HARDY CROSS

Pf= 1720 hab


Dot= 120 l/hab*dia
Qm= 2.39 l/s
Qmh= 5.97 l/s 8 l/s

I TUB D (pulg) L (m) k SIGNO Q (l/s)


1 2.00 220.00 440,180.63 1 4.50
2 2.00 120.00 240,098.53 1 2.00
3 2.00 150.00 300,123.16 -1 3.50

II TUB D (pulg) L (m) k SIGNO Q (l/s)


2 2.00 120.00 240,098.53 -1 1.08
4 2.00 100.00 200,082.10 1 2.50
5 2.00 200.00 400,164.21 -1 5.50

I TUB D (pulg) L (m) k SIGNO Q (l/s)


1 2.00 220.00 440,180.63 1 3.58
2 2.00 120.00 240,098.53 -1 0.85
3 2.00 150.00 300,123.16 -1 4.42

II TUB D (pulg) L (m) k SIGNO Q (l/s)


2 2.00 120.00 240,098.53 1 0.81
4 2.00 100.00 200,082.10 1 4.43
5 2.00 200.00 400,164.21 -1 3.57

I TUB D (pulg) L (m) k SIGNO Q (l/s)


1 2.00 220.00 440,180.63 1 3.62
2 2.00 120.00 240,098.53 -1 1.04
3 2.00 150.00 300,123.16 -1 4.38

II TUB D (pulg) L (m) k SIGNO Q (l/s)


2 2.00 120.00 240,098.53 1 1.02
4 2.00 100.00 200,082.10 1 4.67
5 2.00 200.00 400,164.21 -1 3.33

1
4.5 l/s
+
2 l/s
I
8 l/s
3
3.5 l/s
hfo hfo/Qo Δ (l/s) Q corregido V (m/s)
19.83 4,407.25 -0.924 3.58 2.22
2.41 1,204.67 -0.924 1.08 0.99
-8.49 2,425.75 -0.924 -4.42 1.73
-13.75 14,885.76
Δ m3/S -0.001

hfo hfo/Qo Δ (l/s) Q corregido


-0.76 710.48 1.930 0.85 0.53
3.04 1,214.10 1.930 4.43 1.23
-26.15 4,753.65 1.930 -3.57 2.71
23.87 12,368.08
Δ m3/S 0.002

hfo hfo/Qo Δ (l/s) Q corregido


12.96 3,623.63 0.048 3.62
-0.50 583.52 0.048 -0.81
-13.10 2,961.55 0.048 -4.38
0.64 13,276.44
Δ m3/S 0.000

hfo hfo/Qo Δ (l/s) Q corregido


0.45 555.30 0.235 1.04
8.76 1,976.84 0.235 4.67
-11.74 3,289.10 0.235 -3.33
2.54 10,780.94
Δ m3/S 0.000

hfo hfo/Qo Δ (l/s) Q corregido V (m/s)


13.28 3,665.27 0.020 3.64 1.80
-0.72 690.68 0.020 -1.02 -0.50
-12.84 2,933.99 0.020 -4.36 -2.15
0.27 13,500.96
Δ m3/S 0.000

hfo hfo/Qo Δ (l/s) Q corregido


0.69 679.26 0.002 1.02 0.50
9.64 2,065.90 0.002 4.67 2.30
-10.35 3,103.55 0.002 -3.33 -1.64
0.02 10,831.84
Δ m3/S 0.000

2.5 l/s
4
8 l/s

+ TUB Ø pulg L (m) TUB Ø pulg L (m)


5 1 2 220 2 2 120
2 II 2 2 120 4 2 100
3 2 150 5 2 200
2 l/s
5.5 l/s

3
Pob fut: 1800 hab Dot: 120 l/hab*dia TRAMO Pobl
Qm= 2.500 l/s K2= 2.5 A-B 240
Qmh= 6.250 l/s B-C 220
B-D 200
qu= 0.0035 l/s D-E 210
A - CRP 180
CRP - F 170
F-G 205
F-H 190
H-I 185
TOTAL 1800

Q (L/S) L Cota del Terreno Ø (pulg) V hf


TRAMO
TRAMO DISEÑO m Inicial Final Calc Diseño m/s m
Res - A - 6.250 120.00 3100 3070 1.838 2 3.08 19.88
A-B 0.833 3.021 125.00 3070 3050 1.528 2 1.49 5.39
B-C 0.764 0.764 80.00 3050 3020 0.760 1 1.51 7.90
B-D 0.694 1.424 95.00 3050 3015 0.967 1 2.81 29.73
D-E 0.729 0.729 100.00 3015 2995 0.850 1 1.44 9.06
A - CRP 0.625 3.229 110.00 3070 3020 1.265 1.5 2.83 21.77
CRP - F 0.590 2.604 90.00 3020 2960 1.077 1.5 2.28 11.96
F-G 0.712 0.712 95.00 2960 2950 0.961 1 1.40 8.23
F-H 0.660 1.302 105.00 2960 2975 1.135 1.5 1.14 3.87
H-I 0.642 0.642 120.00 2975 2965 0.970 1 1.27 8.60
6.25
qi (l/s)
0.833 R
0.764
A
0.694
0.729 CR H
P
0.625 F
B
0.590
0.712
I
0.660 D
C
0.642
6.250 G
E

Cota piezométrica PRESIÓN (m)


Inicial Final Inicial Final
3,100.00 3,080.12 - 10.12
3,080.12 3,074.74 10.12 24.74
3,074.74 3,066.83 24.74 46.83
3,074.74 3,045.01 24.74 30.01
3,045.01 3,035.95 30.01 40.95
3,080.12 3,058.35 10.12 38.35
3,020.00 3,008.04 - 48.04
3,008.04 2,999.80 48.04 49.80
3,008.04 3,004.17 48.04 29.17
3,004.17 2,995.57 29.17 30.57