Está en la página 1de 45

PLANTA DE ESTIRENO - MÉTODO DOW

BALANCE DE MATERIA

Factor tiempo= 8760

M (Kg/Kmol) Costo de kmol/h Kg/año


MATERIA PRIMA MP($/Kg) INPUT OUT INPUT OUT
VAPOR 18 0.067 4016.30 0.00 6.33E+08 0
ETILBENCENO 106 1.069 121.00 0.15 1.12E+08 139284
ESTIRENO 104 1.543 0.00 120.03 0 109352131.2
HIDROGENO 2 0.00 119.38 0 2.09E+06
BENCENO 78 0.657 1.21 1.37 826768.8 9.36E+05
TOLUENO 92 0.648 1.21 1.86 975163.2 1.50E+06
AGUA RESIDUAL 18 0 0.00 3000.00 0 4.73E+08
METANO 16 0.00 0.65 0 91104
ETILENO 28 1.202 0.00 0.16 0 39244.8
AGUA IC 18 0.00 1016.30 0 160250184
TOTAL 7.47E+08 7.47E+08
Kg/KgP $/KgP $/año
INPUT OUT INPUT OUT MPD($/año)
5.79 0 0.000388 0 $ 42,430.44
1.02746749 0.00127372 1.098363 0.00136161 $ 120,108,307.44
0 1 0.00 1.543 $ -
0 0.01912663 0.00 0 $ -
0.00756061 8.56E-03 0.004967 0.00562416 $ 543,187.10
0.00891764 0.01370811 0.005779 0.00888286 $ 631,905.75
0 4.33E+00 0.00 0 0.00
0 0.00083313 0.00 0 0.00
0 0.00035888 0.00 0.00043138 0.00
0 1.46545094 0.00 0 0.00
$ 121,325,830.74
kwTOTAL
EFICIENCIA
$/KWh
ESTIMACION DEL COSTO ANUAL DE LOS UTILITIES

DATOS

EQUIPO TIPO DUTY (MJ/h) Ce($/GJ) Cu($/Ru) Ru

E-401 hps 13530 17.7 29.7 1000 Kg

E-402
E-403 bfw->hps 44595 0.354 2.45 1000 Kg
E-404 bfw->lps 13269 11.1 2.45 1 m3
E-405 cw 136609 0.354 14.8 1000 m3
E-406 cw 12951 0.354 14.8 1000 m3
E-407 lps 15742 13.28 27.7 1000 Kg
E-408 cw 46274 0.354 14.8 1000 m3
E-409 lps 45476 13.28 27.7 1000 Kg
E-410
E-411
E-412
E-413
H-401
C-401
P-401
P-402
P-403
P-404
P-405
P-406
P-407
SF= 0.95
Factor tiemp 8760
PRODUCCION TOTAL
CALCULO BENCENO 105.2 Kmol/h 7.19E+07 Kg/año
Costo Anual Relacion
EQUIPO Cu Eficiencia Cantidad Unidad $/año insum/prod
E-401 .0297 $/Kg 1.00 7982 Kgvapor/h 1992960.88 0.0182 $/KgP
E-403 .0025 $/m3 1.00 18451 KgH2O/h 131376.33 0.0012 $/KgP
E-404 2.45 $/m3 1.00 5552 KgH2O/h 1225713.26 0.0112 $/KgP
E-405 .0148 $/KWh 1.00 3269746 KgH2O/h 402448.47 0.0037 $/KgP
E-406 .0148 $/Kg 1.00 309547 KgH2O/h 38153.49 0.0003 $/KgP
E-407 .0277 $/KWh 1.00 7550 Kgvapor/h 1739745.39 0.0159 $/KgP
E-408 .0148 $/KWh 1.00 1105980 KgH2O/h 136322.65 0.0012 $/KgP
E-409 .0277 $/KWh 1.00 21811 Kgvapor/h 5025832.89 0.0460 $/KgP
3.58E+06 TOTAL
hps: vapor a alta presion 1.17E+06
cw : agua de enfriamiento
fg : gas combustible
ed : a electricidad
sd : a vapor
POTENCIA BOMBAS COMPRESORDRIVE
2.59
1.33
0.574
0.775
0.825
0.019
6.113 134 136.7 276.813
0.8 4016.241 13.4 8.369387755 4038.0103878 0.0000369
0.06 $/año
0.0053
0.0925

