -
Reajustes - - - -
Adicionales y/o obras complementarias - - - -
Otros (Premios, Fact. a terceros,etc.) - - - -
CONCILIACIÓN - - - -
COSTO 0 0 0 0 0 0 0 0 0 0 0
Costo Materiales - - - - - - - - - - -
Costo Mano Obra - - - - - - - - - - -
Costo Subcontratos - - - - - - - - - - -
Costo de Equipos
- Propios - - - -
- Terceros - - - -
Costo de Fletes
- Propios - - - -
- Terceros - - - -
Sueldos de empleados - - 0 0
Gastos Generales - - 0 0
0 0 0 0 0 0 0 0 0 0 0
MARGEN
0.00% 0% 0% 0% 0% 0% 0% 0% 0% 0.00%
COSTO APLICADO - - - - - - - - - -
RESULTADO PENDIENTE - - - - - - - - - -
ACTIVOS -
PROVISIONES -
CONTINGENCIAS - - - - - - - - - -
RESULTADO ECONOMICO
FASE 11500: CERAMICO
AL 30 DE NOVIEMBRE DE 2006 FORMATO No. : RO-00-18
OBRA : INFORME No : 05
CLIENTE : MONEDA: MILES DE NUEVOS SOLES PAGINA No. : 10 DE 24
T/ C Inicial : 3.250 Jul-06 Form.Polinómica (K ) : IMPRESO EL : 4-Dec-06
T/ C Actual : 0.000 Nov-06 T/C Prom.Acum. : 0.000 ELABORADO : 0
VENTA 22 119 121 0 125 105 128 75 0 545 1,099 1,098 1,161
Contractual 22 118 120 125 105 128 75 - 545 1,098 1,098 1,161
Reajustes - - - -
Adicionales y/o obras complementarias - - - -
Otros (Premios, Fact. a terceros,etc.) 1 1 1 - -
CONCILIACIÓN - - - -
(1) 2 2 0 2 2 2 1 0 10 19 (26) 0
MARGEN
-2.38% 1.82% 2% 2% 2% 2% 2% 2% 2% 2% 1.75% -2.38% 0.00%
COSTO APLICADO 22 119 - 123 103 126 74 - 535 1,080 1,124 724
RESULTADO PENDIENTE 130 84 - 19 6 (66 ) (74 ) - 30 - - (0 )
ACTIVOS - - -
PROVISIONES - - -
CONTINGENCIAS 130 84 - 19 6 (66 ) (74 ) - 30 - - (0 )
RESULTADO ECONOMICO
FASE 13000: CARPINTERIA DE MADERA
AL 30 DE NOVIEMBRE DE 2006 FORMATO No. : RO-00-18
OBRA : INFORME No : 05
CLIENTE : MONEDA: MILES DE NUEVOS SOLES PAGINA No. : 11 DE 24
T/ C Inicial : 3.250 Jul-06 Form.Polinómica (K ) : IMPRESO EL : 4-Dec-06
T/ C Actual : 0.000 Nov-06 T/C Prom.Acum. : 0.000 ELABORADO : 0
0 0 0 0 1 1 1 0 0 3 6 4 0
MARGEN
0.81% 0.00% 1% 1% 1% 1% 1% 1% 1% 1% 1.14% 0.81% 0.00%
Costo Materiales 2 1 5 - 6 3 - - - - 13 13 -
Costo Mano Obra - - - -
Costo Subcontratos 2 4 - 24 40 110 - - 180 357 346 360
Costo de Equipos
- Propios - - - -
- Terceros - - - -
Costo de Fletes
- Propios 7 - - - -
- Terceros - - - -
Sueldos de empleados 4 - - 0 0
Gastos Generales - - 0 0
3
Costo Materiales - - - -
Costo Mano Obra - - - -
Costo Subcontratos - - - - 102 230 102 - - 360 793 720 720
Costo de Equipos
- Propios - - - -
- Terceros - - - -
Costo de Fletes
- Propios - - - -
- Terceros - - - -
Sueldos de empleados - - 0 0
Gastos Generales - - 0 0
Costo Materiales - - - -
Costo Mano Obra - - - -
Costo Subcontratos 5 - - - 30 100 79 - - 171 381 383 381
Costo de Equipos
- Propios - - - -
- Terceros - - - -
Costo de Fletes
- Propios - - - -
- Terceros - - - -
Sueldos de empleados - - 0 0
Gastos Generales - - 0 0
(0) 0 0 0 0 0 0 0 0 1 3 (2) 0
MARGEN
-0.60% 0.70% 1% 1% 1% 1% 1% 1% 1% 1% 0.69% -0.60% 0.00%
VENTA 26 13 26 0 0 0 33 0 0 33 92 325 66
Contractual 26 13 26 - - 33 - - 33 92 325 66
Reajustes - - - -
Adicionales y/o obras complementarias - - - -
Otros (Premios, Fact. a terceros,etc.) - - - -
CONCILIACIÓN - - - -
COSTO 0 0 0 0 0 14 19 0 0 33 66 66 66
Costo Materiales - - - - - 14 17 - - 31 62 62 62
Costo Mano Obra - - - -
Costo Subcontratos - - - - - - 2 - - 2 4 4 4
Costo de Equipos
- Propios - - - -
- Terceros - - - -
Costo de Fletes
- Propios - - - -
- Terceros - - - -
Sueldos de empleados - - 0 0
Gastos Generales - - 0 0
21 -3 7 0 0 0 9 0 0 9 26 259 0
MARGEN
79.69% -22.91% 28% 28% 28% 28% 28% 28% 28% 28% 28.24% 79.69% 0.00%
COSTO APLICADO 5 19 - - - 24 - - 24 66 66 66
RESULTADO PENDIENTE (5 ) (19 ) - - 14 (4 ) - - 9 - 0 -
ACTIVOS - - -
PROVISIONES - - -
CONTINGENCIAS (5 ) (19 ) - - 14 (4 ) - - 9 - 0 -
RESULTADO ECONOMICO
FASE 28000: INSTALACIONES SANITARIAS INTERIORES
AL 30 DE NOVIEMBRE DE 2006 FORMATO No. : RO-00-18
OBRA : INFORME No : 05
CLIENTE : MONEDA: MILES DE NUEVOS SOLES PAGINA No. : 16 DE 24
T/ C Inicial : 3.250 Jul-06 Form.Polinómica (K ) : IMPRESO EL : 4-Dec-06
T/ C Actual : 0.000 Nov-06 T/C Prom.Acum. : 0.000 ELABORADO : 0
1 0 1 0 0 0 0 0 0 2 4 7 0
MARGEN
0.71% -0.10% 0% 0% 0% 0% 0% 0% 0% 0% 0.37% 0.71% 0.00%
VENTA 186 134 286 0 167 129 28 26 0 617 1,252 1,252 1,252
Contractual 186 134 286 167 129 28 26 - 617 1,252 1,252 1,252
Reajustes - - - -
Adicionales y/o obras complementarias - - - -
Otros (Premios, Fact. a terceros,etc.) - - - -
CONCILIACIÓN - - - -
(0) 1 1 0 0 0 0 0 0 2 3 (0) 0
MARGEN
0.00% 0.58% 0% 0% 0% 0% 0% 0% 0% 0% 0.27% 0.00% 0.00%
COSTO APLICADO 186 285 - 166 128 28 26 - 615 1,249 1,252 1,252
RESULTADO PENDIENTE 38 (128 ) - 118 (30 ) 25 (0 ) - 15 - - -
ACTIVOS - - -
PROVISIONES - - -
CONTINGENCIAS 38 (128 ) - 118 (30 ) 25 (0 ) - 15 - - -
RESULTADO ECONOMICO
FASE 30100: INSTALACIONES SANITARIAS EXTERIORES
AL 30 DE NOVIEMBRE DE 2006 FORMATO No. : RO-00-18
OBRA : INFORME No : 05
CLIENTE : MONEDA: MILES DE NUEVOS SOLES PAGINA No. : 18 DE 24
T/ C Inicial : 3.250 Jul-06 Form.Polinómica (K ) : IMPRESO EL : 4-Dec-06
T/ C Actual : 0.000 Nov-06 T/C Prom.Acum. : 0.000 ELABORADO : 0
Costo Materiales - - - -
Costo Mano Obra - - - -
Costo Subcontratos 47 12 24 - 74 75 16 - - 161 349 353 353
Costo de Equipos
- Propios - - - -
- Terceros - - - -
Costo de Fletes
- Propios - - - -
- Terceros - - - -
Sueldos de empleados - - 0 0
Gastos Generales - - 0 0
Costo Materiales - - - - - - - - - - - - -
Costo Mano Obra - - - -
Costo Subcontratos - 50 50 - - - 13 - - 91 153 182 182
Costo de Equipos
- Propios - - - -
- Terceros - - - -
Costo de Fletes
- Propios - - - -
- Terceros - - - -
Sueldos de empleados - - 0 0
Gastos Generales - - 0 0
0 0 0 0 0 0 0 14 0 14 29 0 0
MARGEN
0.00% 0.00% 16% 16% 16% 16% 16% 16% 16% 16% 15.89% 0.00% 0.00%
VENTA 0 0 0 0 0 17 3 0 0 13 34 34 34
Contractual - - - 17 3 - - 13 34 34 34
Reajustes - - - -
Adicionales y/o obras complementarias - - - -
Otros (Premios, Fact. a terceros,etc.) - - - -
CONCILIACIÓN - - - -
COSTO 0 0 0 0 8 8 0 0 0 13 30 34 34
Costo Materiales - - - -
Costo Mano Obra - - - -
Costo Subcontratos - - - - 8 8 - - - 13 30 34 34
Costo de Equipos
- Propios - - - -
- Terceros - - - -
Costo de Fletes
- Propios - - - -
- Terceros - - - -
Sueldos de empleados - - 0 0
Gastos Generales - - 0 0
0 0 0 0 0 2 0 0 0 1 4 0 0
MARGEN
0.00% 0.00% 11% 11% 11% 11% 11% 11% 11% 11% 10.75% 0.00% 0.00%
COSTO APLICADO - - - - 15 3 - - 12 30 34 34
RESULTADO PENDIENTE - - - 8 (7 ) (3 ) - - 1 - 0 -
ACTIVOS - - -
PROVISIONES - - -
CONTINGENCIAS - - - 8 (7 ) (3 ) - - 1 - 0 -
RESULTADO ECONOMICO
FASE 35000: OBRAS EXTERIORES
AL 30 DE NOVIEMBRE DE 2006 FORMATO No. : RO-00-18
OBRA : INFORME No : 05
CLIENTE : MONEDA: MILES DE NUEVOS SOLES PAGINA No. : 21 DE 24
T/ C Inicial : 3.250 Jul-06 Form.Polinómica (K ) : IMPRESO EL : 4-Dec-06
T/ C Actual : 0.000 Nov-06 T/C Prom.Acum. : 0.000 ELABORADO : 0
Costo Materiales - - - -
Costo Mano Obra - - - -
Costo Subcontratos 39 39 233 - 39 39 39 52 - 415 816 816 829
