Está en la página 1de 9

FORMATO 11 - CRONOGRAMA DE ADQUISICIÓN DE MATERIALES / INSUMOS

PROYECTO :

ENTIDAD :

RESPONSABLE :

DEPARTAMENTO :

PROVINCIA :

DISTRITO :

PRESUPUESTO S/.
COSTO DIRECTO S/.

Item PERIODO
Nº Descripcion / Insumos UND CANTIDAD PRECIO S/. MONTO S/.
MES 01 MES 02 MES 03 MES 04 MES 05 MES 06 MES 07 MES 08

MATERIALES / INSUMOS
1 ACERO DE REFUERZO FY=4200 GRADOkg 90706.6688 3.95 358291.34 0.01 0.02 0.08 0.04 0.14 0.62 0.05 0.03
2 AGUA m3 10682.5576 1.5 16023.84 0.02 0.35 0.48 0.01 0.04 0.04 0.03 0.02
3 ALAMBRE NEGRO N°16 kg 4005.492 3.95 15821.69 0.01 0.03 0.16 0.71 0.06 0.04
4 ALAMBRE NEGRO N°8 kg 5199.4874 3.95 20537.98 0.00 0.00 0.13 0.39 0.36 0.10 0.02 0.00
5 ALCANTARILLA TMC D=36" m 13.6 350.2 4762.72 1.00
6 ANILLO DE JEBE D = 200 mm und 40.7696 8.2 334.31 1.00
7 ANILLO DE JEBE D = 250 mm und 108.4727 8.9 965.41 1.00
8 ARBUSTOS ORNAMENTALES und 175 16.95 2966.25 1.00
9 ARENA FINA (PUESTO EN OBRA) m3 185.2846 110.17 20412.8 0.01 0.01 0.17 0.20 0.16 0.45
10 ARENA GRUESA (PUESTO EN OBRA) m3 5680.8483 84.75 481451.89 0.00 0.00 0.02 0.07 0.33 0.29 0.18 0.11
11 ASFALTO RC-250 gln 2309.107 12.71 29348.75 0.02 0.26 0.30 0.25 0.18
12 CEMENTO PORTLAND TIPO I (42.5KG) BOL 86368.8149 21.61 1866430.09 0.00 0.00 0.01 0.13 0.44 0.35 0.05 0.02
13 CLAVOS PARA MADERA C/C 1" kg 633.9678 3.95 2504.17 0.12 0.15 0.17 0.15 0.15 0.15 0.11
14 CLAVOS PARA MADERA C/C 2" kg 845.2904 3.95 3338.9 0.12 0.15 0.17 0.15 0.15 0.15 0.11
15 CLAVOS PARA MADERA C/C 3" kg 5747.0357 3.95 22700.79 0.03 0.00 0.12 0.38 0.36 0.09 0.02 0.00
16 CODO DE 90 PVC SAP P/AGUA DE 1/2" und 1060 1.27 1346.2 1.00
17 CORDEL m 21968.931 0.8 17575.14 0.16 0.14 0.16 0.15 0.14 0.15 0.10
18 FIERRO LISO DE 1/4" kg 65343.616 3.95 258107.28 0.01 0.31 0.30 0.31 0.07
19 FIERRO LISO DE 5/8" kg 8004.6272 3.95 31618.28 0.01 0.31 0.30 0.31 0.07
20 FLETE TERRESTRE A OBRA GLB 1 349562.75 349562.75 1.00
21 GEOTEXTIL NO TEJIDO CLASE 1 m2 1080.2 5.08 5487.42 1.00
22 GRASA GRUESA kg 1028.247 12.71 13069.02 0.01 0.31 0.30 0.31 0.07
23 GRASS kg 241.049 4.24 1022.05 1.00
24 HORMIGON (PUESTO EN OBRA) m3 39.15 59.32 2322.38 1.00
25 IMPERMEABILIZANTE gln 8.4678 37.14 314.49 1.00
