Semana IP Perfilado Prom IP Encofrado Prom IP Concreto Prom

Sem 2 0.81 0.81 2.65 2.65 0.40 0.40


Sem 3 0.76 0.79 2.21 2.43 0.54 0.47
Sem 4 0.50 0.69 1.98 2.28 0.78 0.57
Sem 5 0.50 0.64 1.76 2.15 0.65 0.59
Sem 6 0.81 0.68 2.06 2.13 0.55 0.58
Sem 7 0.76 0.69 2.18 2.14 0.56 0.58
Sem 8 0.61 0.68 2.18 2.14 0.58 0.58
Sem 9 0.83 0.70 3.05 2.26 0.28 0.54
Sem 10 0.33 0.66 1.56 2.18 0.27 0.51
IP PERFILADO
0.90

0.81 0.81
0.80 0.79
0.76 0.76

0.69 0.69 0.
0.70 0.68
0.64
0.
0.60

0.50 0.50
0.50

0.40

0.30
Sem 2 Sem 3 Sem 4 Sem 5 Sem 6 Sem 7 Sem

IP ENCOFRADO
3.10
3.00
2.90
2.80
2.702.65
2.60
2.50 2.43
2.40
2.28
2.30 2.21
2.15 2.18 2.
2.20 2.13 2.14 2.
2.10 2.06
1.98
2.00
1.90
1.76
1.80
1.70
1.60
1.50
Sem 2 Sem 3 Sem 4 Sem 5 Sem 6 Sem 7 Sem
IP CONCRETO
0.90

0.80 0.78

0.70
0.65
0.59 0.58 0.58 0.
0.60 0.57 0.56
0.54 0.55

0.50 0.47

0.40
0.40

0.30

0.20
Sem 2 Sem 3 Sem 4 Sem 5 Sem 6 Sem 7 Se
IP PERFILADO

0.81 0.83
0.76

0.69 0.70
0.68 0.68
0.66
4
0.61
IP semanal
IP acumulado
0

0.33

5 Sem 6 Sem 7 Sem 8 Sem 9 Sem 10

IP ENCOFRADO
3.05

2.26 IP Semanal
5 2.18 2.18 2.18
2.13 2.14 2.14 IP Acumulado
2.06

1.56

5 Sem 6 Sem 7 Sem 8 Sem 9 Sem 10


IP CONCRETO

5
9 0.58 0.58 0.58
0.55 0.56
0.54
0.51 IP Semanal
IP Acumulado

0.28 0.27

5 Sem 6 Sem 7 Sem 8 Sem 9 Sem 10


OBRA HOTEL BRITANIA MIRAFLORES

HOJAS DE PRODUCCIÓN DE CONCRETO, ENCOFRADO Y ACERO

1.- LUNES 6/12/2017

METRADO EJECUTADO RATIOS OBTENIDOS

PERFILADO UND: M2 / M3 PERFILADO UND

ITEM ELEMENTO DESCRIPCION METRADO (M2) HH


1.00.00 METRADO -
2.00.00 RATIO -
3.00.00
0.00

ENCOFRADO UND: M2 ENCOFRADO UND

ITEM ELEMENTO DESCRIPCION METRADO (M2) HH


1.00.00 METRADO -
2.00.00 RATIO -
3.00.00
0.00

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION HH


1.00.00 10.00

CONCRETO UND: M3 CONCRETO UND

ITEM ELEMENTO DESCRIPCION METRADO (M3) HH


1.00.00 METRADO -
2.00.00 RATIO -
3.00.00
4.00.00
0.00

ACERO UND: KG ACERO UND

ITEM ELEMENTO DESCRIPCION METRADO (KG) HH


1.00.00 METRADO -
2.00.00 RATIO -
3.00.00
4.00.00
0.00

2.- MARTES 6/13/2017

METRADO EJECUTADO RATIOS OBTENIDOS

PERFILADO UND: M2 / M3 PERFILADO UND

ITEM ELEMENTO DESCRIPCION METRADO (M2) HH 17


1.00.00 1.03 15.30 METRADO 28.80
2.00.00 1.06 13.50 RATIO 0.59
3.00.00
28.80
ENCOFRADO UND: M2 ENCOFRADO UND

ITEM ELEMENTO DESCRIPCION METRADO (M2) HH


1.00.00 METRADO -
2.00.00 RATIO -
3.00.00
0.00

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION HH


1.00.00

CONCRETO UND: M3 CONCRETO UND

ITEM ELEMENTO DESCRIPCION METRADO (M3) HH


1.00.00 METRADO -
2.00.00 RATIO -
3.00.00
4.00.00
0.00

ACERO UND: KG ACERO UND

ITEM ELEMENTO DESCRIPCION METRADO (KG) HH


1.00.00 METRADO -
2.00.00 RATIO -
3.00.00
4.00.00
0.00

3.- MIÉRCOLES 6/14/2017

METRADO EJECUTADO RATIOS OBTENIDOS

PERFILADO UND: M2 / M3 PERFILADO UND

ITEM ELEMENTO DESCRIPCION METRADO (M2) HH 17


1.00.00 1.08 13.50 METRADO 27.60
2.00.00 1.1 14.10 RATIO 0.62
3.00.00
27.60

ENCOFRADO UND: M2 ENCOFRADO UND

ITEM ELEMENTO DESCRIPCION METRADO (M2) HH


1.00.00 METRADO -
2.00.00 RATIO -
3.00.00
0.00

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION HH


1.00.00

CONCRETO UND: M3 CONCRETO UND


ITEM ELEMENTO DESCRIPCION METRADO (M3) HH
1.00.00 METRADO -
2.00.00 RATIO -
3.00.00
4.00.00
0.00

ACERO UND: KG ACERO UND

ITEM ELEMENTO DESCRIPCION METRADO (KG) HH


1.00.00 METRADO -
2.00.00 RATIO -
3.00.00
4.00.00
0.00

4.- JUEVES 6/15/2017

METRADO EJECUTADO RATIOS OBTENIDOS

PERFILADO UND: M2 / M3 PERFILADO UND

ITEM ELEMENTO DESCRIPCION METRADO (M2) HH 47


1.00.00 1.12 13.50 METRADO 27.00
2.00.00 1.14 13.50 RATIO 1.74
3.00.00
27.00

ENCOFRADO UND: M2 ENCOFRADO UND


ITEM ELEMENTO DESCRIPCION METRADO (M2) HH 25
1.00.00 1.03-1.06 8.25 METRADO 8.25
2.00.00 RATIO 3.03
3.00.00
8.25

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION HH


1.00.00

CONCRETO UND: M3 CONCRETO UND

ITEM ELEMENTO DESCRIPCION METRADO (M3) HH


1.00.00 METRADO -
2.00.00 RATIO -
3.00.00
4.00.00
0.00

ACERO UND: KG ACERO UND

ITEM ELEMENTO DESCRIPCION METRADO (KG) HH


1.00.00 METRADO -
2.00.00 RATIO -
3.00.00
4.00.00
0.00

5.- VIERNES 6/16/2017


METRADO EJECUTADO RATIOS OBTENIDOS

PERFILADO UND: M2 / M3 PERFILADO UND

ITEM ELEMENTO DESCRIPCION METRADO (M2) HH 12.5


1.00.00 1.16 13.80 METRADO 41.40
2.00.00 1.18 27.60 RATIO 0.30
3.00.00
41.40

ENCOFRADO UND: M2 ENCOFRADO UND

ITEM ELEMENTO DESCRIPCION METRADO (M2) HH 34


1.00.00 1.03-1.06 15.00 METRADO 15.00
2.00.00 RATIO 2.27
3.00.00
15.00

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION HH


1.00.00

CONCRETO UND: M3 CONCRETO UND

ITEM ELEMENTO DESCRIPCION METRADO (M3) HH 2.0


1.00.00 1.06 5.00 METRADO 5.00
2.00.00 RATIO 0.40
3.00.00
4.00.00
5.00

ACERO UND: KG ACERO UND

ITEM ELEMENTO DESCRIPCION METRADO (KG) HH 123


1.00.00 METRADO -
2.00.00 RATIO -
3.00.00
4.00.00
0.00

6.- SÁBADO 6/17/2017

METRADO EJECUTADO RATIOS OBTENIDOS

PERFILADO UND: M2 / M3 PERFILADO UND

ITEM ELEMENTO DESCRIPCION METRADO (M2) HH 6


1.00.00 13.50 METRADO 27.00
2.00.00 13.50 RATIO 0.22
3.00.00
27.00

ENCOFRADO UND: M2 ENCOFRADO UND

ITEM ELEMENTO DESCRIPCION METRADO (M2) HH 14


1.00.00 1.03-1.06 8.25 METRADO 8.25
2.00.00 RATIO 1.70
3.00.00
8.25

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION HH


1.00.00

CONCRETO UND: M3 CONCRETO UND

ITEM ELEMENTO DESCRIPCION METRADO (M3) HH 2.0


1.00.00 1.03 6.50 METRADO 6.50
2.00.00 RATIO 0.31
3.00.00
4.00.00
6.50

ACERO UND: KG ACERO UND

ITEM ELEMENTO DESCRIPCION METRADO (KG) HH 123


1.00.00 METRADO -
2.00.00 RATIO -
3.00.00
4.00.00
0.00
RESUMEN - RATIOS

Lunes Martes Miércoles Jueves Viernes Sábado


Partidas
12-Jun 13-Jun 14-Jun 15-Jun 16-Jun 17-Jun PROM
Perfilado - 0.59 0.62 1.74 0.30 0.22 0.81
Encofrado - - - 3.03 2.27 1.70 2.65
HH/M2 Concreto - - - - 0.40 0.31 0.40
Acero - - - - - - 0.00