Costo de Equipos
- Propios - - - -
- Terceros - - - -
Costo de Fletes
- Propios - - - -
- Terceros - - - -
Sueldos de empleados - - 0 0
Gastos Generales - - 0 0
0 0 0 0 0 3 3 2 0 7 14 14 0
MARGEN
1.65% 0.00% 2% 2% 2% 2% 2% 2% 2% 2% 1.65% 1.65% 0.00%
Costo Materiales 4 3 39 - 3 3 2 2 - 36 85 87 92
Costo Mano Obra 40 31 110 - 45 24 16 - - 211 405 412 354
Costo Subcontratos - - 1 - - - - - - - 1 1 56
Costo de Equipos
- Propios - - - - - - - - - - - - -
- Terceros 3 3 14 - 3 3 3 3 - 28 52 50 49
Costo de Fletes
- Propios - - - -
- Terceros 0 - 1 - 0 0 - - - 1 3 5 3
Sueldos de empleados 47 48 225 - 43 37 37 34 11 349 735 753 731
Gastos Generales 37 41 94 - 11 7 5 4 2 138 263 248 177
(6) -3 (26) 0 (5) (5) (5) (5) 0 (41) (88) (99) (6)
MARGEN
-6.78% -3.06% -6% -6% -6% -6% -6% -6% -6% -6% -6.04% -6.78% -0.42%
VENTA 0 0 0 0 0 0 0 0 0 0 0 0
Contractual - - -
Reajustes - - -
Adicionales y/o obras complementarias - - -
Otros (Premios, Fact. a terceros,etc.) - - -
CONCILIACIÓN - - -
COSTO 0 0 12 0 0 0 0 0 0 0 12 13
Costo Materiales - -
Costo Mano Obra - - 12 - 12 12
Costo Subcontratos - - -
Costo de Equipos
- Propios - - - -
- Terceros - - -
Costo de Fletes
- Propios - - -
- Terceros - - - 1
Sueldos de empleados - - 0
Gastos Generales - - 0
0 0 0 0 0 0 0 0 0 0 (12) (13)
MARGEN
0.00% 0.00% 0% 0% 0% 0% 0% 0% 0% 0% 0.00% 0.00%
COSTO APLICADO - - - - - - - - - - -
RESULTADO PENDIENTE - 12 - - - - - - - 12 13
ACTIVOS
PROVISIONES
CONTINGENCIAS - 12 - - - - - - - 12 13
0.00 PLANILLA CONTROL DE COSTO DE MATERIALES
AL 30 DE NOVIEMBRE DE 2006 FORMATO Nº RO-00-01
0.00 INFORME Nº 05
OBRA : MONEDA : NUEVOS SOLES S/. ELABORADO POR
CLIENTE : T/ C Inicial : 3.25 jul-06 Form.Polinómica (K ) : IMPRESO 4-dic-06
T/ C Actual : nov-06 T/C Prom.Acum. :
TOTAL FASE 05000 292.40 117.46 4,539.26 0.00 2,436.60 133.96 0.00 0.00 0.00 4,136.60 11,246.42 11,099.62 9,278.13
0.29 4.54 0.13
07000 CONCRETO
ADITIVO CURADOR Z EXPUESTO GLN 366.49 110.00 560.00 0.00 250.00 125.00 1,501.30 2,436.30 2,567.79 3,002.60
S/. 6.10 2,235.57 646.85 3,299.34 0.00 1,525.00 762.50 0.00 0.00 0.00 9,157.94 14,744.77 15,571.00 18,315.88
ADITIVO Z GROUT BLS 2.00 2.00 2.00 4.00
S/. 48.29 96.57 96.57 0.00 6.80 0.00 0.00 0.00 0.00 0.00 103.37
AGUA M3 100.00 0.00 0.00 50.00 1,100.00 1,150.00 1,280.00 2,266.85
S/. 3.40 340.00 0.00 0.00 170.00 0.00 0.00 0.00 0.00 3,740.00 3,910.00 4,352.00 7,707.30
BOMBA PARA CONCRETO M3 1,650.00 1,752.50 3,801.00 0.00 1,080.00 5,800.00 10,681.00 10,298.50 11,245.59
S/. 24.38 40,218.75 40,693.05 88,611.34 0.00 26,325.00 0.00 0.00 0.00 0.00 141,375.00 256,311.34 249,012.04 274,111.37
CEMENTO PORTLAND TIPO I BLS 800.00 200.00 408.00 0.00 600.00 50.00 0.00 6,700.00 7,758.00 8,258.00 13,399.68
S/. 15.30 12,240.00 2,888.00 12,076.63 0.00 9,180.00 765.00 0.00 0.00 0.00 102,510.00 124,531.63 132,353.63 205,015.06
CONCRETO PREMEZCLADO F'C = 140 KG/CM2 M3 12.00 0.00 0.00 0.00 65.00 65.00 85.09 141.57
S/. 169.00 2,028.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10,985.00 10,985.00 14,379.41 23,925.26
CONCRETO PREMEZCLADO F'C = 210 KG/CM2 P56 S2 M3 740.00 909.00 1,754.50 0.00 600.00 2,180.00 4,534.50 4,220.50 4,368.92
S/. 188.50 139,490.00 170,028.45 329,312.40 0.00 113,100.00 0.00 0.00 0.00 0.00 410,930.00 853,342.40 795,471.45 823,540.85
CONCRETO PREMEZCLADO F'C = 210 KG/CM2 P67 S6 M3 250.00 370.00 1,675.00 0.00 20.00 2,000.00 3,695.00 3,690.88 4,171.77
S/. 196.63 49,156.25 71,595.00 326,002.50 0.00 3,932.50 0.00 0.00 0.00 0.00 393,250.00 723,185.00 723,532.09 820,274.18
CONCRETO PREMEZCLADO F'C = 80 KG/CM2 M3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 461.77
S/. 143.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 66,032.97
CONCRETO PREMEZCLADO F'C = 175 KG/CM2 P56 S2 M3 0.00 0.00 0.00 150.00 30.00 0.00 125.00 305.00 306.61 306.61
S/. 182.00 0.00 0.00 0.00 27,300.00 5,460.00 0.00 0.00 0.00 22,750.00 55,510.00 55,802.75 55,802.75
TOTAL FASE 07000 465,853.49 399,356.38 1,040,710.29 0.00 318,497.89 8,981.96 0.00 0.00 0.00 1,444,853.31 2,813,043.45 2,828,550.80 2,919,193.26
0.00
08000 ENCOFRADO
ADITIVO DESMOLDANTE EFCO PARA MUROS GLN 165.00 0.00 0.00 19.63 184.63 184.63 39.26
S/. 19.50 0.00 2,593.75 0.00 0.00 0.00 0.00 0.00 0.00 382.79 2,976.54 2,976.54 765.57
ADITIVO DESMOLDANTE Z CRON GLN 235.00 275.00 615.00 0.00 220.00 825.00 1,660.00 1,582.97 1,774.84
S/. 13.57 3,189.53 3,702.54 8,749.77 0.00 2,985.94 0.00 0.00 0.00 0.00 11,197.28 22,932.99 21,917.39 23,782.83
ADITIVO DESMOLDANTE Z LAC PARA TECHOS GLN 20.00 60.00 170.00 0.00 5.00 145.00 320.00 274.08 288.16
S/. 70.65 1,413.00 3,683.34 11,167.74 0.00 353.25 0.00 0.00 0.00 0.00 10,244.25 21,765.24 19,076.69 20,358.57
ADITIVO SOLVENTE PARA DESMOLDANTE DE TECHO GLN 20.00 60.00 175.00 0.00 5.00 130.00 310.00 286.08 288.16
S/. 29.08 536.00 1,744.74 4,729.94 0.00 145.40 0.00 0.00 0.00 0.00 3,780.40 8,655.74 7,570.16 7,722.71
ALAMBRE NEGRO A NRO. 8 KG 2,250.00 1,262.00 4,662.00 0.00 1,600.00 350.00 6,650.00 13,262.00 13,138.47 13,403.41
S/. 2.85 6,421.14 3,572.23 13,432.63 0.00 4,566.14 998.84 0.00 0.00 0.00 18,978.04 37,975.65 37,652.44 37,301.69
CLAVOS KG 25.00 150.00 1,815.00 0.00 400.00 2,215.00 2,092.51 804.23
S/. 2.95 73.83 416.15 5,166.91 0.00 0.00 0.00 0.00 0.00 0.00 1,181.27 6,348.18 6,013.26 2,273.97
CONCRETO PREMEZCLADO F'C A = 175 KG/CM2 P56 S M3 0.00 0.00 0.00 0.00 6.00
S/. 182.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,092.00
CONSUMIBLES (Separadores, conos, etc) M2 20,000.00 18,510.62 30,642.96 0.00 8,000.00 46,300.00 84,942.96 85,999.53 92,734.36
S/. 0.13 2,600.00 2,406.38 3,983.59 0.00 1,040.00 0.00 0.00 0.00 0.00 6,019.00 11,042.59 11,179.94 12,055.47
MADERA TORNILLO P2 7,250.00 1,710.00 5,323.33 0.00 2,600.00 19,750.00 27,673.33 33,327.67 39,646.70
S/. 2.80 18,850.00 4,773.00 14,313.04 0.00 7,280.00 0.00 0.00 0.00 0.00 55,300.00 76,893.04 86,797.31 93,169.74
MADERA CACHIMBO P2 11,800.00 0.00 11,800.00 11,800.00
S/. 2.35 0.00 25,840.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25,840.00 25,840.00
PETRÓLEO GLN 950.00 27.60 52.60 0.00 800.00 100.00 2,850.00 3,802.60 5,525.00 6,000.00
S/. 8.73 8,291.60 250.06 468.26 0.00 6,982.40 872.80 0.00 0.00 0.00 24,874.80 33,198.26 48,222.20 48,420.00
TRIPLAY LUPUNA 18MM x 4' X 8' PLA 45.00 32.00 497.00 0.00 30.00 595.00 1,122.00 1,088.00 1,185.09
S/. 74.56 3,355.31 1,236.00 36,949.05 0.00 2,236.88 0.00 0.00 0.00 0.00 44,364.69 83,550.62 82,165.49 85,326.28
MATERIALES VARIOS GLB 5,700.00 369.60 13,269.26 0.00 6,500.00 3,000.00 23,200.00 45,969.26 46,435.34 46,432.90
S/. 1.00 5,700.00 14,796.46 30,421.62 0.00 6,500.00 3,000.00 0.00 0.00 0.00 23,200.00 63,121.62 49,160.84 46,432.90
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL FASE 08000 50,430.41 36,580.89 157,816.29 0.00 32,090.01 4,871.64 0.00 0.00 0.00 199,522.51 394,300.45 398,572.25 378,701.74
#REF! #REF! #REF!
