FORMATO Nº 01LT

METRADOS REALMENTE EJECUTADOS

PLIEGO : GOBIERNO REGIONAL DE AYACUCHO


UNIDAD EJECUTORA : DIRECCION REGIONAL AGRARIA AYACUCHO
COMPONENTE : MEJORAMIENTO DE LAS CAPACIDADES PRODUCTIVAS PARA EL MANEJO INTEGRAL DE CULTIVO DE PALTO EN LAS 10 PROVINCIAS
META DE AYACUCHO
MODALIDAD DE EJECUCION : ADMINISTRACION DIRECTA
MONTO VALOR REFERENCIA : S/. 784,070.00 NUEVOS SOLES
AÑO FISCAL : 2016
CODIGO METRADO METRADOS EJECUTADOS METRADOS
DESCRIPCION UNIDAD
PARTIDA PROGRAMADO META ADICIONAL MAY. METRADOS TOTAL DEDUCTIVOS

01 CARTEL DE OBRA GLB 1.00 1.00 1.00


01.01 ELABORACION DE EXPEDIENTE ANUAL EXP 1.00 1.00 1.00
02 M AYOR DISPONIBILIDAD DE PLANTONES DE PALTO
02.01 CONSTRUCCION DE VAT EN SANTA ANA-SAN PEDRO-LUCANAS
02.01.01 LOCAL ADM INISTRATIVO
02.01.01.01 ESTRUCTURA M OD
02.01.01.01.01 TRABAJOS PRELIM INARES
02.01.01.01.01.01 ALMACEN, OFICINA, GUARDIANIA m2 34.25 25.00 25.00
02.01.01.01.01.02 LIMPIEZA DE TERRENO MANUAL m2 182.50 124.20 124.20
02.01.01.01.01.03 TRAZO Y REPLANTEO PRELIMINAR m2 182.50 124.20 124.20
02.01.01.01.01.04 TRAZO Y REPLANTEO DURANTE EL PROCESO m2 182.50 124.20 124.20
02.01.01.01.02 M OVIM IENTO DE TIERRAS 0.00
02.01.01.01.02.01 CORTE SUPERFICIAL MANUAL E= 0.10 MT ZONA DE PISO INTERIOR m2 182.50 124.20 124.20
02.01.01.01.02.02 CORTE SUPERFICIAL MANUAL E= 0.05 MT EN VEREDAS m2 42.50 0.00 0.00
02.01.01.01.03 EXCAVACIONES
02.01.01.01.03.01 EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS m3 31.15 31.15 68.69 99.84
02.01.01.01.03.02 EXCAVACION MANUAL DE ZANJAS PARA SARDINELES DE VEREDAS m3 15.53 0.00 15.53
02.01.01.01.03.03 RELLENO COMPACTADO CON MATERIAL PROPIO m3 1.55 1.55 67.78 69.33
02.01.01.01.03.04 REFINE NIVELACION Y COMPACTACION CON PISON MANUAL m2 163.98 0.00 0.00
02.01.01.01.03.05 AFIRMADO DE 4" CON MATERIAL CLASIFICADO PARA PISOS INTERIORES Y m2 163.98 0.00 0.00
02.01.01.01.03.06 EXTERIORES
ELIMINACION DE MATERIAL EXCEDENTE CARGUI0 A MANO m3 128.91 61.81 61.81
02.01.01.01.04 OBRAS DE CONCRETO SIM PLE
02.01.01.01.04.01 VEREDA DE CONCRETO F'C=175 KG/CM2 ACABADO Y BRUÑADO m3 7.76 0.00 7.76
02.01.01.01.04.02 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 10.35 0.00 10.35
02.01.01.01.04.03 SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m2 2.16 2.16 6.48 8.64 -6.48
02.01.01.01.04.04 CONCRETO CIMIENTO CORRIDO 1:10 +30% P.G. m3 17.62 17.62 29.33 46.95 -29.33
02.01.01.01.04.05 CONCRETO PARA SOBRECIMIENTO DE 1:8 CEM-HOR 25% P.M. m3 4.45 4.45 2.54 6.99 -2.54
02.01.01.01.04.06 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS m2 49.40 0.00 49.40
02.01.01.01.04.07 FALSO PISO DE 4" DE CONCRETO 1:10 m2 106.38 0.00 106.38
02.01.01.01.05 OBRAS DE CONCRETO ARM ADO
02.01.01.01.05.01 ZAPATAS
02.01.01.01.05.01.01 CONCRETO PARA ZAPATAS F'C=210 KG/CM2 m3 10.80 10.80 10.80 21.60
02.01.01.01.05.01.02 ZAPATAS - ACERO FY=4200KG/CM2 kg 328.02 328.02 120.12 448.14
02.01.01.01.05.02 VIGAS DE CIM ENTACION
02.01.01.01.05.02.01 CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 m3 4.45 4.45 2.20 6.65
02.01.01.01.05.02.02 ENCOFRADO Y DESENCOFRADO VIGA DE CIMENTACION m2 49.40 26.60 26.60
02.01.01.01.05.02.03 ACERO EN VIGA DE CIMENTACION GRADO 60 kg 1,636.25 627.02 627.02
02.01.01.01.05.03 COLUM NAS
02.01.01.01.05.03.01 CONCRETO PARA COLUMNAS F'C=210 KG/CM2 m3 4.96 0.00 0.00
02.01.01.01.05.03.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 34.46 0.00 0.00 34.46
02.01.01.01.05.03.03 ACERO FY=4200 KG/CM2 EN COLUMNAS kg 880.50 862.35 862.35 18.15
02.01.01.01.05.04 VIGAS
02.01.01.01.05.04.01 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 15.85 0.00 0.00
02.01.01.01.05.04.02 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 144.69 0.00 0.00
02.01.01.01.05.04.03 ACERO FY=4200 KG/CM2 EN VIGAS kg 2,747.89 0.00 0.00
02.01.01.01.05.05 LOSAS ALIGERADAS
02.01.01.01.05.05.01 CONCRETO F'C=210 KG/CM2. PARA LOSAS ALIGERADAS m3 12.77 0.00 12.77
02.01.01.01.05.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS m2 75.32 0.00 75.32
02.01.01.01.05.05.03 ACERO FY=4200 KG/CM2 EN LOSA ALIGERADA kg 1,007.66 0.00 1,007.66
02.01.01.01.05.05.04 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO und 1,104.00 0.00 1,104.00
02.01.01.01.06 M UROS Y TABIQUES DE ALBAÑILERIA
MURO DE LADRILLO KK ARCILLA EN SOGA M:1:5 E=1.5 CM m2 0.00 11.06
02.01.01.01.06.01 MURO DE LADRILLO KK ARCILLA CABEZA M:1:5 E=1.5 CM m2 158.14 6.88 6.88 151.26
02.01.01.01.07 COBERTURA Y TECHO
02.01.01.01.07.01 COBERTURA CON TEJA DE ARCILLA m2 190.44 0.00 190.44
02.01.02 TANQUE SEPTICO
02.01.02.01 OBRAS PRELIM INARES
02.01.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 9.13 0.00 9.13
02.01.02.01.02 TRAZO Y REPLANTEO m2 9.13 0.00 9.13
02.01.02.02 M OVIM IENTO DE TIERRAS
02.01.02.02.01 EXCAVACION EN MATERIAL SUELTO m3 16.43 0.00
02.01.02.02.02 REFINE Y NIVELACION EN TERRENO m2 9.13 0.00
02.01.02.02.03 ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO m3 20.53 0.00
02.01.02.03 CARRETILLA)
OBRAS DE CONCRETO
02.01.02.03.01 SOLADO E=4" m2 9.13 0.00
02.01.02.03.02 ACERO FY= 4200 KG/CM2 kg 155.55 0.00
02.01.02.03.03 ENCOFRADO Y DESENCOFRADO NORMAL m2 24.30 0.00
02.01.02.03.04 CONCRETO PARA F'C=175 KG/CM2 m3 4.00 0.00
02.01.02.04 REVOQUES Y ENLUCIDOS
02.01.02.04.01 TARRAJEO CON IMPERMEABILIZANTE DE MUROS INTERIOR m2 24.10 0.00 24.10
02.01.02.05 CAJA DE REGISTRO
02.01.02.05.01 EXCAVACION EN MATERIAL SUELTO m3 4.61 0.00 4.61
02.01.02.05.02 REFINE Y NIVELACION EN TERRENO m2 1.92 0.00 1.92
02.01.02.05.03 ACERO FY= 4200 KG/CM2 kg 4.48 0.00 4.48
02.01.02.05.04 ENCOFRADO Y DESENCOFRADO NORMAL m2 1.92 0.00 1.92
02.01.02.05.05 CONCRETO F'C= 140 KG/CM2 m3 0.51 0.00 0.51
02.01.02.06 ZANJAS DE PERCOLACIÓN
02.01.02.06.01 TRAZO Y REPLANTEO m2 18.00 0.00 18.00
02.01.02.06.02 EXCAVACION EN MATERIAL SUELTO m3 16.20 0.00 16.20
02.01.02.06.03 REFINE Y NIVELACION EN TERRENO m2 18.00 0.00 18.00
02.01.02.06.04 CAMA DE APOYO CON PIEDRA ZARANDEADA H=10CM m2 18.00 0.00 18.00
02.01.02.06.05 ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO m3 15.75 0.00 15.75
02.01.02.06.06 CARRETILLA)
TUBERIA DE PVC SAL DE 3" PERFORADA" m 20.00 0.00 20.00
02.01.02.06.07 TUBERIA PVC SAL 4" m 30.00 0.00 30.00
02.01.02.06.08 RELLENO CON MATERIAL DE GRAVA SELECCIONADA m3 10.80 0.00 10.80
02.01.02.07 POZO PERCOLADOR
02.01.02.07.01 TRAZO Y REPLANTEO m2 7.60 0.00 7.60
02.01.02.07.02 EXCAVACION EN MATERIAL SUELTO m3 29.26 0.00 29.26
02.01.02.07.03 REFINE Y NIVELACION EN TERRENO m2 7.60 0.00 7.60
02.01.02.07.04 ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO m3 73.15 0.00 73.15
02.01.02.07.05 CARRETILLA)
RELLENO CON MATERIAL DE GRAVA SELECCIONADA m3 5.08 0.00 5.08
02.01.02.07.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 5.28 0.00 5.28
02.01.02.07.07 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 1.92 0.00 1.92
02.01.02.07.08 ACERO FY= 4200 KG/CM2 kg 50.21 0.00 50.21
02.01.02.07.09 ENCOFRADO Y DESENCOFRADO DE LOSA m2 5.66 0.00 5.66
02.01.02.07.10 CONCRETO PARA F'C=175 KG/CM2 m3 1.19 0.00 1.19
02.01.02.07.11 MURO DE LADRILLO CORRIENTE-CABEZA m2 33.66 0.00 33.66
02.01.02.07.12 TUBERIA DE VENTILACION F° G° Ø 2" und 4.00 0.00 4.00
02.01.03 CERCO PERIM ETRICO
02.01.03.01 TRABAJOS PRELIM INARES
02.01.03.01.01 LIMPIEZA DE TERRENO MANUAL m2 172.00 172.00 2,203.80 2,375.80
02.01.03.01.02 TRAZO NIVELACIÓN Y REPLANTEO PRELIMINAR m2 172.00 172.00 137.30 309.30 -137.30
02.01.03.02 M OVIM IENTO DE TIERRAS 0.00
02.01.03.02.01 EXCAVACION PARA CIMIENTOS HASTA 1.00 MT TERRENO NORMAL m3 63.00 20.84 20.84
EXCAVACION PARA CIMIENTOS HASTA 1.00 MT TERRENO SEMIROCOSO m3 29.30 29.30
02.01.03.02.02 EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS m3 8.23 8.23 9.19 17.42
02.01.03.02.03 EXCAVACION DE SARDINELES m3 7.52 0.00 0.00
02.01.03.02.04 RELLENO COMPACTADO CON MATERIAL PROPIO m3 10.97 10.97 3.67 14.64
02.01.03.02.05 ELIMINACION DE MATERIAL EXCEDENTE CARGUI0 A MANO m3 86.63 25.99 25.99
02.01.03.03 OBRAS DE CONCRETO SIM PLE
02.01.03.03.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 52.50 44.57 44.57
02.01.03.03.02 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS m2 120.00 120.00 9.90 129.90
02.01.03.03.03 CONCRETO SOBRECIMIENTO DE 1:8 CEM-HOR 25% P.M. ANCHO=0.25 MT m3 9.00 9.00 7.89 16.89
02.01.03.03.04 CONCRETO CIMIENTO CORRIDO 1:10 +30% P.G. m3 4.10 0.00
02.01.03.03.05 SARDINELES DE CONCRETO DE F'C=140 KG/CM2. m 45.25 0.00
02.01.03.03.06 ENCOFRADO Y DESENCOFRADO EN SARDINELES m2 45.25 0.00
CONCRETO ZAPATA FC=210 KG/CM2 m3 14.26
02.01.03.04 OBRAS DE CONCRETO ARM ADO
02.01.03.04.01 ACERO FY=4200 KG/CM2 EN COLUMNAS kg 1,018.70 1,018.70 43.33 1,062.03
02.01.03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 155.24 81.20 81.20
02.01.03.04.03 CONCRETO F'C=175 KG/CM2. PARA COLUMNAS m3 10.81 5.08 5.08
02.01.03.04.04 ACERO FY=4200 KG/CM2 EN VIGAS kg 418.02 0.00
02.01.03.04.05 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 30.00 0.00
02.01.03.04.06 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 2.25 0.00
02.01.03.04.07 MALLA OLIMPICA CACADO INC. MARCO CON ANGULO DE 2" ML 40.80 0.00 40.80
02.01.03.05 M URO
02.01.03.05.01 MURO DE SOGA LADRILLO 18 HUECOS DE ARCILLA ASENTADO DE SOGA m2 297.00 238.15 238.15 58.85
MEZCLA
MURO DE1: PIEDRA
5 CON CONCRETO 175 KG/CM2 m3 31.70
02.01.04 VARIOS
02.01.04.01 FLETE
02.01.04.01.01 FLETE TERRESTRE (AYACUCHO-SAN PEDRO-LUCANAS) GLB 1.00 0.00 0.00
02.01.04.02 SEGURIDAD EN OBRA 0.00
02.01.04.02.01 Equipos de protección al personal GLB 1.00 1.00 1.00
02.01.04.03 EQUIPAM IENTO 0.00
02.01.04.04 EQUIPAMIENTO DE VIVEROS DE ALTA TECNOLOGIA GLB 1.00 1.00 1.00
03 M AYOR PROM OCION DEL CULTIVO DE PALTO
03.01 DIFUSIÓN
03.01.01 PUBLICIDAD TELEVISIVA spot 12.50 12.50 12.50
03.01.02 PUBLICIDAD RADIAL spot 14.00 14.00 14.00
03.02 CAPACITACION
03.02.01 FORMALIZACIÓN DE CAPACIDADES Y ORGANIZACION DE PRODUCTORES Evento 4.00 0.00 4.00