Metrados

Lunes Martes Miércoles Jueves Viernes Sábado


Partidas
12-Jun 13-Jun 14-Jun 15-Jun 16-Jun 17-Jun
HH/M2 Perfilado 0.00 28.80 27.60 27.00 41.40 27.00 151.80
Encofrado 0.00 0.00 0.00 8.25 15.00 8.25 31.50
Concreto 0.00 0.00 0.00 0.00 5.00 6.50 11.50
Acero 0.000 0.000 0.000 0.000 0.000 0.000 0.00
HH/M3

HH/KG

HH/M2
HH/M2

HH/M3

HH/KG
HH/M2

HH/M2

HH/M3
HH/KG

HH/M2

HH/M2
HH/M3

HH/KG
HH/M2

HH/M2

HH/M3
HH/KG

HH/M2

HH/M2
HH/M3

HH/KG
OBRA HOTEL BRITANIA MIRAFLORES

HOJAS DE PRODUCCIÓN DE CONCRETO, ENCOFRADO Y ACERO

1.- LUNES 6/19/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 1.13 13.50
2.00.00 1.15 13.50
3.00.00
27.00

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 1.09 18.00
2.00.00
3.00.00
18.00

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION HH


1.00.00 9.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION METRADO (M3)


1.00.00
2.00.00
3.00.00
4.00.00
0.00

ACERO UND: KG
ITEM ELEMENTO DESCRIPCION METRADO (KG)
1.00.00
2.00.00
3.00.00
4.00.00
0.00

2.- MARTES 6/20/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 1.17 14.40
2.00.00 1.19 16.50
3.00.00
30.90

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 1.11 15.60
2.00.00 1.13 8.85
3.00.00
24.45

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION HH


1.00.00 9.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION METRADO (M3)


1.00.00
2.00.00
3.00.00
4.00.00
0.00

ACERO UND: KG
ITEM ELEMENTO DESCRIPCION METRADO (KG)
1.00.00
2.00.00
3.00.00
4.00.00
0.00

3.- MIÉRCOLES 6/21/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 1.21 12.60
2.00.00 1.01 12.30
3.00.00
24.90

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 1.13 6.75
2.00.00 1.15 8.85
3.00.00
15.60

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION HH


1.00.00 9.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION METRADO (M3)


1.00.00 12.50
2.00.00
3.00.00
4.00.00
12.50
ACERO UND: KG

ITEM ELEMENTO DESCRIPCION METRADO (KG)


1.00.00
2.00.00
3.00.00
4.00.00
0.00

4.- JUEVES 6/22/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 1.23 13.50
2.00.00
3.00.00
13.50

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 1.15 6.75
2.00.00 1.17 15.60
3.00.00
22.35

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION HH


1.00.00 9.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION METRADO (M3)


1.00.00 12.50
2.00.00
3.00.00
4.00.00
12.50
ACERO UND: KG

ITEM ELEMENTO DESCRIPCION METRADO (KG)


1.00.00
2.00.00
3.00.00
4.00.00
0.00

5.- VIERNES 6/23/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00
2.00.00
3.00.00
0.00

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 1.17 6.75
2.00.00 1.19 20.10
3.00.00
26.85

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION HH


1.00.00 9.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION METRADO (M3)


1.00.00 14.00
2.00.00
3.00.00
4.00.00
14.00

ACERO UND: KG

ITEM ELEMENTO DESCRIPCION METRADO (KG)


1.00.00
2.00.00
3.00.00
4.00.00
0.00

6.- SÁBADO 6/24/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 1.23 10.13
2.00.00 1.26 9.45
3.00.00
19.58

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 1.21 12.90
2.00.00
3.00.00
12.90

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION HH


1.00.00 7.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION METRADO (M3)


1.00.00
2.00.00
3.00.00
4.00.00
0.00

ACERO UND: KG

ITEM ELEMENTO DESCRIPCION METRADO (KG)


1.00.00
2.00.00
3.00.00
4.00.00
0.00
MIRAFLORES

O, ENCOFRADO Y ACERO

RESUMEN - RATIOS

Lunes
Partidas
19-Jun
RATIOS OBTENIDOS Perfilado 0.67
Encofrado 1.89
PERFILADO UND HH/M2 Concreto -
Acero -
HH 18
METRADO 27.00
RATIO 0.67 Metrados

Lunes
Partidas
19-Jun
ENCOFRADO UND HH/M2 Perfilado 27.00
Encofrado 18.00
HH 25 Concreto 0.00
METRADO 18.00 Acero 0.000
RATIO 1.89

1.39

CONCRETO UND HH/M3

HH
METRADO -
RATIO -

ACERO UND HH/KG


HH
METRADO -
RATIO -

RATIOS OBTENIDOS

PERFILADO UND HH/M2

HH 21.5
METRADO 30.90
RATIO 0.70

ENCOFRADO UND HH/M2

HH 42
METRADO 24.45
RATIO 2.09

CONCRETO UND HH/M3

HH
METRADO -
RATIO -

ACERO UND HH/KG


HH
METRADO -
RATIO -

RATIOS OBTENIDOS

PERFILADO UND HH/M2

HH 18.5
METRADO 24.90
RATIO 0.74

ENCOFRADO UND HH/M2

HH 38.5
METRADO 15.60
RATIO 3.04

HH
3.50

CONCRETO UND HH/M3

HH 6.0
METRADO 12.50
RATIO 0.48
ACERO UND HH/KG

HH
METRADO -
RATIO -

RATIOS OBTENIDOS

PERFILADO UND HH/M2

HH 12.5
METRADO 13.50
RATIO 0.93

ENCOFRADO UND HH/M2

HH 42
METRADO 22.35
RATIO 2.28

CONCRETO UND HH/M3

HH 7.5
METRADO 12.50
RATIO 0.60
ACERO UND HH/KG

HH
METRADO -
RATIO -

RATIOS OBTENIDOS

PERFILADO UND HH/M2

HH
METRADO -
RATIO -

ENCOFRADO UND HH/M2

HH 37.5
METRADO 26.85
RATIO 1.73

HH
4.50

CONCRETO UND HH/M3

HH 7.5
METRADO 14.00
RATIO 0.54
ACERO UND HH/KG

HH
METRADO -
RATIO -

RATIOS OBTENIDOS

PERFILADO UND HH/M2

HH 8
METRADO 19.58
RATIO 0.41

ENCOFRADO UND HH/M2

HH 22
METRADO 12.90
RATIO 2.25

HH
4.00

CONCRETO UND HH/M3

HH
METRADO -
RATIO -
ACERO UND HH/KG

HH
METRADO -
RATIO -
Martes Miércoles Jueves Viernes Sábado
20-Jun 21-Jun 22-Jun 23-Jun 24-Jun PROM
0.70 0.74 0.93 - 0.41 0.76
2.09 3.04 2.28 1.73 2.25 2.21
- 0.48 0.60 0.54 - 0.54
- - - - - 0.00

Martes Miércoles Jueves Viernes Sábado


20-Jun 21-Jun 22-Jun 23-Jun 24-Jun
30.90 24.90 13.50 0.00 19.58 115.88
24.45 15.60 22.35 26.85 12.90 120.15
0.00 12.50 12.50 14.00 0.00 39.00
0.000 0.000 0.000 0.000 0.000 0.00
OBRA HOTEL BRITANIA MIRAFLORES

HOJAS DE PRODUCCIÓN DE CONCRETO, ENCOFRADO Y ACERO

1.- LUNES 6/26/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 1.23 3.38
2.00.00 1.26 3.15
3.00.00 1.04 17.40
23.93

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 1.23 15.60
2.00.00
3.00.00
15.60

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION HH


1.00.00 6.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION METRADO (M3)


1.00.00 1.23 5.50
2.00.00
3.00.00
4.00.00
5.50

ACERO UND: KG
ITEM ELEMENTO DESCRIPCION METRADO (KG)
1.00.00
2.00.00
3.00.00
4.00.00
0.00

2.- MARTES 6/27/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 1.08 13.50
2.00.00 1.28 13.20
3.00.00 1.1 7.05
33.75

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 1.23 6.75
2.00.00 1.01 15.60
3.00.00
22.35

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION HH


1.00.00 9.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION METRADO (M3)


1.00.00 1.01 6.05
2.00.00
3.00.00
4.00.00
6.05

ACERO UND: KG
ITEM ELEMENTO DESCRIPCION METRADO (KG)
1.00.00
2.00.00
3.00.00
4.00.00
0.00

3.- MIÉRCOLES 6/28/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1 1.1 7.05
2 1.12 13.50
3 1.14 13.50
4 1.16 6.90
40.95

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 1.23 8.85
2.00.00 1.28 12.00
3.00.00
20.85

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION HH


1.00.00 9.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION METRADO (M3)


1.00.00 1.23-1.26 10.50
2.00.00
3.00.00
4.00.00
10.50
ACERO UND: KG

ITEM ELEMENTO DESCRIPCION METRADO (KG)


1.00.00
2.00.00
3.00.00
4.00.00
0.00

4.- JUEVES 6/29/2017 FERIADO


METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00
2.00.00
3.00.00
0.00

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00
2.00.00
3.00.00
0.00

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION HH


1.00.00 10.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION METRADO (M3)


1.00.00
2.00.00
3.00.00
4.00.00
0.00

ACERO UND: KG

ITEM ELEMENTO DESCRIPCION METRADO (KG)


1.00.00
2.00.00
3.00.00
4.00.00
0.00

5.- VIERNES 6/30/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 1.16 6.75
2.00.00 1.18 13.50
3.00.00
20.25