09000 ACERO
ALAMBRE NEGRO A NRO. 16 KG 8,000.00 2,500.00 9,350.00 0.00 5,500.00 2,650.00 29,250.00 46,750.00 48,400.00 58,684.21
S/. 2.90 23,190.93 7,081.04 26,788.92 0.00 15,943.77 7,682.00 0.00 0.00 0.00 84,791.85 135,206.53 140,155.79 163,318.17
ALAMBRE NEGRO B NRO. 8 KG 0.00 850.00 0.00 0.00 0.00 0.00 60.00 910.00 913.93 127.87
S/. 2.78 0.00 2,445.40 0.00 0.00 0.00 0.00 0.00 0.00 166.98 2,612.38 2,623.32 355.85
FIERRO CORRUGADO FY = 4200 KG/CM2 KG 101,330.00 84,141.40 342,814.33 0.00 428,580.00 771,394.33 789,582.93 857,162.75
S/. 2.32 235,085.60 187,084.89 750,713.61 0.00 0.00 0.00 0.00 0.00 0.00 994,305.60 1,745,019.21 1,795,339.93 1,800,041.78
TOTAL FASE 09000 259,716.53 211,647.20 937,259.41 0.00 16,593.77 7,832.00 0.00 0.00 0.00 1,089,664.43 2,051,349.61 2,093,479.82 1,984,323.68
#REF! #REF! #REF!
TOTAL FASE 10000 3,469.40 3,486.09 11,721.56 0.00 3,541.00 2,267.50 0.00 0.00 0.00 0.00 17,530.06 15,139.27
11500 CERAMICO
ADHESIVO KERFIX PRIMER ACRÍLICO LT 0.00 0.00 0.00 9.00 0.00 0.00 8.50 17.50 17.99 17.99
S/. 19.00 0.00 0.00 0.00 171.00 0.00 0.00 0.00 0.00 161.50 332.50 341.74 341.74
ADITIVO IMPERMEABILIZANTE AQUAFUGO KG 0.00 0.00 0.00 268.40 0.00 0.00 250.00 518.40 518.40 518.40
S/. 3.55 0.00 0.00 0.00 952.82 0.00 0.00 0.00 0.00 887.50 1,840.32 1,840.32 1,840.32
ALQUITRAN LIQUIDO GLN 140.00 140.00 45.00 20.00 205.00
S/. 19.00 2,660.00 2,660.00 0.00 855.00 380.00 0.00 0.00 0.00 0.00 3,895.00
ARENA GRUESA M3 0.00 0.00 0.00 0.02 3.30 0.00 2.00 5.32 5.38 5.36
S/. 19.00 0.00 0.00 0.00 0.41 62.70 0.00 0.00 0.00 38.00 101.11 102.17 102.17
BREA BLQ 400.00 400.00 300.00 120.00 820.00
S/. 33.00 13,200.00 13,200.00 0.00 9,900.00 3,960.00 0.00 0.00 0.00 0.00 27,060.00
CEMENTO PORTLAND TIPO I BLS 1,230.00 0.00 0.00 0.00 0.00 0.00 1,230.00 1,230.00 2,480.00 2,491.03
S/. 15.30 18,819.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18,819.00 18,819.00 37,944.00 38,115.12
CERAMICO DE COLOR 2 30 X 30 - Celima M2 2,130.00 932.50 2,660.50 2,150.00 1,400.00 0.00 0.00 6,250.00 12,460.50 12,238.00 12,522.66
CEM S/. 16.93 36,066.23 14,444.46 41,132.11 0.00 36,404.88 23,705.50 0.00 0.00 0.00 105,828.13 207,070.61 204,648.23 212,039.89
CERAMICO DE COLOR 30 X 30 - Celima M2 13.50 343.00 0.00 0.00 343.00 699.50 699.50 685.49
S/. 15.45 0.00 227.78 0.00 5,299.35 0.00 0.00 0.00 0.00 5,299.35 10,826.48 10,826.48 10,092.14
CONTRAZOCALO DE MADERA ML 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20,083.39
S/. 2.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 52,216.80
FRAGUA PARA CERAMICA KG 2,000.00 2,280.00 2,280.00 625.00 0.00 0.00 2,650.00 5,555.00 5,600.00 5,597.28
S/. 5.85 11,700.00 7,110.76 7,110.76 0.00 3,656.25 0.00 0.00 0.00 0.00 15,502.50 26,269.51 32,760.00 32,744.10
MATERIALES VARIOS EST 0.00 0.00 0.00 3.46 0.00 0.00 3.46 6.91 6.91 6.91
S/. 3.25 0.00 0.00 0.00 11.23 0.00 0.00 0.00 0.00 11.23 22.46 22.46 22.46
MORTERO PREMEZCLADO 1:5 M3 0.00 0.00 0.00 0.00 0.00 45.00 45.00 98.70 98.70
S/. 192.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8,643.60 8,643.60 18,958.58 18,958.58
PARQUET M2 2,760.00 3,050.00 8,400.00 0.00 0.00 8,400.00 16,800.00 16,810.00 16,814.79
S/. 12.95 35,742.00 39,497.50 108,780.00 0.00 0.00 0.00 0.00 0.00 0.00 108,780.00 217,560.00 217,689.50 198,414.56
PEGAMENTO PARA MAYOLICA BLS 900.00 900.00 500.00 1,400.00
S/. 11.97 9,863.21 9,863.21 0.00 5,985.00 0.00 0.00 0.00 0.00 0.00 15,848.21
PEPELMA 30 x 30 CM M2 0.00 0.00 0.00 0.00 0.00 0.22 0.00 0.00 0.15 0.37 0.37 0.37
S/. 40.63 0.00 0.00 0.00 0.00 0.00 8.94 0.00 0.00 6.09 15.03 15.23 15.23
PORCELLANATO M2 0.00 0.00 140.00 0.00 0.00 140.00 280.00 288.20 284.82
S/. 55.25 0.00 0.00 0.00 0.00 7,735.00 0.00 0.00 0.00 7,735.00 15,470.00 15,922.80 15,736.16
MATERIALES VARIOS GLB 2,000.00 161.06 1,700.89 1,200.00 600.00 0.00 0.00 5,020.00 8,520.89 9,439.82 10,113.81
S/. 1.00 2,000.00 342.43 1,882.25 0.00 1,200.00 600.00 0.00 0.00 0.00 5,020.00 8,702.25 9,439.82 10,113.81
0.00 0.00 0.00 0.00
TOTAL FASE 11500 104,327.23 87,118.36 184,856.11 0.00 64,435.94 36,443.20 8.94 0.00 0.00 276,731.90 562,476.08 550,511.33 590,753.09
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL FASE 13000 0.00 0.00 0.00 0.00 247,943.98 0.00 0.00 0.00 0.00 248,708.06 496,652.03 498,371.21 498,371.21
0.00 0.00 0.00 248.71
TOTAL FASE 13000 3,780.05 1,408.28 4,799.98 0.00 5,531.82 2,915.69 0.00 0.00 0.00 0.00 13,247.49 13,365.30
TOTAL FASE 27000 0.00 0.00 0.00 0.00 0.00 13,601.93 17,404.43 0.00 0.00 30,925.12 61,931.48 61,931.48 61,931.48
0.00 0.00 13.60 30.93
TOTAL FASE 28000 140,941.38 73,676.87 146,899.49 0.00 116,934.14 14,164.77 284.79 0.00 0.00 286,943.45 565,226.65 561,673.76 570,120.85
TOTAL FASE 29000 192,702.41 18,518.12 81,170.24 0.00 241,426.99 66,196.27 30,808.24 9,214.40 0.00 440,259.21 869,075.36 871,272.30 871,267.70
TOTAL FASE 30200 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
35000 VARIOS
CONTOMETRO EN DPTOS. 0.00 0.00 0.00 0.00 136.00 0.00 136.00 272.00 272.00 272.00
S/. 93.50 0.00 0.00 0.00 0.00 0.00 0.00 12,716.00 0.00 12,716.00 25,432.00 25,432.00 25,432.00
COUNTER EN EDIFICIOS 0.00 0.00 0.00 0.00 2.00 0.00 2.00 4.00 4.00 4.00
S/. 4,875.00 0.00 0.00 0.00 0.00 0.00 0.00 9,750.00 0.00 9,750.00 19,500.00 19,500.00 19,500.00
EXTRACTOR DE AIRE 0.00 98.00 98.00 0.00 0.00 0.00 0.00 0.00 0.00 32.00 130.00 64.00 64.00
S/. 276.25 0.00 7,271.40 7,271.40 0.00 0.00 0.00 0.00 0.00 0.00 8,840.00 16,111.40 17,680.00 17,680.00
LUZ DE VALIZAJE 0.00 0.00 0.00 0.00 0.00 0.00 2.00 0.00 2.00 4.00 4.00 4.00
S/. 812.50 0.00 0.00 0.00 0.00 0.00 0.00 1,625.00 0.00 1,625.00 3,250.00 3,250.00 3,250.00
MATERIALES VARIOS (sub estación) 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00 1.00 1.00 1.00
S/. 65,000.00 0.00 0.00 0.00 0.00 0.00 0.00 65,000.00 0.00 0.00 65,000.00 65,000.00 65,000.00
TECNOPORT 370.00 40.00 90.00 0.00 300.00 120.00 515.00 1,025.00 1,050.00 1,030.00
S/. 7.88 2,916.40 189.69 455.70 0.00 2,364.65 945.86 0.00 0.00 0.00 4,059.31 7,825.52 8,148.17 8,118.62