26 IMPRIMANTE ASFALTICO kg 35.153 18.14 637.68 0.02 0.20 0.78
27 LUBRICANTE PARA TUBERIA PVC-UF gln 2.6972 38.14 102.87 1.00
28 MADERA PARA ENCOFRADO p2 128571.242 3.81 489856.43 0.00 0.00 0.13 0.39 0.36 0.10 0.02 0.00
29 MADERA ROBLE NACIONAL p2 3096.525 3.81 11797.76 1.00
30 MADERA TORNILLO p2 2277.9 3.81 8678.8 0.00 0.70 0.30
31 MARCO Y TAPA F°F° P. BUZON DE Ý 1.20pza 14 338.98 4745.72 1.00
32 MASILLA PLASTICA BITUMINOSA kg 304.0648 5.85 1778.78 0.24 0.76
33 MATERIAL DE RESPALDO PARA SELLA m 757.32 5.51 4172.83 0.02 0.19 0.79
34 MATERIAL SELECCINADO (PUESTO EN m3 161.829 40 6473.16 1.00
35 MICROESFERAS DE VIDRIO kg 655.137 4.49 2941.57 1.00
36 MOVILIZACION Y DESMOVILIZACION D GLB 1 80378.93 80378.93 0.60 0.00 0.00 0.00 0.00 0.00 0.00 0.40
37 PEGAMENTO PARA PVC gln 53 38.14 2021.42 0.70 0.30
38 PETROLEO gln 1037.0985 10.49 10879.16 0.00 0.00 0.13 0.39 0.36 0.10 0.02 0.00
39 PIEDRA CHANCADA DE 3/4" (PUESTO E m3 7942.7434 85.08 675768.61 0.00 0.00 0.04 0.13 0.43 0.32 0.07 0.01
40 PINTURA ESMALTE gln 528.3028 38.14 20149.47 0.11 0.14 0.16 0.14 0.14 0.14 0.10 0.08
41 PINTURA IMPRIMANTE gln 77.559 10 775.59 1.00
42 PINTURA PARA TRAFICO gln 220.9034 59.32 13103.99 1.00
43 PLANTAS ORNAMENTALES und 178 2 356 1.00
44 REJILLA METALICA und 30 92.2 2766 1.00
45 SEÑALIZACION AMBIENTAL INC. POSTEund 20 220 4400 1.00
46 SEÑALIZACION EN CRUCE DE CALLES und 10 420 4200 0.60 0.40
47 SOLVENTE XILOL gln 119.134 10 1191.34 1.00
48 TACHOS ECOLOGICOS DE 3 UNIDADESund 9 750 6750 1.00
49 TEKNOPOR DE 3/4" m2 760.897 3 2282.69 0.02 0.19 0.79
50 TIERRA AGRICOLA m3 445.1225 42.37 18859.84 0.04 0.96
51 TUBERIA PVC S-25, D=6" m 530 101.69 53895.7 0.40 0.60
52 TUBERIA PVC SAP C-10 DE 1/2" m 530 8.9 4717 1.00
53 TUBERIA PVC UF DN = 200 mm (8") AL m 257.88 31.07 8012.33 1.00
54 TUBERIA PVC UF DN = 250 mm (10") A m 686.1225 37.5 25729.59 1.00
55 TUBO PVC PARA DESAGUE Ø 3" m 240 6 1440 1.00
56 TUBO PVC PARA DESAGUE Ø 4" m 300 9 2700 1.00
57 TUBO PVC SEL 1 1/2" X 3.00 M. und 12824.448 13.56 173899.51 0.01 0.31 0.30 0.31 0.07
58 TUBO PVC SEL 3/4" X 3.00 M. und 1122.144 11.86 13308.63 0.01 0.31 0.30 0.31 0.07
59 YESO EN BOLSAS DE 25 KG BOL 3679.4684 8.47 31165.1 0.16 0.14 0.16 0.15 0.14 0.15 0.10