01 CARTEL DE OBRA GLB 1.00 1.00 1.00


01.01 ELABORACION DE EXPEDIENTE ANUAL EXP 1.00 1.00 1.00
02 M AYOR DISPONIBILIDAD DE PLANTONES DE PALTO
02.01 CONSTRUCCION DE VAT EN CCARASPAMPA - PAUSA- PAUCAR DE SARA
02.02 SARA
LOCAL ADM INISTRATIVO
02.02.01 ESTRUCTURA M OD
02.02.01.01 TRABAJOS PRELIM INARES
02.02.01.01.01 ALMACEN, OFICINA, GUARDIANIA m2 34.25 30.00 30.00
02.02.01.01.02 LIMPIEZA DE TERRENO MANUAL m2 182.50 130.00 130.00
02.02.01.01.03 TRAZO Y REPLANTEO PRELIMINAR m2 182.50 130.00 130.00
02.02.01.01.04 TRAZO Y REPLANTEO DURANTE EL PROCESO m2 182.50 130.00 130.00
02.02.01.02 M OVIM IENTO DE TIERRAS
02.02.01.02.01 CORTE SUPERFICIAL MANUAL E= 0.10 MT ZONA DE PISO INTERIOR m2 182.50 130.00 130.00
02.02.01.02.02 CORTE SUPERFICIAL MANUAL E= 0.05 MT EN VEREDAS m2 42.50 0.00
02.02.01.03 EXCAVACIONES
02.02.01.03.01 EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS m3 31.15 31.15 12.89 44.04
02.02.01.03.02 EXCAVACION MANUAL DE ZANJAS PARA SARDINELES DE VEREDAS m3 15.53 0.00
02.02.01.03.03 RELLENO COMPACTADO CON MATERIAL PROPIO m3 1.55 1.55 5.34 6.89
02.02.01.03.04 REFINE NIVELACION Y COMPACTACION CON PISON MANUAL m2 163.98 0.00
02.02.01.03.05 AFIRMADO DE 4" CON MATERIAL CLASIFICADO PARA PISOS INTERIORES Y m2 163.98 0.00
02.02.01.03.06 EXTERIORES
ELIMINACION DE MATERIAL EXCEDENTE CARGUI0 A MANO m3 128.91 72.21 72.21
02.02.01.04 OBRAS DE CONCRETO SIM PLE
02.02.01.04.01 VEREDA DE CONCRETO F'C=175 KG/CM2 ACABADO Y BRUÑADO m3 7.76 0.00 7.76
02.02.01.04.02 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 10.35 0.00 10.35
02.02.01.04.03 SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m2 2.16 2.16 2.16
02.02.01.04.04 CONCRETO CIMIENTO CORRIDO 1:10 +30% P.G. m3 17.62 17.62 6.98 24.60
02.02.01.04.05 CONCRETO PARA SOBRECIMIENTO DE 1:8 CEM-HOR 25% P.M. m3 4.45 4.45 0.63 5.08 -0.63
02.02.01.04.06 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS m2 49.40 47.24 47.24 2.16
02.02.01.04.07 FALSO PISO DE 4" DE CONCRETO 1:10 m2 106.38 0.00 106.38
02.02.01.05 OBRAS DE CONCRETO ARM ADO
02.02.01.05.01 ZAPATAS
02.02.01.05.01.01 CONCRETO PARA ZAPATAS F'C=210 KG/CM2 m3 10.80 10.80 10.80
02.02.01.05.01.02 ZAPATAS - ACERO FY=4200KG/CM2 kg 328.02 328.02 120.12 448.14
02.02.01.05.02 VIGAS DE CIM ENTACION
02.02.01.05.02.01 CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 m3 4.45 4.45 3.26 7.71
02.02.01.05.02.02 ENCOFRADO Y DESENCOFRADO VIGA DE CIMENTACION m2 49.40 61.68 61.68
02.02.01.05.02.03 ACERO EN VIGA DE CIMENTACION GRADO 60 kg 1,636.25 776.59 776.59
02.02.01.05.03 COLUM NAS
02.02.01.05.03.01 CONCRETO PARA COLUMNAS F'C=210 KG/CM2 m3 4.96 4.00 4.00
02.02.01.05.03.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 34.46 27.45 27.45
02.02.01.05.03.03 ACERO FY=4200 KG/CM2 EN COLUMNAS kg 880.50 880.50 147.58 1,028.08
02.02.01.05.04 VIGAS
02.02.01.05.04.01 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 15.85 0.00
02.02.01.05.04.02 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 144.69 0.00
02.02.01.05.04.03 ACERO FY=4200 KG/CM2 EN VIGAS kg 2,747.89 0.00
02.02.01.05.05 LOSAS ALIGERADAS
02.02.01.05.05.01 CONCRETO F'C=210 KG/CM2. PARA LOSAS ALIGERADAS m3 12.77 0.00 12.77
02.02.01.05.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS m2 75.32 0.00 75.32
02.02.01.05.05.03 ACERO FY=4200 KG/CM2 EN LOSA ALIGERADA kg 1,007.76 0.00 1,007.76
02.02.01.05.05.04 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO und 1,104.00 0.00 1,104.00
02.02.01.06 M UROS Y TABIQUES DE ALBAÑILERIA
02.02.01.06.01 MURO DE SOGA LADRILLO 18 HUECOS DE ARCILLA ASENTADO DE SOGA m2 82.81 82.81
02.02.01.06.02 MEZCLA
MURO DE1.5LADRILLO KK ARCILLA CABEZA M:1:5 E=1.5 CM m2 158.14 84.80 84.80 73.34
02.02.01.07 COBERTURA Y TECHO
02.02.01.07.01 COBERTURA CON TEJA DE ARCILLA m2 190.44 0.00 190.44
02.03 CERCO PERIM ETRICO
02.03.01 TRABAJOS PRELIM INARES
02.03.01.01 LIMPIEZA DE TERRENO MANUAL m2 172.00 172.00 2,158.11 2,330.11
02.03.01.02 TRAZO NIVELACIÓN Y REPLANTEO PRELIMINAR m2 172.00 172.00 242.08 414.08
02.03.02 M OVIM IENTO DE TIERRAS
02.03.02.01 EXCAVACION PARA CIMIENTOS HASTA 1.00 MT TERRENO NORMAL m3 63.00 42.82 42.82
02.03.02.02 EXCAVACION EN TERRENO SEMIROCOSO m3 41.06 41.06
02.03.02.02 EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS m3 8.23 8.23 21.00 29.23
02.03.02.03 EXCAVACION DE SARDINELES m3 7.52 0.00
02.03.02.04 RELLENO COMPACTADO CON MATERIAL PROPIO m3 10.97 10.97 8.02 18.99
02.03.02.05 ELIMINACION DE MATERIAL EXCEDENTE CARGUI0 A MANO m3 86.63 86.63 16.91 103.54
02.03.03 OBRAS DE CONCRETO SIM PLE
02.03.03.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 52.50 52.50 14.45 66.95
02.03.03.02 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS m2 120.00 120.00 37.97 157.97
02.03.03.03 CONCRETO SOBRECIMIENTO DE 1:8 CEM-HOR 25% P.M. ANCHO=0.25 MT m3 9.00 9.00 9.59 18.59
02.03.03.04 CONCRETO CIMIENTO CORRIDO 1:10 +30% P.G. m3 4.10 0.00
02.03.03.05 SARDINELES DE CONCRETO DE F'C=140 KG/CM2. m 45.25 0.00
02.03.03.06 ENCOFRADO Y DESENCOFRADO EN SARDINELES m2 45.25 0.00
02.03.04 OBRAS DE CONCRETO ARM ADO
02.03.04.01 CONCRETO EN ZAPATAS m3 21.96
02.03.04.01 ACERO FY=4200 KG/CM2 EN COLUMNAS kg 1,018.70 1,018.70 639.35 1,658.05
02.03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 155.24 21.20 21.20
02.03.04.03 CONCRETO F'C=175 KG/CM2. PARA COLUMNAS m3 10.81 1.30 1.30
02.03.04.04 ACERO FY=4200 KG/CM2 EN VIGAS kg 418.02 0.00
02.03.04.05 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 30.00 0.00
02.03.04.06 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 2.25 0.00
02.03.04.07 MALLA OLIMPICA CACADO INC. MARCO CON ANGULO DE 2" ML 40.80 0.00 40.80
02.03.05 M URO
02.03.05.01 MURO DE SOGA LADRILLO 18 HUECOS DE ARCILLA ASENTADO DE SOGA m2 297.00 196.09 196.09 100.91
02.04 MEZCLA
VARIOS1: 5
02.04.01 FLETE
02.04.01.01 FLETE TERRESTRE (AYACUCHO-PAUSA-PAUCAR DEL ZARA ZARA) GLB 1.00 0.00
02.04.02 SEGURIDAD EN OBRA
02.04.02.01 Equipos de protección al personal GLB 1.00 1.00 1.00
02.04.03 EQUIPAM IENTO
02.04.04 EQUIPAMIENTO DE VIVEROS DE ALTA TECNOLOGIA GLB 1.00 1.00 1.00
KIT DE HERRAMIENTAS GLB 1 1.00
TALA Y RETIRO DE ARBOLES und 12
DEMOLICION DE MURO TIPO TAPIAL M3 90.72
CORTE DE MATERIAL RENDIMEINTO 460M3/DIA M3 466
03 M AYOR PROM OCION DEL CULTIVO DE PALTO
03.01 DIFUSIÓN
03.01.01 PUBLICIDAD TELEVISIVA spot 12.50 0.00
03.01.02 PUBLICIDAD RADIAL spot 14.00 14.00 14.00
03.02 CAPACITACION
03.02.01 FORMALIZACIÓN DE CAPACIDADES Y ORGANIZACION DE PRODUCTORES Evento 4.00 1.00 1.00 3.00
FORMATO 02 LT
VALORIZACION PRINCIPAL DE META
PLIEGO : GOBIERNO REGIONAL DE AYACUCHO
UNIDAD EJECUTORA : DIRECCION REGIONAL AGRARIA AYACUCHO
COMPONENTE : MEJORAMIENTO DE LAS CAPACIDADES PRODUCTIVAS PARA EL MANEJO INTEGRAL
DE CULTIVO DE PALTO EN LAS 10 PROVINCIAS DE AYACUCHO
META 0
MODALIDAD DE EJECUCION : ADMINISTRACION DIRECTA
MONTO VALOR REFERENCIAL : S/. 784,070.00 NUEVOS SOLES