TIERRA DE CHACRA M3 0.00 0.00 0.00 0.00 0.00 0.00 213.49 0.00 200.00 413.49 413.49 413.49
S/. 12.00 0.00 0.00 0.00 0.00 0.00 0.00 2,561.88 0.00 2,400.00 4,961.88 4,961.84 4,961.84
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL FASE 35000 2,916.40 7,461.09 7,727.10 0.00 2,364.65 945.86 0.00 91,652.88 0.00 39,390.31 142,080.80 143,972.01 143,942.46
TOTAL MATER. COSTO DIRECTO 1,272,582.38 896,165.53 2,727,437.23 0.00 1,103,957.67 208,939.36 63,698.48 102,480.39 0.00 4,288,277.71 8,502,517.94 8,518,504.24 8,485,721.31
90000 INDIRECTOS
CHALECOS Y CASACAS GLB 0.32 1.63 0.23 1.86 1.46 1.00
PET S/. 1,157.80 0.00 369.71 1,887.51 0.00 0.00 0.00 0.00 0.00 0.00 263.98 2,151.49 1,691.47 527.80
COMBUSTIBLES GLB 0.06 0.02 0.07 0.05 0.05 0.05 0.05 0.50 0.77 0.93 1.00
PET S/. 44,470.59 2,668.24 766.79 3,147.82 0.00 2,223.53 2,223.53 2,223.53 2,223.53 0.00 22,235.29 34,277.23 41,386.11 44,470.59
MATERIAL DE COMPUTO GLB 1.06 1.06 1.06 1.00
(Pc's, impresoras, faxes, etc) S/. 23,261.25 0.00 24,770.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 24,770.27 24,770.27 23,261.25
MOBILIARIO DE OFICINA GLB 0.07 0.29 0.50 0.79 0.49 1.00
(Escritorios, sillas, etc) S/. 11,409.65 0.00 770.63 3,362.63 0.00 0.00 0.00 0.00 0.00 0.00 5,704.83 9,067.46 5,558.51 11,409.65
MATERIAL DE COMUNICACIÓN GLB 0.10 1.10 0.00 0.00 0.00 0.00 0.50 1.60 1.00 1.00
(Radios WT) S/. 2,502.50 0.00 251.26 2,753.76 0.00 0.00 0.00 0.00 0.00 0.00 1,251.25 4,005.01 2,502.50 1,608.75
IMPLEMENTOS DE SEGURIDAD GLB 0.20 0.37 0.65 0.50 1.15 0.98 1.00
(Casco, lentes, ect) S/. 1,586.16 317.23 588.72 1,035.10 0.00 0.00 0.00 0.00 0.00 0.00 793.08 1,828.18 1,556.69 1,586.16
MATERIALES VARIOS GLB 0.06 0.04 0.21 0.06 0.07 0.65 0.98 1.00 1.00
S/. 9,493.25 569.60 392.99 1,954.73 0.00 569.60 617.06 0.00 0.00 0.00 6,142.69 9,284.08 9,460.69 9,493.25
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL FASE 90000 3,555.06 3,140.11 38,911.83 0.00 2,793.12 2,840.59 2,223.53 2,223.53 0.00 36,391.12 85,383.72 86,926.24 92,357.45
TOTAL MATER. COSTO INDIRECTO 3,555.06 3,140.11 38,911.83 0.00 2,793.12 2,840.59 2,223.53 2,223.53 0.00 36,391.12 85,383.72 86,926.24 92,357.45
TOTAL MATERIALES 1,276,137.45 899,305.64 2,766,349.05 0.00 1,106,750.79 211,779.95 65,922.01 104,703.92 0.00 4,324,668.83 8,587,901.66 8,605,430.48 8,578,078.76
FORMATO Nº RO-00-02
OBRA : Moneda : NUEVOS SOLES S/. INFORME Nº 05
CLIENTE : T/C Inicial : 3.25 jul-06 Form.Polinómica (K ) : ELABORADO POR
02000 OBRAS PRELIMINARES H-H 117.41 468.00 3,327.00 355.00 295.00 150.00 3,560.00 7,687.00 9,944.28 7,118.28
Planillas + Bonos S/. 1,160.53 6,573.22 44,136.97 3,841.21 3,191.99 1,623.05 0.00 0.00 38,520.30 91,313.52 107,600.13 68,304.88
Beneficios Sociales S/. 0.00 0.00 0.00 0.00
Regularización por Conciliación S/. 0.00 0.00 0.00 0.00
Movilidad y Transporte S/. 0.00 0.00 0.00 0.00
Implementos de Seguridad S/. 0.00 0.00 0.00 0.00
Costo H-H S/. 9.88 14.05 13.27 0.00 10.82 10.82 10.82 0.00 0.00 10.82 11.88 10.82 9.60
T SUB TOTAL FASE 02000 S/. 1,160.53 6,573.22 44,136.97 0.00 3,841.21 3,191.99 1,623.05 0.00 0.00 38,520.30 91,313.52 107,600.13 68,304.88
05000 MOVIMIENTO DE TIERRAS H-H 1,118.24 722.00 3,902.00 720.00 150.00 90.00 4,640.00 9,502.00 9,374.32 9,285.60
Planillas + Bonos S/. 10,293.40 7,534.38 32,829.51 6,322.15 1,317.11 790.27 0.00 0.00 40,742.72 82,001.75 82,313.59 87,656.04
Beneficios Sociales S/. 0.00 0.00 0.00 0.00
Regularización por Conciliación S/. 0.00 0.00 0.00 0.00
Movilidad y Transporte S/. 0.00 0.00 0.00 0.00
Implementos de Seguridad S/. 0.00 0.00 0.00 0.00
Costo H-H S/. 9.20 10.44 8.41 0.00 8.78 8.78 8.78 0.00 0.00 8.78 8.63 8.78 9.44
T SUB TOTAL FASE 05000 S/. 10,293.40 7,534.38 32,829.51 0.00 6,322.15 1,317.11 790.27 0.00 0.00 40,742.72 82,001.75 82,313.59 87,656.04
07000 CONCRETO H-H 6,716.51 3,450.00 10,835.50 3,500.00 1,800.00 700.00 450.00 0.00 28,510.00 45,795.50 45,733.24 57,018.51
Planillas + Bonos S/. 67,948.94 34,331.62 106,462.97 35,408.44 18,210.06 7,081.69 4,552.51 0.00 288,427.07 460,142.75 460,083.86 578,578.87
Beneficios Sociales S/. 0.00 0.00 0.00 0.00
Regularización por Conciliación S/. 0.00 0.00 0.00 0.00
Movilidad y Transporte S/. 0.00 0.00 0.00 0.00
Implementos de Seguridad S/. 0.00 0.00 0.00 0.00
Costo H-H S/. 10.12 9.95 9.83 0.00 10.12 10.12 10.12 10.12 0.00 10.12 10.05 10.06 10.15
T SUB TOTAL FASE 07000 S/. 67,948.94 34,331.62 106,462.97 0.00 35,408.44 18,210.06 7,081.69 4,552.51 0.00 288,427.07 460,142.75 460,083.86 578,578.87
08000 ENCOFRADO H-H 16,202.85 12,900.00 31,515.00 9,800.00 6,000.00 1,800.00 625.00 0.00 50,785.00 100,525.00 95,770.52 101,576.33
Planillas + Bonos S/. 170,197.64 128,860.03 316,718.98 102,155.44 62,544.14 18,763.24 6,515.02 0.00 529,384.06 1,036,080.88 998,314.25 1,071,968.26
Beneficios Sociales S/. 0.00 0.00 0.00 0.00
Regularización por Conciliación S/. 0.00 0.00 0.00 0.00
Movilidad y Transporte S/. 0.00 0.00 0.00 0.00
Implementos de Seguridad S/. 0.00 0.00 0.00 0.00
Costo H-H S/. 10.50 9.99 10.05 0.00 10.42 10.42 10.42 10.42 0.00 10.42 10.31 10.42 10.55
T SUB TOTAL FASE 08000 S/. 170,197.64 128,860.03 316,718.98 0.00 102,155.44 62,544.14 18,763.24 6,515.02 0.00 529,384.06 1,036,080.88 998,314.25 1,071,968.26
0.00 0.00 0.00 0.00
09000 ACERO H-H 7,252.36 4,363.00 12,017.00 0.00 3,200.00 1,500.00 950.00 500.00 0.00 22,100.00 40,267.00 42,159.04 44,204.95
Planillas + Bonos S/. 76,291.22 55,169.54 139,418.98 0.00 33,945.76 15,912.08 10,077.65 5,304.03 0.00 234,437.91 439,096.40 447,225.20 465,257.10
Beneficios Sociales S/. 0.00 0.00 0.00 0.00
Regularización por Conciliación S/. 0.00 0.00 0.00 0.00
Movilidad y Transporte S/. 0.00 0.00 0.00 0.00
Implementos de Seguridad S/. 0.00 0.00 0.00 0.00
Costo H-H S/. 10.52 12.64 11.60 0.00 10.61 10.61 10.61 10.61 0.00 10.61 10.90 10.61 10.53
FORMATO Nº RO-00-02
OBRA : Moneda : NUEVOS SOLES S/. INFORME Nº 05
CLIENTE : T/C Inicial : 3.25 jul-06 Form.Polinómica (K ) : ELABORADO POR
