DATOS:
ﻻs
s
= 1800 kg/m³ = 1.80 tn/m³ f'c = 210 kg/cm2
δt = 0.90 kg/cm² = 9 tn/m² Pd = 5315 kg = 5.315 tn
s/c = 250 kg/m² = 0.25 tn/m² Pl = 621 kg = 0.621 tn
df = 1.50 m b = 25 cm
ﻻc
s
= 2400 kg/m³ d = 30 cm
METRADO DE CARGAS
2.48 m
2.35 m
Donde:
δn = δt - ﻻs
(s
x df - s/c
δn = 6.05 tn/m²
Entonces:
Luego:
B= 0.30+2x
0.30
x x
0.25
a= 4
b= 1.10
c= -1.005
x2 = 8 - 17.29 x2 = 0.48 m
8
Luego:
Cálculo de WNU:
dz = 28 cm
hz = dz + r + Øl hz = 28 cm + 7.5 cm + 1.27 cm
hz = 36.77 cm
hz = 40.00 cm
Vc > Vactuante
Entonces:
Vc > Vactuante
23.99 tn > 0.44 tn Ok
Perimetro de Punzonamiento:
bo = 2.35m
bo = 235 m
V Cp = 116988.23 kg
V Cp = 116.99 tn
Entonces:
V Cp > Vup
116.99 tn > 4.96 tn Ok
Cálculo del Acero Mínimo:
As mín = 0.0018 x b x hz
A = 0.18 m
A = 0.20 m Ok
Dimensionamiento:
A= 0.25+2x
x x
B= 0.25+x
0.25
0.25
A= 0.25+x
0.25
x
B= 0.25+x
0.25