MANO DE OBRA
1 OPERARIO hh 31699.1843 19.18 607990.35 0.05 0.10 0.12 0.14 0.25 0.12 0.12 0.10
2 OFICIAL hh 44315.562893 15.9 704617.45 0.05 0.10 0.12 0.14 0.25 0.12 0.12 0.10
3 PEON hh 109540.89 14.3 1566434.73 0.05 0.10 0.12 0.14 0.25 0.12 0.12 0.10

EQUIPOS Y HERRAMIENTAS
1 BOMBA MANUAL PARA PRUEBA DE TUBERhm 24.0046 25 600.12 1.00
2 CAMION CISTERNA (2,000 GLNS.) hm 85.8539 128.96 11071.72 0.13 0.75 0.13
3 CAMION VOLQUETE DE 12 M3 hm 2106.0446 169.49 356953.5 0.14 0.27 0.03 0.11 0.26 0.19
4 CARGADOR FRONTAL SOBRE LLANTAS 115 hm 1190.6657 230 273853.11 0.02 0.19 0.38 0.03 0.01 0.07 0.17 0.12
5 COMPACTADORA VIBRATORIA TIPO PLANCH HE 2551.0227 12.71 32423.5 0.01 0.11 0.04 0.50 0.22 0.01 0.11
6 ESTACION TOTAL hm 985.8845 14.44 14236.17 0.16 0.13 0.21 0.14 0.13 0.13 0.10
7 GPS he 309.6525 4.15 1285.06 1.00
9 HERRAMIENTAS MANUALES %MO 138284.32 0.05 0.10 0.12 0.14 0.25 0.12 0.12 0.10
10 MAQUINA PARA PINTAR MARCAS EN PAVI hm 12.0765 20.68 249.74 1.00
11 MEZCLADORA DE CONCRETO DE 11 P3-18 hm 4252.3096 16.95 72076.65 0.01 0.01 0.09 0.37 0.34 0.13 0.05
12 MOLDE METALICO PARA BUZON hm 63.3346 5.2 329.34 1.00
13 MOTONIVELADORA DE 130-135 HP hm 417.7515 211.38 88304.31 0.10 0.50 0.39 0.01
14 NIVEL TOPOGRAFICO hm 676.2323 6.9 4666 0.12 0.14 0.22 0.15 0.13 0.14 0.10
15 RETROEXCAVADOR S/LLANTAS 58 HP 1 YD3hm 143.0523 118.64 16971.72 0.39 0.06 0.56
16 RODILLO LISO VIBR AUTOP 101-135HP 10- hm 334.8572 155.76 52157.36 0.10 0.50 0.39 0.00 0.00 0.00 0.00 0.00
17 TRACTOR DE ORUGAS DE 140-160 HP hm 719.1972 243.06 174808.07 0.25 0.36 0.35 0.01 0.01 0.00 0.01 0.00
18 VIBRADOR DE CONCRETO 4 HP 1.50" hm 4252.3137 5.55 23600.34 0.01 0.01 0.09 0.37 0.34 0.13 0.05
19 ZARANDA hm 207.6652 4.15 861.81 0.00 0.32 0.61 0.03 0.03 0.02 0.00

SUBCONTRATOS
1 SC CAPACITACION Y SENSIBILIZACION PA GLB 1 6000 6000 1.00
2 SC MANTENIMIENTO DE VIA ALTERNA GLB 1 15000 15000 0.12 0.13 0.13 0.13 0.13 0.13 0.13 0.09
3 SC MONITOREO DE AGUA pto 2 500 1000 0.09 0.15 0.16 0.16 0.15 0.16 0.15
4 SC MONITOREO DE AIRE pto 2 700 1400 0.09 0.15 0.16 0.16 0.15 0.16 0.15
5 SC MONITOREO DE RUIDO pto 2 300 600 0.09 0.15 0.16 0.16 0.15 0.16 0.15
5 SC REUBICACION DE POSTES ELECTRICOS GLB 1 7000 7000 0.09 0.15 0.16 0.16 0.15 0.16 0.15

I.- COSTO DIRECTO TOTAL 9,382,027.81 9.87 15.71 9.89 8.22 8.45 11.05 5.24 16.57
FORMATO 11 - CRONOGRAMA DE ADQUISICIÓN DE MATERIALES / INSUMOS
: MEJORAMIENTO DE LA TRANSITIBILIDAD VEHICULAR Y PEATONAL A TRAVES DE PISTAS Y VEREDAS DE LAS VIAS PRINCIPALES Y SECUNDARIA DEL CENTRO POBLADO RURAL DE SAN MARTIN DE MAYUNMARCA, D
PROYECTO ACOBAMBA, DEPARTAMENTO DE HUANCAVELICA
ENTIDAD : GOBIERNO REGIONAL DE HUANCAVELICA
RESPONSABLE :
DEPARTAMENTO : HUANCAVELICA
PROVINCIA : ACOBAMBA PRESUPUESTO TOTAL DEL
DISTRITO : ANDABAMBA COSTO DIRECTO :
Item PERIODO
Descripcion / Insumos UND CANTIDAD PRECIO S/. MONTO S/.
Nº MES 01 MES 02 MES 03 MES 04 MES 05