Programado Ejecutado Saldo


Part. Descripcion Unid. P.U.
Metrado Parcial S/. Metrado Parcial % Metrado

01 CARTEL DE OBRA GLB 2,354.76 1.00 2,354.76 1.00 2,354.76 0.35%


01.01 ELABORACION DE EXPEDIENTE ANUAL EXP 3,500.00 1.00 3,500.00 1.00 3,500.00 0.51%
02 MAYOR DISPONIBILIDAD DE PLANTONES DE PALTO
02.01 CONSTRUCCION DE VAT EN SANTA ANA-SAN PEDRO-LUCANAS
02.01.01 LOCAL ADMINISTRATIVO
02.01.01.01 ESTRUCTURA MOD
02.01.01.01.0 TRABAJOS PRELIMINARES
02.01.01.01.0 ALMACEN, OFICINA, GUARDIANIA m2 101.54 34.25 3,477.75 25.00 2,538.50 0.37%
02.01.01.01.0 LIMPIEZA DE TERRENO MANUAL m2 1.71 182.50 312.08 124.20 212.38 0.03%
02.01.01.01.0 TRAZO Y REPLANTEO PRELIMINAR m2 1.94 182.50 354.05 124.20 240.95 0.04%
02.01.01.01.0 TRAZO Y REPLANTEO DURANTE EL PROCESO m2 1.11 182.50 202.58 124.20 137.86 0.02%
02.01.01.01.0 MOVIMIENTO DE TIERRAS
02.01.01.01.0 CORTE SUPERFICIAL MANUAL E= 0.10 MT ZONA DE PISO INTERIOR m2 16.76 182.50 3,058.70 124.20 2,081.59 0.31%
02.01.01.01.0 CORTE SUPERFICIAL MANUAL E= 0.05 MT EN VEREDAS m2 12.58 42.50 534.65 0.00 0.00 0.00%
02.01.01.01.0 EXCAVACIONES
02.01.01.01.0 EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS m3 33.53 31.15 1,044.46 31.15 1,044.46 0.15%
02.01.01.01.0 EXCAVACION MANUAL DE ZANJAS PARA SARDINELES DE VEREDAS m3 33.53 15.53 520.72 15.53
02.01.01.01.0 RELLENO COMPACTADO CON MATERIAL PROPIO m3 52.22 1.55 80.94 1.55 80.94 0.01%
02.01.01.01.0 REFINE NIVELACION Y COMPACTACION CON PISON MANUAL m2 3.35 163.98 549.33 0.00 0.00 0.00%
02.01.01.01.0 AFIRMADO DE 4" CON MATERIAL CLASIFICADO PARA PISOS INTERIORES Y m2 14.93 163.98 2,448.22 0.00 0.00 0.00%
02.01.01.01.0 EXTERIORES
ELIMINACION DE MATERIAL EXCEDENTE CARGUI0 A MANO m3 52.12 128.91 6,718.79 61.81 3,221.54 0.47%
02.01.01.01.0 OBRAS DE CONCRETO SIMPLE
02.01.01.01.0 VEREDA DE CONCRETO F'C=175 KG/CM2 ACABADO Y BRUÑADO m3 414.08 7.76 3,213.26 7.76
02.01.01.01.0 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 28.56 10.35 295.60 10.35
02.01.01.01.0 SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m2 44.15 2.16 95.36 2.16 95.36 0.01% 0.00
02.01.01.01.0 CONCRETO CIMIENTO CORRIDO 1:10 +30% P.G. m3 212.77 17.62 3,749.01 17.62
02.01.01.01.0 CONCRETO PARA SOBRECIMIENTO DE 1:8 CEM-HOR 25% P.M. m3 264.28 4.45 1,176.05 4.45
02.01.01.01.0 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS m2 31.38 49.40 1,550.17 49.40
02.01.01.01.0 FALSO PISO DE 4" DE CONCRETO 1:10 m2 251.78 106.38 26,784.36 106.38
02.01.01.01.0 OBRAS DE CONCRETO ARMADO
02.01.01.01.0 ZAPATAS
02.01.01.01.0 CONCRETO PARA ZAPATAS F'C=210 KG/CM2 m3 455.02 10.80 4,914.22 10.80 4,914.22 0.72%
02.01.01.01.0 ZAPATAS - ACERO FY=4200KG/CM2 kg 4.75 328.02 1,558.10 328.02 1,558.10 0.23%
02.01.01.01.0 VIGAS DE CIMENTACION
02.01.01.01.0 CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 m3 455.02 4.45 2,024.84 4.45 2,024.84 0.30%
02.01.01.01.0 ENCOFRADO Y DESENCOFRADO VIGA DE CIMENTACION m2 39.16 49.40 1,934.50 26.60 1,041.66 0.15%
02.01.01.01.0 ACERO EN VIGA DE CIMENTACION GRADO 60 kg 4.75 1,636.25 7,772.19 627.02 2,978.35 0.44%
02.01.01.01.0 COLUMNAS
02.01.01.01.0 CONCRETO PARA COLUMNAS F'C=210 KG/CM2 m3 455.02 4.96 2,256.90 0.00 0.00 0.00%
02.01.01.01.0 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 40.65 34.46 1,400.80 0.00 0.00 0.00% 34.46
02.01.01.01.0 ACERO FY=4200 KG/CM2 EN COLUMNAS kg 4.82 880.50 4,244.01 862.35 4,156.53 0.61% 18.15
02.01.01.01.0 VIGAS
02.01.01.01.0 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 455.01 15.85 7,211.91 0.00 0.00 0.00%
02.01.01.01.0 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 42.27 144.69 6,116.05 0.00 0.00 0.00%
02.01.01.01.0 ACERO FY=4200 KG/CM2 EN VIGAS kg 4.52 2,747.89 12,420.46 0.00 0.00 0.00%
02.01.01.01.0 LOSAS ALIGERADAS
02.01.01.01.0 CONCRETO F'C=210 KG/CM2. PARA LOSAS ALIGERADAS m3 455.01 12.77 5,810.48 12.77
02.01.01.01.0 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS m2 38.80 75.32 2,922.42 75.32

02.01.01.01.0 ACERO FY=4200 KG/CM2 EN LOSA ALIGERADA kg 4.61 1,007.66 4,645.31 1,007.66

02.01.01.01.0 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO und 4.56 1,104.00 5,034.24
1,104.00

02.01.01.01.0 MUROS Y TABIQUES DE ALBAÑILERIA


02.01.01.01.0 MURO DE LADRILLO KK ARCILLA CABEZA M:1:5 E=1.5 CM m2 123.54 158.14 19,536.62 6.88 849.96 0.12% 151.26
02.01.01.01.0 COBERTURA Y TECHO
02.01.01.01.0 COBERTURA CON TEJA DE ARCILLA m2 54.94 190.44 10,462.77 190.44
02.01.02 TANQUE SEPTICO
02.01.02.01 OBRAS PRELIMINARES
02.01.02.01.0 LIMPIEZA DE TERRENO MANUAL m2 1.71 9.13 15.61 9.13
02.01.02.01.0 TRAZO Y REPLANTEO m2 1.04 9.13 9.50 9.13
02.01.02.02 MOVIMIENTO DE TIERRAS
02.01.02.02.0 EXCAVACION EN MATERIAL SUELTO m3 33.53 16.43 550.90 0.00 0.00 0.00%
02.01.02.02.0 REFINE Y NIVELACION EN TERRENO m2 0.83 9.13 7.58 0.00 0.00 0.00%
02.01.02.02.0 ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO m3 16.76 20.53 344.08
0.00 0.00 0.00%
CARRETILLA)
02.01.02.03 OBRAS DE CONCRETO
02.01.02.03.0 SOLADO E=4" m2 25.50 9.13 232.82 0.00 0.00 0.00%
02.01.02.03.0 ACERO FY= 4200 KG/CM2 kg 4.75 155.55 738.86 0.00 0.00 0.00%
02.01.02.03.0 ENCOFRADO Y DESENCOFRADO NORMAL m2 27.76 24.30 674.57 0.00 0.00 0.00%
02.01.02.03.0 CONCRETO PARA F'C=175 KG/CM2 m3 399.08 4.00 1,596.32 0.00 0.00 0.00%
02.01.02.04 REVOQUES Y ENLUCIDOS
02.01.02.04.0 TARRAJEO CON IMPERMEABILIZANTE DE MUROS INTERIOR m2 34.22 24.10 824.70 24.10
02.01.02.05 CAJA DE REGISTRO
02.01.02.05.0 EXCAVACION EN MATERIAL SUELTO m3 33.53 4.61 154.57 4.61
02.01.02.05.0 REFINE Y NIVELACION EN TERRENO m2 0.83 1.92 1.59 1.92
02.01.02.05.0 ACERO FY= 4200 KG/CM2 kg 4.75 4.48 21.28 4.48
02.01.02.05.0 ENCOFRADO Y DESENCOFRADO NORMAL m2 27.76 1.92 53.30 1.92
02.01.02.05.0 CONCRETO F'C= 140 KG/CM2 m3 309.54 0.51 157.87 0.51
02.01.02.06 ZANJAS DE PERCOLACIÓN
02.01.02.06.0 TRAZO Y REPLANTEO m2 1.04 18.00 18.72 18.00
02.01.02.06.0 EXCAVACION EN MATERIAL SUELTO m3 33.53 16.20 543.19 16.20
02.01.02.06.0 REFINE Y NIVELACION EN TERRENO m2 0.83 18.00 14.94 18.00
02.01.02.06.0 CAMA DE APOYO CON PIEDRA ZARANDEADA H=10CM m2 40.44 18.00 727.92 18.00
02.01.02.06.0 ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO m3 16.76 15.75 263.97
15.75
CARRETILLA)
02.01.02.06.0 TUBERIA DE PVC SAL DE 3" PERFORADA" m 7.27 20.00 145.40 20.00
02.01.02.06.0 TUBERIA PVC SAL 4" m 7.66 30.00 229.80 30.00
02.01.02.06.0 RELLENO CON MATERIAL DE GRAVA SELECCIONADA m3 46.85 10.80 505.98 10.80
02.01.02.07 POZO PERCOLADOR
02.01.02.07.0 TRAZO Y REPLANTEO m2 1.04 7.60 7.90 7.60
02.01.02.07.0 EXCAVACION EN MATERIAL SUELTO m3 33.53 29.26 981.09 29.26
02.01.02.07.0 REFINE Y NIVELACION EN TERRENO m2 0.83 7.60 6.31 7.60
02.01.02.07.0 ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO m3 16.76 73.15 1,225.99
73.15
CARRETILLA)
02.01.02.07.0 RELLENO CON MATERIAL DE GRAVA SELECCIONADA m3 46.85 5.08 238.00 5.08
02.01.02.07.0 ENCOFRADO Y DESENCOFRADO NORMAL m2 27.76 5.28 146.57 5.28
02.01.02.07.0 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 212.27 1.92 407.56
1.92

02.01.02.07.0 ACERO FY= 4200 KG/CM2 kg 4.75 50.21 238.50 50.21


02.01.02.07.0 ENCOFRADO Y DESENCOFRADO DE LOSA m2 15.11 5.66 85.52 5.66
02.01.02.07.1 CONCRETO PARA F'C=175 KG/CM2 m3 399.08 1.19 474.91 1.19
02.01.02.07.1 MURO DE LADRILLO CORRIENTE-CABEZA m2 74.64 33.66 2,512.38 33.66
02.01.02.07.1 TUBERIA DE VENTILACION F° G° Ø 2" und 24.32 4.00 97.28 4.00
02.01.03 CERCO PERIMETRICO
02.01.03.01 TRABAJOS PRELIMINARES
02.01.03.01.0 LIMPIEZA DE TERRENO MANUAL m2 3.09 172.00 531.48 172.00 531.48 0.08%
02.01.03.01.0 TRAZO NIVELACIÓN Y REPLANTEO PRELIMINAR m2 1.99 172.00 342.28 172.00 342.28 0.05% 0.00
02.01.03.02 MOVIMIENTO DE TIERRAS
02.01.03.02.0 EXCAVACION PARA CIMIENTOS HASTA 1.00 MT TERRENO NORMAL m3 33.53 63.00 2,112.39 20.84 698.77 0.10%
02.01.03.02.0 EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS m3 33.53 8.23 275.95 8.23 275.95 0.04%
02.01.03.02.0 EXCAVACION DE SARDINELES m3 20.58 7.52 154.76 0.00 0.00 0.00%
02.01.03.02.0 RELLENO COMPACTADO CON MATERIAL PROPIO m3 52.22 10.97 572.85 10.97 572.85 0.08%
02.01.03.02.0 ELIMINACION DE MATERIAL EXCEDENTE CARGUI0 A MANO m3 52.12 86.63 4,515.16 25.99 1,354.60 0.20%
02.01.03.03 OBRAS DE CONCRETO SIMPLE
02.01.03.03.0 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 212.27 52.50 11,144.18
44.57 9,460.87 1.39%

02.01.03.03.0 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS m2 31.38 120.00 3,765.60 120.00 3,765.60 0.55%
02.01.03.03.0 CONCRETO SOBRECIMIENTO DE 1:8 CEM-HOR 25% P.M. ANCHO=0.25 MT m3 264.28 9.00 2,378.52
9.00 2,378.52 0.35%