Planillas + Bonos S/. 6,669.66 8,677.14 15,918.49 0.00 7,578.00 4,124.52 4,210.00 4,210.00 0.00 36,041.01 34,845.23
Beneficios Sociales S/. 0.00 0.00 0.00 0.00
Regularización por Conciliación S/. 0.00 0.00 0.00 0.00
Movilidad y Transporte S/. 0.00 0.00 0.00 0.00
Implementos de Seguridad S/. 0.00 0.00 0.00 0.00
Costo H-H S/. 10.06 11.68 10.97 0.00 10.53 10.06 10.53 10.53 0.00 0.00 10.66 10.37
T SUB TOTAL FASE 10000 S/. 6,669.66 8,677.14 15,918.49 0.00 7,578.00 4,124.52 4,210.00 4,210.00 0.00 0.00 36,041.01 34,845.23
11000 ALBAÑILERIA, REVOQUES Y ENLUCIDOS H-H 7,273.38 8,264.00 16,853.50 0.00 9,500.00 5,100.00 2,400.00 35,618.00 69,471.50 69,996.00 71,236.31
Planillas + Bonos S/. 78,856.47 107,434.65 189,799.36 0.00 102,996.99 55,293.12 26,020.29 0.00 0.00 386,162.80 760,272.56 748,120.91 772,405.82
Beneficios Sociales S/. 0.00 0.00 0.00 0.00
Regularización por Conciliación S/. 0.00 0.00 0.00 0.00
Movilidad y Transporte S/. 0.00 0.00 0.00 0.00
Implementos de Seguridad S/. 0.00 0.00 0.00 0.00
Costo H-H S/. 10.84 13.00 11.26 0.00 10.84 10.84 10.84 0.00 0.00 10.84 10.94 10.69 10.84
T SUB TOTAL FASE 11000 S/. 78,856.47 107,434.65 189,799.36 0.00 102,996.99 55,293.12 26,020.29 0.00 0.00 386,162.80 760,272.56 748,120.91 772,405.82
0.00 0.00 0.00 0.00
11500 CERAMICO H-H 3,862.26 1,859.00 2,114.50 0.00 3,400.00 3,000.00 1,800.00 15,480.00 25,794.50 28,111.24 30,971.70
Planillas + Bonos S/. 42,070.55 2,728.74 0.00 37,035.23 32,678.14 19,606.89 0.00 0.00 168,619.22 260,668.22 306,153.42 337,126.97
Beneficios Sociales S/. 0.00 0.00 0.00 0.00
Regularización por Conciliación S/. 0.00 0.00 0.00 0.00
Movilidad y Transporte S/. 0.00 0.00 0.00 0.00
Implementos de Seguridad S/. 0.00 0.00 0.00 0.00
Costo H-H S/. 10.89 0.00 1.29 0.00 10.89 10.89 10.89 0.00 0.00 10.89 10.11 10.89 10.89
T SUB TOTAL FASE 11500 S/. 42,070.55 0.00 2,728.74 0.00 37,035.23 32,678.14 19,606.89 0.00 0.00 168,619.22 260,668.22 306,153.42 337,126.97
28000 INSTALACIONES SANITARIAS H-H 5,766.00 5,766.00 4,800.00 2,200.00 1,210.00 855.00 14,831.00 0.00 0.00
Planillas + Bonos S/. 65,263.29 65,263.29 54,336.00 24,904.00 13,697.20 9,678.60 0.00 167,879.09 0.00 0.00
Beneficios Sociales S/. 0.00 0.00 0.00 0.00
Regularización por Conciliación S/. 0.00 0.00 0.00 0.00
Movilidad y Transporte S/. 0.00 0.00 0.00 0.00
Implementos de Seguridad S/. 0.00 0.00 0.00 0.00
Costo H-H S/. 0.00 11.32 11.32 0.00 11.32 11.32 11.32 11.32 0.00 0.00 11.32 0.00 0.00
T SUB TOTAL FASE 28000 S/. 0.00 65,263.29 65,263.29 0.00 54,336.00 24,904.00 13,697.20 9,678.60 0.00 0.00 167,879.09 0.00 0.00
0.00 0.00 0.00 0.00
29000 INSTALACIONES ELÉCTRICAS H-H 5,803.00 5,803.00 3,500.00 2,500.00 1,600.00 1,080.00 14,483.00 0.00 0.00
Planillas + Bonos S/. 60,393.85 60,393.85 37,800.00 27,000.00 17,280.00 11,664.00 0.00 154,137.85 0.00 0.00
Beneficios Sociales S/. 0.00 0.00 0.00
Regularización por Conciliación S/. 0.00 0.00 0.00 0.00
Movilidad y Transporte S/. 0.00 0.00 0.00 0.00
FORMATO Nº RO-00-02
OBRA : Moneda : NUEVOS SOLES S/. INFORME Nº 05
CLIENTE : T/C Inicial : 3.25 jul-06 Form.Polinómica (K ) : ELABORADO POR
FORMATO Nº RO-00-02
OBRA : Moneda : NUEVOS SOLES S/. INFORME Nº 05
CLIENTE : T/C Inicial : 3.25 jul-06 Form.Polinómica (K ) : ELABORADO POR
Planillas + Bonos S/. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,474.24 3,474.24 3,474.24 3,474.24
Beneficios Sociales S/. 0.00 0.00 0.00
Regularización por Conciliación S/. 0.00 0.00 0.00 0.00
Movilidad y Transporte S/. 0.00 0.00 0.00 0.00
Implementos de Seguridad S/. 0.00 0.00 0.00 0.00
Costo H-H S/. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.44 9.44 9.44 9.44
T SUB TOTAL FASE 35000 S/. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,474.24 3,474.24 3,474.24 3,474.24
0.00 0.00 0.00 0.00
TOTAL HORAS-HOMBRE M.O.DIR H.H. 43,206.03 44,338.00 93,584.00 39,495.00 22,955.00 11,100.00 3,910.00 0.00 161,061.03 332,105.03 304,816.17 321,779.71
TOTAL COSTO DIRECTO M.O. S/. 453,488.41 474,237.72 973,671.14 0.00 421,419.21 245,175.17 119,150.27 41,924.15 0.00 1,689,768.33 3,491,108.28 3,188,130.84 3,384,772.18
0.00 0.00 0.00
0.00 0.00 0.00
90000 INDIRECTOS H-H 2,816.50 3,391.00 9,511.50 3,100.00 1,650.00 1,080.00 14,660.00 30,001.50 29,333.00 0.00
Planillas + Bonos S/. 40,464.21 31,056.41 109,711.44 44,950.00 23,705.29 15,516.19 0.00 0.00 210,617.92 404,500.84 412,145.37 353,763.51
Beneficios Sociales S/. 0.00 0.00 0.00
Regularización por Conciliación S/. 0.00 0.00 0.00 0.00
Movilidad y Transporte S/. 0.00 0.00 0.00 0.00
Implementos de Seguridad S/. 0.00 0.00 0.00 0.00
Costo H-H S/. 14.37 9.16 11.53 0.00 14.50 14.37 14.37 0.00 0.00 14.37 13.48 14.05 0.00
SUB TOTAL FASE 90000 S/. 40,464.21 31,056.41 109,711.44 0.00 44,950.00 23,705.29 15,516.19 0.00 0.00 210,617.92 404,500.84 412,145.37 353,763.51
0.00 0.00 0.00 0.00
100000 HH TERCEROS H-H 1,141.00 1,141.00 1,141.00 0.00
Planillas + Bonos S/. 493,952.62 505,294.13 1,095,646.93 0.00 466,369.21 268,880.46 134,666.46 41,924.15 0.00 1,900,386.25 3,907,873.47 3,612,540.56 3,738,535.69
Beneficios Sociales S/. 0.00 0.00 0.00 0.00
Regularización por Conciliación S/. 0.00 0.00 0.00 0.00
Movilidad y Transporte S/. 0.00 0.00 0.00 0.00
Implementos de Seguridad S/. 0.00 0.00 0.00 0.00
Costo H-H S/. 10.73 10.59 10.51 0.00 10.95 10.93 11.06 10.72 0.00 10.81 10.76 10.77 11.62
TOTAL S/. 493,952.62 505,294.13 1,095,646.93 0.00 466,369.21 268,880.46 134,666.46 41,924.15 0.00 1,900,386.25 3,907,873.47 3,612,540.56 3,738,535.69
ELIMINACION DE DESMONTE % Avance 10% 0% 0% 0% 17% 17% 17% 0% 0% 49% 100% 100% 100%
Costo Contrato S/. 3,046.40 130.00 5,178.00 5,078.00 5,077.00 15,000.00 30,463.00 30,594.00 30,464.00
Costo Reajustes S/. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Costo Adicionales S/. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Costo Total S/. 3,046.40 0.00 130.00 0.00 5,178.00 5,078.00 5,077.00 0.00 0.00 15,000.00 30,463.00 30,594.00 30,464.00