MATERIALES / INSUMOS
1 ACERO DE REFUERZO FY=4200 GRADO 60 kg 90706.6688 3.95 358291.34 4,129.09 8,375.06 30,052.11 12,879.47 49,426.13
2 AGUA m3 10682.5576 1.5 16023.84 369.02 5,556.62 7,725.70 133.09 682.79
3 ALAMBRE NEGRO N°16 kg 4005.492 3.95 15821.69 204.64 420.23 2,480.13
4 ALAMBRE NEGRO N°8 kg 5199.4874 3.95 20537.98 33.10 21.87 2,704.35 7,949.26 7,420.70
5 ALCANTARILLA TMC D=36" m 13.6 350.2 4762.72 4,762.72
6 ANILLO DE JEBE D = 200 mm und 40.7696 8.2 334.31 334.31
7 ANILLO DE JEBE D = 250 mm und 108.4727 8.9 965.41 965.41
8 ARBUSTOS ORNAMENTALES und 175 16.95 2966.25
9 ARENA FINA (PUESTO EN OBRA) m3 185.2846 110.17 20412.8 143.24 217.95 3,456.93
10 ARENA GRUESA (PUESTO EN OBRA) m3 5680.8483 84.75 481451.89 1,497.38 221.24 8,886.19 33,467.90 158,458.11
11 ASFALTO RC-250 gln 2309.107 12.71 29348.75 472.79 7,498.97
12 CEMENTO PORTLAND TIPO I (42.5KG) BOL 86368.8149 21.61 1866430.09 1,517.44 2,849.16 21,482.55 233,792.99 817,608.64
13 CLAVOS PARA MADERA C/C 1" kg 633.9678 3.95 2504.17 308.25 369.10 423.80 381.85 369.07
14 CLAVOS PARA MADERA C/C 2" kg 845.2904 3.95 3338.9 411.00 492.13 565.07 509.13 492.10
15 CLAVOS PARA MADERA C/C 3" kg 5747.0357 3.95 22700.79 715.06 25.44 2,754.13 8,668.06 8,071.93
16 CODO DE 90 PVC SAP P/AGUA DE 1/2" und 1060 1.27 1346.2 1,346.20
17 CORDEL m 21968.931 0.8 17575.14 2,802.47 2,483.04 2,851.03 2,568.83 2,482.88
18 FIERRO LISO DE 1/4" kg 65343.616 3.95 258107.28 2,581.07 80,013.26 77,432.18
19 FIERRO LISO DE 5/8" kg 8004.6272 3.95 31618.28 316.18 9,801.67 9,485.48
20 FLETE TERRESTRE A OBRA GLB 1 349562.75 349562.75 349,562.75
21 GEOTEXTIL NO TEJIDO CLASE 1 m2 1080.2 5.08 5487.42
22 GRASA GRUESA kg 1028.247 12.71 13069.02 130.69 4,051.40 3,920.71
23 GRASS kg 241.049 4.24 1022.05
24 HORMIGON (PUESTO EN OBRA) m3 39.15 59.32 2322.38 2,322.38
25 IMPERMEABILIZANTE gln 8.4678 37.14 314.49 314.49
26 IMPRIMANTE ASFALTICO kg 35.153 18.14 637.68
27 LUBRICANTE PARA TUBERIA PVC-UF gln 2.6972 38.14 102.87 102.87
28 MADERA PARA ENCOFRADO p2 128571.242 3.81 489856.43 800.12 529.93 63,894.42 190,198.51 177,469.40
29 MADERA ROBLE NACIONAL p2 3096.525 3.81 11797.76 11,797.76
30 MADERA TORNILLO p2 2277.9 3.81 8678.8 2.81 6,073.19 2,602.80
31 MARCO Y TAPA F°F° P. BUZON DE Ý 1.20 M. pza 14 338.98 4745.72 4,745.72
32 MASILLA PLASTICA BITUMINOSA kg 304.0648 5.85 1778.78
33 MATERIAL DE RESPALDO PARA SELLADORES m 757.32 5.51 4172.83
34 MATERIAL SELECCINADO (PUESTO EN OBRA) m3 161.829 40 6473.16 6,473.16
35 MICROESFERAS DE VIDRIO kg 655.137 4.49 2941.57
36 MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y HERRAMIENTAS GLB 1 80378.93 80378.93 48,227.36 0.00 0.00 0.00 0.00
FORMATO 11 - CRONOGRAMA DE ADQUISICIÓN DE MATERIALES / INSUMOS
: MEJORAMIENTO DE LA TRANSITIBILIDAD VEHICULAR Y PEATONAL A TRAVES DE PISTAS Y VEREDAS DE LAS VIAS PRINCIPALES Y SECUNDARIA DEL CENTRO POBLADO RURAL DE SAN MARTIN DE MAYUNMARCA, D
PROYECTO ACOBAMBA, DEPARTAMENTO DE HUANCAVELICA
ENTIDAD : GOBIERNO REGIONAL DE HUANCAVELICA
RESPONSABLE :
DEPARTAMENTO : HUANCAVELICA
PROVINCIA : ACOBAMBA PRESUPUESTO TOTAL DEL
DISTRITO : ANDABAMBA COSTO DIRECTO :
Item PERIODO
Descripcion / Insumos UND CANTIDAD PRECIO S/. MONTO S/.
Nº MES 01 MES 02 MES 03 MES 04 MES 05