02.01.03.03.0 CONCRETO CIMIENTO CORRIDO 1:10 +30% P.G. m3 212.77 4.10 872.36 0.00 0.00 0.00%
02.01.03.03.0 SARDINELES DE CONCRETO DE F'C=140 KG/CM2. m 9.75 45.25 441.19 0.00 0.00 0.00%
02.01.03.03.0 ENCOFRADO Y DESENCOFRADO EN SARDINELES m2 29.30 45.25 1,325.83 0.00 0.00 0.00%
02.01.03.04 OBRAS DE CONCRETO ARMADO
02.01.03.04.0 ACERO FY=4200 KG/CM2 EN COLUMNAS kg 4.82 1,018.70 4,910.13 1,018.70 4,910.13 0.72%
02.01.03.04.0 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 38.02 155.24 5,902.22 81.20 3,087.22 0.45%
02.01.03.04.0 CONCRETO F'C=175 KG/CM2. PARA COLUMNAS m3 414.08 10.81 4,476.20 5.08 2,103.53 0.31%
02.01.03.04.0 ACERO FY=4200 KG/CM2 EN VIGAS kg 4.82 418.02 2,014.86 0.00 0.00 0.00%
02.01.03.04.0 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 40.65 30.00 1,219.50 0.00 0.00 0.00%
02.01.03.04.0 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 436.39 2.25 981.88 0.00 0.00 0.00%
02.01.03.04.0 MALLA OLIMPICA CACADO INC. MARCO CON ANGULO DE 2" ML 76.57 40.80 3,124.06 40.80
02.01.03.05 MURO
02.01.03.05.0 MURO DE SOGA LADRILLO 18 HUECOS DE ARCILLA ASENTADO DE SOGA m2 84.73 297.00 25,164.81
238.15 20,178.45 2.96% 58.85
MEZCLA 1: 5
02.01.04 VARIOS
02.01.04.01 FLETE
02.01.04.01.0 FLETE TERRESTRE (AYACUCHO-SAN PEDRO-LUCANAS) GLB 30,940.30 1.00 30,940.30 0.00 0.00 0.00%
02.01.04.02 SEGURIDAD EN OBRA
02.01.04.02.0 Equipos de protección al personal GLB 2,035.00 1.00 2,035.00 1.00 2,035.00 0.30%
02.01.04.03 EQUIPAMIENTO
02.01.04.04 EQUIPAMIENTO DE VIVEROS DE ALTA TECNOLOGIA GLB 59,430.00 1.00 59,430.00 1.00 59,430.00 8.72%
03 MAYOR PROMOCION DEL CULTIVO DE PALTO
03.01 DIFUSIÓN
03.01.01 PUBLICIDAD TELEVISIVA spot 64.00 12.50 800.00 12.50 800.00 0.12%
03.01.02 PUBLICIDAD RADIAL spot 44.00 14.00 616.00 14.00 616.00 0.09%
03.02 CAPACITACION
03.02.01 FORMALIZACIÓN DE CAPACIDADES Y ORGANIZACION DE PRODUCTORES Evento 500.00 4.00 2,000.00
4.00

01 CARTEL DE OBRA GLB 2,354.76 1.00 2,354.76 1.00 2,354.76 0.35%


01.01 ELABORACION DE EXPEDIENTE ANUAL EXP 3,500.00 1.00 3,500.00 1.00 3,500.00 0.51%
02 MAYOR DISPONIBILIDAD DE PLANTONES DE PALTO
02.01 CONSTRUCCION DE VAT EN CCARASPAMPA - PAUSA- PAUCAR DE
SARA SARA
02.02 LOCAL ADMINISTRATIVO
02.02.01 ESTRUCTURA MOD
02.02.01.01 TRABAJOS PRELIMINARES
02.02.01.01.0 ALMACEN, OFICINA, GUARDIANIA m2 101.54 34.25 3,477.75 30.00 3,046.20 0.45%
02.02.01.01.0 LIMPIEZA DE TERRENO MANUAL m2 1.71 182.50 312.08 130.00 222.30 0.03%
02.02.01.01.0 TRAZO Y REPLANTEO PRELIMINAR m2 2.39 182.50 436.18 130.00 310.70 0.05%
02.02.01.01.0 TRAZO Y REPLANTEO DURANTE EL PROCESO m2 1.20 182.50 219.00 130.00 156.00 0.02%
02.02.01.02 MOVIMIENTO DE TIERRAS
02.02.01.02.0 CORTE SUPERFICIAL MANUAL E= 0.10 MT ZONA DE PISO INTERIOR m2 16.76 182.50 3,058.70 130.00 2,178.80 0.32%
02.02.01.02.0 CORTE SUPERFICIAL MANUAL E= 0.05 MT EN VEREDAS m2 12.58 42.50 534.65 0.00 0.00 0.00%
02.02.01.03 EXCAVACIONES
02.02.01.03.0 EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS m3 33.53 31.15 1,044.46 31.15 1,044.46 0.15%
02.02.01.03.0 EXCAVACION MANUAL DE ZANJAS PARA SARDINELES DE VEREDAS m3 33.53 15.53 520.72 0.00 0.00 0.00%
02.02.01.03.0 RELLENO COMPACTADO CON MATERIAL PROPIO m3 21.29 1.55 33.00 1.55 33.00 0.00%
02.02.01.03.0 REFINE NIVELACION Y COMPACTACION CON PISON MANUAL m2 3.35 163.98 549.33 0.00 0.00 0.00%
02.02.01.03.0 AFIRMADO DE 4" CON MATERIAL CLASIFICADO PARA PISOS INTERIORES Y m2 14.93 163.98 2,448.22 0.00 0.00 0.00%
02.02.01.03.0 EXTERIORES
ELIMINACION DE MATERIAL EXCEDENTE CARGUI0 A MANO m3 52.12 128.91 6,718.79 72.21 3,763.59 0.55%
02.02.01.04 OBRAS DE CONCRETO SIMPLE
02.02.01.04.0 VEREDA DE CONCRETO F'C=175 KG/CM2 ACABADO Y BRUÑADO m3 439.49 7.76 3,410.44 7.76
02.02.01.04.0 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 28.56 10.35 295.60 10.35
02.02.01.04.0 SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m2 43.07 2.16 93.03 2.16 93.03 0.01%
02.02.01.04.0 CONCRETO CIMIENTO CORRIDO 1:10 +30% P.G. m3 199.32 17.62 3,512.02 17.62 3,512.02 0.52%
02.02.01.04.0 CONCRETO PARA SOBRECIMIENTO DE 1:8 CEM-HOR 25% P.M. m3 258.69 4.45 1,151.17 4.45
02.02.01.04.0 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS m2 31.38 49.40 1,550.17 49.40
02.02.01.04.0 FALSO PISO DE 4" DE CONCRETO 1:10 m2 168.07 106.38 17,879.29 106.38
02.02.01.05 OBRAS DE CONCRETO ARMADO
02.02.01.05.0 ZAPATAS
02.02.01.05.0 CONCRETO PARA ZAPATAS F'C=210 KG/CM2 m3 485.67 10.80 5,245.24 10.80 5,245.24 0.77%
02.02.01.05.0 ZAPATAS - ACERO FY=4200KG/CM2 kg 4.75 328.02 1,558.10 328.02 1,558.10 0.23%
02.02.01.05.0 VIGAS DE CIMENTACION
02.02.01.05.0 CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 m3 485.67 4.45 2,161.23 4.45 2,161.23 0.32%
02.02.01.05.0 ENCOFRADO Y DESENCOFRADO VIGA DE CIMENTACION m2 39.16 49.40 1,934.50 61.68 2,415.39 0.35%
02.02.01.05.0 ACERO EN VIGA DE CIMENTACION GRADO 60 kg 4.75 1,636.25 7,772.19 776.59 3,688.80 0.54%
02.02.01.05.0 COLUMNAS
02.02.01.05.0 CONCRETO PARA COLUMNAS F'C=210 KG/CM2 m3 485.67 4.96 2,408.92 4.00 1,942.68 0.28%
02.02.01.05.0 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 40.65 34.46 1,400.80 27.45 1,115.84 0.16%
02.02.01.05.0 ACERO FY=4200 KG/CM2 EN COLUMNAS kg 4.75 880.50 4,182.38 880.50 4,182.38 0.61%
02.02.01.05.0 VIGAS
02.02.01.05.0 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 485.66 15.85 7,697.71 0.00 0.00 0.00%
02.02.01.05.0 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 42.27 144.69 6,116.05 0.00 0.00 0.00%
02.02.01.05.0 ACERO FY=4200 KG/CM2 EN VIGAS kg 4.52 2,747.89 12,420.46 0.00 0.00 0.00%
02.02.01.05.0 LOSAS ALIGERADAS
02.02.01.05.0 CONCRETO F'C=210 KG/CM2. PARA LOSAS ALIGERADAS m3 485.66 12.77 6,201.88 12.77
02.02.01.05.0 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS m2 38.80 75.32 2,922.42 75.32
02.02.01.05.0 ACERO FY=4200 KG/CM2 EN LOSA ALIGERADA kg 4.61 1,007.76 4,645.77 1,007.76
02.02.01.05.0 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO und 5.92 1,104.00 6,535.68
1,104.00

02.02.01.06 MUROS Y TABIQUES DE ALBAÑILERIA


02.02.01.06.0 MURO DE LADRILLO KK ARCILLA CABEZA M:1:5 E=1.5 CM m2 151.74 158.14 23,996.16 158.14
02.02.01.07 COBERTURA Y TECHO
02.02.01.07.0 COBERTURA CON TEJA DE ARCILLA m2 54.92 190.44 10,458.96 190.44
02.03 CERCO PERIMETRICO
02.03.01 TRABAJOS PRELIMINARES
02.03.01.01 LIMPIEZA DE TERRENO MANUAL m2 3.09 172.00 531.48 172.00 531.48 0.08%
02.03.01.02 TRAZO NIVELACIÓN Y REPLANTEO PRELIMINAR m2 2.04 172.00 350.88 172.00 350.88 0.05%
02.03.02 MOVIMIENTO DE TIERRAS
02.03.02.01 EXCAVACION PARA CIMIENTOS HASTA 1.00 MT TERRENO NORMAL m3 33.53 63.00 2,112.39 42.82 1,435.75 0.21%
02.03.02.02 EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS m3 33.53 8.23 275.95 8.23 275.95 0.04%
02.03.02.03 EXCAVACION DE SARDINELES m3 20.58 7.52 154.76 0.00 0.00 0.00%
02.03.02.04 RELLENO COMPACTADO CON MATERIAL PROPIO m3 21.29 10.97 233.55 10.97 233.55 0.03%
02.03.02.05 ELIMINACION DE MATERIAL EXCEDENTE CARGUI0 A MANO m3 52.12 86.63 4,515.16 86.63 4,515.16 0.66%
02.03.03 OBRAS DE CONCRETO SIMPLE
02.03.03.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 198.82 52.50 10,438.05
52.50 10,438.05 1.53%

02.03.03.02 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS m2 31.38 120.00 3,765.60 120.00 3,765.60 0.55%
02.03.03.03 CONCRETO SOBRECIMIENTO DE 1:8 CEM-HOR 25% P.M. ANCHO=0.25 MT m3 258.69 9.00 2,328.21
9.00 2,328.21 0.34%

02.03.03.04 CONCRETO CIMIENTO CORRIDO 1:10 +30% P.G. m3 199.32 4.10 817.21 0.00 0.00 0.00%
02.03.03.05 SARDINELES DE CONCRETO DE F'C=140 KG/CM2. m 9.75 45.25 441.19 0.00 0.00 0.00%
02.03.03.06 ENCOFRADO Y DESENCOFRADO EN SARDINELES m2 29.30 45.25 1,325.83 0.00 0.00 0.00%
02.03.04 OBRAS DE CONCRETO ARMADO
02.03.04.01 ACERO FY=4200 KG/CM2 EN COLUMNAS kg 4.75 1,018.70 4,838.83 1,018.70 4,838.83 0.71%
02.03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 38.02 155.24 5,902.22 21.20 806.02 0.12%
02.03.04.03 CONCRETO F'C=175 KG/CM2. PARA COLUMNAS m3 439.49 10.81 4,750.89 1.30 571.34 0.08%
02.03.04.04 ACERO FY=4200 KG/CM2 EN VIGAS kg 4.75 418.02 1,985.60 0.00 0.00 0.00%
02.03.04.05 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 40.65 30.00 1,219.50 0.00 0.00 0.00%
02.03.04.06 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 467.85 2.25 1,052.66 0.00 0.00 0.00%
02.03.04.07 MALLA OLIMPICA CACADO INC. MARCO CON ANGULO DE 2" ML 76.57 40.80 3,124.06 40.80
02.03.05 MURO
02.03.05.01 MURO DE SOGA LADRILLO 18 HUECOS DE ARCILLA ASENTADO DE SOGA m2 100.02 297.00 29,705.94 196.09 19,612.92 2.88% 100.91
02.04 MEZCLA
VARIOS 1: 5
02.04.01 FLETE
02.04.01.01 FLETE TERRESTRE (AYACUCHO-PAUSA-PAUCAR DEL ZARA ZARA) GLB 28,201.58 1.00 28,201.58 0.00 0.00 0.00%
02.04.02 SEGURIDAD EN OBRA
02.04.02.01 Equipos de protección al personal GLB 2,035.00 1.00 2,035.00 1.00 2,035.00 0.30%
02.04.03 EQUIPAMIENTO
02.04.04 EQUIPAMIENTO DE VIVEROS DE ALTA TECNOLOGIA GLB 58,930.00 1.00 58,930.00 1.00 58,930.00 8.64%
03 MAYOR PROMOCION DEL CULTIVO DE PALTO
03.01 DIFUSIÓN
03.01.01 PUBLICIDAD TELEVISIVA spot 64.00 12.50 800.00 0.00 0.00 0.00%
03.01.02 PUBLICIDAD RADIAL spot 44.00 14.00 616.00 14.00 616.00 0.09%
03.02 CAPACITACION
03.02.01 FORMALIZACIÓN DE CAPACIDADES Y ORGANIZACION DE PRODUCTORES Evento 500.00 4.00 2,000.00
1.00 500.00 0.07% 3.00