T TOTAL FASE 02000 10,723.78 8,100.00 52,584.00 0.00 11,778.00 11,678.00 11,677.00 7,498.84 3,300.00 102,073.54 200,589.37 208,975.12 221,726.50
8.10 52.58 0.00 11.78 13,051.03
05000 MOVIMIENTO DE TIERRAS
EXCAVACIÓN Y ELIMINACIÓN MASIVA % Avance 24% 23% 76% 0% 3% 0% 0% 0% 0% 21% 100% 100% 100%
T TOTAL FASE 05000 33,707.23 27,248.49 108,285.99 0.00 3,022.50 0.00 0.00 0.00 0.00 46,626.00 157,934.49 177,588.73 116,569.43
27.25 108.29 0.00 3.02 34,248.77
07000 CONCRETO
T TOTAL FASE 07000 1,179.36 150.00 150.00 0.00 0.00 0.00 0.00 0.00 0.00 1,685.00 1,835.00 3,369.60 3,369.60
46.15
10000 TRANSPORTE VERTICAL
ALQUILER TORRE GRUA % Avance 21% 27% 66% 0% 34% 0% 0% 0% 0% 0% 100% 100%
Costo Contrato S/. 12,350.00 15,600.00 38,350.00 0.00 20,150.00 0.00 58,500.00 58,500.00
Costo Reajustes S/. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Costo Adicionales S/. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Costo Total S/. 12,350.00 15,600.00 38,350.00 0.00 20,150.00 0.00 0.00 0.00 0.00 0.00 58,500.00 58,500.00
T TOTAL FASE 10000 12,350.00 15,600.00 38,350.00 0.00 20,150.00 0.00 0.00 0.00 0.00 0.00 58,500.00 58,500.00
6,200.00 18,000.00
11000 ALBAÑILERIA, REVOQUES Y RESANES
PLACA P-10 EDIFICIOS - MO % Avance 32% 28% 46% 0% 33% 21% 0% 0% 0% 0% 100% 100%
Costo Contrato S/. 18,000.00 15,445.40 25,347.15 0.00 18,400.00 11,752.85 55,500.00 55,500.00
Costo Reajustes S/. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Costo Adicionales S/. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Costo Total S/. 18,000.00 15,445.40 25,347.15 0.00 18,400.00 11,752.85 0.00 0.00 0.00 0.00 55,500.00 55,500.00
PLACA P-10 CASA CLUB % Avance 0% 0% 0% 0% 74% 26% 0% 0% 0% 100% 100% 100%
Costo Contrato S/. 0.00 0.00 0.00 13,724.76 4,935.70 18,660.46 18,660.46 18,660.46
Costo Reajustes S/. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Costo Adicionales S/. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Costo Total S/. 0.00 0.00 0.00 0.00 0.00 13,724.76 4,935.70 0.00 0.00 0.00 18,660.46 18,660.46 18,660.46
T TOTAL FASE 11000 18,000.00 15,445.40 25,347.15 0.00 18,400.00 25,477.61 4,935.70 0.00 0.00 0.00 74,160.46 74,160.46 18,660.46
15.45 25.35 0.00 18.40 22,818.60 74.16 18.66
11500 CERAMICO
TOTAL SUBFASE 11400 5,115.00 9,454.38 14,338.28 0.00 40,000.00 40,000.00 14,000.00 0.00 0.00 93,769.97 202,108.25 208,376.63 208,377.72
Pág. 49 de 58 33,334.86 PLANILLA DE SUBCONTRATOS
CONTRAZOCALO DE MADERA % Avance 0.00 0% 0% 0% 0% 0% 51% 0% 0% 49% 100% 100% 100%
Costo Contrato S/. 0.00 0.00 0.00 0.00 0.00 27,000.00 0.00 26,082.00 53,082.00 57,960.00 24,400.38
Costo Reajustes S/. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Costo Adicionales S/. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PLANILLA CONTROL DE COSTO DE EQUIPOS
AL 30 DE NOVIEMBRE DE 2006 FORMATO Nº RO-00-04
INFORME Nº 05
OBRA : MONEDA : NUEVOS SOLES S/. ELABORADO POR
CLIENTE : T/ C Inicial : 3.25 jul-06 Form.Polinómica (K ) : IMPRESO 4-dic-06
T/ C Actual : nov-06 T/C Prom.Acum. :
TER TOTAL EQU.TERCEROS FASE 02000 528.30 245.80 420.80 0.00 245.80 245.80 245.80 491.60 0.00 2,810.15 4,459.95 4,563.55 5,071.75
T TOTAL EQUIPO 02000 528.30 245.80 420.80 0.00 245.80 245.80 245.80 491.60 0.00 2,810.15 4,459.95 4,563.55 5,071.75
0.00 507.63
TER TOTAL EQU.TERCEROS FASE 05000 310.00 2,937.65 2,410.00 0.00 2,380.00 0.00 0.00 0.00 0.00 37,353.95 44,021.60 39,643.95 72,117.37
T TOTAL EQUIPO 05000 310.00 2,937.65 2,410.00 0.00 2,380.00 0.00 0.00 0.00 0.00 37,353.95 44,021.60 39,643.95 72,117.37
2,051.58
07000 CONCRETO
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00
S/. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
P TOTAL EQU.PROPIO FASE 07000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 CORTADORA DE CONCRETO DE 14" H-M 382.50 0.00 0.00 382.50 250.00 1,020.00 1,652.50 2,035.00 2,040.00
0.00
S/. 14.30 5,469.75 0.00 0.00 5,469.75 3,575.00 0.00 0.00 0.00 14,586.00 23,630.75 29,100.50 29,172.00
2 FRAGUA PARA CINCELES H-M 382.50 0.00 382.50 255.00 1,020.00 1,657.50 2,040.00 2,040.00
0.00
S/. 1.56 597.66 0.00 0.00 597.66 398.44 0.00 0.00 0.00 1,593.75 2,589.84 3,187.50 3,187.50
TER TOTAL EQU.TERCEROS FASE 07000 12,793.41 1,021.59 10,595.11 0.00 8,141.21 5,977.24 1,723.80 0.00 0.00 53,195.16 80,654.11 90,228.32 99,399.39
T TOTAL EQUIPO 07000 12,793.41 1,021.59 10,595.11 0.00 8,141.21 5,977.24 1,723.80 0.00 0.00 53,195.16 80,654.11 90,228.32 99,399.39
10.60 53.20 8,448.91
08000 ENCOFRADOS
1 0.00 0.00 0.00 0.00 0.00 0.00
0.00
S/. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
P TOTAL EQU.PROPIO FASE 08000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 ELEVADOR VERTICAL TIPO PLATAFORMA MES 0.00 0.00 6.00 6.00 6.00 12.00
0.00
S/. 5,118.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 30,712.50 30,712.50 30,712.50 61,425.00
2 ENCOFRADO METÁLICO PARA COLUMNAS M2 40.33 0.00 0.00 0.00 46.09 46.09 115.23 115.23
0.00
S/. 28.02 1,130.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,291.48 1,291.48 3,228.70 3,228.70
3 ENCOFRADO METÁLICO PARA MUROS M2 15,500.00 14,000.00 32,260.00 0.00 10,500.00 1,400.00 42,177.76 86,337.76 83,517.76 84,355.51
0.00
S/. 2.61 40,483.18 23,542.32 53,280.21 0.00 27,424.09 3,656.55 0.00 0.00 0.00 110,160.63 194,521.47 200,179.28 220,321.25
4 ENCOFRADO METÁLICO PARA TECHOS M2 4,000.00 5,500.00 13,800.00 4,200.00 520.00 14,070.56 32,590.56 28,645.56 28,141.12
0.00
S/. 3.94 15,769.39 13,366.80 31,527.57 0.00 16,557.86 2,050.02 0.00 0.00 0.00 55,471.04 105,606.48 98,370.04 110,942.07
5 ENCOFRADO METÁLICO PARA VIGAS M2 250.00 0.00 350.00 55.00 270.00 675.00 654.99 674.98
0.00
S/. 19.87 4,968.44 0.00 0.00 6,955.81 1,093.06 0.00 0.00 0.00 5,365.91 13,414.78 13,017.11 13,414.38
6 SIERRA CIRCULAR H-M 382.50 170.65 255.97 0.00 255.00 1,020.00 1,530.97 1,742.82 2,040.00
0.00
S/. 2.93 1,120.73 500.00 750.00 0.00 747.15 0.00 0.00 0.00 0.00 2,988.60 4,485.75 5,106.48 5,977.20
4 MATERIALES VARIOS GLB 240.00 2,840.76 2,917.95 200.00 120.00 37.47 3,275.42 674.66 37.47
0.00