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 1.04 18.30
2.00.00 1.08 6.75
3.00.00 P13 5.10
30.15

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION HH


1.00.00 9.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION METRADO (M3)


1.00.00
2.00.00
3.00.00
4.00.00
0.00

ACERO UND: KG

ITEM ELEMENTO DESCRIPCION METRADO (KG)


1.00.00
2.00.00
3.00.00
4.00.00
0.00

6.- SÁBADO 7/1/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 1.18 13.50
2.00.00
3.00.00
13.50

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 1.08 6.75
2.00.00 1.10 6.75
3.00.00 P22 3.30
16.80

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION HH


1.00.00 7.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION METRADO (M3)


1.00.00 1.04-1.08 10.50
2.00.00
3.00.00
4.00.00
10.50

ACERO UND: KG

ITEM ELEMENTO DESCRIPCION METRADO (KG)


1.00.00
2.00.00
3.00.00
4.00.00
0.00
A MIRAFLORES

ETO, ENCOFRADO Y ACERO

RESUMEN - RATIOS

Lunes
Partidas
26-Jun
RATIOS OBTENIDOS Perfilado 0.54
Encofrado 2.44
PERFILADO UND HH/M2 Concreto 0.73
Acero -
HH 13
METRADO 23.93
RATIO 0.54 Metrados

Lunes
Partidas
26-Jun
ENCOFRADO UND HH/M2 Perfilado 23.93
Encofrado 15.60
HH 32 Concreto 5.50
METRADO 15.60 Acero 0.000
RATIO 2.44

HH
13.00

CONCRETO UND HH/M3

HH 4.0
METRADO 5.50
RATIO 0.73

ACERO UND HH/KG


HH
METRADO -
RATIO -

RATIOS OBTENIDOS

PERFILADO UND HH/M2

HH 12.5
METRADO 33.75
RATIO 0.37

ENCOFRADO UND HH/M2

HH 25
METRADO 22.35
RATIO 1.52

HH
17.00

CONCRETO UND HH/M3

HH 6.0
METRADO 6.05
RATIO 0.99

ACERO UND HH/KG


HH 123
METRADO -
RATIO -

RATIOS OBTENIDOS

PERFILADO UND HH/M2

HH 18.5
METRADO 40.95
RATIO 0.45

ENCOFRADO UND HH/M2

HH 38.5
METRADO 20.85
RATIO 2.28

HH
3.50

CONCRETO UND HH/M3

HH 6.5
METRADO 10.50
RATIO 0.62
ACERO UND HH/KG

HH 123
METRADO -
RATIO -

O
RATIOS OBTENIDOS

PERFILADO UND HH/M2

HH
METRADO -
RATIO -

ENCOFRADO UND HH/M2

HH
METRADO -
RATIO -

CONCRETO UND HH/M3

HH
METRADO -
RATIO -
ACERO UND HH/KG

HH
METRADO -
RATIO -

RATIOS OBTENIDOS

PERFILADO UND HH/M2

HH 13
METRADO 20.25
RATIO 0.64

ENCOFRADO UND HH/M2

HH 42
METRADO 30.15
RATIO 1.69

CONCRETO UND HH/M3

HH
METRADO -
RATIO -
ACERO UND HH/KG

HH
METRADO -
RATIO -

RATIOS OBTENIDOS

PERFILADO UND HH/M2

HH 3
METRADO 13.50
RATIO 0.22

ENCOFRADO UND HH/M2

HH 23
METRADO 16.80
RATIO 1.79

HH
3.00

CONCRETO UND HH/M3

HH 9.0
METRADO 10.50
RATIO 0.86
ACERO UND HH/KG

HH
METRADO -
RATIO -
Martes Miércoles Jueves Viernes Sábado
27-Jun 28-Jun 29-Jun 30-Jun 1-Jul PROM
0.37 0.45 - 0.64 0.22 0.50
1.52 2.28 - 1.69 1.79 1.98
0.99 0.62 - - 0.86 0.78
- - - - - 0.00

Martes Miércoles Jueves Viernes Sábado


27-Jun 28-Jun 29-Jun 30-Jun 1-Jul
33.75 40.95 0.00 20.25 13.50 132.38
22.35 20.85 0.00 30.15 16.80 105.75
6.05 10.50 0.00 0.00 10.50 32.55
0.000 0.000 0.000 0.000 0.000 0.00
OBRA HOTEL BRITANIA MIRAFLORES

HOJAS DE PRODUCCIÓN DE CONCRETO, ENCOFRADO Y ACERO

1.- LUNES 7/3/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 1.20 6.75
2.00.00
3.00.00
6.75

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 1.28 17.70
2.00.00 1.09 17.70
3.00.00
35.40

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION HH


1.00.00 15.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION METRADO (M3)


1.00.00 1.28-1.09 se vacea manualmente 1.50 m3 10.50
2.00.00
3.00.00
4.00.00
10.50

ACERO UND: KG
ITEM ELEMENTO DESCRIPCION METRADO (KG)
1.00.00
2.00.00
3.00.00
4.00.00
0.00

2.- MARTES 7/4/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 1.20 6.75
2.00.00
3.00.00
6.75

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 1.12 15.30
2.00.00 1.16 15.60
3.00.00
30.90

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION HH


1.00.00 13.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION METRADO (M3)


1.00.00 1.12 6.80
2.00.00
3.00.00
4.00.00
6.80

ACERO UND: KG
ITEM ELEMENTO DESCRIPCION METRADO (KG)
1.00.00
2.00.00
3.00.00
4.00.00
0.00

3.- MIÉRCOLES 7/5/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 1.22 15.00
2.00.00
3.00.00
15.00

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 1.14 se vacea vereda de calle colina 15.30
2.00.00
3.00.00
15.30

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION HH


1.00.00 18.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION METRADO (M3)


1.00.00 1.14-1.16 14.50
2.00.00
3.00.00
4.00.00
14.50
ACERO UND: KG

ITEM ELEMENTO DESCRIPCION METRADO (KG)


1.00.00
2.00.00
3.00.00
4.00.00
0.00

4.- JUEVES 7/6/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 1.02 13.50
2.00.00 1.05 15.60
3.00.00
29.10

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 1.02 7.20
2.00.00 1.20 17.10
3.00.00
24.30

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION HH


1.00.00 12.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION METRADO (M3)


1.00.00 1.20 7.00
2.00.00
3.00.00
4.00.00
7.00
ACERO UND: KG

ITEM ELEMENTO DESCRIPCION METRADO (KG)


1.00.00
2.00.00
3.00.00
4.00.00
0.00

5.- VIERNES 7/7/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 1.07 10.80
2.00.00 1.27 19.80
3.00.00
30.60

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 1.02 8.10
2.00.00 1.22 6.00
3.00.00 1.05 15.30
29.40

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION HH


1.00.00 9.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION METRADO (M3)


1.00.00 1.02-1.05 13.00
2.00.00
3.00.00
4.00.00
13.00

ACERO UND: KG

ITEM ELEMENTO DESCRIPCION METRADO (KG)


1.00.00
2.00.00
3.00.00
4.00.00
0.00

6.- SÁBADO 7/8/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00
2.00.00
3.00.00
0.00

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 1.22 9.00
2.00.00 1.07 8.55
3.00.00
17.55

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION HH


1.00.00 11.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION METRADO (M3)


1.00.00 1.22 6.00
2.00.00
3.00.00
4.00.00
6.00

ACERO UND: KG

ITEM ELEMENTO DESCRIPCION METRADO (KG)


1.00.00
2.00.00
3.00.00
4.00.00
0.00
MIRAFLORES

ETO, ENCOFRADO Y ACERO

RESUMEN - RATIOS

Lunes
Partidas
3-Jul
RATIOS OBTENIDOS Perfilado 0.89
Encofrado 1.30
PERFILADO UND HH/M2 Concreto 1.00
Acero -
HH 6
METRADO 6.75
RATIO 0.89 Metrados

Lunes
Partidas
3-Jul
ENCOFRADO UND HH/M2 Perfilado 6.75
Encofrado 35.40
HH 31 Concreto 10.50
METRADO 35.40 Acero 0.000
RATIO 1.30

HH
5.00

CONCRETO UND HH/M3

HH 10.5
METRADO 10.50
RATIO 1.00

ACERO UND HH/KG


HH
METRADO -
RATIO -

RATIOS OBTENIDOS

PERFILADO UND HH/M2

HH 3
METRADO 6.75
RATIO 0.44

ENCOFRADO UND HH/M2

HH 30
METRADO 30.90
RATIO 1.39

HH
8.00

CONCRETO UND HH/M3

HH 6.0
METRADO 6.80
RATIO 0.88

ACERO UND HH/KG


HH
METRADO -
RATIO -

RATIOS OBTENIDOS

PERFILADO UND HH/M2

HH 8
METRADO 15.00
RATIO 0.53

ENCOFRADO UND HH/M2

HH 30
METRADO 15.30
RATIO 3.14

HH
3.00

CONCRETO UND HH/M3

HH 6.0
METRADO 14.50
RATIO 0.41
ACERO UND HH/KG

HH
METRADO -
RATIO -

RATIOS OBTENIDOS

PERFILADO UND HH/M2

HH 13
METRADO 29.10
RATIO 0.45

ENCOFRADO UND HH/M2

HH 29.5
METRADO 24.30
RATIO 1.71

HH
9.50

CONCRETO UND HH/M3

HH 4.0
METRADO 7.00
RATIO 0.57
ACERO UND HH/KG

HH
METRADO -
RATIO -

RATIOS OBTENIDOS

PERFILADO UND HH/M2

HH 6
METRADO 30.60
RATIO 0.20

ENCOFRADO UND HH/M2

HH 28.5
METRADO 29.40
RATIO 1.28

HH
13.50

CONCRETO UND HH/M3

HH 5.0
METRADO 13.00
RATIO 0.38
ACERO UND HH/KG

HH
METRADO -
RATIO -

RATIOS OBTENIDOS

PERFILADO UND HH/M2

HH
METRADO -
RATIO -

ENCOFRADO UND HH/M2

HH 19
METRADO 17.55
RATIO 1.71

HH
3.00

CONCRETO UND HH/M3

HH 4.0
METRADO 6.00
RATIO 0.67
ACERO UND HH/KG

HH
METRADO -
RATIO -
Martes Miércoles Jueves Viernes Sábado
4-Jul 5-Jul 6-Jul 7-Jul 8-Jul PROM
0.44 0.53 0.45 0.20 - 0.50
1.39 3.14 1.71 1.28 1.71 1.76
0.88 0.41 0.57 0.38 0.67 0.65
- - - - - 0.00

