Eje C Tramo 1-3

 Losa

𝑊𝑉𝐼 = (1.5625 𝑚2 ) (0.9986 𝑡𝑜𝑛⁄ 2 )


𝑚
𝑊𝑉𝐼 = 1.5603 𝑡𝑜𝑛

 Pared

𝑊 = (0.2 𝑡𝑜𝑛⁄ 2 ) (0.8 𝑚)(3.2 𝑚)(1.2)


𝑚
𝑊 = 0.6944 𝑡𝑜𝑛

 Viga
𝑊 = 0.5846 𝑡𝑜𝑛
 Total

𝑊 = 1.5603 𝑡𝑜𝑛 + 0.6144 𝑡𝑜𝑛 + 0.5846 𝑡𝑜𝑛

𝑊 = 2.7593 𝑡𝑜𝑛⁄2.90 𝑚

𝑊 = 0.9515 𝑡𝑜𝑛⁄𝑚

Eje C Tramo 3-4


 Losa
𝑊𝐼𝑋 = 0.4445 𝑡𝑜𝑛

 Pared

𝑊 = (0.2 𝑡𝑜𝑛⁄ 2 ) (1.35 𝑚)(3.2 𝑚)(1.2)


𝑚
𝑊 = 1.037 𝑡𝑜𝑛

 Viga
𝑊 = 0.2722 𝑡𝑜𝑛
 Total

𝑊 = 0.4445 𝑡𝑜𝑛 + 1.037 𝑡𝑜𝑛 + 0.2722 𝑡𝑜𝑛

𝑊 = 1.7537 𝑡𝑜𝑛⁄1.35 𝑚

𝑊 = 1.2990 𝑡𝑜𝑛⁄𝑚