Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Agua Potable Con Reservorio en SWR7
Agua Potable Con Reservorio en SWR7
UBICACIÓN NNNNNNNN
ELABORADO POR MMMMMM
FECHA 25 DE MAYO DEL 2016
OTRAS OPCIONES
S OPCIONES
CONTRATA
ADMINISTRACION DIRECTA
1 6
2 5
3
4
SI
NO
MO y EQ
TODOS
SEMANAL
MENSUAL
DATOS NECESARIOS PARA EL CALCULO DE FLETES
FLETE CON VEHICULO
INSUMOS
ORIGEN - DESTINO Prec. U.
MATERIALES HUARAZ - HUANCAPU 0.10
AGREGADOS 0.00
TUBERIAS HUARAZ - HUANCAPU 400.00
1003 Cama de apoyo con material propio zarandeado e = 0.10 m 120 M 3.29 1.71 3
1003C
1051 Tarrajeo interior con mortero arena cemento + impermeabiliz 6 M2 31.15 23.08 8
1051C
1082 Cama de apoyo con material de préstamo seleccionado e = 110 M 2.86 1.86 3
1082C
1083 Acarreo de material excedente (manual) hasta 50m. 2.4 M3 21.97 21.33 2
1083C
1086 Suministro e instalación de tubos PVC C-10 de 3" 280 M 12.05 0.95 6
1086C
1087 Suministro e instalación de tubos PVC C-10 de 2" 280 M 7.8 0.95 6
1087C
1088 Suministro e instalación de tubos PVC C-10 de 1.5" 600 M 4.82 0.45 6
1088C
1089 Suministro e instalación de tubos PVC C-10 de 1" 600 M 3.99 0.45 6
1089C
1090 Suministro e instalación de tubos PVC C-10 de 3/4" 600 M 2.47 0.45 6
1090C
1091 Accesorios para tubería PVC C-10 de 3" 2 GLB 198.05 107.28 8
1091C
1094 Concreto f'c = 100 Kg/cm2 para solado 120 M2 19.9 5.28 8
1094C
1095 Accesorios para tubería PVC C-10 de 2" 1 GLB 332.94 214.56 12
1095C
1096 Accesorios para tubería PVC C-10 de 1.5" en linea de cond 1 GLB 232.06 176.52 9
1096C
1097 Accesorios para tubería PVC C-10 de 1" en linea de distribu 1 GLB 587.69 518.88 10
1097C
1098 Accesorios para tubería PVC C-10 de 3/4" en linea de distri 1 GLB 197.87 153.7 11
1098C
1099 Doble prueba hidraúlica y desinfección de las redes de agua 600 M 0.81 0.45 7
1099C
1100 Excavación manual de zanja en terreno con bolonería(30% Ro2.8 M3 18.84 18.29 2
1100C
1134 Base solado con concreto f'c = 140 Kg/cm2 120 M2 23.29 4.64 7
1134C
1135 Doble prueba hidraúlica y desinfección de las conexiones dom600 M 0.81 0.45 7
1135C
1156 Instalación de válvulas y accesorios en reservorio para ingr 3 UND 411.27 71.52 14
1156C
1166 Instalación de Tapas metálicas en filtro lento de arena 1 GLB 1073 214.56 7
1166C
1167 Instalación de Tapas metálicas en cámara rompe presión 2 UND 360.56 107.28 6
1167C
1175 Instalación de válvulas y accesorios en reservorio para salid 3 UND 411.48 71.52 13
1175C