Martes Miércoles Jueves Viernes Sábado


4-Jul 5-Jul 6-Jul 7-Jul 8-Jul
6.75 15.00 29.10 30.60 0.00 88.20
30.90 15.30 24.30 29.40 17.55 152.85
6.80 14.50 7.00 13.00 6.00 57.80
0.000 0.000 0.000 0.000 0.000 0.00
OBRA HOTEL BRITANIA MIRAFLORES

HOJAS DE PRODUCCIÓN DE CONCRETO, ENCOFRADO Y ACERO

1.- LUNES 7/10/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 M1 11.25
2.00.00
3.00.00
11.25

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 1.07 6.75
2.00.00 M1 11.25
3.00.00
18.00

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION HH


1.00.00 10.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION METRADO (M3)


1.00.00 1.07-M1 10.00
2.00.00
3.00.00
4.00.00
10.00

ACERO UND: KG
ITEM ELEMENTO DESCRIPCION METRADO (KG)
1.00.00
2.00.00
3.00.00
4.00.00
0.00

2.- MARTES 7/11/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 1.27 17.25
2.00.00 1.25 8.31
3.00.00
25.56

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 1.18 27.00
2.00.00 M2 13.80
3.00.00
40.80

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION HH


1.00.00 15.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION METRADO (M3)


1.00.00 1.18-M2 13.50
2.00.00
3.00.00
4.00.00
13.50

ACERO UND: KG
ITEM ELEMENTO DESCRIPCION METRADO (KG)
1.00.00
2.00.00
3.00.00
4.00.00
0.00

3.- MIÉRCOLES 7/12/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 M15 5.54
2.00.00
3.00.00
5.54

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 1.27 19.80
2.00.00 M15 11.02
3.00.00
30.82

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION HH


1.00.00 13.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION METRADO (M3)


1.00.00 1.27-1.25 12.50
2.00.00
3.00.00
4.00.00
12.50
ACERO UND: KG

ITEM ELEMENTO DESCRIPCION METRADO (KG)


1.00.00
2.00.00
3.00.00
4.00.00
0.00

4.- JUEVES 7/13/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 2.15 12.15
2.00.00 2.11 9.89
3.00.00 2.09 10.92
32.96

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 1.25 7.29
2.00.00 2.13 8.06
3.00.00
15.35

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION HH


1.00.00 14.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION METRADO (M3)


1.00.00 1.25 2.50
2.00.00 2.13 3.00
3.00.00
4.00.00
5.50
ACERO UND: KG

ITEM ELEMENTO DESCRIPCION METRADO (KG)


1.00.00
2.00.00
3.00.00
4.00.00
0.00

5.- VIERNES 7/14/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 2.01 8.39
2.00.00 2.03 9.68
3.00.00
18.07

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 2.09 7.35
2.00.00 2.11 9.89
3.00.00 2.15 6.08
23.32

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION HH


1.00.00 16.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION METRADO (M3)


1.00.00 no se vacea por falla unicon
2.00.00
3.00.00
4.00.00
0.00

ACERO UND: KG

ITEM ELEMENTO DESCRIPCION METRADO (KG)


1.00.00
2.00.00
3.00.00
4.00.00
0.00

6.- SÁBADO 7/15/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 2.18 9.07
2.00.00 1.24 13.13
3.00.00
22.19

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 2.15 6.08
2.00.00
3.00.00
6.08

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION HH


1.00.00 0.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION METRADO (M3)


1.00.00 2.09-2.11-2.15 13.50
2.00.00
3.00.00
4.00.00
13.50

ACERO UND: KG

ITEM ELEMENTO DESCRIPCION METRADO (KG)


1.00.00
2.00.00
3.00.00
4.00.00
0.00
NIA MIRAFLORES

RETO, ENCOFRADO Y ACERO

RESUMEN - RATIOS

Lunes
Partidas
10-Jul
RATIOS OBTENIDOS Perfilado 0.62
Encofrado 2.64
PERFILADO UND HH/M2 Concreto 0.60
Acero -
HH 7
METRADO 11.25
RATIO 0.62 Metrados

Lunes
Partidas
10-Jul
ENCOFRADO UND HH/M2 Perfilado 11.25
Encofrado 18.00
HH 37.5 Concreto 10.00
METRADO 18.00 Acero 0.000
RATIO 2.64

HH
3.50

CONCRETO UND HH/M3

HH 6.0
METRADO 10.00
RATIO 0.60

ACERO UND HH/KG


HH
METRADO -
RATIO -

RATIOS OBTENIDOS

PERFILADO UND HH/M2

HH 12.5
METRADO 25.56
RATIO 0.49

ENCOFRADO UND HH/M2

HH 36
METRADO 40.80
RATIO 1.25

CONCRETO UND HH/M3

HH 6.5
METRADO 13.50
RATIO 0.48

ACERO UND HH/KG


HH
METRADO -
RATIO -

RATIOS OBTENIDOS

PERFILADO UND HH/M2

HH 4
METRADO 5.54
RATIO 0.72

ENCOFRADO UND HH/M2

HH 29.5
METRADO 30.82
RATIO 1.38

CONCRETO UND HH/M3

HH 5.0
METRADO 12.50
RATIO 0.40
ACERO UND HH/KG

HH
METRADO -
RATIO -

RATIOS OBTENIDOS

PERFILADO UND HH/M2

HH 6.5
METRADO 32.96
RATIO 0.20

ENCOFRADO UND HH/M2

HH 28.5
METRADO 15.35
RATIO 2.77

CONCRETO UND HH/M3

HH 4.0
METRADO 5.50
RATIO 0.73
ACERO UND HH/KG

HH
METRADO -
RATIO -

RATIOS OBTENIDOS

PERFILADO UND HH/M2

HH 36.5
METRADO 18.07
RATIO 2.02

ENCOFRADO UND HH/M2

HH 36.5
METRADO 23.32
RATIO 2.25

HH
7.00

CONCRETO UND HH/M3

HH 74.0
METRADO -
RATIO -
ACERO UND HH/KG

HH 123
METRADO -
RATIO -

RATIOS OBTENIDOS

PERFILADO UND HH/M2

HH 10.5
METRADO 22.19
RATIO 0.47

ENCOFRADO UND HH/M2

HH 27
METRADO 6.08
RATIO 4.44

HH
17.00

CONCRETO UND HH/M3

HH 6.0
METRADO 13.50
RATIO 0.44
ACERO UND HH/KG

HH
METRADO -
RATIO -
Martes Miércoles Jueves Viernes Sábado
11-Jul 12-Jul 13-Jul 14-Jul 15-Jul PROM
0.49 0.72 0.20 2.02 0.47 0.81
1.25 1.38 2.77 2.25 4.44 2.06
0.48 0.40 0.73 - 0.44 0.55
- - - - - 0.00

Martes Miércoles Jueves Viernes Sábado


11-Jul 12-Jul 13-Jul 14-Jul 15-Jul
25.56 5.54 32.96 18.07 22.19 115.56
40.80 30.82 15.35 23.32 6.08 134.36
13.50 12.50 5.50 0.00 13.50 55.00
0.000 0.000 0.000 0.000 0.000 0.00
OBRA HOTEL BRITANIA MIRAFLORES

HOJAS DE PRODUCCIÓN DE CONCRETO, ENCOFRADO Y ACERO

1.- LUNES 7/17/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 2.18 9.07
2.00.00 1.24 13.13
3.00.00
22.19

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 2.01 9.56
2.00.00 2.03 11.06
3.00.00
20.62

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION HH


1.00.00 20.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION METRADO (M3)


1.00.00 2.01-2.03 8.00
2.00.00
3.00.00
4.00.00
8.00

ACERO UND: KG
ITEM ELEMENTO DESCRIPCION METRADO (KG)
1.00.00
2.00.00
3.00.00
4.00.00
0.00

2.- MARTES 7/18/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 2.06 8.39
2.00.00 2.10 11.40
3.00.00 2.14 4.95
24.73

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 2.18 20.32
2.00.00 2.10 12.81
3.00.00
33.13

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION HH


1.00.00 22.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION METRADO (M3)


1.00.00 2.10-2.18 11.00
2.00.00
3.00.00
4.00.00
11.00

ACERO UND: KG
ITEM ELEMENTO DESCRIPCION METRADO (KG)
1.00.00
2.00.00
3.00.00
4.00.00
0.00

3.- MIÉRCOLES 7/19/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 2.02 9.00
2.00.00 2.12 10.35
3.00.00
19.35