cw
calentar
ESTIMACION DEL COSTO ANUAL DE LOS UTILITIES

DATOS

EQUIPO TIPO DUTY (MJ/h) Ce($/GJ) Cu($/Ru) Ru


E-401 hps 13530 17.7 29.7 1000 Kg
E-403 bfw->hps 44595 0.354 2.45 1000 Kg
E-404 bfw->lps 13269 11.1 2.45 1 m3
E-405 cw 136609 0.354 14.8 1000 m3
E-406 cw 12951 0.354 14.8 1000 m3
E-407 lps 15742 13.28 27.7 1000 Kg
E-408 cw 46274 0.354 14.8 1000 m3
E-409 lps 45476 13.28 27.7 1000 Kg
H-401 fg 23.63 11.1 0.42 1 m3
C-401 ed - 16.8 0.06 1 KWh
D-401 ed - 16.8 0.06 1 KWh
P-401 ed - 16.8 0.06 1 KWh
P-402 ed - 16.8 0.06 1 KWh
P-403 ed - 16.8 0.06 1 KWh
P-404 ed - 16.8 0.06 1 KWh
P-405 ed - 16.8 0.06 1 KWh
P-406 ed - 16.8 0.06 1 KWh

SF= 0.96
Factor tiemp 8760
PRODUCCION TOTAL
CALCULO STYRENO 120.03 Kmol/h 1.09E+08

Costo Anual
EQUIPO Cu Eficiencia Cantidad Unidad $/año

E-401 .0297 $/Kg 1.00 Kgvapor/h 2013939.42


E-403 .0025 $/m3 1.00 KgH2O/h 132759.24
E-404 2.45 $/m3 1.00 KgH2O/h 1238615.50
E-405 .0148 $/KWh 1.00 KgH2O/h 406684.77
E-406 .0148 $/Kg 1.00 KgH2O/h 38555.11
E-407 .0277 $/KWh 1.00 Kgvapor/h 1758058.50
E-408 .0148 $/KWh 1.00 KgH2O/h 137757.62
E-409 .0277 $/KWh 1.00 Kgvapor/h 5078736.40
H-401 .42 $/m3 1.00 2205.78
C-401 .06 $/KWh 0.60 112688.64
D-401 .06 $/KWh 0.98 70383.20
P-401 .06 $/KWh 0.80 1633.56
P-402 .06 $/KWh 0.80 838.86
P-403 .06 $/KWh 0.80 362.03
P-404 .06 $/KWh 0.80 488.81
P-405 .06 $/KWh 0.80 520.34
P-406 .06 $/KWh 0.80 11.98
TOTAL
VAPOR

hps: vapor a alta presion


cw : agua de enfriamiento
fg : gas combustible
ed : a electricidad
sd : a vapor
S

Utility
Power(KW) hps: vapor a alta presion
cw : agua de enfriamiento
- fg : gas combustible
- ed : a electricidad
- sd : a vapor
- Fuente :Turton
- 2.0059
-
- 18.9
-
134
136.7
2.59
1.33
0.574
0.775
0.825
0.019

Kg/año

Relacion insum/prod hps (kg/s) mps (kg/s) lps (kg/s) cw (m3/s) fg (m3/s)

0.0184 $/KgP 2013939.42 - - - -


0.0012 $/KgP 132759.24 - - -
0.0113 $/KgP - - 1238615.50 - -
0.0037 $/KgP - - 406684.77 -
0.0004 $/KgP - - - 38555.11 -
0.0161 $/KgP - - 1758058.50 - -
0.0013 $/KgP - - - 137757.62
0.0464 $/KgP - - 5078736.40 - -
0.00002017 $/KgP - - - - 2205.78
0.00103051 $/KgP - - - - -
0.00064364 $/KgP - - - - -
0.00001494 $/KgP
0.00000767 $/KgP
0.00000331 $/KgP
0.00000447 $/KgP
0.00000476 $/KgP
0.00000011 $/KgP

$10,222,109.062 2146698.66 0.00 8075410.40 582997.50 2205.78


Cu($/Ru) Ru
29.7 1000 Kg
14.8 1000 m3
0.42 1 m3
0.06 1 KWh

Electric Power
(KW)

-
-
-
-
-
-
-
-
-
112688.64
70383.20
1633.56
838.86
362.03
488.81
520.34
11.98

TOTAL UTILITIES $/año


186927.43
$ 10,994,239.78
CALCULO DEL CBM

EQUIPO K1 K2 K3 Capacidad Cp°(2001)