1176 Accesorios de rebose, limpia y ventilación del reservorio 1 UND 812.17 265.76 16
1176C
1177 Abastecimiento temporal del servicio de agua para las vivie 1 GLB 1235 801.2 16
1177C
1178 Reparación de cercos y canales de riego afectados durante 1 GLB 1236 1199.6 3
1178C
1181 Accesorios para tubería PVC C-10 de 1.5" en linea de aducc 1 GLB 471.29 353.04 9
1181C
1182 Accesorios para tubería PVC C-10 de 1.5" en linea de distri 1 GLB 704.36 518.88 10
1182C
1002
1
9.51
0.38
1004
4
6.4
1.71
1002
2
9.51
12.68
1002
1
9.51
6.34
1028
1
5692
5692
1029
1
2890
2890
1002
1
9.51
0.11
1002
1
9.51
0.38
1002
1
9.51
3.8
1003
1
10.91
14.55
1002
2
9.51
12.68
1002
0.5
9.51
4.76
1002
1
9.51
38.04
1003
1
10.91
174.56
1122
6
79.42
476.52
1320
1
593.22
593.22
1004
1
6.4
0.64
1002
1
9.51
0.13
1002
1
9.51
0.08
1004
1
6.4
6.4
1004
1
6.4
0.57
1004
4
6.4
1.86
1004
1
6.4
21.33
1002
1
9.51
0.27
1002
1
9.51
0.27
1002
1
9.51
0.13
1002
1
9.51
0.13
1002
1
9.51
0.13
1002
1
9.51
38.04
1002
2
9.51
12.68
1002
2
9.51
1.27
1002
1
9.51
76.08
1002
0.5
9.51
38.04
1002
5
9.51
380.4
1002
0.2
9.51
15.22
1002
1
9.51
0.13
1004
1
6.4
18.29
1004
1
6.4
2.56
1004
1
6.4
12.8
1003
0.5
10.91
7.27
1002
1
9.51
6.34
1004
1
6.4
0.85
1003
1
10.91
14.55
1002
0.1
9.51
3.8
1002
0.5
9.51
12.68
1003
1
10.91
43.64
1003
1
10.91
43.64
1003
1
10.91
4.36
1002
0.5
9.51
12.68
1002
0.5
9.51
12.68
1002
1
9.51
0.3
1002
0.5
9.51
19.02
1002
0.5
9.51
9.51
1002
1
9.51
12.68
1002
1
9.51
0.63
1002
1
9.51
0.13
1004
4
6.4
5.85
1004
1
6.4
1.22
1319
1
2288
2288
1280
1
47.51
47.51
1281
1
33.9
33.9
1002
1
9.51
76.08
1003
1
10.91
14.55
1002
1
9.51
76.08
1003
1
10.91
7.27
1003
1
10.91
17.46
1003
1
10.91
29.09
1002
1
9.51
1.9
1002
1
9.51
25.36
1002
1
9.51
38.04
1002
1
9.51
76.08
1003
4
10.91
349.12
1309
1
16.95
16.95
1003
0.5
10.91
7.27
1318
1
1356
1356
1321
1
847.46
847.46
1002
1
9.51
76.08
1002
1
9.51
38.04
1002
1
9.51
38.04
1002
1
9.51
38.04
1002
1
9.51
38.04
1002
1
9.51
19.02
1003
1
10.91
10.91
1003
1
10.91
21.82
1002
0.5
9.51
1.9
1002
1
9.51
25.36
1002
1
9.51
76.08
1002
4
9.51
304.32
1002
5
9.51
380.4
1341
1
677.97
677.97
1002
1
9.51
38.04
1002
1
9.51
76.08
1002
5
9.51
380.4
1349
1
101.69
101.69
1350
1
152.54
152.54
1261
2
44.85
89.7
1253
25
2.38
59.5
1357
1
152.54
152.54
1002
1
9.51
9.51
### Encofrado#N/A #N/A 1188C #VALUE!
### 1188 Encofrado y desencofrado en reservorio
###
### OBRA POR CONTRATA MO MA
### En Soles 26.82 71.72
Insumos Und Cuad./cant. Cantidad
1002 OFICIAL HH 1 1.0000
1003 OPERARIO HH 1 1.0000
1004 PEON HH 1 1.0000