S/. 1.00 946.16 2,840.76 2,917.95 0.00 788.47 473.08 0.00 0.00 0.00 37.47 4,216.97 2,322.38 37.47
TER TOTAL EQU.TERCEROS FASE 08000 64,417.94 40,249.87 85,557.78 0.00 52,473.38 7,272.70 0.00 0.00 0.00 206,027.63 354,249.44 352,936.48 415,346.09
T TOTAL EQUIPO 08000 64,417.94 40,249.87 85,557.78 0.00 52,473.38 7,272.70 0.00 0.00 0.00 206,027.63 354,249.44 352,936.48 415,346.09
85.56 206.03 45,606.71
09000 ACERO
1 CIZALLA MANUAL 36" UND 1.00 3.00 0.00 0.00 4.00 7.00 8.00 0.00
0.00
S/. 82.50 82.50 960.00 0.00 0.00 0.00 0.00 0.00 0.00 330.00 1,290.00 1,372.50 0.00
P TOTAL EQU.PROPIO FASE 09000 82.50 0.00 960.00 0.00 0.00 0.00 0.00 0.00 0.00 330.00 1,290.00 1,372.50 0.00
1 CIZALLA ELECTRICA H-M 382.50 211.20 422.40 255.00 1,020.00 1,697.40 1,868.70 2,040.00
0.00
T TOTAL EQUIPO 09000 1,636.41 858.00 2,676.00 0.00 1,035.94 0.00 0.00 0.00 0.00 10,211.25 13,923.19 14,701.59 19,762.50
1,142.13
T TOTAL EQUIPO 10000 4,641.00 0.00 7,784.40 0.00 8,353.80 0.00 0.00 0.00 0.00 13,923.00 30,061.20 30,061.20
2,570.40 4,965.60
11000 ALBAÑILERÍA
1 ELECTROBOMBA UND 1.00 0.00 1.00 0.00 0.00 0.00 2.00 2.00 0.00
0.00
S/. 980.00 0.00 963.14 0.00 980.00 0.00 0.00 0.00 0.00 0.00 1,943.14 1,943.14 0.00
P TOTAL EQU.PROPIO FASE 11000 0.00 0.00 963.14 0.00 980.00 0.00 0.00 0.00 0.00 0.00 1,943.14 1,943.14 0.00
1 AMOLADORA H-M 212.50 1.00 0.00 212.50 212.50 106.25 637.50 1,169.75 1,169.75 1,275.00
0.00
S/. 2.71 575.52 610.20 0.00 575.52 575.52 287.76 0.00 0.00 1,726.56 3,775.56 3,775.56 3,453.13
2 ANDAMIO UND 3,700.00 420.84 420.84 0.00 3,200.00 1,200.00 6,300.00 11,120.84 12,600.00 12,600.00
0.00
S/. 1.00 3,700.00 420.84 420.84 0.00 3,200.00 1,200.00 0.00 0.00 0.00 6,300.00 11,120.84 12,600.00 12,600.00
3 MARTILLO DEMOLEDOR ELÉCTRICO H-M 199.74 58.13 58.13 0.00 237.29 654.47 949.89 1,091.50 1,291.24
0.00
S/. 12.68 2,531.68 736.82 736.82 0.00 3,007.64 0.00 0.00 0.00 0.00 8,295.41 12,039.87 13,834.73 16,366.41
TER TOTAL EQU.TERCEROS FASE 11000 6,807.20 1,157.66 1,767.86 0.00 6,783.16 1,775.52 287.76 0.00 0.00 16,321.97 26,936.27 30,210.29 33,455.47
T TOTAL EQUIPO 11000 6,807.20 1,157.66 2,730.99 0.00 7,763.16 1,775.52 287.76 0.00 0.00 16,321.97 28,879.41 32,153.43 33,455.47
2.73 546.31 88.54 16.32 3,863.83
1 BOMBA PARA CONCRETO M3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00
S/. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TER TOTAL EQU.TERCEROS FASE 11200 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
T TOTAL EQUIPO 11400 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00
11450 PISOS
0.00 0.00 0.00 0.00 0.00
T TOTAL EQUIPO 11450 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11500 CERAMICO
0.00 0.00 0.00 0.00 0.00
0.00
S/. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
P TOTAL EQU.PROPIO FASE 11500 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 CORTADORA DE MAYÓLICA H-M 320.00 1,044.58 1,044.58 0.00 300.00 255.00 637.50 2,237.08 1,512.50 1,275.00
0.00
S/. 0.81 260.00 848.72 848.72 0.00 243.75 207.19 0.00 0.00 0.00 517.97 1,817.63 1,228.91 1,035.94
0.00 0.00 0.00 0.00 0.00 0.00
0.00
S/. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TER TOTAL EQU.TERCEROS FASE 11500 260.00 848.72 848.72 0.00 243.75 207.19 0.00 0.00 0.00 517.97 1,817.63 1,228.91 1,035.94
T TOTAL EQUIPO 11500 260.00 848.72 848.72 0.00 243.75 207.19 0.00 0.00 0.00 517.97 1,817.63 1,228.91 1,035.94
399.89
35000 VARIOS
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00
S/. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
P TOTAL EQUIPO PROPIOS DE FASE 35000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
T TOTAL EQUIPO 35000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL EQUIPOS PROPIOS COSTO DIRECTO 82.50 0.00 1,923.14 0.00 980.00 0.00 0.00 0.00 0.00 330.00 3,233.14 3,315.64 0.00
TOTAL EQUIPOS TERCEROS COSTO DIRECTO 91,311.76 47,319.30 111,100.66 0.00 79,657.04 15,478.45 2,257.36 491.60 0.00 340,031.08 554,833.39 562,201.80 645,152.58
TOTAL EQUIPOS COSTO DIRECTO 91,394.26 47,319.30 113,023.80 0.00 80,637.04 15,478.45 2,257.36 491.60 0.00 340,361.08 558,066.52 565,517.43 645,152.58
66,986.29
90000 INDIRECTOS
MES 0.00 0.00 0.00 0.00
0.00
S/. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
MES 0.00 0.00 0.00 0.00
0.00
S/. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
P TOTAL EQU.PROPIO FASE 90000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CAMIONETA MES 1.00 1.00 4.90 1.00 1.00 1.00 1.00 10.10 19.00 18.00 18.00
T TOTAL EQUIPO 90000 2,762.50 2,762.50 13,545.16 0.00 2,762.50 2,762.50 2,762.50 2,762.50 0.00 27,901.25 52,496.41 49,733.91 48,895.47
7,567.74
TOTAL EQUIPOS PROPIOS 82.50 0.00 1,923.14 0.00 980.00 0.00 0.00 0.00 0.00 330.00 3,233.14 3,315.64 0.00
TOTAL EQUIPOS TERCEROS 94,074.26 50,081.80 124,645.83 0.00 82,419.54 18,240.95 5,019.86 3,254.10 0.00 367,932.33 607,329.80 611,935.71 694,048.05
TOTAL EQUIPOS 94,156.76 50,081.80 126,568.96 0.00 83,399.54 18,240.95 5,019.86 3,254.10 0.00 368,262.33 610,562.93 615,251.34 694,048.05
08000 ENCOFRADO
1 MOVILIZACIÓN Y DESMOVILIZACIÓN DE ENCOFRAD VIAJE 7.00 5.00 7.00 0.00 10.00 8.00 25.00 50.00 50.00 50.00
S/. 450.00 3,150.00 1,936.49 2,636.49 0.00 4,500.00 3,600.00 0.00 0.00 0.00 16,250.00 26,986.49 22,300.00 32,500.00
0.00 0.00 0.00 0.00 0.00 0.00
S/. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
T TOTAL FASE 08000 3,150.00 1,936.49 2,636.49 0.00 4,500.00 3,600.00 0.00 0.00 0.00 16,250.00 26,986.49 22,300.00 32,500.00
35000 VARIOS
0.00 0.00 0.00 0.00 0.00
S/. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
S/. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
T TOTAL FASE 35000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL COSTO DIRECTO 3,150.00 1,936.49 2,636.49 0.00 4,500.00 3,600.00 0.00 0.00 0.00 16,250.00 26,986.49 22,300.00 32,500.00
90000 INDIRECTOS
MOVILIZACIÓN DE EQUIPO LIVIANO 1.00 0.00 0.00 1.00 0.70 3.00 4.70 7.70 6.00
S/. 487.50 487.50 806.61 0.00 487.50 341.25 0.00 0.00 0.00 1,462.50 3,097.86 4,560.36 2,925.00
0.00 0.00 0.00 0.00