681,799.92 299,882.48 43.98%


MANEJO INTEGRAL

Saldo Obsercaciones
Parcial S/, %

520.72 0.08%
3,213.26 0.47%
295.60 0.04%
0.00 0.00%
3,749.01 0.55%
1,176.05 0.17%
1,550.17 0.23%
26,784.36 3.93%

1,400.80 0.21%
87.48 0.01%

5,810.48 0.85%

2,922.42 0.43%

4,645.31 0.68%

5,034.24 0.74%

18,686.66 2.74%

10,462.77 1.53%
15.61 0.00%
9.50 0.00%

824.70 0.12%

154.57 0.02%
1.59 0.00%
21.28 0.00%
53.30 0.01%
157.87 0.02%

18.72 0.00%
543.19 0.08%
14.94 0.00%
727.92 0.11%

263.97 0.04%

145.40 0.02%
229.80 0.03%
505.98 0.07%

7.90 0.00%
981.09 0.14%
6.31 0.00%
1,225.99 0.18%

238.00 0.03%
146.57 0.02%

407.56 0.06%

238.50 0.03%
85.52 0.01%
474.91 0.07%
2,512.38 0.37%
97.28 0.01%

0.00 0.00%
3,124.06 0.46%

4,986.36 0.73%

2,000.00 0.29%
3,410.44 0.50%
295.60 0.04%

1,151.17 0.17%
1,550.17 0.23%
17,879.29 2.62%

6,201.88 0.91%
2,922.42 0.43%
4,645.77 0.68%
6,535.68 0.96%

23,996.16 3.52%

10,458.96 1.53%

3,124.06 0.46%

10,093.02 1.48%
1,500.00 0.22%

200,324.70 29.38%
FORMATO 03-A LT
VALORIZACION FINAL DE MAYORES METRADOS

PLIEGO : GOBIERNO REGIONAL DE AYACUCHO


UNIDAD EJECUTORA : DIRECCION REGIONAL AGRARIA AYACUCHO
COMPONENTE : MEJORAMIENTO DE LAS CAPACIDADES PRODUCTIVAS PARA EL MANEJO INTEGRAL DE CULTIVO
DE PALTO EN LAS 10 PROVINCIAS DE AYACUCHO
META 0
MODALIDAD DE EJECUCION : ADMINISTRACION DIRECTA
MONTO VALOR REFERENCIAL : S/. 784,070.00 NUEVOS SOLES
AÑO FISCAL : 2016
Programado Ejecutado
Part. Descripcion Unid. P.U.
Metrado Parcial S/. Metrado Parcial %
CONSTRUCCION DE VAT EN SANTA ANA-SAN PEDRO-LUCANAS
02.01.01. EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS m3 33.53 31.15 1,044.46 99.84 3,347.64 320.51%
02.01.01. RELLENO COMPACTADO CON MATERIAL PROPIO m3 52.22 1.55 80.94 69.33 3,620.41 4472.90%
02.01.01. SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m2 44.15 2.16 95.36 8.64 381.46 400.00%
02.01.01. CONCRETO PARA ZAPATAS F'C=210 KG/CM2 m3 455.02 10.80 4,914.22 21.60 9,828.43 200.00%
02.01.01. ZAPATAS - ACERO FY=4200KG/CM2 kg 4.75 328.02 1,558.10 448.14 2,128.67 136.62%
02.01.01. CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 m3 455.02 4.45 2,024.84 6.65 3,025.88 149.44%
02.01.03. LIMPIEZA DE TERRENO MANUAL m2 3.09 172.00 531.48 2,375.80 7,341.22 1381.28%
02.01.03. TRAZO NIVELACIÓN Y REPLANTEO PRELIMINAR m2 1.99 172.00 342.28 309.30 615.51 179.83%
02.01.03. EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS m3 33.53 8.23 275.95 17.42 584.09 211.66%
02.01.03. RELLENO COMPACTADO CON MATERIAL PROPIO m3 52.22 10.97 572.85 14.64 764.50 133.45%
02.01.03. ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS m2 31.38 120.00 3,765.60 129.90 4,076.26 108.25%
02.01.03. CONCRETO SOBRECIMIENTO DE 1:8 CEM-HOR 25% P.M. m3 264.28 9.00 2,378.52 16.89 4,463.69 187.67%
02.01.03. ANCHO=0.25 MT KG/CM2 EN COLUMNAS
ACERO FY=4200 kg 4.82 1,018.70 4,910.13 1,062.03 5,118.98 104.25%

CONSTRUCCION DE VAT EN CCARASPAMPA - PAUSA- PAUCAR DE SARA SARA

02.02.01. EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS m3 33.53 31.15 1,044.46 44.04 1,476.66 141.38%
02.02.01. RELLENO COMPACTADO CON MATERIAL PROPIO m3 21.29 1.55 33.00 6.89 146.69 444.52%
02.02.01. CONCRETO CIMIENTO CORRIDO 1:10 +30% P.G. m3 199.32 17.62 3,512.02 24.60 4,903.27 139.61%
02.02.01. ZAPATAS - ACERO FY=4200KG/CM2 KG. 4.75 328.02 1,558.10 448.14 2,128.67 136.62%
02.02.01. CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 m3 485.67 4.45 2,161.23 7.71 3,744.52 173.26%
02.02.01. ENCOFRADO Y DESENCOFRADO VIGA DE CIMENTACION m2 39.16 49.40 1,934.50 61.68 2,415.39 124.86%
02.02.01. ACERO FY=4200 KG/CM2 EN COLUMNAS KG. 4.75 880.50 4,182.38 1,028.08 4,883.38 116.76%
02.03.01. LIMPIEZA DE TERRENO MANUAL m2 3.09 172.00 531.48 2,330.11 7,200.04 1354.72%
02.03.01. TRAZO NIVELACIÓN Y REPLANTEO PRELIMINAR m2 2.04 172.00 350.88 414.08 844.72 240.74%
02.03.02. EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS m3 33.53 8.23 275.95 29.23 980.08 355.16%
02.03.02. RELLENO COMPACTADO CON MATERIAL PROPIO m3 21.29 10.97 233.55 18.99 404.30 173.11%
02.03.02. ELIMINACION DE MATERIAL EXCEDENTE CARGUI0 A MANO m3 52.12 86.63 4,515.16 103.54 5,396.50 119.52%
02.03.03. CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% m3 198.82 52.50 10,438.05 66.95 13,311.00 127.52%
02.03.03. PIEDRA
ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS m2 31.38 120.00 3,765.60 157.97 4,957.10 131.64%
02.03.03. CONCRETO SOBRECIMIENTO DE 1:8 CEM-HOR 25% P.M. m3 258.69 9.00 2,328.21 18.59 4,809.05 206.56%
02.03.04. ANCHO=0.25 MT KG/CM2 EN COLUMNAS
ACERO FY=4200 kg 4.75 1,018.70 4,838.83 1,658.05 7,875.74 162.76%

1 COSTO DIRECTO 65,477.10


Porcentaje de Avance (%)
2 GASTOS GENERALES (%)
3 SUB TOTAL (1) + (2)
4 FACTOR DE REAJUSTE K-1
5 COSTO TOTAL VALORIZADO (3) + (4)

* Los precios son los aprobados por el Supervisor y/o pactados.

___________________ ___________________ _______________________


Responsable de Meta Supervisor de Meta Director de Proyectos Agrar
Firma y Sello Firma y Sello
FORMATO 03- B LT
VALORIZACION FINAL DE METAS ADICIONALES

PLIEGO :
UNIDAD EJECUTORA :
COMPONENTE :
META :
MODALIDAD DE EJECUCION :
MONTO VALOR REFERENCIAL :
AÑO FISCAL :

Programado Ejecutado
Part. Descripcion Unid. P.U.
Metrado Parcial S/. Metrado Parcial %

1 COSTO DIRECTO
Porcentaje de Avance (%)
2 GASTOS GENERALES (%)
3 SUB TOTAL (1) + (2)
4 FACTOR DE REAJUSTE K-1
5 COSTO TOTAL VALORIZADO (3) + (4)
*En el caso de metas adicionales no existe metrado programado.

___________________ ___________________ _______________________


Responsable de Meta Supervisor de Meta Director de Proyectos Agrar
Firma y Sello Firma y Sello
JO INTEGRAL DE CULTIVO

Obsercaciones
_______________________
Director de Proyectos Agrar
Obsercaciones

_______________________
Director de Proyectos Agrar
FORMATO Nº 04 LT
RESUMEN TOTAL DE VALORIZACION DE META

PLIEGO : GOBIERNO REGIONAL DE AYACUCHO


UNIDAD EJECUTORA : DIRECCION REGIONAL AGRARIA AYACUCHO
COMPONENTE : MEJORAMIENTO DE LAS CAPACIDADES PRODUCTIVAS PARA EL MANEJO INTEGRAL DE CULTIVO DE PALTO EN LAS 10 PROVINCIAS
DE AYACUCHO
OBRA/META 0
MODADLIDAD DE EJECUCION : ADMINISTRACION DIRECTA
MONTO VALOR REFERENCIAL : S/. 784,070.00 NUEVOS SOLES

PROGRAMADO EJECUTADO
DEDUCTIVO DE
PARTIDA
METRADO COSTO(S/.) VALORIZACION PRINCIPAL MAYORES METRADOS METAS ADICIONALES TOTAL VALORIZADO METAS

CODIGO DESCRIPCION UNID CANTIDAD P. UNIT. P. PARCIAL METRADO MONTO METRADO MONTO METRADO MONTO METRADO MONTO METRADO MONTO
5,854.76
01 CARTEL DE OBRA GLB 1.00 2,354.76 2,354.76 1.00 2,354.76 1.00 2,354.76 0.00 0.00
01.01 ELABORACION DE EXPEDIENTE ANUAL EXP 1.00 3,500.00 3,500.00 1.00 3,500.00 1.00 3,500.00 0.00 0.00
02 M AYOR DISPONIBILIDAD DE PLANTONES DE PALTO 156,431.87 39,791.79
02.01 CONSTRUCCION DE VAT EN SANTA ANA-SAN PEDRO-LUCANAS
02.01.01 LOCAL ADM INISTRATIVO
02.01.01.01 ESTRUCTURA M OD
02.01.01.01. TRABAJOS PRELIM INARES
02.01.01.01. ALMACEN, OFICINA, GUARDIANIA m2 34.25 101.54 3,477.75 25.00 2,538.50 25.00 2,538.50 0.00 0.00
02.01.01.01. LIMPIEZA DE TERRENO MANUAL m2 182.50 1.71 312.08 124.20 212.38 124.20 212.38 0.00 0.00
02.01.01.01. TRAZO Y REPLANTEO PRELIMINAR m2 182.50 1.94 354.05 124.20 240.95 124.20 240.95 0.00 0.00
02.01.01.01. TRAZO Y REPLANTEO DURANTE EL PROCESO m2 182.50 1.11 202.58 124.20 137.86 124.20 137.86 0.00 0.00
02.01.01.01. M OVIM IENTO DE TIERRAS
02.01.01.01. CORTE SUPERFICIAL MANUAL E= 0.10 MT ZONA DE PISO INTERIOR m2 182.50 16.76 3,058.70 124.20 2,081.59 124.20 2,081.59 0.00 0.00
02.01.01.01. CORTE SUPERFICIAL MANUAL E= 0.05 MT EN VEREDAS m2 42.50 12.58 534.65 0.00 0.00 0.00 0.00 0.00 0.00
02.01.01.01. EXCAVACIONES
02.01.01.01. EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS m3 31.15 33.53 1,044.46 31.15 1,044.46 68.69 2,303.18 99.84 3,347.64 0.00 0.00
02.01.01.01. EXCAVACION MANUAL DE ZANJAS PARA SARDINELES DE VEREDAS m3 15.53 33.53 520.72 0.00 0.00 0.00 0.00 15.53 520.72
02.01.01.01. RELLENO COMPACTADO CON MATERIAL PROPIO m3 1.55 52.22 80.94 1.55 80.94 67.78 3,539.47 69.33 3,620.41 0.00 0.00
02.01.01.01. REFINE NIVELACION Y COMPACTACION CON PISON MANUAL m2 163.98 3.35 549.33 0.00 0.00 0.00 0.00 0.00 0.00
02.01.01.01. AFIRMADO DE 4" CON MATERIAL CLASIFICADO PARA PISOS INTERIORES Y EXTERIORES m2 163.98 14.93 2,448.22
0.00 0.00 0.00 0.00 0.00 0.00