1021 CLAVOS 2, 2-1/2", 3 Y 4" KG 0.2 0.2000
1039 MADERA ROLLIZO DE EUCALIPTO 4" X 5m UND 2 2.0000
1041 MADERA PARA ENCOFRADO P2 13.08 13.0800
1043 PETROLEO GL 0.02 0.0200
1067 ALAMBRE NEGRO RECOCIDO # 8 KG 0.15 0.1500
1900 HERRAMIENTAS MANUALES %MO 3 3.0000
#N/A #VALUE! NO BORRAR ESTA FILA, ES LA FORMULA MODELO
8 M2/DIA
EQ TOTAL
0.80 99.34
P.U. Parcial
9.51 9.51
10.91 10.91
6.40 6.40
3.24 0.65
9.35 18.70
3.95 51.67
10.59 0.21
3.24 0.49
26.82 0.80
PRESUPUESTO GENERAL DEL PROYECTO
Proyecto
SISTEMA DE AGUA POTABLE CON RESERVORIO
Lugar NNNNNNNN
Elab. Por MMMMMM
Fecha 25 DE MAYO DEL 2016
Lugar NNNNNNNN
Elab. Por MMMMMM
Fecha 25 DE MAYO DEL 2016
Lugar NNNNNNNN
Elab. Por MMMMMM
Fecha 25 DE MAYO DEL 2016
Lugar NNNNNNNN
Elab. Por MMMMMM
Fecha 25 DE MAYO DEL 2016
Lugar NNNNNNNN
Elab. Por MMMMMM
Fecha 25 DE MAYO DEL 2016
Lugar NNNNNNNN
Elab. Por MMMMMM
Fecha 25 DE MAYO DEL 2016
C.U. PARCIAL
7 584.71
56.09 2 243.60
722.98 722.98
2 147.68 2 147.68
1 234.86 1 234.86
1 235.59 1 235.59
3 784.77
406.15 406.15
2 262.13 2 262.13
101.69 101.69
669.47 669.47
345.33 345.33
51 067.42
199.50
2.85 199.50
3 692.01
18.84 1 602.72
2.64 83.16
61.67 69.69
21.97 1 936.44
794.08
34.49 57.94
19.90 655.51
323.64 45.31
166.08 33.22
1.25 2.10
27 233.67
99.34 12 066.83
368.04 7 714.12
323.64 391.60
3.81 6 909.28
1.25 151.84
534.24
31.80 534.24
2 503.10
31.15 1 096.48
29.89 1 406.62
2 046.40
411.27 411.27
411.48 822.96
812.17 812.17
1 134.69
299.08 299.08
341.45 341.45
SistemasRW7.0
C.U. PARCIAL
494.16 494.16
143.75
143.75 143.75
532.75
7.28 532.75
11 575.26
0.67 22.78
18.84 56.52
21.97 69.21
34.49 689.80
216.96 433.92
111.71 2 792.75
91.71 5 310.01
21.80 1 262.22
365.44 365.44
62.63 62.63
7.04 509.98
677.97
677.97 677.97
3 630.75
205.20
0.55 62.70
0.89 101.46
0.36 41.04
2 453.16
6.59 751.26
0.59 67.26
3.29 375.06
10.28 1 171.92
21.97 87.66
549.48
4.82 549.48
330.57
232.06 232.06
307.85 98.51
92.34
0.81 92.34
24 382.37
1 445.40
0.55 441.65
0.89 714.67
0.36 289.08
17 279.83
6.59 5 291.77
SistemasRW7.0
C.U. PARCIAL
0.59 473.77
3.29 2 641.87
10.28 8 254.84
21.97 617.58
3 870.46
4.82 3 870.46
1 136.25
471.29 471.29
307.85 664.96
650.43
0.81 650.43
75 813.13
4 739.22
0.55 1 448.10
0.89 2 343.28
0.36 947.84
56 657.21
6.59 17 350.81
0.59 1 553.41
3.29 8 662.24
10.28 27 066.21
21.97 2 024.54
9 060.93
4.82 4 435.36
3.99 1 037.40
2.47 3 588.17
3 223.12
704.36 704.36
587.69 587.69
197.87 197.87
307.85 1 733.20
2 132.65
0.81 2 132.65
16 088.38
99.95
2.85 99.95