37 PEGAMENTO PARA PVC gln 53 38.14 2021.42 1,414.99 606.43


38 PETROLEO gln 1037.0985 10.49 10879.16 17.49 11.58 1,432.52 4,210.81 3,930.83
39 PIEDRA CHANCADA DE 3/4" (PUESTO EN OBRA) m3 7942.7434 85.08 675768.61 440.71 740.53 24,313.46 89,173.79 289,462.68
40 PINTURA ESMALTE gln 528.3028 38.14 20149.47 2,278.47 2,728.26 3,132.59 2,822.51 2,728.07
41 PINTURA IMPRIMANTE gln 77.559 10 775.59
42 PINTURA PARA TRAFICO gln 220.9034 59.32 13103.99
43 PLANTAS ORNAMENTALES und 178 2 356
44 REJILLA METALICA und 30 92.2 2766 2,766.00
45 SEÑALIZACION AMBIENTAL INC. POSTE und 20 220 4400
46 SEÑALIZACION EN CRUCE DE CALLES SEGÚN DISEÑO und 10 420 4200 2,520.00 1,680.00
47 SOLVENTE XILOL gln 119.134 10 1191.34
48 TACHOS ECOLOGICOS DE 3 UNIDADES - SEGUN DISEÑO und 9 750 6750
49 TEKNOPOR DE 3/4" m2 760.897 3 2282.69
50 TIERRA AGRICOLA m3 445.1225 42.37 18859.84
51 TUBERIA PVC S-25, D=6" m 530 101.69 53895.7 21,558.28 32,337.42
52 TUBERIA PVC SAP C-10 DE 1/2" m 530 8.9 4717 4,717.00
53 TUBERIA PVC UF DN = 200 mm (8") ALCANTARILLADO m 257.88 31.07 8012.33 8,012.33
54 TUBERIA PVC UF DN = 250 mm (10") ALCANTARILLADO m 686.1225 37.5 25729.59 25,729.59
55 TUBO PVC PARA DESAGUE Ø 3" m 240 6 1440
56 TUBO PVC PARA DESAGUE Ø 4" m 300 9 2700
57 TUBO PVC SEL 1 1/2" X 3.00 M. und 12824.448 13.56 173899.51 1,739.00 53,908.85 52,169.85
58 TUBO PVC SEL 3/4" X 3.00 M. und 1122.144 11.86 13308.63 133.09 4,125.68 3,992.59
59 YESO EN BOLSAS DE 25 KG BOL 3679.4684 8.47 31165.1 4,968.04 4,410.79 5,054.13 4,553.85 4,401.49

