PRESUPUESTO

OBRA : SIFION INVERTIDO


PROYECTO : MEJORAMIENTO DEL CAUDAL PARA RIEGO
PROPIETARIO : COMUNIDAD CARHUACAYAN
FECHA : JUNIO 2018

COSTO
ITEM DESCRIPCIÓN UND CANT PARCIAL
UNITARIO
0.00 OBRAS DE RIEGO 43,555.00
1.00 SISTEMA DE TUBERIAS 38,872.00
1.40 RED DE TUBERIAS , ACCESORIOS DE CONEXIÓN Y PURGAS (2) 34,800.00
1.4.1 MANGUERA HDPE (4") 110MM PN-6 M 1,500.00 22.00 33,000.00
1.4.2 COPLA DE COMPRESION 110MM PN 10 UND 15.00 120.00 1,800.00
PURGA (3) 1,974.00
1.4.4 TEE PE 110 MM X 4" X 110 MM UND 3.00 120.00 360.00
UPR PVC INYECTADO 4" HILO FINO UND 6.00 20.00 120.00
BRIDA LOCA PVC 4", CON BUJE 4" SP INY. UND 6.00 50.00 300.00
VALVULA MARIPOSA WAFER PVC C/PALANCA 4" PN10 UND 3.00 350.00 1,050.00
PERNO ZINCADO 5/8" x 5" INC/ ARANDELA, HUACHA PRESION Y TUERCA UND 18.00 8.00 144.00
ENLACE CON EL SISTEMA DE RIEGO 1,138.00
COPLA PE 110MM CON DERIVACION RH 4" UND 1.00 120.00 120.00
UPR PVC INYECTADO 4" HILO FINO UND 1.00 20.00 20.00
BRIDA LOCA PVC 4", CON BUJE 4" SP INY. UND 2.00 50.00 100.00
VALVULA MARIPOSA WAFER PVC C/PALANCA 4" PN10 UND 1.00 350.00 350.00
PERNO ZINCADO 5/8" x 5" INC/ ARANDELA, HUACHA PRESION Y TUERCA UND 6.00 8.00 48.00
OTROS ACCESIORIOS DE CONECCION GBL 1.00 500.00 500.00
2.10 VALVULAS DE AIRE (8) 960.00
2.1.1 VALVULA DE AIRE 1" DOBLE EFECTO VYR UND 8.00 100.00 800.00
2.1.5 ABRAZADERA-COLLARIN PE 110MM X 1" PN10 SAB UND 8.00 20.00 160.00
CAMARA DE CAPTACION (1) 1,683.00
PURGA DE CAMARA (1) 655.00
TEE PVC 4" SP TF UND 1.00 15.00 15.00
ADAPTADOR UPR PVC 4" NTP TF UND 1.00 10.00 10.00
NIPLE PVC 4" UND 2.00 20.00 40.00
UNION SIMPLE FºGº 4" R/H UND 2.00 35.00 70.00
CODO PVC SP 4" UND 2.00 20.00 40.00
TUBO PVC 4" PN 10 X 5 M UND 4.00 120.00 480.00
TOMA DE AGUA (1) 1,028.00
FILTRO ARTESANAL PVC 4" UND 1.00 200.00 200.00
NIPLE PVC 4" UND 2.00 20.00 40.00
BRIDA LOCA PVC 4", CON BUJE 4" SP INY. UND 2.00 50.00 100.00
CODO PE 90º 110MM COMPRESION ROSCA UND 1.00 125.00 125.00
VALVULA MARIPOSA WAFER PVC C/PALANCA 4" PN10 UND 1.00 350.00 350.00
PERNO ZINCADO 5/8" x 5" INC/ ARANDELA, HUACHA PRESION Y TUERCA UND 6.00 8.00 48.00
CODO PE MANG. MANG. 110MM SAB UND 1.00 125.00 125.00
PEGAMENTO 1/4 GLN NEGRO OATEY GLN 1.00 40.00 40.00
4.00 SERVICIO DE INSTALACION Y TRASLADO DE MATERIAL 3,000.00
TRASLADO DE MATERIAL GBL 1.00 3,000.00 3,000.00
PRESUPUESTO (INC. IGV) 43,555.00

CONDICIONES DE VENTA
PRECIO EN SOLES INCLUYE IGV
Forma de Pago
Validez dela Oferta 15 días
Inicio de Obra 05 DIAS GENERADA LA O.C.
Destino Final obra
Observaciones MATERIALES PUESTOS EN OBRA

Atentamente,
...........................................................
GERARDO MARTINEZ MEDINA
AREA DE DISEÑO Y PROYECTOS
999325311
Gerardomartinez.med@gmail.com