2 266.56
18.84 652.62
2.64 89.58
61.67 1 158.78
21.97 365.58
1 560.95
34.49 546.32
19.90 326.56
SistemasRW7.0
C.U. PARCIAL
307.85 43.10
323.64 359.24
175.37 263.06
166.08 13.29
1.25 9.38
4 670.66
34.49 1 771.41
3.81 1 087.91
323.64 1 770.31
1.25 41.03
1 401.31
29.89 631.28
31.15 770.03
3 787.56
215.49 1 292.94
128.09 768.54
164.48 986.88
123.20 739.20
2 163.36
360.56 2 163.36
138.03
7.28 138.03
1 246.36
3.59
2.85 3.59
69.77
18.84 16.58
2.64 3.33
61.67 12.95
21.97 36.91
359.00
34.49 198.66
19.90 25.07
307.85 15.39
323.64 119.75
1.25 0.13
317.54
158.77 317.54
496.46
248.23 496.46
11 041.39
24.62
2.85 24.62
2 555.34
SistemasRW7.0
C.U. PARCIAL
18.84 606.27
2.64 141.61
61.67 1 665.09
21.97 142.37
3 560.03
34.49 1 489.97
19.90 171.94
307.85 86.20
323.64 1 754.13
166.08 39.86
1.25 17.93
1 501.02
83.39 1 501.02
3 400.38
188.91 3 400.38
1 237.70
3.65
2.85 3.65
79.07
18.84 24.12
2.64 3.38
61.67 29.60
21.97 21.97
492.46
34.49 295.23
19.90 25.47
307.85 18.47
323.64 129.46
166.08 23.25
1.25 0.58
213.98
106.99 213.98
448.54
224.27 448.54
30 128.05
1 959.62
2.85 93.02
1.83 1 866.60
18 250.40
6.59 6 721.80
0.59 601.80
3.29 1 677.90
10.28 8 912.76
21.97 336.14
SistemasRW7.0
C.U. PARCIAL
9 091.83
118.97 8 089.96
409.63 241.68
23.29 760.19
826.20
0.81 826.20
271.20
33.90 271.20
8 581.80
5 692.03 5 692.03
2 889.77 2 889.77
1 694.92
847.46 1 694.92
2 288.14
2 288.14 2 288.14
238 841.09
28 660.93
23 884.11
291 386.13
52 449.50
343 835.63
13 753.43
357 589.06
Ubicación: NNNNNNNN
COEF.
ESP.
ITEM DESCRIPCION UNIDAD CANTIDAD P.UNIT. PARTICIP
GASTO
ACION
TOTAL
S
0.00 0.00%
RELACION DE INSUMOS DEL PROYECTO
Lugar NNNNNNNN
Elab. Por MMMMMM
Fecha 25 DE MAYO DEL 2016
Cantidad Parcial
116 950.53
1 099.83 10 459.38
96.08 913.72
1 399.38 15 267.24
13 820.53 88 451.39
154.90 1 858.80
110 548.95
53.19 172.34
2.20 22.37
0.13 8.26
2 444.89 6 454.51
6.00 51.72
7.20 7.78
31.20 56.16
428.00 308.16
18.00 45.36
121.50 104.49
140.97 503.26
104.95 340.04
84.10 272.48
1.00 237.29
185.28 1 884.30
3.20 352.54
8.80 1 081.34
2.00 89.70
9.00 152.55
25.00 59.50
3.00 30.51
1.00 677.97
12.50 346.50
12.50 443.88
1.00 57.20
6.00 40.68
68.68 1 745.85
16.40 243.21
2.00 25.86
2.60 52.29
2.00 1 694.92
25.00 233.75
471.44 6 604.87
25.00 381.25
5.00 233.05
92.00 66.24
2.40 13.80
6.00 34.50
6.00 163.80
10.00 50.30
10.40 11.23
10.80 11.66
8.80 9.50
33.20 119.19
19.20 68.93
17.20 61.75
224.00 161.28
36.00 155.16
16.50 11.88
53.00 38.16
49.00 35.28
6.00 64.68
20.00 67.80