H-401 6.9617 -1.4800 0.3161 23630 KW $ 3,428,284.43
R-401 3.3496 -0.2765 0.0025 25 m3 $ 928.87
E-401 4.1884 -0.2503 0.1974 260 m2 $ 54,348.55
E-402 4.1884 -0.2503 0.1974 226 m2 $ 49,331.37
E-403 4.1884 -0.2503 0.1974 1457 m2 $ 235,538.50
E-404 4.1884 -0.2503 0.1974 702 m2 $ 118,911.69
T-401 3.4974 0.4485 0.1074 131.48 m3 $ 85,089.32
Platos 2.9949 0.4465 0.3961 7.07 m2 $ 4,569.41
C-401 2.2897 1.3604 -0.1027 223.33 KW $ 82,901.17
D-401 2.4604 1.4191 -0.1798 139.49 KW $ 47,512.60
V-401 3.4974 0.4485 0.1074 26.8 m3 $ 22,749.31
E-405 4.1884 -0.2503 0.1974 1446 m2 $ 233,763.81
R-402 3.4974 0.4485 0.1074 25 m3 $ 21,590.42
P-401
P-403
P-404
E-407
E-408
V-403
T-402 3.4974 0.4485 0.1074 901.17 m3 S/. 575,871.88
Platos 2.9949 0.4465 0.3961 37.39 m2 S/. 47,529.97
P-402 3.3892 0.0536 0.1538 1.33 KW S/. 2,501.48
P-405 3.3892 0.0536 0.1538 .83 KW S/. 2,431.06
V-402 4.5472 -0.7269 0.134 5 m3 S/. 12,722.89
E-406 3.3444 0.2745 -0.0472 173 m2 S/. 5,276.26
P-406 3.3892 0.0536 0.1538 .019 KW S/. 5,657.22

u-tube http://web2.clarkson.edu/projects/subramanian/ch302/notes/shelltube.pdf
https://en.wikipedia.org/wiki/Shell_and_tube_heat_exchanger
CEPCI(2016) 576.1 N>20 1
CEPCI(2001) 397
Cp°(2014) factor grafico Presión(barg) FT FM FP B1 B2
$ 4,974,898.39 55 41.37 1.0054 - 1.78 - -
$ 1,347.92 - - - - - - -
$ 78,867.00 - 0.90 - 1 1.00 1.63 1.66
$ 71,586.41 5 41.02 - 2.7 0.07 1.63 1.66
$ 341,797.81 5 0.25 - 2.7 1.00 1.63 1.66
$ 172,556.74 - 0.10 - 1 1.00 1.63 1.66
$ 123,475.96 18 0.65 - 1 1 2.25 1.82
$ 6,630.82 60 0.65 - - - - -
$ 120,300.66 1 0.65 - - - - -
$ 68,947.12 13 0.65 - - - - -
$ 33,012.28 18 0.8 - 1 1.25 2.25 1.82
$ 339,222.50 - - - 1 1 1.74 1.55
$ 31,330.58 66 - - - - -
-
-
-
-
-
-
S/. 835,666.98 18 0.65 - 1 1 2.25 1.82
S/. 68,972.33 60 0.65 - - - - -
S/. 3,629.99 38 0.65 - 1 1 1.89 1.35
S/. 3,527.79 38 0.25 - 1 1 1.89 1.35
S/. 18,462.61 18 0.65 - 1 1 2.25 1.82
S/. 7,656.55 1 0.45 - - - - -
S/. 8,209.38 38 0.45 - 1 1 1.89 1.35

2/notes/shelltube.pdf
FOB CIF
FBM CBM CBM
2.800 $ 24,881,169.23 $ 24,881,169.23
4.000 $ 5,391.66 $ 5,391.66
3.290 $ 259,472.44 $ 259,472.44
1.943 $ 139,111.60 $ 139,111.60
6.112 $ 2,089,068.19 $ 2,089,068.19
3.290 $ 567,711.68 $ 567,711.68
4.07 $ 502,547.14 $ 502,547.14 R-401
1 $ 160,578,538.64 $ 160,578,538.64 V (m3) 25
2.7 $ 324,811.79 $ 324,811.79 K1 3.3496
1.5 $ 103,420.68 $ 103,420.68 K2 -0.2765
4.525 $ 149,380.57 $ 149,380.57 K3 0.0025
3.29 $ 1,116,042.02 $ 1,116,042.02 Cp 928.870517
7.1 $ 222,447.12 $ 5,391.66 FBM 4
$ 15,221.66 $ 15,221.66 CBM $ 3,715.48
$ 13,493.80 $ 13,493.80
$ 11,386.86 $ 11,386.86
$ 97,776.21 $ 97,776.21
$ 294,092.52 $ 294,092.52
$ 26,207.47 $ 26,207.47
4.07 S/. 3,401,164.60 S/. 3,401,164.60
1 S/. 10,897,627.50 S/. 10,897,627.50
3.24 S/. 11,761.16 S/. 11,761.16
3.24 S/. 11,430.04 S/. 11,430.04
4.07 S/. 75,142.80 S/. 75,142.80
1 S/. 7,656.55 S/. 7,656.55
3.24 S/. 26,598.38 S/. 26,598.38
Σ CBM $ 205,611,616.88 $ 205,611,616.88
k
FCI($) $345,427,516.35