MANO DE OBRA
1 OPERARIO hh 31699.1843 19.18 607990.35 30,399.52 60,799.04 72,958.84 85,118.65 151,997.59
2 OFICIAL hh 44315.562893 15.9 704617.45 35,230.87 70,461.75 84,554.09 98,646.44 176,154.36
3 PEON hh 109540.89 14.3 1566434.73 78,321.74 156,643.47 187,972.17 219,300.86 391,608.68

EQUIPOS Y HERRAMIENTAS
1 BOMBA MANUAL PARA PRUEBA DE TUBERIA hm 24.0046 25 600.12 600.12
2 CAMION CISTERNA (2,000 GLNS.) hm 85.8539 128.96 11071.72 1,383.97 8,303.79 1,383.97
3 CAMION VOLQUETE DE 12 M3 hm 2106.0446 169.49 356953.5 49,342.11 95,357.59 12,306.40
4 CARGADOR FRONTAL SOBRE LLANTAS 115 HP 5 YD3 hm 1190.6657 230 273853.11 6,625.59 52,634.80 103,724.83 8,739.56 2,361.22
5 COMPACTADORA VIBRATORIA TIPO PLANCHA 7 HP HE 2551.0227 12.71 32423.5 282.29 3,514.61 1,370.27 16,358.90 6,976.79
6 ESTACION TOTAL hm 985.8845 14.44 14236.17 2,268.76 1,842.08 3,049.76 1,977.76 1,833.52
7 GPS he 309.6525 4.15 1285.06 1,285.06
FORMATO 11 - CRONOGRAMA DE ADQUISICIÓN DE MATERIALES / INSUMOS
: MEJORAMIENTO DE LA TRANSITIBILIDAD VEHICULAR Y PEATONAL A TRAVES DE PISTAS Y VEREDAS DE LAS VIAS PRINCIPALES Y SECUNDARIA DEL CENTRO POBLADO RURAL DE SAN MARTIN DE MAYUNMARCA, D
PROYECTO ACOBAMBA, DEPARTAMENTO DE HUANCAVELICA
ENTIDAD : GOBIERNO REGIONAL DE HUANCAVELICA
RESPONSABLE :
DEPARTAMENTO : HUANCAVELICA
PROVINCIA : ACOBAMBA PRESUPUESTO TOTAL DEL
DISTRITO : ANDABAMBA COSTO DIRECTO :
Item PERIODO
Descripcion / Insumos UND CANTIDAD PRECIO S/. MONTO S/.
Nº MES 01 MES 02 MES 03 MES 04 MES 05

8 HERRAMIENTAS MANUALES %MO 0 0 138284.32 6,914.22 13,828.43 16,594.12 19,359.80 34,571.08


9 MAQUINA PARA PINTAR MARCAS EN PAVIMENTO hm 12.0765 20.68 249.74
10 MEZCLADORA DE CONCRETO DE 11 P3-18 HP hm 4252.3096 16.95 72076.65 991.49 797.93 6,554.70 26,521.21
11 MOLDE METALICO PARA BUZON hm 63.3346 5.2 329.34 329.34
12 MOTONIVELADORA DE 130-135 HP hm 417.7515 211.38 88304.31 9,148.10 43,880.73 34,682.36
13 NIVEL TOPOGRAFICO hm 676.2323 6.9 4666 567.65 630.84 1,044.42 677.30 627.91
14 RETROEXCAVADOR S/LLANTAS 58 HP 1 YD3. hm 143.0523 118.64 16971.72 6,564.62 979.89 9,427.21
15 RODILLO LISO VIBR AUTOP 101-135HP 10-12T hm 334.8572 155.76 52157.36 5,425.68 26,025.39 20,569.90 0.00 0.00
16 TRACTOR DE ORUGAS DE 140-160 HP hm 719.1972 243.06 174808.07 44,260.98 63,435.85 60,560.02 2,243.92 1,986.00
17 VIBRADOR DE CONCRETO 4 HP 1.50" hm 4252.3137 5.55 23600.34 324.65 261.27 2,146.23 8,683.94
18 ZARANDA hm 207.6652 4.15 861.81 0.30 271.91 523.70 24.65 21.82