S/. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL FASE 90000 487.50 0.00 806.61 0.00 487.50 341.25 0.00 0.00 0.00 1,462.50 3,097.86 4,560.36 2,925.00
TOTAL COSTO INDIRECTO 487.50 0.00 806.61 0.00 487.50 341.25 0.00 0.00 0.00 1,462.50 3,097.86 4,560.36 2,925.00
TOTAL 3,637.50 1,936.49 3,443.09 0.00 4,987.50 3,941.25 0.00 0.00 0.00 17,712.50 30,084.34 26,860.36 35,425.00
3 917003 ATENCIONES AL PERSONAL Y SUPERVISION S/. 913.87 4,768.20 300.00 5,068.20 4,154.33 0.00
4 917004 SERVICIO DE ASESORIA EN GENERAL S/. 2,400.00 70.00 1,900.00 4,370.00 4,370.00 2,860.00
6 917006 ELECTRICIDAD Y AGUA S/. 3,269.12 3,242.44 9,416.64 3,269.12 2,500.00 2,000.00 1,000.00 500.00 39,460.54 58,146.30 52,172.98 0.00
7 917007 CORREOS Y TELECOMUNICACIONES S/. 1,750.00 1,235.39 5,665.47 1,500.00 1,500.00 1,500.00 1,500.00 1,000.00 18,000.00 30,665.47 29,930.09 31,518.66
8 917008 GASTOS DE REPRESENTACION S/. 614.12 103.19 500.00 450.00 350.00 350.00 2,930.00 4,683.19 5,505.55 5,850.00
9 917009 GASTOS NOTARIALES Y DE REGISTRO S/. 70.00 33.00 321.45 55.00 55.00 500.00 931.45 913.45 0.00
11 917011 GASTOS DE MOVILIDAD S/. 310.00 298.00 1,299.40 300.00 250.00 250.00 300.00 200.00 2,400.00 4,999.40 4,241.40 0.00
12 917012 ESTACIONAMIENTO Y PEAJE S/. 12.00 21.00 61.28 10.00 10.00 10.00 10.00 10.00 50.00 161.28 112.28 0.00
13 917013 ENSAYO EN LABORATORIO DE TERCEROS S/. 1,200.00 1,717.65 3,121.84 1,800.00 1,000.00 8,300.00 14,221.84 15,340.67 16,500.00
14 917014 MANTENIMIENTO Y REPARACION DE INSTALACIONES S/. 350.00 1,762.91 9,293.96 1,000.00 10,293.96 8,131.05 0.00
15 917015 MANTENIMIENTO Y REPARACION DE EQUIPOS S/. 10.00 1,354.88 3,682.88 1,000.00 4,682.88 2,338.00 0.00
16 917016 SEGURIDAD Y VIGILANCIA S/. 300.00 13,994.18 14,500.00 28,494.18 29,082.09 28,778.51
17 917017 PUBLICIDAD, PUBLICACIONES Y REL. PUBLICAS S/. 0.00 0.00 0.00 0.00
20 917025 OTROS TRIBUTOS MUNICIPALES S/. 100.00 166.70 166.70 266.70 0.00
21 917027 SEGUROS DE OBRA ( POLIZA CAR) S/. 26,812.50 28,066.84 28,066.84 28,066.84 56,133.67 53,625.00 53,625.00
23 917029 ALQUILER DE MUEBLES Y EQ. DE OFICINA S/. 0.00 0.00 0.00 0.00
24 917030 FOTOS, FOTOCOPIAS, ANILLADOS, EMPASTES E IMPRESIONES S/. 830.00 849.58 3,719.62 830.00 850.00 850.00 450.00 200.00 9,463.24 16,362.85 13,993.27 14,625.00
25 917031 UTILES DE OFICINA S/. 240.00 1,048.35 4,739.77 200.00 1,500.00 6,439.77 6,024.07 2,925.00
26 917032 UTILES DE LIMPIEZA Y ASEO S/. 280.00 417.41 1,719.76 250.00 250.00 180.00 180.00 50.00 1,900.00 4,529.76 4,262.36 0.00
28 917036 MEDICINAS S/. 420.00 214.27 100.00 100.00 100.00 100.00 3,785.29 4,399.57 5,249.57 5,850.00
29 917038 GASTOS NO DEDUCIBLES (LICENCIAS Y MULTAS MUNICIPALES) S/. 200.00 166.70 1,166.70 150.00 150.00 1,466.70 1,200.00 0.00
31 917040 GASTOS BANCARIOS S/. 10.00 2.00 4.00 7.00 7.00 6.00 6.00 6.00 36.00 27.00 0.00
33 917037 GASTOS DIVERSOS S/. 890.00 10.97 498.07 200.00 200.00 200.00 100.00 50.00 5,441.36 6,689.43 7,313.12 8,409.38
TOTAL 37,367.74 41,440.97 94,424.23 0.00 11,241.12 7,267.00 5,446.00 4,051.00 2,016.00 138,497.27 262,942.62 248,252.99 170,941.55
02000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
07000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
08000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 Jefe de Proyecto MES 1.00 1.00 5.53 1.00 1.00 1.00 1.00 8.47 18.00 18.00 17.00
Ruiz Elias, Walter 11,573.32 11,573.32 S/. 11,573.32 11,573.32 64,023.74 0.00 11,573.32 11,573.32 11,573.32 11,573.32 0.00 98,026.02 208,343.04 208,343.04 211,351.65
2 Jefe de Producción MES 1.00 1.00 1.00 1.00 1.00 1.00 1.00 9.00 14.00 14.00
Diaz Urteaga Ricardo 4,323.45 4,323.45 S/. 4,323.45 4,316.50 4,316.50 0.00 4,323.45 4,323.45 4,323.45 4,323.45 0.00 38,911.05 60,521.35 60,528.30
3 Jefe de Calidad MES 1.00 1.00 4.70 1.00 1.00 1.00 1.00 1.00 8.30 18.00 16.00 16.00
Naupari Saberbein, Pedro 2,250.00 2,250.00 S/. 2,250.00 2,158.25 8,778.84 0.00 2,250.00 2,250.00 2,250.00 2,250.00 2,250.00 18,675.00 38,703.84 34,295.59 55,645.28
4 Jefe de Gestión Operativa y Comercial MES 1.00 1.00 6.50 1.00 1.00 1.00 1.00 1.00 8.50 20.00 19.50 18.00
Ugarriza Echevarria, Alexis 3,165.43 3,165.43 S/. 3,165.43 3,165.43 22,996.84 0.00 3,165.43 3,165.43 3,165.43 3,165.43 3,165.43 26,906.16 65,730.15 64,147.43 84,833.10
5 Supervisor de Seguridad MES 1.00 1.00 2.00 1.00 1.00 1.00 8.00 13.00 13.00
Guillen Orejuela, Raul Gerardo 2,158.25 2,158.25 S/. 2,158.25 2,158.25 4,316.50 0.00 2,158.25 2,158.25 2,158.25 0.00 0.00 17,266.00 28,057.25 28,057.25
6 Jefe de Administración MES 1.00 0.77 5.77 9.00 14.77 19.00 18.00
Sotomayor Acosta, Cesar 4,323.45 4,323.45 S/. 4,323.45 3,971.59 25,641.56 0.00 0.00 0.00 0.00 0.00 0.00 38,911.05 64,552.61 82,198.27 84,833.10
7 Asistente de Administración MES 1.00 1.00 2.00 1.00 1.00 1.00 1.00 1.00 6.00 13.00 12.00
Calderón Valdivia, Frank 2,653.52 2,653.52 S/. 2,653.52 2,653.52 5,307.04 0.00 2,653.52 2,653.52 2,653.52 2,653.52 2,653.52 15,921.12 34,495.76 31,842.24
8 Maestro de Obra MES 1.00 1.00 4.50 1.00 1.00 1.00 1.00 9.00 17.50 7.50 17.00
Delgado García, Policarpio 6,043.10 6,043.10 S/. 6,043.10 6,043.10 27,193.95 0.00 6,043.10 6,043.10 6,043.10 6,043.10 0.00 54,387.90 105,754.25 45,323.25 111,615.71
10 Jefe de Almacen MES 1.00 1.00 4.70 1.00 1.00 1.00 1.00 1.00 9.00 18.70 17.70 18.00
Bullon Ruiz, Homero 2,589.90 2,589.90 S/. 2,589.90 2,589.90 12,177.19 0.00 2,589.90 2,589.90 2,589.90 2,589.90 2,589.90 23,309.10 48,435.79 45,845.89 51,484.86
11 Jefe de Seguridad MES 1.00 1.00 5.00 1.00 1.00 1.00 1.00 9.00 18.00 17.00 17.00
Miota Oblitas, Cesar 1,870.48 1,870.48 S/. 1,870.48 1,870.48 9,352.41 0.00 1,870.48 1,870.48 1,870.48 1,870.48 0.00 16,834.32 33,668.65 31,798.17 35,501.44
90000 GASTOS GENERALES 47,216.78 48,384.85 224,632.78 0.00 42,893.33 36,627.45 36,627.45 34,469.20 10,658.85 349,147.72 735,056.77 752,745.42 731,133.07
TOTAL 47,216.78 48,384.85 224,632.78 0.00 42,893.33 36,627.45 36,627.45 34,469.20 10,658.85 349,147.72 735,056.77 752,745.42 731,133.07