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 1.24 23.02
2.00.00 P10 3.25
3.00.00 2.06 8.39
34.66

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION HH


1.00.00 18.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION METRADO (M3)


1.00.00 1.24 10.00
2.00.00 2.06 3.50
3.00.00
4.00.00
13.50
ACERO UND: KG

ITEM ELEMENTO DESCRIPCION METRADO (KG)


1.00.00
2.00.00
3.00.00
4.00.00
0.00

4.- JUEVES 7/20/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 2.05 9.00
2.00.00 2.23 10.29
3.00.00
19.29

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 2.12 9.48
2.00.00 2.14 13.11
3.00.00 M3-2 11.10
2.02 3.57
37.26

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION HH


1.00.00 18.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION METRADO (M3)


1.00.00 M3-2.12-2.14 14.50
2.00.00
3.00.00
4.00.00
14.50

ACERO UND: KG

ITEM ELEMENTO DESCRIPCION METRADO (KG)


1.00.00
2.00.00
3.00.00
4.00.00
0.00

5.- VIERNES 7/21/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 2.26 5.25
2.00.00
3.00.00
5.25

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 2.02 4.83
2.00.00 2.05 11.22
3.00.00 2.23 10.63
P9 2.75
2.07 3.60
33.03

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION HH


1.00.00 16.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION METRADO (M3)


1.00.00 2.02-2.05-2.23 11.00
2.00.00
3.00.00
4.00.00
11.00

ACERO UND: KG

ITEM ELEMENTO DESCRIPCION METRADO (KG)


1.00.00
2.00.00
3.00.00
4.00.00
0.00

6.- SÁBADO 7/22/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 2.04 13.59
2.00.00 M1 10.45
3.00.00 2.26 12.60
36.64

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION METRADO (M2)


1.00.00 2.07 8.82
2.00.00
3.00.00
8.82

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION HH


1.00.00 11.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION METRADO (M3)


1.00.00 No hay vaceado
2.00.00
3.00.00
4.00.00
0.00

ACERO UND: KG

ITEM ELEMENTO DESCRIPCION METRADO (KG)


1.00.00
2.00.00
3.00.00
4.00.00
0.00
A MIRAFLORES

ETO, ENCOFRADO Y ACERO

RESUMEN - RATIOS

Lunes
Partidas
17-Jul
RATIOS OBTENIDOS Perfilado 0.34
Encofrado 3.18
PERFILADO UND HH/M2 Concreto 0.63
Acero -
HH 7.5
METRADO 22.19
RATIO 0.34 Metrados

Lunes
Partidas
17-Jul
ENCOFRADO UND HH/M2 Perfilado 22.19
Encofrado 20.62
HH 45.5 Concreto 8.00
METRADO 20.62 Acero 0.000
RATIO 3.18

HH
2.50

CONCRETO UND HH/M3

HH 5.0
METRADO 8.00
RATIO 0.63

ACERO UND HH/KG


HH
METRADO -
RATIO -

RATIOS OBTENIDOS

PERFILADO UND HH/M2

HH 23
METRADO 24.73
RATIO 0.93

ENCOFRADO UND HH/M2

HH 44
METRADO 33.13
RATIO 1.99

HH
2.00

CONCRETO UND HH/M3

HH 7.0
METRADO 11.00
RATIO 0.64

ACERO UND HH/KG


HH
METRADO -
RATIO -

RATIOS OBTENIDOS

PERFILADO UND HH/M2

HH 15.5
METRADO 19.35
RATIO 0.80

ENCOFRADO UND HH/M2

HH 50
METRADO 34.66
RATIO 1.96

CONCRETO UND HH/M3

HH 6.5
METRADO 13.50
RATIO 0.48
ACERO UND HH/KG

HH
METRADO -
RATIO -

RATIOS OBTENIDOS

PERFILADO UND HH/M2

HH 11.5
METRADO 19.29
RATIO 0.60

ENCOFRADO UND HH/M2

HH 46
METRADO 37.26
RATIO 1.72

HH
4.00

CONCRETO UND HH/M3

HH 7.0
METRADO 14.50
RATIO 0.48
ACERO UND HH/KG

HH
METRADO -
RATIO -

RATIOS OBTENIDOS

PERFILADO UND HH/M2

HH 6
METRADO 5.25
RATIO 1.14

ENCOFRADO UND HH/M2

HH 52
METRADO 33.03
RATIO 2.06

CONCRETO UND HH/M3

HH 6.5
METRADO 11.00
RATIO 0.59

ACERO UND HH/KG

HH
METRADO -
RATIO -

RATIOS OBTENIDOS

PERFILADO UND HH/M2

HH 14
METRADO 36.64
RATIO 0.38

ENCOFRADO UND HH/M2

HH 13
METRADO 8.82
RATIO 1.47

HH
20.00

CONCRETO UND HH/M3

HH
METRADO -
RATIO -

ACERO UND HH/KG

HH
METRADO -
RATIO -
Martes Miércoles Jueves Viernes Sábado
18-Jul 19-Jul 20-Jul 21-Jul 22-Jul PROM
0.93 0.80 0.60 1.14 0.38 0.76
1.99 1.96 1.72 2.06 1.47 2.18
0.64 0.48 0.48 0.59 - 0.56
- - - - - 0.00

Martes Miércoles Jueves Viernes Sábado


18-Jul 19-Jul 20-Jul 21-Jul 22-Jul
24.73 19.35 19.29 5.25 36.64 127.45
33.13 34.66 37.26 33.03 8.82 167.50
11.00 13.50 14.50 11.00 0.00 58.00
0.000 0.000 0.000 0.000 0.000 0.00
OBRA HOTEL BRITANIA MIRAFLORES

HOJAS DE PRODUCCIÓN DE CONCRETO, ENCOFRADO Y ACERO

1.- LUNES 7/24/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION


1.00.00 2.16
2.00.00
3.00.00

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION


1.00.00 2.04
2.00.00 M2
3.00.00 P13
2.16

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION


1.00.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION


1.00.00 2.07-2.04-M2
2.00.00
3.00.00
4.00.00
ACERO UND: KG

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00
4.00.00

EXCAVACION MANUAL UND: KG

ITEM ELEMENTO DESCRIPCION


1.00.00 ZAPATA
2.00.00
3.00.00
4.00.00

2.- MARTES 7/25/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION


1.00.00 2.08
2.00.00
3.00.00

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION


1.00.00 2.26
2.00.00 P17
3.00.00

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION


1.00.00
CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION


1.00.00 2.16-2.26
2.00.00
3.00.00
4.00.00

ACERO UND: KG

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00
4.00.00

EXCAVACION MANUAL UND: KG

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00
4.00.00

3.- MIÉRCOLES 7/26/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION


1.00.00 2.19
2.00.00
3.00.00

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION


1.00.00 2.08-M2
2.00.00 P22
3.00.00

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION


1.00.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION


1.00.00 ZAPATA
2.00.00
3.00.00
4.00.00

ACERO UND: KG

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00
4.00.00

EXCAVACION MANUAL UND: KG

ITEM ELEMENTO DESCRIPCION


1.00.00 ZAPATA
2.00.00 BASE DE MURO
3.00.00
4.00.00

4.- JUEVES 7/27/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION


1.00.00 2.19
2.00.00
3.00.00

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION


1.00.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION


1.00.00 ZAPATA
2.00.00 BASE MURO
3.00.00 SOLADO
4.00.00 MURO 2.18-M2

ACERO UND: KG

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00
4.00.00

EXCAVACION MANUAL UND: KG

ITEM ELEMENTO DESCRIPCION


1.00.00 ZAPATA PLACA 05
2.00.00 ZAPATA PLACA 06
3.00.00 BASE MURO 6
4.00.00
5.- VIERNES 7/28/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION


1.00.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00
4.00.00

ACERO UND: KG

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00
4.00.00

6.- SÁBADO 7/29/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION


1.00.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION


1.00.00 No hay vaceado
2.00.00
3.00.00
4.00.00

ACERO UND: KG

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00
4.00.00
HOTEL BRITANIA MIRAFLORES