Concepto $/año $/KgP


A)Costo de Manufactura (COM) CM=MPD+MOD+GIF
1)Materia Prima Directa(MPD)
Etilbenceno 120,108,307 1.09836
Vapor de agua 42,430 0.00039
Benceno 543,187 0.00497
Tolueno 631,906 0.00578
2)Mano de Obra Directa (MOD): (15operarios) 793,500
($52,900/año) 0.00726

3)Gastos Indirectos de Fabricación(GIF)

3.1)Costos Fijos(CF):
-Mano de Obra Indirecta(MOI): 20%MOD 158,700 0.00145
-Supervisión directa: 20%de(MOD+MOI) 190,440 0.00174
-Suministros de operación: 1%Costo de planta 3,454,275
0.03159
-Mantenimiento y Reparación: 6%Costo de Planta 20,725,651 0.18953
-Control de Calidad: 15%MOD 119,025
0.00109
-Depreciacición:10%Costo de Planta 34542751.64 0.31589
Seguro de Fabrica: 3%Costo de Planta 10362825.49 0.09477
Overhead: 0.5%Costo de Planta 1727137.58
0.01579
3.2)Costos Variables(CV):Utilities
-Vapor 10,222,109 0.09348
-Agua de Refrigeración 582,998 0.00533
-Gas Combustible 2,206 0.00002
-Electricidad 186,927 0.00171
COM($/año) $ 204,394,376.37 1.86914
Sin depreciación --> COMd($/año) $ 169,851,624.74 1.55325
B)GASTOS ADMINISTRATIVOS $ 3,280,243.65 0.03000

COSTO DEL PRODUCTO CP=CM+GA


$ 207,674,620.02 1.89914
precio
en el mercado
MANO DE OBRA DIRECTA (MOD)
Tipo de equipo Número de equipos Nop
Compresores 2 2
Intercambiadores de calor 9 9
Heaters 1 1
Bombas 6 0

Reactores 2 2

Columnas 2 2

Recipientes 3 0
Nnp Total 16

numero de operadores Nol =


requeridos por turno 3.1575306808
Labor de operación= 0.0
operadores totales(todos los
turnos) 15
Costos de labor= $ 793,500.00

Pago de trabajadores 2006


($/año) 52900
P 0

80cents/lb
1.8573945589

Total de CF 75,354,549.50 = MOD+GIF(3.1) +GA


Total de CV 132,320,071 = MPD +GIF (3.2)

COP
207,674,620.02
80$/45Kg --> fuente ICIS pricing
1.8573633157
n el mercado
0

= MOD+GIF(3.1) +GA
= MPD +GIF (3.2)
INVERSIÓN FIJA DE CAPITAL
VALOR EN USD
PARA PLANTA DE AMONIACO PLANTA DE ÁCIDO NÍTRICO PLANTA DE UREA
2030 $ 60,032,641
2040 - 2030 $ 26,172,296
IFC TOTAL
PLANTA DE NITRATO DE AMONIO
$ 6,745,000 $ 66,777,641
$ 2,545,001 $ 28,717,297
Complejo Petroquímico -2030 Precio de referencia
FCI($) $66,777,640.70 350 $ / T Urea

Concepto $/año
$/ T Urea
A)Costo de Manufactura (COM) CM=MPD+MOD+GIF
1)Materia Prima Directa(MPD)
Gas Natural 369,909 0.298
MEA 1,152 21.923
ZnO 99,713 0.000018
Diatomita 2,118 -
Agua 1,271,123 7

2)Mano de Obra Directa (MOD): 441,000


0.00403

3)Gastos Indirectos de Fabricación(GIF)

