Está en la página 1de 19

CONSTRUCCION

LIMA PROJECT SANDVIK


FASE: 3006
POSTORES : PERI
PPTO CONTRACTUAL S/. 69,012.82

CUADRO DE PROPUESTAS
PPTO. HYHE PERI
PARTIDA UND. DESCRIPCION
CANT. CONTRAC. META TOTAL CANT MES P.U. PERIODO TOTAL

1.00 ENCOFRADO METALICO

3006 M2 ENCOFRADO DE COLUMNAS H = 4.00 M 689.09 S/. 10.12 S/. 8.10 S/. 5,578.87 40.00 2.00 54.883 26/04 - 25/06 4,390.64

3006 M2 ENCOFRADO MURO DE CISTERNA 1281.84 S/. 8.00 S/. 6.40 S/. 8,203.78 360.00 1.00 37.231 06/05 - 26/05 13,403.16

3006 M2 ENCOFRADO DE LOSAS 1665.94 S/. 9.61 S/. 7.69 S/. 12,807.75 300.00 2.50 15.961 03/05 - 17/07 11,970.75

3006 M2 ENCOFRADO DE VIGAS 1309.57 S/. 21.42 S/. 17.14 S/. 22,440.79 175.00 2.50 33.573 03/05 - 17/07 14,688.19

3006 M2 ENCOFRADO DE PLACAS 437.76 S/. 8.00 S/. 6.40 S/. 2,801.66 72.00 2.00 42.729 26/04 - 25/06 6,152.98

3006 M2 ENCOFRADO DE MUROS 527.72 S/. 8.00 S/. 6.40 S/. 3,377.41

3006 GBL REPARACION Y LIMPIEZA 1.00 15.00% 7,590.86

PRECIOS MAS IGV


FORMA DE PAGO VALORIZACIONES MENSUALES

PLAZO DE ENTREGA (DIAS CALENDARIOS)

S/.55,210.26 S/.58,196.57

A FAVOR DE HUARCAYA ###

MONTO
ASIGNACION S/. 58,196.57 POR MEJOR PRECIO
MARGEN A NIVEL DE PPTO META -5.41% -2,986.31
MARGEN A NIVEL PPTO CONTRACTUAL 15.67% 10,816.25
NOTAS :
- EXPRESADO EN NUEVOS SOLES
- NO INCLUYE EL I.G.V
- VALORIZACIONES MENSUALES
- EL ALQUILER POR PIEZA DIA DEBE SER EQUIVALENTE AL ALQUILER POR SOLUCION
- LAS VALORIZACIONES SE REALIZARAN POR MES O SU FRACCION SEGÚN LA PERMANENCIA EN OBRA.
OBRA: LIMA PROJECT SANDVIK
RESIDENTE: ELIAS GENOVEZ LOPEZ
FECHA: 23/03/2017

RESUMEN PORCENTUAL DE LIQUIDACIONES

ITEM COD DESCRIPCION MONTO %


1 ALQ ALQUILER S/. 123,379.64 100.00% APD
2 RYL VENTA REPARACION Y LIMPIEZA S/. 12,297.77 9.97%
3 VRT VENTA ROTOS S/. 12,595.18 10.21%
4 BAJ VENTA BAJAS S/. 4,330.53 3.51%
5 DEP DEDUCTIVO POR MAL USO A PERSONAL -S/.7,634.70 -6.19%
6 DEC DEDUCTIVO POR MAL USO A SUBCONTRATISTA -S/.3,616.24 -2.93%
S/. 152,603.11

TOTAL PORCENTUAL DE VENTAS 14.57%


CALIFICACION DE GESTION MALA GESTION

RESUMEN DE LIQUIDACIONES

ALQUILER
S/. 12,595.18 S/. 4,330.53
VENTA REPARACION Y LIMPIEZA
S/. 12,297.77
VENTA ROTOS
S/. 123,379.64
VENTA BAJAS

CALIFICACION DE GESTION

BUENA GESTION 0% - 5%
REGULAR GESTION 5% - 10%
MALA GESTION 10% - 20%
SIN GESTION 20% - MAS

NOMBRE NOMBRE
OFICINA TECNICA DE OBRA RESIDENTE DE OBRA

NOMBRE NOMBRE
JEFE DE PROYECTO GERENTE DE OPERACIONES
CONSTRUCCION

LIMA PROJECT SANDVIK


FASE: 3006
POSTORES : PERI
PPTO CONTRACTUAL S/. 189,825.33

CUADRO DE PROPUESTAS
PPTO. HYHE PERI
PARTIDA UND. DESCRIPCION
CANT. CONTRAC. META TOTAL CANT LIQUIDACION N/C PERIODO TOTAL COD