CCIÓN DE CONCRETO, ENCOFRADO Y ACERO

RATIOS OBTENIDOS

PERFILADO UND HH/M2

METRADO (M2) HH 10
13.02 METRADO 13.02
RATIO 0.77

13.02

ENCOFRADO UND HH/M2

METRADO (M2) HH 56.5


13.59 METRADO 42.35
10.31 RATIO 1.38
3.57
14.88
42.35

HH HH
2.00 9.50

CONCRETO UND HH/M3

METRADO (M3) HH 7.5


13.00 METRADO 13.00
RATIO 0.58

13.00
ACERO UND HH/KG

METRADO (KG) HH
METRADO -
RATIO -

0.00

EXCAVACION MANU UND HH/KG

METRADO (KG) HH 5 22.5


4.30 METRADO 4.30
RATIO 1.16

HH
4.30 20.00

RATIOS OBTENIDOS

PERFILADO UND HH/M2

METRADO (M2) HH 9
21.32 METRADO 21.32
RATIO 0.42

21.32

ENCOFRADO UND HH/M2

METRADO (M2) HH 35
9.99 METRADO 14.45
4.47 RATIO 3.36

14.45

HH HH
13.50 19.50
CONCRETO UND HH/M3

METRADO (M3) HH 6.0


11.00 METRADO 11.00
RATIO 0.55

11.00

ACERO UND HH/KG

METRADO (KG) HH
METRADO -
RATIO -

0.00

EXCAVACION MANU UND HH/KG

METRADO (KG) HH 0 15.0


METRADO -
RATIO -

HH
0.00 27.50

RATIOS OBTENIDOS

PERFILADO UND HH/M2

METRADO (M2) HH 6
10.65 METRADO 10.65
RATIO 0.56

10.65

ENCOFRADO UND HH/M2

METRADO (M2) HH 22.5


17.22 METRADO 19.55
2.33 RATIO 1.79
19.55

HH HH
12.5 33.00

CONCRETO UND HH/M3

METRADO (M3) HH 4.5


12.50 METRADO 12.50
RATIO 0.36

12.50

ACERO UND HH/KG

METRADO (KG) HH
METRADO -
RATIO -

0.00

EXCAVACION MANU UND HH/KG

METRADO (KG) HH 10.5 21.0


4.20 METRADO 5.84
1.64 RATIO 1.80

HH
5.84 21.50

RATIOS OBTENIDOS

PERFILADO UND HH/M2

METRADO (M2) HH 7.5


10.65 METRADO 10.65
RATIO 0.70
10.65

ENCOFRADO UND HH/M2

METRADO (M2) HH
METRADO -
RATIO -

0.00

HH HH
68.00

CONCRETO UND HH/M3

METRADO (M3) HH 9.5


3.40 METRADO 11.50
1.30 RATIO 0.83
0.50
6.30
11.50

ACERO UND HH/KG

METRADO (KG) HH
METRADO -
RATIO -

0.00

EXCAVACION MANU UND HH/KG

METRADO (KG) HH 12 29.0


5.30 METRADO 12.60
3.65 RATIO 0.95
3.65
HH
12.60 13.50
RATIOS OBTENIDOS

PERFILADO UND HH/M2

METRADO (M2) HH
METRADO -
RATIO -

0.00

ENCOFRADO UND HH/M2

METRADO (M2) HH
METRADO -
RATIO -

0.00

HH
16.00

CONCRETO UND HH/M3

METRADO (M3) HH
METRADO -
RATIO -

0.00

ACERO UND HH/KG

METRADO (KG) HH
METRADO -
RATIO -
0.00

RATIOS OBTENIDOS

PERFILADO UND HH/M2

METRADO (M2) HH
METRADO -
RATIO -

0.00

ENCOFRADO UND HH/M2

METRADO (M2) HH
METRADO -
RATIO -

0.00

HH
11.00

CONCRETO UND HH/M3

METRADO (M3) HH
METRADO -
RATIO -

0.00

ACERO UND HH/KG

METRADO (KG) HH
METRADO -
RATIO -
0.00
RESUMEN - RATIOS

Lunes Martes Miércoles Jueves Viernes Sábado


Partidas
24-Jul 25-Jul 26-Jul 27-Jul 28-Jul 29-Jul PROM
Perfilado 0.77 0.42 0.56 0.70 - - 0.61
Encofrado 1.38 3.36 1.79 - - - 2.18
Concreto 0.58 0.55 0.36 0.83 - - 0.58
Acero - - - - - - 0.00

Metrados

Lunes Martes Miércoles Jueves Viernes Sábado


Partidas
24-Jul 25-Jul 26-Jul 27-Jul 28-Jul 29-Jul
Perfilado 13.02 21.32 10.65 10.65 0.00 0.00 55.64
Encofrado 42.35 14.45 19.55 0.00 0.00 0.00 76.35
Concreto 13.00 11.00 12.50 11.50 0.00 0.00 48.00
Acero 0.000 0.000 0.000 0.000 0.000 0.000 0.00
42.5
20.0
42.5
27.5
42.5
21.5
42.5
13.5
OBRA HOTEL BRITANIA MIRAFLORES

HOJAS DE PRODUCCIÓN DE CONCRETO, ENCOFRADO Y

1.- LUNES 7/31/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION


1.00.00 2.17
2.00.00
3.00.00

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION


1.00.00 2.19
2.00.00
3.00.00

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION


1.00.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION


1.00.00 2.19
2.00.00 ZAPATAS
3.00.00 BASE DE MUROS
4.00.00
ACERO UND: KG

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00
4.00.00

EXCAVACION MANUAL UND: KG

ITEM ELEMENTO DESCRIPCION


1.00.00 ZAPATAS
2.00.00
3.00.00
4.00.00

2.- MARTES 8/1/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION


1.00.00 2.20
2.00.00
3.00.00

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION


1.00.00 2.17
2.00.00
3.00.00

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION


1.00.00
CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION


1.00.00 M2.17
2.00.00 P19
3.00.00 ZAPATAS
4.00.00 BASE MUROS

ACERO UND: KG

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00
4.00.00

EXCAVACION MANUAL UND: KG

ITEM ELEMENTO DESCRIPCION


1.00.00 ZAPATAS
2.00.00
3.00.00
4.00.00

3.- MIÉRCOLES 8/2/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION


1.00.00 2.22
2.00.00
3.00.00

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION


1.00.00 2.20-M2
2.00.00
3.00.00

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION


1.00.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION


1.00.00 ZAPATAS
2.00.00 VIGA DE CIMENTACION
3.00.00
4.00.00

ACERO UND: KG

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00
4.00.00

EXCAVACION MANUAL UND: KG

ITEM ELEMENTO DESCRIPCION


1.00.00 ZAPATAS
2.00.00
3.00.00
4.00.00

4.- JUEVES 8/3/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION


1.00.00 2.22
2.00.00
3.00.00

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION


1.00.00 2.20-M2
2.00.00
3.00.00

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION


1.00.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION


1.00.00 ZAPATA
2.00.00 VIGA DE CIMENTACION
3.00.00 M 2.20-M2
4.00.00 COLUMNA P19

ACERO UND: KG

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00
4.00.00

EXCAVACION MANUAL UND: KG

ITEM ELEMENTO DESCRIPCION


1.00.00 ZAPATA
2.00.00 VIGA DE CIMENTACION
3.00.00
4.00.00
5.- VIERNES 8/4/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION


1.00.00 2.22
2.00.00
3.00.00

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION


1.00.00 2.22
2.00.00
3.00.00

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION


1.00.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION


1.00.00 ZAPATA
2.00.00 VIGA DE CIMENTACION
3.00.00
4.00.00

ACERO UND: KG

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00
4.00.00

EXCAVACION MANUAL UND: KG

ITEM ELEMENTO DESCRIPCION


1.00.00 ZAPATA
2.00.00
3.00.00
4.00.00

6.- SÁBADO 8/5/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION


1.00.00 2.22
2.00.00
3.00.00

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION


1.00.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION


1.00.00 ZAPATAS
2.00.00 VIGA DE CIMENTACION
3.00.00 SOLADO
4.00.00

ACERO UND: KG

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00
4.00.00

EXCAVACION MANUAL UND: KG

ITEM ELEMENTO DESCRIPCION


1.00.00 ZAPATA
2.00.00
3.00.00
4.00.00
RA HOTEL BRITANIA MIRAFLORES

UCCIÓN DE CONCRETO, ENCOFRADO Y ACERO

RATIOS OBTENIDOS

PERFILADO UND HH/M2

METRADO (M2) HH 7
18.36 METRADO 18.36
RATIO 0.38

18.36

ENCOFRADO UND HH/M2

METRADO (M2) HH 26.5


18.60 METRADO 18.60
RATIO 1.96

18.60

HH HH
10.00 31.50

CONCRETO UND HH/M3

METRADO (M3) HH 5.0


8.80 METRADO 13.90
3.80 RATIO 0.36
1.30

13.90
ACERO UND HH/KG

METRADO (KG) HH
METRADO -
RATIO -

0.00

EXCAVACION MANUAL UND HH/KG

METRADO (KG) HH 10.5


10.80 METRADO 10.80
RATIO 0.97
42.5 42.5
HH
10.80 20.00

RATIOS OBTENIDOS

PERFILADO UND HH/M2

METRADO (M2) HH 7
19.24 METRADO 19.24
RATIO 0.36

19.24

ENCOFRADO UND HH/M2

METRADO (M2) HH 20.5


18.36 METRADO 18.36
RATIO 1.80

18.36

HH HH
12.50 35.00
CONCRETO UND HH/M3

METRADO (M3) HH 3.0


7.70 METRADO 24.00
2.30 RATIO 0.13
12.45
1.55
24.00

ACERO UND HH/KG

METRADO (KG) HH
METRADO -
RATIO -

0.00

EXCAVACION MANUAL UND HH/KG

METRADO (KG) HH 7
10.50 METRADO 10.50
RATIO 0.67

HH
10.50 25.50

RATIOS OBTENIDOS

PERFILADO UND HH/M2

METRADO (M2) HH 6
5.00 METRADO 5.00
RATIO 1.20

5.00

ENCOFRADO UND HH/M2

METRADO (M2) HH 5.5


9.62 METRADO 9.62
RATIO 2.39
9.62

68.00

HH HH
17.5 45.00

CONCRETO UND HH/M3

METRADO (M3) HH 6.0


11.20 METRADO 14.30
3.10 RATIO 0.42

14.30

ACERO UND HH/KG

METRADO (KG) HH
METRADO -
RATIO -

0.00

EXCAVACION MANUAL UND HH/KG

METRADO (KG) HH 13
9.15 METRADO 9.15
RATIO 1.42

HH
9.15 17.50

RATIOS OBTENIDOS

PERFILADO UND HH/M2

METRADO (M2) HH 7
5.00 METRADO 5.00
RATIO 1.40
5.00

ENCOFRADO UND HH/M2

METRADO (M2) HH 26.5


9.62 METRADO 9.62
RATIO 2.75

9.62

HH HH
41.50

CONCRETO UND HH/M3

METRADO (M3) HH 6.0


12.50 METRADO 25.50
0.70 RATIO 0.24
10.00
2.30
25.50

ACERO UND HH/KG

METRADO (KG) HH
METRADO -
RATIO -

0.00

EXCAVACION MANUAL UND HH/KG

METRADO (KG) HH 7
11.30 METRADO 12.50
1.20 RATIO 0.56

HH
12.50 22.50
RATIOS OBTENIDOS

PERFILADO UND HH/M2

METRADO (M2) HH 4
5.00 METRADO 5.00
RATIO 0.80

5.00

ENCOFRADO UND HH/M2

METRADO (M2) HH 3
3.00 METRADO 3.00
RATIO 6.34

3.00

HH HH
16.00 49.00

CONCRETO UND HH/M3

METRADO (M3) HH 7.5


21.60 METRADO 29.00
7.40 RATIO 0.26

29.00

ACERO UND HH/KG

METRADO (KG) HH
METRADO -
RATIO -
0.00

EXCAVACION MANUAL UND HH/KG

METRADO (KG) HH 2.5


3.96 METRADO 3.96
RATIO 0.63

HH
3.96 28.50

RATIOS OBTENIDOS

PERFILADO UND HH/M2

METRADO (M2) HH 0
METRADO -
RATIO -

0.00

ENCOFRADO UND HH/M2

METRADO (M2) HH 16 16.00


6.99 METRADO 6.99
RATIO 2.29

6.99

HH HH
0.00 28.00

CONCRETO UND HH/M3

METRADO (M3) HH 9.0


9.80 METRADO 18.00
5.20 RATIO 0.50
3.00
18.00

ACERO UND HH/KG

METRADO (KG) HH
METRADO -
RATIO -

0.00

EXCAVACION MANUAL UND HH/KG

METRADO (KG) HH 7
4.20 METRADO 4.20
RATIO 1.67

HH
4.20 11.50
RESUMEN - RATIOS

Lunes Martes Miércoles Jueves Viernes Sábado


Partidas
31-Jul 1-Aug 2-Aug 3-Aug 4-Aug 5-Aug PROM
Perfilado 0.38 0.36 1.20 1.40 0.80 - 0.83
Encofrado 1.96 1.80 2.39 2.75 6.34 2.29 3.05
Concreto 0.36 0.13 0.42 0.24 0.26 0.50 0.28
Acero - - - - - - 0.00

Metrados

Lunes Martes Miércoles Jueves Viernes Sábado


Partidas
31-Jul 1-Aug 2-Aug 3-Aug 4-Aug 5-Aug
Perfilado 18.36 19.24 5.00 5.00 5.00 0.00 52.59
Encofrado 18.60 18.36 9.62 9.62 3.00 6.99 66.19
Concreto 13.90 24.00 14.30 25.50 29.00 18.00 124.70
Acero 0.000 0.000 0.000 0.000 0.000 0.000 0.00
44
28.00
OBRA HOTEL BRITANIA MIRAFLORES

HOJAS DE PRODUCCIÓN DE CONCRETO, ENCOFRADO Y ACE

1.- LUNES 8/7/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION


1.00.00 ZAPATAS
2.00.00 VIGA DE CIMENTACION
3.00.00

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION


1.00.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00
4.00.00
ACERO UND: KG

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00
4.00.00

EXCAVACION MANUAL UND: KG

ITEM ELEMENTO DESCRIPCION


1.00.00 ZAPATAS
2.00.00
3.00.00
4.00.00

2.- MARTES 8/8/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION


1.00.00 2.21
2.00.00
3.00.00

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION


1.00.00 ZAPATAS
2.00.00 BASE DE MUROS
3.00.00 2.21

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION


1.00.00
CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION


1.00.00 VIGA DE CIMENTACION
2.00.00 SOLADO
3.00.00
4.00.00

ACERO UND: KG

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00
4.00.00

EXCAVACION MANUAL UND: KG

ITEM ELEMENTO DESCRIPCION


1.00.00 VIGA DE CIMENTACION
2.00.00 BASE DE MURO
3.00.00 ZAPATAS
4.00.00

3.- MIÉRCOLES 8/9/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION


1.00.00 2.28
2.00.00
3.00.00

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION


1.00.00 2.21
2.00.00 ZAPATAS
3.00.00 BASE DE MURO

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION


1.00.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION


1.00.00 ZAPATA
2.00.00 BASE DE MURO
3.00.00 MURO 2.21
4.00.00

ACERO UND: KG

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00
4.00.00

EXCAVACION MANUAL UND: KG

ITEM ELEMENTO DESCRIPCION


1.00.00 ZAPATAS
2.00.00
3.00.00
4.00.00

4.- JUEVES 8/10/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION


1.00.00 ZAPATA
2.00.00 VIGA DE CIMENTACION
3.00.00 BASE DE MURO

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION


1.00.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION


1.00.00 ZAPATA
2.00.00 VIGA DE CIMENTACION
3.00.00 MURO
4.00.00 SOLADO

ACERO UND: KG

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00
4.00.00

EXCAVACION MANUAL UND: KG

ITEM ELEMENTO DESCRIPCION


1.00.00 ZAPATAS
2.00.00
3.00.00
4.00.00
5.- VIERNES 8/11/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION


1.00.00 2.27
2.00.00
3.00.00

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION


1.00.00 ZAPATAS
2.00.00 VIGA DE CIMENTACION
3.00.00 BASE DE MUROS

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION


1.00.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION


1.00.00 ZAPATAS
2.00.00 VIGA DE CIMENTACION
3.00.00 BASE DE MUROS
4.00.00

ACERO UND: KG

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00
4.00.00

EXCAVACION MANUAL UND: KG

ITEM ELEMENTO DESCRIPCION


1.00.00 ZAPATAS
2.00.00
3.00.00
4.00.00

6.- SÁBADO 8/12/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION


1.00.00 ZAPATAS
2.00.00
3.00.00

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION


1.00.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION


1.00.00 ZAPATA
2.00.00
3.00.00
4.00.00

ACERO UND: KG

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00
4.00.00

EXCAVACION MANUAL UND: KG

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00
4.00.00
OTEL BRITANIA MIRAFLORES

ÓN DE CONCRETO, ENCOFRADO Y ACERO

RESUMEN - RATIOS

Partidas

RATIOS OBTENIDOS Perfilado


Encofrado
PERFILADO UND HH/M2 Concreto
Acero
METRADO (M2) HH
METRADO -
RATIO - Metrados

0.00

Partidas

ENCOFRADO UND HH/M2 Perfilado


Encofrado
METRADO (M2) HH 15.5 Concreto
9.37 METRADO 20.57 Acero
11.20 RATIO 0.75