02.01.01.01. ELIMINACION DE MATERIAL EXCEDENTE CARGUI0 A MANO m3 128.91 52.12 6,718.79 61.81 3,221.54 61.81 3,221.54 0.00 0.00
02.01.01.01. OBRAS DE CONCRETO SIM PLE
02.01.01.01. VEREDA DE CONCRETO F'C=175 KG/CM2 ACABADO Y BRUÑADO m3 7.76 414.08 3,213.26 0.00 0.00 0.00 0.00 7.76 3,213.26
02.01.01.01. ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 10.35 28.56 295.60 0.00 0.00 0.00 0.00 10.35 295.60
02.01.01.01. SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m2 2.16 44.15 95.36 2.16 95.36 6.48 286.09 8.64 381.46 -6.48 -286.09
02.01.01.01. CONCRETO CIMIENTO CORRIDO 1:10 +30% P.G. m3 17.62 212.77 3,749.01 0.00 0.00 0.00 0.00 -29.33 -6,240.54
02.01.01.01. CONCRETO PARA SOBRECIMIENTO DE 1:8 CEM-HOR 25% P.M. m3 4.45 264.28 1,176.05 0.00 0.00 0.00 0.00 -2.54 -671.27
02.01.01.01. ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS m2 49.40 31.38 1,550.17 0.00 0.00 0.00 0.00 49.40 1,550.17
02.01.01.01. FALSO PISO DE 4" DE CONCRETO 1:10 m2 106.38 251.78 26,784.36 0.00 0.00 0.00 0.00 106.38 26,784.36
02.01.01.01. OBRAS DE CONCRETO ARM ADO
02.01.01.01. ZAPATAS
02.01.01.01. CONCRETO PARA ZAPATAS F'C=210 KG/CM2 m3 10.80 455.02 4,914.22 10.80 4,914.22 10.80 4,914.22 21.60 9,828.43 0.00 0.00
02.01.01.01. ZAPATAS - ACERO FY=4200KG/CM2 kg 328.02 4.75 1,558.10 328.02 1,558.10 120.12 570.57 448.14 2,128.67 0.00 0.00
02.01.01.01. VIGAS DE CIM ENTACION
02.01.01.01. CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 m3 4.45 455.02 2,024.84 4.45 2,024.84 2.20 1,001.04 6.65 3,025.88 0.00 0.00
02.01.01.01. ENCOFRADO Y DESENCOFRADO VIGA DE CIMENTACION m2 49.40 39.16 1,934.50 26.60 1,041.66 26.60 1,041.66 0.00 0.00
02.01.01.01. ACERO EN VIGA DE CIMENTACION GRADO 60 kg 1,636.25 4.75 7,772.19 627.02 2,978.35 627.02 2,978.35 0.00 0.00
02.01.01.01. COLUM NAS
02.01.01.01. CONCRETO PARA COLUMNAS F'C=210 KG/CM2 m3 4.96 455.02 2,256.90 0.00 0.00 0.00 0.00 0.00 0.00
02.01.01.01. ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 34.46 40.65 1,400.80 0.00 0.00 0.00 0.00 34.46 1,400.80
02.01.01.01. ACERO FY=4200 KG/CM2 EN COLUMNAS kg 880.50 4.82 4,244.01 862.35 4,156.53 862.35 4,156.53 18.15 87.48
02.01.01.01. VIGAS
02.01.01.01. CONCRETO EN VIGAS F'C=210 KG/CM2 m3 15.85 455.01 7,211.91 0.00 0.00 0.00 0.00 0.00 0.00
02.01.01.01. ENCOFRADO Y DESENCOFRADO DE VIGAS m2 144.69 42.27 6,116.05 0.00 0.00 0.00 0.00 0.00 0.00
02.01.01.01. ACERO FY=4200 KG/CM2 EN VIGAS kg 2,747.89 4.52 12,420.46 0.00 0.00 0.00 0.00 0.00 0.00
02.01.01.01. LOSAS ALIGERADAS
02.01.01.01. CONCRETO F'C=210 KG/CM2. PARA LOSAS ALIGERADAS m3 12.77 455.01 5,810.48 0.00 0.00 0.00 0.00 12.77 5,810.48
02.01.01.01. ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS m2 75.32 38.80 2,922.42 0.00 0.00 0.00 0.00 75.32 2,922.42
02.01.01.01. ACERO FY=4200 KG/CM2 EN LOSA ALIGERADA kg 1,007.66 4.61 4,645.31 0.00 0.00 0.00 0.00 1,007.66 4,645.31
02.01.01.01. LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO und 1,104.00 4.56 5,034.24 0.00 0.00 0.00 0.00 1,104.00 5,034.24
02.01.01.01. M UROS Y TABIQUES DE ALBAÑILERIA
02.01.01.01. MURO DE LADRILLO KK ARCILLA CABEZA M:1:5 E=1.5 CM m2 158.14 123.54 19,536.62 6.88 849.96 6.88 849.96 151.26 18,686.66
02.01.01.01. COBERTURA Y TECHO
02.01.01.01. COBERTURA CON TEJA DE ARCILLA m2 190.44 54.94 10,462.77 0.00 0.00 0.00 0.00 190.44 10,462.77
02.01.02 TANQUE SEPTICO 14,255.47 0.00
02.01.02.01 OBRAS PRELIM INARES
02.01.02.01. LIMPIEZA DE TERRENO MANUAL m2 9.13 1.71 15.61 0.00 0.00 0.00 0.00 9.13 15.61
02.01.02.01. TRAZO Y REPLANTEO m2 9.13 1.04 9.50 0.00 0.00 0.00 0.00 9.13 9.50
02.01.02.02 M OVIM IENTO DE TIERRAS 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.01.02.02. EXCAVACION EN MATERIAL SUELTO m3 16.43 33.53 550.90 0.00 0.00 0.00 0.00 0.00 0.00
02.01.02.02. REFINE Y NIVELACION EN TERRENO m2 9.13 0.83 7.58 0.00 0.00 0.00 0.00 0.00 0.00
02.01.02.02. ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA) m3 20.53 16.76 344.08
0.00 0.00 0.00 0.00 0.00 0.00

02.01.02.03 OBRAS DE CONCRETO


02.01.02.03. SOLADO E=4" m2 9.13 25.50 232.82 0.00 0.00 0.00 0.00 0.00 0.00
02.01.02.03. ACERO FY= 4200 KG/CM2 kg 155.55 4.75 738.86 0.00 0.00 0.00 0.00 0.00 0.00
02.01.02.03. ENCOFRADO Y DESENCOFRADO NORMAL m2 24.30 27.76 674.57 0.00 0.00 0.00 0.00 0.00 0.00
02.01.02.03. CONCRETO PARA F'C=175 KG/CM2 m3 4.00 399.08 1,596.32 0.00 0.00 0.00 0.00 0.00 0.00
02.01.02.04 REVOQUES Y ENLUCIDOS
02.01.02.04. TARRAJEO CON IMPERMEABILIZANTE DE MUROS INTERIOR m2 24.10 34.22 824.70 0.00 0.00 0.00 0.00 24.10 824.70
02.01.02.05 CAJA DE REGISTRO
02.01.02.05. EXCAVACION EN MATERIAL SUELTO m3 4.61 33.53 154.57 0.00 0.00 0.00 0.00 4.61 154.57
02.01.02.05. REFINE Y NIVELACION EN TERRENO m2 1.92 0.83 1.59 0.00 0.00 0.00 0.00 1.92 1.59
02.01.02.05. ACERO FY= 4200 KG/CM2 kg 4.48 4.75 21.28 0.00 0.00 0.00 0.00 4.48 21.28
02.01.02.05. ENCOFRADO Y DESENCOFRADO NORMAL m2 1.92 27.76 53.30 0.00 0.00 0.00 0.00 1.92 53.30
02.01.02.05. CONCRETO F'C= 140 KG/CM2 m3 0.51 309.54 157.87 0.00 0.00 0.00 0.00 0.51 157.87
02.01.02.06 ZANJAS DE PERCOLACIÓN
02.01.02.06. TRAZO Y REPLANTEO m2 18.00 1.04 18.72 0.00 0.00 0.00 0.00 18.00 18.72
02.01.02.06. EXCAVACION EN MATERIAL SUELTO m3 16.20 33.53 543.19 0.00 0.00 0.00 0.00 16.20 543.19
02.01.02.06. REFINE Y NIVELACION EN TERRENO m2 18.00 0.83 14.94 0.00 0.00 0.00 0.00 18.00 14.94
02.01.02.06. CAMA DE APOYO CON PIEDRA ZARANDEADA H=10CM m2 18.00 40.44 727.92 0.00 0.00 0.00 0.00 18.00 727.92
02.01.02.06. ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA) m3 15.75 16.76 263.97
0.00 0.00 0.00 0.00 15.75 263.97

02.01.02.06. TUBERIA DE PVC SAL DE 3" PERFORADA" m 20.00 7.27 145.40 0.00 0.00 0.00 0.00 20.00 145.40
02.01.02.06. TUBERIA PVC SAL 4" m 30.00 7.66 229.80 0.00 0.00 0.00 0.00 30.00 229.80
02.01.02.06. RELLENO CON MATERIAL DE GRAVA SELECCIONADA m3 10.80 46.85 505.98 0.00 0.00 0.00 0.00 10.80 505.98
02.01.02.07 POZO PERCOLADOR
02.01.02.07. TRAZO Y REPLANTEO m2 7.60 1.04 7.90 0.00 0.00 0.00 0.00 7.60 7.90
02.01.02.07. EXCAVACION EN MATERIAL SUELTO m3 29.26 33.53 981.09 0.00 0.00 0.00 0.00 29.26 981.09
02.01.02.07. REFINE Y NIVELACION EN TERRENO m2 7.60 0.83 6.31 0.00 0.00 0.00 0.00 7.60 6.31
02.01.02.07. ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA) m3 73.15 16.76 1,225.99
0.00 0.00 0.00 0.00 73.15 1,225.99

02.01.02.07. RELLENO CON MATERIAL DE GRAVA SELECCIONADA m3 5.08 46.85 238.00 0.00 0.00 0.00 0.00 5.08 238.00
02.01.02.07. ENCOFRADO Y DESENCOFRADO NORMAL m2 5.28 27.76 146.57 0.00 0.00 0.00 0.00 5.28 146.57
02.01.02.07. CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 1.92 212.27 407.56 0.00 0.00 0.00 0.00 1.92 407.56
02.01.02.07. ACERO FY= 4200 KG/CM2 kg 50.21 4.75 238.50 0.00 0.00 0.00 0.00 50.21 238.50
02.01.02.07. ENCOFRADO Y DESENCOFRADO DE LOSA m2 5.66 15.11 85.52 0.00 0.00 0.00 0.00 5.66 85.52
02.01.02.07. CONCRETO PARA F'C=175 KG/CM2 m3 1.19 399.08 474.91 0.00 0.00 0.00 0.00 1.19 474.91
02.01.02.07. MURO DE LADRILLO CORRIENTE-CABEZA m2 33.66 74.64 2,512.38 0.00 0.00 0.00 0.00 33.66 2,512.38
02.01.02.07. TUBERIA DE VENTILACION F° G° Ø 2" und 4.00 24.32 97.28 0.00 0.00 0.00 0.00 4.00 97.28
02.01.03 CERCO PERIM ETRICO 76,226.20 59,847.70
02.01.03.01 TRABAJOS PRELIM INARES
02.01.03.01. LIMPIEZA DE TERRENO MANUAL m2 172.00 3.09 531.48 172.00 531.48 2,203.80 6,809.74 2,375.80 7,341.22 0.00 0.00
02.01.03.01. TRAZO NIVELACIÓN Y REPLANTEO PRELIMINAR m2 172.00 1.99 342.28 172.00 342.28 137.30 273.23 309.30 615.51 -137.30 -273.23
02.01.03.02 M OVIM IENTO DE TIERRAS
02.01.03.02. EXCAVACION PARA CIMIENTOS HASTA 1.00 MT TERRENO NORMAL m3 63.00 33.53 2,112.39 20.84 698.77 20.84 698.77 0.00 0.00
02.01.03.02. EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS m3 8.23 33.53 275.95 8.23 275.95 9.19 308.14 17.42 584.09 0.00 0.00
02.01.03.02. EXCAVACION DE SARDINELES m3 7.52 20.58 154.76 0.00 0.00 0.00 0.00 0.00 0.00
02.01.03.02. RELLENO COMPACTADO CON MATERIAL PROPIO m3 10.97 52.22 572.85 10.97 572.85 3.67 191.65 14.64 764.50 0.00 0.00
02.01.03.02. ELIMINACION DE MATERIAL EXCEDENTE CARGUI0 A MANO m3 86.63 52.12 4,515.16 25.99 1,354.60 25.99 1,354.60 0.00 0.00
02.01.03.03 OBRAS DE CONCRETO SIM PLE
02.01.03.03. CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 52.50 212.27 11,144.18 44.57 9,460.87 44.57 9,460.87 0.00 0.00
02.01.03.03. ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS m2 120.00 31.38 3,765.60 120.00 3,765.60 9.90 310.66 129.90 4,076.26 0.00 0.00
02.01.03.03. CONCRETO SOBRECIMIENTO DE 1:8 CEM-HOR 25% P.M. ANCHO=0.25 MT m3 9.00 264.28 2,378.52 9.00 2,378.52 7.89 2,085.17 16.89 4,463.69 0.00 0.00
02.01.03.03. CONCRETO CIMIENTO CORRIDO 1:10 +30% P.G. m3 4.10 212.77 872.36 0.00 0.00 0.00 0.00 0.00 0.00
02.01.03.03. SARDINELES DE CONCRETO DE F'C=140 KG/CM2. m 45.25 9.75 441.19 0.00 0.00 0.00 0.00 0.00 0.00
02.01.03.03. ENCOFRADO Y DESENCOFRADO EN SARDINELES m2 45.25 29.30 1,325.83 0.00 0.00 0.00 0.00 0.00 0.00
02.01.03.04 OBRAS DE CONCRETO ARM ADO
02.01.03.04. ACERO FY=4200 KG/CM2 EN COLUMNAS kg 1,018.70 4.82 4,910.13 1,018.70 4,910.13 43.33 208.85 1,062.03 5,118.98 0.00 0.00
02.01.03.04. ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 155.24 38.02 5,902.22 81.20 3,087.22 81.20 3,087.22 0.00 0.00
02.01.03.04. CONCRETO F'C=175 KG/CM2. PARA COLUMNAS m3 10.81 414.08 4,476.20 5.08 2,103.53 5.08 2,103.53 0.00 0.00
02.01.03.04. ACERO FY=4200 KG/CM2 EN VIGAS kg 418.02 4.82 2,014.86 0.00 0.00 0.00 0.00 0.00 0.00
02.01.03.04. ENCOFRADO Y DESENCOFRADO EN VIGAS m2 30.00 40.65 1,219.50 0.00 0.00 0.00 0.00 0.00 0.00
02.01.03.04. CONCRETO EN VIGAS F'C=210 KG/CM2 m3 2.25 436.39 981.88 0.00 0.00 0.00 0.00 0.00 0.00
02.01.03.04. MALLA OLIMPICA CACADO INC. MARCO CON ANGULO DE 2" ML 40.80 76.57 3,124.06 0.00 0.00 0.00 0.00 40.80 3,124.06
02.01.03.05 M URO
02.01.03.05. MURO DE SOGA LADRILLO 18 HUECOS DE ARCILLA ASENTADO DE SOGA MEZCLA 1: 5 m2 297.00 84.73 25,164.81
238.15 20,178.45 238.15 20,178.45 58.85 4,986.36