1.00 152.54
1.00 5 692.03
1.00 2 889.77
20.00 135.60
6.56 78.92
0.09 0.76
0.76 86.95
25.00 212.75
25.00 254.25
25.00 178.25
1.00 33.90
77.12 1 052.69
20.99 79.97
39.85 4 052.35
6.83 103.00
11.98 111.89
20.00 25.40
25.00 99.00
2 354.07 9 298.58
146.40 310.37
244.94 2 290.19
62.80 2 616.25
20.00 25.40
993.80 15 582.78
1.00 135.59
1.00 2 288.14
3.60 38.81
16.50 331.82
6.00 64.68
6.60 44.75
12.00 25.92
12.28 879.49
4.00 21.56
17.07 180.77
15.72 1 891.74
2.06 65.26
1.30 31.95
15.99 344.58
3.69 145.79
1.00 152.54
2.00 50.84
12.50 53.00
8.00 271.20
22.24 40.03
28.00 50.40
14.00 60.34
13.60 22.98
15.00 25.35
5.00 25.15
3.00 24.96
46.76 84.17
3.20 11.42
3.36 142.36
1.00 101.69
30.00 83.40
12.68 136.69
2.00 169.50
18.00 1 372.86
6.00 711.84
2.00 271.18
6.00 775.68
68.68 1 280.20
1.00 186.44
1.00 228.81
18.00 32.40
8.00 40.64
18.00 12.96
20.24 21.86
27.60 138.83
10.00 8.50
20.00 115.00
40.08 28.86
3.00 38.79
253.12 6 434.31
26.53 582.60
20.00 254.20
81.00 2 230.74
302.00 975.46
1 958.06 7 871.40
1 074.00 1 235.10
80.40 511.34
10.00 103.40
1 590.34 2 830.81
1.20 2.16
3.30 14.22
2.10 7.12
20.00 57.40
12.00 43.08
4.00 2.88
2.40 13.80
11.20 120.74
136.00 390.32
6.00 81.90
2.00 51.72
4.50 22.14
3.00 387.84
1.20 24.13
5.30 323.57
71.40 231.34
20.10 143.31
1.00 122.09
1.20 30.17
3.30 125.86
2.10 62.29
18.48 305.47
67.32 169.65
11 178.83
1.00 3 732.25
32.00 949.12
9.65 16.31
347.61 4 133.08
60.93 361.31
34.99 652.21
154.90 131.67
27.29 277.54
80.43 341.02
80.43 341.02
15.36 243.30
TOTAL 238 678.31
CALCULO DEL FLETE
Proyecto : SISTEMA DE AGUA POTABLE CON RESERVORIO
Lugar : NNNNNNNN
Elab.Por : MMMMMM
Fecha : 25 DE MAYO DEL 2016
P. PARCIAL(kg)
PRESUPUESTO ANALITICO
Proyecto SISTEMA DE AGUA POTABLE CON RESERVORIO
Lugar NNNNNNNN
Elab. Por MMMMMM
Fecha 25 DE MAYO DEL 2016
CUADRI
PUEST
Jan-16 Feb-16
METR
PRES
MES
ADO
DIAS
LLA
PAR T I DAS UND PRECE DENCIA
O
U
######
######
######
######
######
######
######
DIAS C.
DIAS L.
######
######
######
Feb-16
1 1 1 1
######
######
######
######
######
######
Mar-16
1 1 1 1
######
######
SistemasRW7.0
PROGRAMACIÓN DE LA EJECUCION FISICA DE LA OBRA
PROYECTO: SISTEMA DE AGUA POTABLE CON RESERVORIO
LUGAR: NNNNNNNN Inicio: 1/1/2016
Fecha 25 DE MAYO DEL 2016 Plazo (días calendarios): 90
Costo Directo S/. 0.00 Fin: 3/30/2016 Feriados
Unidad de programación: MESES Domingos 5 5 4 4 5
CUADRILL
METRAD
2016
PUESTO
PRESU
DIAS
PAR T I DAS UND PRECE DENCIA MES
25 May
23 Feb
26 Mar
25 Jan
25 Apr
DIAS L.