SUBCONTRATOS
1 SC CAPACITACION Y SENSIBILIZACION PARA MANTENIMIENTO DE OBRAS VIALES GLB 1 6000 6000
2 SC MANTENIMIENTO DE VIA ALTERNA GLB 1 15000 15000 1,768.06 1,955.46 2,020.64 2,020.64 1,955.46
3 SC MONITOREO DE AGUA pto 2 500 1000 89.43 150.09 155.10 155.10 150.09
4 SC MONITOREO DE AIRE pto 2 700 1400 125.20 210.13 217.14 217.14 210.13
5 pto 2 300 600 53.66 90.06 93.06 93.06 90.06
6 SC MONITOREO DE RUIDO pto 2 300 600 53.66 90.06 93.06 93.06 90.06

I.- COSTO DIRECTO TOTAL 9,382,627.81 672,085.89 637,268.88 902,206.75 1,264,909.66 2,489,281.58
DE ADQUISICIÓN DE MATERIALES / INSUMOS
AS VIAS PRINCIPALES Y SECUNDARIA DEL CENTRO POBLADO RURAL DE SAN MARTIN DE MAYUNMARCA, DISTRITO DE ANDABAMBA, PROVINCIA DE
OBAMBA, DEPARTAMENTO DE HUANCAVELICA

PRESUPUESTO TOTAL DEL PROYECTO :


COSTO DIRECTO : S/. 9,382,627.81
PERIODO
MES 06 MES 07 MES 08

223,817.90 17,578.76 12,032.82


665.01 525.74 365.88
11,230.82 882.08 603.78
2,039.44 366.78 2.49

2,966.25
4,119.12 3,338.09 9,137.47
139,504.75 86,861.97 52,554.35
8,934.91 7,241.06 5,201.02
651,379.37 99,213.34 38,586.61
381.38 270.73
508.50 360.97
2,036.67 426.60 2.90

2,565.64 1,821.26
80,013.26 18,067.51
9,801.67 2,213.28

5,487.42
4,051.40 914.83
1,022.05

15.91 124.77 497.00

48,016.83 8,886.89 60.34

433.55 1,345.23
79.58 779.11 3,314.13

2,941.57
0.00 0.00 32,151.57
DE ADQUISICIÓN DE MATERIALES / INSUMOS
AS VIAS PRINCIPALES Y SECUNDARIA DEL CENTRO POBLADO RURAL DE SAN MARTIN DE MAYUNMARCA, DISTRITO DE ANDABAMBA, PROVINCIA DE
OBAMBA, DEPARTAMENTO DE HUANCAVELICA

PRESUPUESTO TOTAL DEL PROYECTO :


COSTO DIRECTO : S/. 9,382,627.81
PERIODO
MES 06 MES 07 MES 08

1,080.31 194.30 1.32


219,576.95 47,280.87 4,779.61
2,819.01 2,001.11 1,639.45
775.59
13,103.99
356.00

4,400.00

1,191.34
6,750.00
45.58 429.33 1,807.78
808.57 18,051.27

1,440.00
2,700.00
53,908.85 12,172.97
4,125.68 931.60
4,548.20 3,228.61

72,958.84 72,958.84 60,799.04


84,554.09 84,554.09 70,461.75
187,972.17 187,972.17 156,643.47

39,989.48 92,283.42 67,674.51


19,533.69 46,917.66 33,315.76
196.03 3,724.61
1,894.64 1,369.64
DE ADQUISICIÓN DE MATERIALES / INSUMOS
AS VIAS PRINCIPALES Y SECUNDARIA DEL CENTRO POBLADO RURAL DE SAN MARTIN DE MAYUNMARCA, DISTRITO DE ANDABAMBA, PROVINCIA DE
OBAMBA, DEPARTAMENTO DE HUANCAVELICA

PRESUPUESTO TOTAL DEL PROYECTO :


COSTO DIRECTO : S/. 9,382,627.81
PERIODO
MES 06 MES 07 MES 08

16,594.12 16,594.12 13,828.43


249.74
24,539.14 9,342.00 3,330.18

593.12
648.84 469.05

0.00 0.00 136.39


0.00 1,547.53 773.77
8,034.95 3,058.89 1,090.41
17.00 2.43

6,000.00
2,020.64 1,955.46 1,303.64
155.10 145.09
217.14 203.13
93.06 87.05
93.06 87.05

1,944,822.66 841,553.17 630,499.23

También podría gustarte