02.01.04 VARIOS 92,405.30 61,465.00


02.01.04.01 FLETE
02.01.04.01. FLETE TERRESTRE (AYACUCHO-SAN PEDRO-LUCANAS) GLB 1.00 30,940.30 30,940.30 0.00 0.00 0.00 0.00 0.00 0.00
02.01.04.02 SEGURIDAD EN OBRA
02.01.04.02. Equipos de protección al personal GLB 1.00 2,035.00 2,035.00 1.00 2,035.00 1.00 2,035.00 0.00 0.00
02.01.04.03 EQUIPAM IENTO
02.01.04.04 EQUIPAMIENTO DE VIVEROS DE ALTA TECNOLOGIA GLB 1.00 59,430.00 59,430.00 1.00 59,430.00 1.00 59,430.00 0.00 0.00
03 M AYOR PROM OCION DEL CULTIVO DE PALTO 3,416.00 1,416.00
03.01 DIFUSIÓN
03.01.01 PUBLICIDAD TELEVISIVA spot 12.50 64.00 800.00 12.50 800.00 12.50 800.00 0.00 0.00
03.01.02 PUBLICIDAD RADIAL spot 14.00 44.00 616.00 14.00 616.00 14.00 616.00 0.00 0.00
03.02 CAPACITACION 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.02.01 FORMALIZACIÓN DE CAPACIDADES Y ORGANIZACION DE PRODUCTORES Evento 4.00 500.00 2,000.00 0.00 0.00 0.00 0.00 4.00 2,000.00
145,573.24 168,375.24
5,854.76
01 CARTEL DE OBRA GLB 1.00 2,354.76 2,354.76 1.00 2,354.76 1.00 2,354.76 0.00 0.00
01.01 ELABORACION DE EXPEDIENTE ANUAL EXP 1.00 3,500.00 3,500.00 1.00 3,500.00 1.00 3,500.00 0.00 0.00
02 M AYOR DISPONIBILIDAD DE PLANTONES DE PALTO
02.01 CONSTRUCCION DE VAT EN CCARASPAMPA - PAUSA- PAUCAR DE SARA SARA
02.02 LOCAL ADM INISTRATIVO
02.02.01 ESTRUCTURA M OD 163,016.76 49,575.47
02.02.01.01 TRABAJOS PRELIM INARES
02.02.01.01. ALMACEN, OFICINA, GUARDIANIA m2 34.25 101.54 3,477.75 30.00 3,046.20 30.00 3,046.20 0.00 0.00
02.02.01.01. LIMPIEZA DE TERRENO MANUAL m2 182.50 1.71 312.08 130.00 222.30 130.00 222.30 0.00 0.00
02.02.01.01. TRAZO Y REPLANTEO PRELIMINAR m2 182.50 2.39 436.18 130.00 310.70 130.00 310.70 0.00 0.00
02.02.01.01. TRAZO Y REPLANTEO DURANTE EL PROCESO m2 182.50 1.20 219.00 130.00 156.00 130.00 156.00 0.00 0.00
02.02.01.02 M OVIM IENTO DE TIERRAS
02.02.01.02. CORTE SUPERFICIAL MANUAL E= 0.10 MT ZONA DE PISO INTERIOR m2 182.50 16.76 3,058.70 130.00 2,178.80 130.00 2,178.80 0.00 0.00
02.02.01.02. CORTE SUPERFICIAL MANUAL E= 0.05 MT EN VEREDAS m2 42.50 12.58 534.65 0.00 0.00 0.00 0.00 0.00 0.00
02.02.01.03 EXCAVACIONES
02.02.01.03. EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS m3 31.15 33.53 1,044.46 31.15 1,044.46 12.89 432.20 44.04 1,476.66 0.00 0.00
02.02.01.03. EXCAVACION MANUAL DE ZANJAS PARA SARDINELES DE VEREDAS m3 15.53 33.53 520.72 0.00 0.00 0.00 0.00 0.00 0.00
02.02.01.03. RELLENO COMPACTADO CON MATERIAL PROPIO m3 1.55 21.29 33.00 1.55 33.00 5.34 113.69 6.89 146.69 0.00 0.00
02.02.01.03. REFINE NIVELACION Y COMPACTACION CON PISON MANUAL m2 163.98 3.35 549.33 0.00 0.00 0.00 0.00 0.00 0.00
02.02.01.03. AFIRMADO DE 4" CON MATERIAL CLASIFICADO PARA PISOS INTERIORES Y EXTERIORES m2 163.98 14.93 2,448.22
0.00 0.00 0.00 0.00 0.00 0.00

02.02.01.03. ELIMINACION DE MATERIAL EXCEDENTE CARGUI0 A MANO m3 128.91 52.12 6,718.79 72.21 3,763.59 72.21 3,763.59 0.00 0.00
02.02.01.04 OBRAS DE CONCRETO SIM PLE
02.02.01.04. VEREDA DE CONCRETO F'C=175 KG/CM2 ACABADO Y BRUÑADO m3 7.76 439.49 3,410.44 0.00 0.00 0.00 0.00 7.76 3,410.44
02.02.01.04. ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 10.35 28.56 295.60 0.00 0.00 0.00 0.00 10.35 295.60
02.02.01.04. SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m2 2.16 43.07 93.03 2.16 93.03 2.16 93.03 0.00 0.00
02.02.01.04. CONCRETO CIMIENTO CORRIDO 1:10 +30% P.G. m3 17.62 199.32 3,512.02 17.62 3,512.02 6.98 1,391.25 24.60 4,903.27 0.00 0.00
02.02.01.04. CONCRETO PARA SOBRECIMIENTO DE 1:8 CEM-HOR 25% P.M. m3 4.45 258.69 1,151.17 0.00 0.00 0.00 0.00 -0.63 -162.97
02.02.01.04. ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS m2 49.40 31.38 1,550.17 0.00 0.00 0.00 0.00 2.16 67.78
02.02.01.04. FALSO PISO DE 4" DE CONCRETO 1:10 m2 106.38 168.07 17,879.29 0.00 0.00 0.00 0.00 106.38 17,879.29
02.02.01.05 OBRAS DE CONCRETO ARM ADO
02.02.01.05. ZAPATAS
02.02.01.05. CONCRETO PARA ZAPATAS F'C=210 KG/CM2 m3 10.80 485.67 5,245.24 10.80 5,245.24 10.80 5,245.24 0.00 0.00
02.02.01.05. ZAPATAS - ACERO FY=4200KG/CM2 kg 328.02 4.75 1,558.10 328.02 1,558.10 120.12 570.57 448.14 2,128.67 0.00 0.00
02.02.01.05. VIGAS DE CIM ENTACION
02.02.01.05. CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 m3 4.45 485.67 2,161.23 4.45 2,161.23 3.26 1,583.28 7.71 3,744.52 0.00 0.00
02.02.01.05. ENCOFRADO Y DESENCOFRADO VIGA DE CIMENTACION m2 49.40 39.16 1,934.50 49.40 1,934.50 12.28 480.88 61.68 2,415.39 0.00 0.00
02.02.01.05. ACERO EN VIGA DE CIMENTACION GRADO 60 kg 1,636.25 4.75 7,772.19 776.59 3,688.80 776.59 3,688.80 0.00 0.00
02.02.01.05. COLUM NAS
02.02.01.05. CONCRETO PARA COLUMNAS F'C=210 KG/CM2 m3 4.96 485.67 2,408.92 4.00 1,942.68 4.00 1,942.68 0.00 0.00
02.02.01.05. ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 34.46 40.65 1,400.80 27.45 1,115.84 27.45 1,115.84 0.00 0.00
02.02.01.05. ACERO FY=4200 KG/CM2 EN COLUMNAS kg 880.50 4.75 4,182.38 880.50 4,182.38 147.58 701.01 1,028.08 4,883.38 0.00 0.00
02.02.01.05. VIGAS
02.02.01.05. CONCRETO EN VIGAS F'C=210 KG/CM2 m3 15.85 485.66 7,697.71 0.00 0.00 0.00 0.00 0.00 0.00
02.02.01.05. ENCOFRADO Y DESENCOFRADO DE VIGAS m2 144.69 42.27 6,116.05 0.00 0.00 0.00 0.00 0.00 0.00
02.02.01.05. ACERO FY=4200 KG/CM2 EN VIGAS kg 2,747.89 4.52 12,420.46 0.00 0.00 0.00 0.00 0.00 0.00
02.02.01.05. LOSAS ALIGERADAS
02.02.01.05. CONCRETO F'C=210 KG/CM2. PARA LOSAS ALIGERADAS m3 12.77 485.66 6,201.88 0.00 0.00 0.00 0.00 12.77 6,201.88
02.02.01.05. ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS m2 75.32 38.80 2,922.42 0.00 0.00 0.00 0.00 75.32 2,922.42
02.02.01.05. ACERO FY=4200 KG/CM2 EN LOSA ALIGERADA kg 1,007.76 4.61 4,645.77 0.00 0.00 0.00 0.00 1,007.76 4,645.77
02.02.01.05. LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO und 1,104.00 5.92 6,535.68 0.00 0.00 0.00 0.00 1,104.00 6,535.68
02.02.01.06 M UROS Y TABIQUES DE ALBAÑILERIA
02.02.01.06. MURO DE SOGA LADRILLO 18 HUECOS DE ARCILLA ASENTADO DE SOGA MEZCLA 1.5 m2 82.81 97.98 8,113.72 0.00 0.00 82.81 8,113.72 82.81 8,113.72 0.00 0.00
02.02.01.06. MURO DE LADRILLO KK ARCILLA CABEZA M:1:5 E=1.5 CM m2 158.14 151.74 23,996.16 0.00 0.00 0.00 0.00 73.34 11,128.61
02.02.01.07 COBERTURA Y TECHO
02.02.01.07. COBERTURA CON TEJA DE ARCILLA m2 190.44 54.92 10,458.96 0.00 0.00 0.00 0.00 190.44 10,458.96
02.03 CERCO PERIM ETRICO 93,085.73 78,914.46
02.03.01 TRABAJOS PRELIM INARES
02.03.01.01 LIMPIEZA DE TERRENO MANUAL m2 172.00 3.09 531.48 172.00 531.48 2,158.11 6,668.56 2,330.11 7,200.04 0.00 0.00
02.03.01.02 TRAZO NIVELACIÓN Y REPLANTEO PRELIMINAR m2 172.00 2.04 350.88 172.00 350.88 242.08 493.84 414.08 844.72 0.00 0.00
02.03.02 M OVIM IENTO DE TIERRAS
02.03.02.01 EXCAVACION PARA CIMIENTOS HASTA 1.00 MT TERRENO NORMAL m3 63.00 33.53 2,112.39 42.82 1,435.75 42.82 1,435.75 0.00 0.00
02.03.02.02 EXCAVACION EN TERRENO SEMIROCOSO m3 41.06 61.03 2,505.89 41.06 2,505.89
02.03.02.02 EXCAVACION MANUAL DE ZANJAS PARA ZAPATAS m3 8.23 33.53 275.95 8.23 275.95 21.00 704.13 29.23 980.08 0.00 0.00
02.03.02.03 EXCAVACION DE SARDINELES m3 7.52 20.58 154.76 0.00 0.00 0.00 0.00 0.00 0.00
02.03.02.04 RELLENO COMPACTADO CON MATERIAL PROPIO m3 10.97 21.29 233.55 10.97 233.55 8.02 170.75 18.99 404.30 0.00 0.00
02.03.02.05 ELIMINACION DE MATERIAL EXCEDENTE CARGUI0 A MANO m3 86.63 52.12 4,515.16 86.63 4,515.16 16.91 881.35 103.54 5,396.50 0.00 0.00
02.03.03 OBRAS DE CONCRETO SIM PLE
02.03.03.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 52.50 198.82 10,438.05 52.50 10,438.05 14.45 2,872.95 66.95 13,311.00 0.00 0.00
02.03.03.02 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS m2 120.00 31.38 3,765.60 120.00 3,765.60 37.97 1,191.50 157.97 4,957.10 0.00 0.00
02.03.03.03 CONCRETO SOBRECIMIENTO DE 1:8 CEM-HOR 25% P.M. ANCHO=0.25 MT m3 9.00 258.69 2,328.21 9.00 2,328.21 9.59 2,480.84 18.59 4,809.05 0.00 0.00
02.03.03.04 CONCRETO CIMIENTO CORRIDO 1:10 +30% P.G. m3 4.10 199.32 817.21 0.00 0.00 0.00 0.00 0.00 0.00
02.03.03.05 SARDINELES DE CONCRETO DE F'C=140 KG/CM2. m 45.25 9.75 441.19 0.00 0.00 0.00 0.00 0.00 0.00
02.03.03.06 ENCOFRADO Y DESENCOFRADO EN SARDINELES m2 45.25 29.30 1,325.83 0.00 0.00 0.00 0.00 0.00 0.00
02.03.04 OBRAS DE CONCRETO ARM ADO
02.03.04.01 CONCRETO EN ZAPATAS m3 21.96 487.70 10,709.89 21.96 10,709.89 21.96 10,709.89
02.03.04.01 ACERO FY=4200 KG/CM2 EN COLUMNAS kg 1,018.70 4.75 4,838.83 1,018.70 4,838.83 639.35 3,036.91 1,658.05 7,875.74 0.00 0.00
02.03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 155.24 38.02 5,902.22 21.20 806.02 21.20 806.02 0.00 0.00
02.03.04.03 CONCRETO F'C=175 KG/CM2. PARA COLUMNAS m3 10.81 439.49 4,750.89 1.30 571.34 1.30 571.34 0.00 0.00
02.03.04.04 ACERO FY=4200 KG/CM2 EN VIGAS kg 418.02 4.75 1,985.60 0.00 0.00 0.00 0.00 0.00 0.00
02.03.04.05 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 30.00 40.65 1,219.50 0.00 0.00 0.00 0.00 0.00 0.00
02.03.04.06 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 2.25 467.85 1,052.66 0.00 0.00 0.00 0.00 0.00 0.00
02.03.04.07 MALLA OLIMPICA CACADO INC. MARCO CON ANGULO DE 2" ML 40.80 76.57 3,124.06 0.00 0.00 0.00 0.00 40.80 3,124.06
02.03.05 M URO
02.03.05.01 MURO DE SOGA LADRILLO 18 HUECOS DE ARCILLA ASENTADO DE SOGA MEZCLA 1: 5 m2 297.00 100.02 29,705.94
196.09 19,612.92 196.09 19,612.92 100.91 10,093.02