3.1)Costos Fijos(CF):
-Mano de Obra Indirecta(MOI): 20%MOD 88,200 0.00081
-Supervisión directa: 20%de(MOD+MOI) 105,840
0.00097
-Suministros de operación: 1%Costo de planta 667,776
0.00611
-Mantenimiento y Reparación: 6%Costo de Planta 4,006,658 0.03664
-Control de Calidad: 15%MOD 66,150 0.00060
-Depreciacición:10%Costo de Planta 6677764.07 0.06107
Seguro de Fabrica: 3%Costo de Planta 2003329.22 0.01832
Overhead: 0.5%Costo de Planta 333888.20 0.00305
3.2)Costos Variables(CV):Utilities
-Vapor 10,222,109 0.09348
-Agua de Refrigeración 582,998 0.00533
Agua
-Gas Combustible 2,206 0.00002
-Electricidad 186,927 0.00171
Vapor de alta presión
COM($/año) $ 27,128,861.09 0.24809
Sin depreciación --> COMd($/año) $ 20,451,097.02 0.18702
B)GASTOS ADMINISTRATIVOS $ 696,254.77 0.00637

COSTO DEL PRODUCTO CP=CM+GA


$ 27,825,115.85 0.25445
precio
en el mercado
Precio de referencia Gas
305 $ / T Nitrato

Reposición de la MEA por día

$/T Nitrato
Balance al 2030 (Tm/día)

0.396 4192
29.074 13.055
0.0000235 1130
4 24
10 14405

INVERSIÓN FIJA DE CAPITAL


PARA
PLANTA DE AMONIACO
2030 $ 60,032,641
2040 - 2030 $ 26,172,296
CAPACIDAD

2030
2040
2040 - 2030
125760

0.100%
Entrada Salida

Precio ($/Tm) Balance al 2030 (Tm/año) NH3


Gas Natural 4192 R (Gas/NH3)
0.242 1530080 MEA 13.055 R (MEA/NH3)
2611 4765.075 ZnO 1130 R (ZnO/NH3)
0.0036 412450 Diatomita 24 -
120 8760 Agua 13743 R (Agua/NH3)
1.64 5257825 Agua 662 -

Gas Natural

MEA

ZnO
Diatomita
Agua para amoniaco

Agua para ácido nitrico


Agua TOTAL

VALOR EN USD
NTA DE AMONIACO PLANTA DE ÁCIDO NÍTRICO PLANTA DE UREA PLANTA DE NITRATO DE AMON
60,032,641 $ 6,745,00
26,172,296 $ 2,545,00
0.12

Para Urea Para Nitrato


Salida

3120 822
1919 1763 616 0.74939173 0.5650641
2.18 3851 1346
0.006803 26.2000 9.1544 643495 >>|
0.59 15 5 1138800 0.5650641
- - 24
7.16 12626 4412 643495
- - 662 700435

tural 1.234 T/ T de Urea 1.637 T/ T de Nitrato

A .008397 T/ T de Urea .011137 T/ T de Nitrato

O .005 T/ T de Urea .007 T/ T de Nitrato


mita - .029 T/ T de Nitrato
amoniaco 4.047 T/ T de Urea 5.367 T/ T de Nitrato

ido nitrico - .805 T/ T de Nitrato


OTAL 4.047 T/ T de Urea 6.172 T/ T de Nitrato

IFC TOTAL
NTA DE NITRATO DE AMONIO
6,745,000 $ 66,777,641
2,545,001 $ 28,717,297
MANO DE OBRA DIRECTA (MOD) - Complejo
PLANTA DE UREA

Tipo de equipo Número de operadores/(turno.equipo)

Bombas 0
Compresores 0.1
Torres 0.3
Reactores 0.3
I.C. [Condensador+Descomponedor] 0.05
Evaporadores 0.2
PLANTA DE NITRATO DE AMONIO

Tipo de equipo Número de operadores/(turno.equipo)


Sueldo ($/mes) 500
# Sueldos 14
BRA DIRECTA (MOD) - Complejo
PLANTA DE UREA
Total Total
Total (Operadores)+ Costo MOD
Número de equipos (Operadore (Operadores)
s/turno) Cobertura

5 0
1 0.1
5 1.5 7.5 11 77000
1 0.3
4 0.2
2 0.4
A DE NITRATO DE AMONIO
Total Total
Total (Operadores)+ Costo MOD
Número de equipos (Operadore (Operadores)
s/turno) Cobertura
Complejo Petroquímico - 2030 Precio de referencia
FCI($) $310,121,298.61 350 $ / T Urea

Concepto $/año
$/ T Urea
A)Costo de Manufactura (COM) CM=MPD+MOD+GIF
1)Materia Prima Directa(MPD)
Gas Natural 369,204 0.298
Hidrógeno 5,736 0.096
ZnO 99,537 0.001191
Diatomita 2,118 -
Agua 1,268,828 7

2)Mano de Obra Directa (MOD): 441,000 0.205

3)Gastos Indirectos de Fabricación(GIF) IF para Urea

3.1)Costos Fijos(CF): 279,271,870.17


-Mano de Obra Indirecta(MOI): 20%MOD 88,200 34,393
-Supervisión directa: 20%de(MOD+MOI) 105,840 41,272