25 Jun
2016
23 Jul
26 Aug
25 Sep
25 Oct
25 Nov
26 Dec
26 Jan
24 Feb
27 Mar
25 Apr
27 May
4 5 4 4 5 4 4 5 4 4 5 4 4
26 Jun
2017
SistemasRW7.0
Lugar :
Elab. Por :
Fecha :
CONFORMACION DE MONOMIOS
COEF. SIMB. % COEF.
N°M N° IU IU ELEMENTO INICIAL AGRUP. INCID. ACUM.
AVANCE FISICO DE OBRA VALO
MES :
PRESUPUESTO BASE
P A R T I D A S UND.
METR. C.U.
O DE OBRA VALORIZADO Nº …….
PARCIAL
METR. VALORIZADO METR. VALORIZADO METR. VALORIZADO %
DURACION EN DIAS
SALDOS
AVANCES
PROGR
SALDO
METR. VALORIZADO AMADO ANTE ACTU ACUMU %
RIOR AL LADO
CALCULO DEL COEFICIENTE "K" PARA EL REAJUSTE
Proyecto :
SISTEMA DE AGUA POTABLE CON RESERVORIO
:
Lugar NNNNNNNN
INDICES UNIFICADOS
SIMB. % COEF. SIN PONDERAR PONDERADOS
N° IU ELEMENTO AGRUP. INCID. ACUM. Oct-13 Jan-14 Feb-14 Oct-13
1 47 Mano de obra (incluido leyes sociales) J 100.000 0.381 497.55 498.10 498.10 497.55
2 72 Tubería de PVC para agua T 100.000 0.090 356.58 370.19 376.37 356.58
3 4 Agregado fino AM 65.620 0.128 754.16 754.16 764.34 691.05
4 43 Madera nacional para encofrado y carpintería AM 34.380 570.60 572.02 577.63
5 21 Cemento Portlan tipo I CAB 33.630 0.113 339.42 339.42 339.42 479.53
6 3 Acero de construcción corrugado CAB 41.070 468.45 474.67 473.60
7 17 Bloque y ladrillo CAB 25.300 683.76 682.87 684.31
8 32 Flete terrestre F 100.000 0.033 455.86 455.19 455.19 455.86
9 39 Indice General de Precios al Consumidor G 100.000 0.255 392.43 393.46 395.83 392.43
TOTAL 1.000 K=
S UNIFICADOS
PONDERADOS
Jan-14 Feb-14
498.10 498.10
370.19 376.37
691.54 700.15
481.86 481.78
455.19 455.19
393.46 395.83
1.005 1.010
CUADRO RESUMEN DE VALORIZACIONES Y REAJUSTES
POR CANCELAR
CULADA REAJUSTADA SIN RETENCION
REAJUSTE A
MONTO
SER DEDUCCION VALORIZACIO IGV (18%)
FACTURADO
PAGADO (S/.) N NETA (S/.) (S/.)
(S/.)
(S/.)
Rp D VN IGV MF
797.32 0.00 156617.07 28191.07 184808.14
1421.87 0.00 146619.07 26391.43 173010.50
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
2219.19 0.00 303236.14 54582.50 357818.64
ARANTIAS
MONTO
FACTURADO
(S/.)
MF
166107.30
153572.69
0.00
0.00
319679.99
38138.65
CUADRO RESUMEN DE LIQUIDACION FINAL DE OBRA
OBRA
SISTEMA DE AGUA POTABLE CON RESERVORIO
LUGAR NNNNNNNN
8. MONTO NETO FACTURABLE SIN I.G.V. (5+6+7) 303 376.66 270 915.25
30 101.70
2 359.71
32 461.41
0.00
32 461.41
0.00
0.00
32 461.41
30 101.70
0.00
32 461.41
5 843.07
38 304.48