02.04 VARIOS 101,776.86 73,575.28


02.04.01 FLETE
02.04.01.01 FLETE TERRESTRE (AYACUCHO-PAUSA-PAUCAR DEL ZARA ZARA) GLB 1.00 28,201.58 28,201.58 0.00 0.00 0.00 0.00 0.00 0.00
02.04.02 SEGURIDAD EN OBRA
02.04.02.01 Equipos de protección al personal GLB 1.00 2,035.00 2,035.00 1.00 2,035.00 1.00 2,035.00 0.00 0.00
02.04.03 EQUIPAM IENTO
02.04.04 EQUIPAMIENTO DE VIVEROS DE ALTA TECNOLOGIA GLB 1.00 58,930.00 58,930.00 1.00 58,930.00 1.00 58,930.00 0.00 0.00
KIT DE HERRAMENTAS GLB 1.00 4,437.00 4,437.00 1.00 4,437.00 1.00 4,437.00
TALA Y RETIRO DE ARBOLES UND 12.00 165.70 1,988.40 12.00 1,988.40 12.00 1,988.40
DEMOLICION DE MURO TIPO TAPIAL M3 90.72 24.00 2,177.28 90.72 2,177.28 90.72 2,177.28
CORTE DE MATERIAL RENDIMIENTO 460M3/DIA M3 466.00 8.60 4,007.60 466.00 4,007.60 466.00 4,007.60

03 M AYOR PROM OCION DEL CULTIVO DE PALTO 3,416.00 1,116.00


03.01 DIFUSIÓN
03.01.01 PUBLICIDAD TELEVISIVA spot 12.50 64.00 800.00 0.00 0.00 0.00 0.00 0.00 0.00
03.01.02 PUBLICIDAD RADIAL spot 14.00 44.00 616.00 14.00 616.00 14.00 616.00 0.00 0.00
03.02 CAPACITACION
03.02.01 FORMALIZACIÓN DE CAPACIDADES Y ORGANIZACION DE PRODUCTORES Evento 4.00 500.00 2,000.00 1.00 500.00 1.00 500.00 3.00 1,500.00

1,419,769.89 444,974.83 46,575.72 33,939.79 917,342.91 172,264.43

412,217.18

209,035.97

377,411.21
FORMATO 05 LT
CAPACITACIONES

PROYECTO
TEMA
L OCALIDAD : DISTRITO
FECHA DEL EVENTO :

COSTOS DEL EVENTO (S/.)


NOMBRES Y APELLIDOS DE LOS
Nº DNI
ASISTENTES ALIMENTACION ALOJAMIENTO
1
2
3
4
5
6
7
8
9
10
11

____________________ ________________ _________________


FIRMA DEL FACILITADOR AUTORIDAD LOCAL RESPONSABLE META
PROVINCIA

EL EVENTO (S/.)
MATERIAL TOTAL FIRMA
DIDACTICO

____________ __________
ONSABLE META SUPERVISOR
FORMATO 06 LT
ASISTENCIA TECNICA
PLIEGO
UNIDAD EJECUTORA
COMPONENTE
META
MODALIDAD DE EJECUCION
MONTO VALOR REFERENCIA
AÑO FISCAL

ACTIVIDA
Nº NOMBRES Y APELLIDOS DNI COMUNIDAD DISTRITO TELEFONO
1
2
3
4
5
6
7
8
9
10

Prestador de Asistencia Tec. Responsable de Meta Supervisor / Inspector


CA

ACTIVIDADES
FIRMA

sor / Inspector Director de Proyectos Agrarios


FORMATO Nº 01LF
EJECUCION PRESUPUESTAL ANALITCA ANUAL
PLIEGO
UNIDAD EJECUTORA ::
COMPONENTE :
META :
ASIGNACION PRESUPUESTAL :
AÑO :

Documento Compromiso Comprobante de Pago Ejecución Presupuestal por Específica Montos


Detalle de Gastos TOTAL
Fecha Clase Nº Importe Fecha Nº 71.61 71.62 71.63 Otros Directos Indirectos

TOTAL S/.

_____________________ ________________________ ______________________


Responsable Administrativo Responsable de Meta Supervisor o Inspector
Firma y Sello Firma y Sello Firma y Sello
FORMATO Nº 02LF
EJECUCION PRESUPUESTAL ANUAL Y ACUMULADA SEGÚN NATURALEZA DEL GASTO

PLIEGO : GOBIERNO REGIONAL DE AYACUCHO


UNIDAD EJECUTORA : DIRECCION REGIONAL AGRARIA AYACUCHO
COMPONENTE : 2086418 DESARROLLO DEL CULTIVO DE DURAZNO EN LAS PROVINCIAS DE LA MAR, HUANTA, HUAMANGA, CANGALLO
VICTOR FAJARDO, HUANCASANCOS Y SUCRE.
META : 002
PRESUESTO DEL PROYECTO : S/. 739,206.00 NUEVOS SOLES

EJECUCION PRESUPUESTAL POR ESPECIFICA EJECUCION


ITEM AÑO FISCAL PIA PERSONAL SERVICIOS COSTO DIRECTO GASTOS PRESUPUESTAL AVANCE %
BIENES (2) (6)=(4)+(5)
(1) (3) (4)=(1)+(2)+(3) GENERALES (5)

TOTALES (S/.)

______________________ _____________________ _______________________


Responsable Administrativo Responsable de Meta Supervisor o inspector
Firma y Sello Firma y Sello Firma y Sello
FORMATO Nº 03LF
MOVIMIENTO DE ALMACEN ANUAL
UNIDAD EJECUTORA
COMPONENTE
META
MODALIDAD DE EJECUCION
MONTO VALOR REFERENCIA
AÑO FISCAL

DESCRIPCION DEL BIEN SALDO INGRESO ANUAL AL ALMACEN


DETALLE UNID ANTERIOR FECHA DOCUM. Nº PROVEEDOR CANTIDAD

RESPONSABLE ADMINISTRATIVO RESPONSABLE DE META


FIRMA Y SELLO FIRMA Y SELLO
Nº 03LF
LMACEN ANUAL

INGRESO
ACUMULAD EGRESO DEL ALAMACEN
SALDO
O FECHA Nº PECOSA SOLICITANTE CANTIDAD

SUPERVISOR O INSPECTOR
FIRMA Y SELLO
FORMATO Nº 04-A LF
SALDO DE INSUMOS VALORIZADO EN ALMACEN

PLIEGO :
UNIDAD EJECUTORA :
COMPONENTE :
META :
ASIGNACION PRESUPUESTAL :
AÑO :

Documentos Unid. Precio Precio


Cant. Descripción Ubicación
Año Nº c/p Nº o/c Nº NEA Med. Unitario Total

VALORIZACION TOTAL S/.

___________________ ______________ ______________________


Responsable Administrativo Responsable de Meta Supervisor o Inspector
Firma y Sello Firma y Sello Firma y Sello

FORMATO Nº 04- B LF
ADQUISICION ANUAL DE BIENES DURADEROS

PLIEGO :
UNIDAD EJECUTORA :
COMPONENTE :
META :
ASIGNACION PRESUPUESTAL :
AÑO :

Documentos Unid. Precio Precio


Cant. Descripción Ubicación
Año Nº c/p Nº o/c Nº NEA Med. Unitario Total

VALORIZACION TOTAL S/.


Fuente para Valorizacion Patrimonial

___________________ ______________ ______________________


Responsable Administrativo Responsable de Meta Supervisor o Inspector
Firma y Sello Firma y Sello Firma y Sello
FORMATO Nº 06 LF
RESUMEN DE EJECUCION PATRIMONIAL ANUAL

PLIEGO :
UNIDAD EJECUTORA :
COMPONENTE :
OBRA/META :
ASIGNACION PRESUPUESTAL :
AÑO :

Ejecución
Descripción
total S/.
1504 INVERSIONES INTANGIBES (F 02LF - F 04B LF)
1503.07 Otras Inversiones Intangibles

1503 INVERSIONES TANGIBLES (F-04B LF)


Vehiculos, maquinarias, equipos, otros

TOTAL S/, (F-02 LF)

____________________ ______________ _____________________


Resp. Administrativo Responsable Meta Supervisor o Inspector
Firma y Sello Firma y Sello Firma y Sello
FORMATO Nº 10F (08LF)
RESUMEN ANUAL DE EJECUCION DE GASTOS

PLIEGO :
COMPONENTE :
META :
FUENTE DE FINANCIAMIENTO :
ASIGNACION PRESUPUESTAL :

PART COSTO COSTO


DESCRIPCION
DIRECTO INDIRECTO
TOTAL S/,
ESPECIFICA
2.6.71.61 Contratacion del Personal
2.6.71.62 Adquisicion de Bienes
2.6.71.63 Contratacion de Servicios

TOTAL (S/.)
PORCENTAJE (%)

______________________ _____________ _______________________


Resp. Administrativo Resp. Meta Supervisor o Inspector
Firma y Sello Firma y Sello Firma y Sello
FORMATO Nº 07 B - LF
COSTO TOTAL REAL DE META

PLIEGO :
COMPONENTE :
OBRA/META :
FUENTE DE FINANCIAMIENTO :
ASIGNACION PRESUPUESTAL :

ITEM DESCRIPCION TOTAL S/,

1.00 TOTAL EJECUCION PRESUPUESTAL

2.00 SALDO TOTA DE ALMACEN

3.00 TOTAL INSUMOS DE OTRAS METAS

4.00 REVERSIONES

COSTO TOTAL REAL DE OBRA (1-2+3 - 4)

______________________ _____________ _______________________


Resp. Administrativo Resp. Meta Supervisor o Inspector
Firma y Sello Firma y Sello Firma y Sello

FORMATO Nº07 B - LF
BALANCE DE VALORIZACION TOTAL VERSUS COSTO REAL DE META

PLIEGO :
COMPONENTE :
OBRA/META :
FUENTE DE FINANCIAMIENTO :
ASIGNACION PRESUPUESTAL :

ITEM DESCRIPCION TOTAL S/,

1.00 COSTO REAL VALORIZADO

2.00 COSTO REAL DE METAS

BALANCE REAL DE META (1-2)

______________________ _____________ _______________________


Resp. Administrativo Responsable Meta Supervisor o Inspector
Firma y Sello Firma y Sello Firma y Sello