-Suministros de operación: 1%Costo de planta 3,101,213 2,792,719


-Mantenimiento y Reparación: 6%Costo de Planta 18,607,278 16,756,312
-Control de Calidad: 15%MOD 66,150 25,795
-Depreciacición:10%Costo de Planta 31012129.86 27927187.02
Seguro de Fabrica: 3%Costo de Planta 9303638.96 8378156.11
Overhead: 0.5%Costo de Planta 1550606.49 1396359.35
3.2)Costos Variables(CV):Utilities
Combustible falta pero no interesa 109
falta pero no interesa
Electricidad 1
Agua de enfriamento falta pero no interesa 2
Vapor de agua falta pero no interesa 20
Otros costos variables falta pero no interesa 1
COM($/año) falta pero no interesa -
Sin depreciación --> COMd($/año) falta pero no interesa -
B)GASTOS ADMINISTRATIVOS falta pero no interesa $ 2,550,591.50
COSTO DEL PRODUCTO CP=CM+GA falta pero no interesa

= MOD+GIF(3.1) +GA
= MPD +GIF (3.2)
Precio de referencia
305 $ / T Nitrato

UREA $/AÑO NITRATO $/AÑO


$/T Nitrato

0.396 250,441.45 118,762.07


0.127 80,466.78 38,158.22
0.0015809 1,000.25 474.33
4 - 1,051,200.00
10 5,569,756.69 3,037,512.71

0.897 171,966.06 269,033.94

INF para Nitrato IF para Urea INF para Nitrato

30,849,428.43 279,271,870.17 30,849,428.43


53,807 34,393.21 53,806.79
64,568 41,271.85 64,568.15

308,494 2,792,718.70 308,494.28


1,850,966 16,756,312.21 1,850,965.71
40,355 25,794.91 40,355.09
3084942.84 27,927,187.02 3,084,942.84
925482.85 8,378,156.11 925,482.85
154247.14 1,396,359.35 154,247.14

50 91,785,236.00 14,916,528.00
1,007,400.00 38,589,552.00
129
2 1,785,288.00 484,207.25
0 17,140,155.45 1,553.63
82 948,270.00 24,455,803.00
- 176,092,174.03 89,445,648.01
- 148,164,987.01 86,360,705.17
$ 335,756.19 $ 2,550,591.50 $ 335,756.19
178,642,765.53 89,781,404.20

COP ($/T de producto) 212.80 106.95

Total de CF 60,074,750.92 7,087,652.99


Total de CV 118,568,014.61 82,693,751.21
COP ($/año) 178,642,765.53 89,781,404.20
Gas 125520

Reposición de la MEA por día 0.100%

Balance al 2030 (Tm/día) Precio ($/Tm)

4184 0.242
65 5
1128 0.0036
24 120
14379 1.64

UREA

NITRATO

INVERSIÓN FIJA DE CAPITAL


VALOR EN USD

PLANTA DE AMONIACO
2030 $ 60,032,641
variación $ 26,172,296
$/NH3
2030 - para urea 40,721,880.04
2030 - para nitrato 31,348.64 19,310,760.66
Variación - para urea
Variación - para nitrato =$F$28/

CVU - Utilities
Amoniaco
Electro-combustible 0.06KWh
agua de enfriamientro 120m3
Otros costos
Ácido Nitríco Producción de ácido por día
Combustible

Electricidad

Agua
Otros costos
Urea Producción de urea por día
Combustible
Electricidad
Agua
Vapor de agua
Otros costos variables
Nitrato de amonio Producción de Nitrato por día
Electricidad
Agua
Vapor Saturado
Otros costos variables 10%
Entrada Salida

Balance al 2030 (Tm/año) NH3 1915


Gas Natural 4184 R (Gas/NH3) 2.18
1527160 Hidrógeno 65 R (H2/NH3) 0.033943
23725 ZnO 1128 R (ZnO/NH3) 0.59
411720 Diatomita 24 - -
8760 Agua 13717 R (Agua/NH3) 7.16
5248335 Agua 662 - -

Gas Natural
839500

Hidrógeno
300030
ZnO
Diatomita
Agua para amoniaco

Agua para ácido nitrico


Agua TOTAL

VALOR EN USD

PLANTA DE ÁCIDO NÍTRICO PLANTA DE UREA PLANTA DE NITRATO DE AMONIO


4,793,667.77 238,549,990.14 $ 6,745,000
1,812,100.86 115,888,305.94 $ 2,545,001

238549990
115888306

CVU - Utilities
Precio $ Para urea $ Para Nitrato
0.06 0.6$/KWh 3.6$/NH3 4676.4 2217.6
120 0.0148$/m3 1.8$/NH3 2338.2 1108.8
2.0$/NH3 2598 1232