20.57 68.00

HH HH
0.00 52.50

CONCRETO UND HH/M3

METRADO (M3) HH
METRADO -
RATIO -

0.00
ACERO UND HH/KG

METRADO (KG) HH
METRADO -
RATIO -

0.00

EXCAVACION MANUAL UND HH/KG

METRADO (KG) HH 10
5.50 METRADO 5.50
RATIO 1.82

HH 34.00 34
5.50 24.00 FALTA PALOMINO

RATIOS OBTENIDOS

PERFILADO UND HH/M2

METRADO (M2) HH 4
15.54 METRADO 15.54
RATIO 0.26

15.54

ENCOFRADO UND HH/M2

METRADO (M2) HH 29
25.20 METRADO 29.55
2.80 RATIO 0.98
1.55
29.55
68.00

HH HH
39.00
CONCRETO UND HH/M3

METRADO (M3) HH 4.0


3.50 METRADO 8.50
5.00 RATIO 0.47

8.50

ACERO UND HH/KG

METRADO (KG) HH
METRADO -
RATIO -

0.00

EXCAVACION MANUAL UND HH/KG

METRADO (KG) HH 18.5


0.48 METRADO 11.88
0.90 RATIO 1.56
10.50
HH 42.5 42.5
11.88 16.00 0.0

RATIOS OBTENIDOS

PERFILADO UND HH/M2

METRADO (M2) HH 5.5


11.88 METRADO 11.88
RATIO 0.46

11.88

ENCOFRADO UND HH/M2

METRADO (M2) HH 39
13.99 METRADO 23.15
6.40 RATIO 1.68
2.76
23.15

68.00

HH HH
29.00

CONCRETO UND HH/M3

METRADO (M3) HH 15.0


69.05 METRADO 80.50
4.25 RATIO 0.19
7.20

80.50

ACERO UND HH/KG

METRADO (KG) HH
METRADO -
RATIO -

0.00

EXCAVACION MANUAL UND HH/KG

METRADO (KG) HH 10.5


9.73 METRADO 9.73
RATIO 1.08

HH 42.500 42.50
9.73 11.50

RATIOS OBTENIDOS

PERFILADO UND HH/M2

METRADO (M2) HH
METRADO -
RATIO -
0.00

ENCOFRADO UND HH/M2

METRADO (M2) HH 47
16.90 METRADO 25.98
5.60 RATIO 2.42
3.48

25.98 68 68.00

HH HH
16.00 5.00

CONCRETO UND HH/M3

METRADO (M3) HH 5.0


14.20 METRADO 21.00
0.80 RATIO 0.24
4.00
2.00
21.00

ACERO UND HH/KG

METRADO (KG) HH
METRADO -
RATIO -

0.00

EXCAVACION MANUAL UND HH/KG

METRADO (KG) HH 11
8.33 METRADO 8.33
RATIO 1.32

HH 42.500 42.50
8.33 26.50
RATIOS OBTENIDOS

PERFILADO UND HH/M2

METRADO (M2) HH 6
23.10 METRADO 23.10
RATIO 0.26

23.10

ENCOFRADO UND HH/M2

METRADO (M2) HH 46
27.10 METRADO 30.95
0.40 RATIO 1.94
3.45
68 68.00

30.95

HH HH
14.00 8.00

CONCRETO UND HH/M3

METRADO (M3) HH 7.0


35.11 METRADO 37.00
0.76 RATIO 0.19
1.13

37.00

ACERO UND HH/KG

METRADO (KG) HH
METRADO -
RATIO -
0.00

EXCAVACION MANUAL UND HH/KG

METRADO (KG) HH 8.5


7.40 METRADO 7.40
RATIO 1.15

HH 51.000 51.00
7.40 29.50

RATIOS OBTENIDOS

PERFILADO UND HH/M2

METRADO (M2) HH 0
METRADO -
RATIO -

0.00

ENCOFRADO UND HH/M2

METRADO (M2) HH 23
25.40 METRADO 25.40
RATIO 0.91

25.40
44 44.00

HH HH
0.00 21.00

CONCRETO UND HH/M3

METRADO (M3) HH 6.5


24.00 METRADO 24.00
RATIO 0.27
24.00

ACERO UND HH/KG

METRADO (KG) HH
METRADO -
RATIO -

0.00

EXCAVACION MANUAL UND HH/KG

METRADO (KG) HH 0
METRADO -
RATIO -

HH 33.000 33.0
0.00 26.50
ESUMEN - RATIOS

Lunes Martes Miércoles Jueves Viernes Sábado


7-Aug 8-Aug 9-Aug 10-Aug 11-Aug 12-Aug PROM
- 0.26 0.46 - 0.26 - 0.33
0.75 0.98 1.68 2.42 1.94 0.91 1.56
- 0.47 0.19 0.24 0.19 0.27 0.27
- - - - - - 0.00

Lunes Martes Miércoles Jueves Viernes Sábado


7-Aug 8-Aug 9-Aug 10-Aug 11-Aug 12-Aug
0.00 15.54 11.88 0.00 23.10 0.00 50.52
20.57 29.55 23.15 25.98 30.95 25.40 155.60
0.00 8.50 80.50 21.00 37.00 24.00 171.00
0.000 0.000 0.000 0.000 0.000 0.000 0.00
OBRA HOTEL BRITANIA MIRAFLORES

HOJAS DE PRODUCCIÓN DE CONCRETO, ENCOFRADO Y ACE

1.- LUNES 8/14/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION


1.00.00 COLUMNAS
2.00.00 ZAPATAS
3.00.00 VIGA DE CIMENTACION

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION


1.00.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION


1.00.00 COLUMNAS
2.00.00 BASE DE MURO
3.00.00 ZAPATAS
4.00.00
ACERO UND: KG

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00
4.00.00

EXCAVACION MANUAL UND: KG

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00
4.00.00

2.- MARTES 8/15/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION


1.00.00 VIGA DE CIMENTACION
2.00.00 COLUMNAS
3.00.00 M 2.27

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION


1.00.00
CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION


1.00.00 COLUMNAS
1.00.01 VIGA DE CIMENTACION
1.00.02 BASE DE MURO
1.00.03 M.2.27
1.00.04 SOLADO

ACERO UND: KG

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00
4.00.00

EXCAVACION MANUAL UND: KG

ITEM ELEMENTO DESCRIPCION


1.00.00 ZAPATAS
2.00.00
3.00.00
4.00.00

3.- MIÉRCOLES 8/16/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION


1.00.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00
4.00.00

ACERO UND: KG

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00
4.00.00

EXCAVACION MANUAL UND: KG

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00
4.00.00

4.- JUEVES 8/17/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION


1.00.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00
4.00.00

ACERO UND: KG

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00
4.00.00

EXCAVACION MANUAL UND: KG

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00
4.00.00
5.- VIERNES 8/18/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION


1.00.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00
4.00.00

ACERO UND: KG

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00
4.00.00

EXCAVACION MANUAL UND: KG

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00
4.00.00

6.- SÁBADO 8/19/2017

METRADO EJECUTADO

PERFILADO UND: M2 / M3

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00

ENCOFRADO UND: M2

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00

DESENCOFRADO Y ACARREO

ITEM ELEMENTO DESCRIPCION


1.00.00

CONCRETO UND: M3

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00
4.00.00

ACERO UND: KG

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00
4.00.00

EXCAVACION MANUAL UND: KG

ITEM ELEMENTO DESCRIPCION


1.00.00
2.00.00
3.00.00
4.00.00
OTEL BRITANIA MIRAFLORES

ÓN DE CONCRETO, ENCOFRADO Y ACERO

RESUMEN - RATIOS

Partidas

RATIOS OBTENIDOS Perfilado


Encofrado
PERFILADO UND HH/M2 Concreto
Acero
METRADO (M2) HH
METRADO -
RATIO - Metrados

0.00

Partidas

ENCOFRADO UND HH/M2 Perfilado


Encofrado
METRADO (M2) HH 41.5 Concreto
13.50 METRADO 28.26 Acero
6.12 RATIO 1.47
8.64

28.26 74.50 74.5

HH HH
0.00 33.00

CONCRETO UND HH/M3

METRADO (M3) HH 12.5


2.47 METRADO 15.00
7.11 RATIO 0.83
5.42

15.00
ACERO UND HH/KG

METRADO (KG) HH
METRADO -
RATIO -

0.00

EXCAVACION MANUAL UND HH/KG

METRADO (KG) HH
METRADO -
RATIO -

HH 51.0 51
0.00 38.50

RATIOS OBTENIDOS

PERFILADO UND HH/M2

METRADO (M2) HH
METRADO -
RATIO -

0.00

ENCOFRADO UND HH/M2

METRADO (M2) HH 35.5


13.50 METRADO 56.95
23.85 RATIO 0.62
19.60
56.95
76.50 76.5

HH HH
41.00
CONCRETO UND HH/M3

METRADO (M3) HH 7.5


3.40 METRADO 16.00
2.95 RATIO 0.47
0.65
8.00
1.00
16.00

ACERO UND HH/KG

METRADO (KG) HH
METRADO -
RATIO -

0.00

EXCAVACION MANUAL UND HH/KG

METRADO (KG) HH 9
4.20 METRADO 4.20
RATIO 2.14

HH 51.0 51
4.20 34.50 0.0

RATIOS OBTENIDOS

PERFILADO UND HH/M2

METRADO (M2) HH
METRADO -
RATIO -

0.00

ENCOFRADO UND HH/M2

METRADO (M2) HH
METRADO -
RATIO -

0.00

0.00

HH HH

CONCRETO UND HH/M3

METRADO (M3) HH
METRADO -
RATIO -

0.00

ACERO UND HH/KG

METRADO (KG) HH
METRADO -
RATIO -

0.00

EXCAVACION MANUAL UND HH/KG

METRADO (KG) HH
METRADO -
RATIO -

HH 42.500 0.00
0.00

RATIOS OBTENIDOS

PERFILADO UND HH/M2

METRADO (M2) HH
METRADO -
RATIO -

0.00

ENCOFRADO UND HH/M2

METRADO (M2) HH
METRADO -
RATIO -

0.00 68 16.00

HH HH
16.00

CONCRETO UND HH/M3

METRADO (M3) HH
METRADO -
RATIO -

0.00

ACERO UND HH/KG

METRADO (KG) HH
METRADO -
RATIO -

0.00

EXCAVACION MANUAL UND HH/KG

METRADO (KG) HH
METRADO -
RATIO -

HH 42.500 0.00
0.00

RATIOS OBTENIDOS

PERFILADO UND HH/M2

METRADO (M2) HH
METRADO -
RATIO -

0.00

ENCOFRADO UND HH/M2

METRADO (M2) HH
METRADO -
RATIO -

68 14.00

0.00

HH HH
14.00

CONCRETO UND HH/M3

METRADO (M3) HH
METRADO -
RATIO -

0.00

ACERO UND HH/KG

METRADO (KG) HH
METRADO -
RATIO -
0.00

EXCAVACION MANUAL UND HH/KG

METRADO (KG) HH
METRADO -
RATIO -

HH 51.000 0.00
0.00

RATIOS OBTENIDOS

PERFILADO UND HH/M2

METRADO (M2) HH
METRADO -
RATIO -

0.00

ENCOFRADO UND HH/M2

METRADO (M2) HH
METRADO -
RATIO -

0.00
44 0.00

HH HH
0.00

CONCRETO UND HH/M3

METRADO (M3) HH
METRADO -
RATIO -
0.00

ACERO UND HH/KG

METRADO (KG) HH
METRADO -
RATIO -

0.00

EXCAVACION MANUAL UND HH/KG

METRADO (KG) HH 0
METRADO -
RATIO -

HH 33.000 0.0
0.00
ESUMEN - RATIOS

Lunes Martes Miércoles Jueves Viernes Sábado


14-Aug 15-Aug 16-Aug 17-Aug 18-Aug 19-Aug PROM
- - - - - - #DIV/0!
1.47 0.62 - - - - 1.05
0.83 0.47 - - - - 0.65
- - - - - - 0.00

Lunes Martes Miércoles Jueves Viernes Sábado


14-Aug 15-Aug 16-Aug 17-Aug 18-Aug 19-Aug
0.00 0.00 0.00 0.00 0.00 0.00 0.00
28.26 56.95 0.00 0.00 0.00 0.00 85.21
15.00 16.00 0.00 0.00 0.00 0.00 31.00
0.000 0.000 0.000 0.000 0.000 0.000 0.00