1098
35.2$/ácido - 38649.6

0.6$/ácido - 658.8
0.01$/ ácido - 10.98
59.9$/ácido - 65770
2300 $/urea
107.3 246790 -
1.2 2760 -
1.11 2553 -
20.4171 46959.33 -
0 0-
822 $/nitrato
81.6 - 67075.2
0.2516 - 206.8152
0.00517825 - 4.2565215
0- 0
0.12

Para Urea Para Nitrato

2300 822
1299 616 0.74939173 0.56478261
2838 1345.8715
44 20.9086 474135 >>|
765 362.8449 839500 0.56478261
- 24
9305 4412 474135
- 662 698975

1.234 T/ T de Urea 1.637 T/ T de Nitrato

.01917 T/ T de Urea .025436 T/ T de Nitrato

.333 T/ T de Urea .441 T/ T de Nitrato


- .029 T/ T de Nitrato
4.045 T/ T de Urea 5.368 T/ T de Nitrato

- .805 T/ T de Nitrato
4.045 T/ T de Urea 6.173 T/ T de Nitrato

IFC TOTAL

$ 310,121,299
$ 146,417,704
MOD TOTAL

MANO DE OBRA DIRECTA (MOD) - Complejo


PLANTA DE UREA

Tipo de equipo Número de operadores/(turno.equipo)

Bombas 0
Compresores 0.1
Torres 0.3
Reactores 0.3
I.C. [Condensador+Descomponedor] 0.05
Evaporadores 0.2
PLANTA DE ÁCIDO NÍTRICO

Tipo de equipo Número de operadores/(turno.equipo)

Tanque de almacenamiento
0
Filtro 0.1
Bombas 0
Mezclador
0.2
Hornos
0.3
Intercambiador de calor 0.05
Torre de absorción 0.3
Refrigerantes 0.3
Tina 0
Torre de inversión 0.3
Columna de destilación 0.3
PLANTA DE AMONIACO
Tipo de equipo Número de operadores/(turno.equipo)
Reactor 0.3
Absorbedor 0.3
Intercambiador de calor 0.05
Cooler (I.C) 0.3
Stripper 0.3
Tanque de almacenamiento 0
Flash 0.3

Bombas
0
Compresores 0.1
Separador 0.1
Secador 0.05
Condensador 0.05
Divisor 0
PLANTA DE NITRATO DE AMONIO
TANQUE DE ALMACENAMIENTO
0
TANQUE DE DISOLUCIÓN 0.2

INTERCAMBIADOR DE CALOR
0.05
REACTOR 0.3
SEPARADOR FLASH 0.3
EVAPORADOR 0.2
TORRE GRANULADORA 0.3
SECADOR ROTATORIO 0.05
TAMIZ CLASIFICADOR GRUESO 0.03
TAMIZ CLASIFICADOR FINOS 0.03
ENFRIADOR 0.6
MEZCLADOR 0.2
BOMBAS CENTRÍFUGAS 0
ELEVADORES 0.1
FAJA TRANSPORTADORA 0.1
TRANSPORTADOR TORNILLO HELICOIDAL 0.1
VENTILADOR 0.05
441000 Sueldo ($/mes) 500
# Sueldos 14
O DE OBRA DIRECTA (MOD) - Complejo
PLANTA DE UREA

Total Total Total (Operadores)


Número de equipos Costo MOD
(Operadores/turno) (Operadores) + Cobertura

5 0
1 0.1
5 1.5 7.5 11 77000
1 0.3
4 0.2
2 0.4
PLANTA DE ÁCIDO NÍTRICO

Total Total Total (Operadores)


Número de equipos Costo MOD
(Operadores/turno) (Operadores) + Cobertura

6 0
1 0.1
6 0

2 0.4
15.15 18 126000
2 0.6
1 0.05
5 1.5
6 1.8
2 0
1 0.3
1 0.3
PLANTA DE AMONIACO
Total Total Total (Operadores)
Número de equipos Costo MOD
(Operadores/turno) (Operadores) + Cobertura

8 2.4
1 0.3
11 0.55
3 0.9
1 0.3
1 0
1 0.3 16.65 20 140000

4 0
4 0.4
3 0.3
1 0.05
1 0.05
1 0
PLANTA DE NITRATO DE AMONIO
4
0
1 0.2

2
0.1
1 0.3
1 0.3
1 0.2
1 0.3
1 0.05 10.68 14 98000
1 0.03
1 0.03
1 0.6
1 0.2
5 0
2 0.2
6 0.6
3 0.3
3 0.15
MOD POR tonelada de Urea y MOD por tonelada de Nitrato
TOTAL $
TOTAL $ MOD para MOD
i Costo MOD PRODUCCIÓN DE i $/prod i para
Urea Nitrato

AMONIACO 140000 474135 0.20029329


224840
AC. NIT 126000 400770 0.31439479 171966.057441253 269033.943
UREA 77000 839500 0.09172126
NITRATO 98000 300030 0.326634
e Nitrato
TOTAL $ TOTAL $
MOD/ T MOD/ T
Urea Nitrato

0.20484343 0.89669014

62,767,610.97
Estado de Ganancias y Pérdidas EPG
Años 1 2
Volumen (TN/año) 109352.1312 109352.1312
Ventas (V) $ 269,977,006.02 $ 269,977,006.02
Costo del producto (COP)
Costos variables (CV) $ 132,320,070.52 $ 132,320,070.52
Costosç fijos (CF) $ 75,354,549.50 $ 75,354,549.50
COP = CV + CF $ 207,674,620.02 $ 207,674,620.02
Utilidad (U) $ 62,302,386.01 $ 62,302,386.01

Años 1 2
Utilidad (U) $ 62,302,386.01 $ 62,302,386.01
Depreciación (D) $ 34,542,751.64 $ 34,542,751.64
FGO $ 96,845,137.64 $ 96,845,137.64
*FGO: Fondos Generados por operaciones

Modelos de medición de la RENTABILIDAD


ROI 18%
PAYBACK (años) 3.57
TIR 12%
VAN $ -12,950,317.39
Estado de Ganancias y Pérdidas EPG
3 4 5
109352.1312 109352.1312 109352.1312
$ 269,977,006.02 $ 269,977,006.02 $ 269,977,006.02

$ 132,320,070.52 $ 132,320,070.52 $ 132,320,070.52


$ 75,354,549.50 $ 75,354,549.50 $ 75,354,549.50
$ 207,674,620.02 $ 207,674,620.02 $ 207,674,620.02
$ 62,302,386.01 $ 62,302,386.01 $ 62,302,386.01

3 4 5
$ 62,302,386.01 $ 62,302,386.01 $ 62,302,386.01
$ 34,542,751.64 $ 34,542,751.64 $ 34,542,751.64
$ 96,845,137.64 $ 96,845,137.64 $ 96,845,137.64

FGO = U + D
Año FGO
0 $ -345,427,516.35
1 $ 96,845,137.64
2 $ 96,845,137.64
3 $ 96,845,137.64
4 $ 96,845,137.64
5 $ 96,845,137.64

Años 0
Flujos $ -345,427,516.35
Acumulado $ -345,427,516.35
VA en $ $ -345,427,516.35

Entonces para el Payback viene dado por :

Payback = 2 + abs(-3,090,737) / 13,150,324.6


Payback = 3.57

VAN $ -12,950,317.39
TIR 12%
Inversión fija $ 345,427,516.35 % Depreciaciòn
Factor (Kg/ton) 1000 Producción (TN/año)
Costos fijos ($) $ 75,354,549.50
Costos variablesn ($) $ 132,320,070.52
CVU ($/Kg de producto) 1.21
COP ($/Kg de producto) $ 1.899
Precio de venta (PV) ($/Kg) $ 2.47

U+D
D U Suma Acumulada
FGO
$ 34,542,751.64 $ 62,302,386.01 $ 96,845,137.64
$ 34,542,751.64 $ 62,302,386.01 $ 193,690,275.28
$ 34,542,751.64 $ 62,302,386.01 $ 290,535,412.92
$ 34,542,751.64 $ 62,302,386.01 $ 387,380,550.56
$ 34,542,751.64 $ 62,302,386.01 $ 484,225,688.20
(∑U)/n $ 62,302,386.01
R = ROI % 18%

r o Tm 14%
1 2 3 4
$96,845,137.64 $96,845,137.64 $96,845,137.64 $96,845,137.64
-$248,582,378.71 -$151,737,241.07 -$54,892,103.43 $41,953,034.21
$84,951,875.12 $74,519,188.70 $65,367,709.39 $57,340,095.96

AÑOS año 3.00


meses: 6.84
días: 25.2
10%
109352.1312

S/. 109,352,131.20

$ 10,000,000.00

5
$96,845,137.64
$138,798,171.85
$50,298,329.79