1.00 ENCOFRADO METALICO

3006 M2 ENCOFRADO DE COLUMNAS H = 4.00 M 701.59 S/. 10.12 S/. 9.11 S/. 6,390.08

3006 M2 ANDAMIO METALICO P/COLUMNAS 701.59 S/. 1.95 S/. 1.76 S/. 1,231.29

3006 M2 ENCOFRADO DE LOSAS 1665.94 S/. 12.28 S/. 11.05 S/. 18,411.97

3006 M2 ANDAMIO METALICO P/LOSAS 1665.94 S/. 0.75 S/. 0.68 S/. 1,124.51

3006 M2 ENCOFRADO DE VIGAS 1309.57 S/. 21.42 S/. 19.28 S/. 25,245.89

3006 M2 ENCOFRADO DE PLACAS Y MUROS 4371.30 S/. 8.00 S/. 7.20 S/. 31,473.36

3006 M2 ANDAMIO METALICO P/PLACAS Y MUROS 4371.30 S/. 1.50 S/. 1.35 S/. 5,901.26

990402 MES Andamios y escaleras 2.00 S/. 12,000.00 S/. 10,800.00 S/. 21,600.00

5006 GBL ANDAMIOS ULMA (INSTALACIONES) 1.00 S/. 23,040.00 S/. 20,736.00 S/. 20,736.00

4001 M2 Andamios tomado en cuenta en Liquidacion de Pintura 9153.85 S/. 1.86 S/. 1.67 S/. 15,291.41

4001 M2 Andamios tomado en cuenta en Liquidacion de Estructura Metalica 5826.64 S/. 0.90 S/. 0.81 S/. 4,719.58

3006 M2 ENCOFRADO Y DESENCOFRADO (adicional 001) 14.60 S/. 9.50 S/. 8.55 S/. 124.83

3006 M2 ENCOFRADO Y ANDAMIOS PLACAS (adicional 004) 396.37 S/. 9.50 S/. 8.55 S/. 3,388.96

3006 M2 ENCOFRADO Y ANDAMIOS PLACAS (adicional 093) 94.15 S/. 9.50 S/. 8.55 S/. 804.95

M2 Encofrado y desencofrado (Deductivo 009) -16.77 S/.9.50 S/.8.55 -S/.143.38

GBL DESCUENTOS A PERSONAL OBRERO (Revisar Excel Adjunto) 1.00 S/. 12,914.66 S/. 12,914.66 S/. 12,914.66

GBL DESCUENTOS A SUBCONTRATISTAS (Revisar Liquidacion) 1.00 S/. 3,243.21 S/. 3,243.21 S/. 3,243.21

3006 GBL LIQ. 29443 MAYO ALQUILER 1.00 S/. 22,359.55 S/. 100.37 05/05 - 03/06 S/. 22,259.17 ALQ

3006 GBL LIQ. 29894 JUNIO ALQUILER 1.00 S/. 45,334.31 S/. 752.81 04/06 - 03/07 S/. 44,581.50 ALQ

3006 GBL LIQ. 29895 JUNIO ALQUILER PIEZA DIA 1.00 S/. 78.57 S/. 15.71 04/06 - 03/07 S/. 62.86 APD

3006 GBL LIQ. 29904 REPARACION Y LIMPIEZA 1.00 S/. 9,609.49 S/. 1,921.90 04/06 - 03/07 S/. 7,687.59 RYL

3006 GBL LIQ. 29903 VENTA ROTO 1.00 S/. 8,162.79 S/. 1,632.56 04/06 - 03/07 S/. 6,530.23 VRT

3006 GBL LIQ. 30305 JULIO ALQUILER 1.00 S/. 18,803.67 S/. 451.69 04/07 - 02/08 S/. 18,351.98 ALQ

3006 GBL LIQ. 30306 JULIO ALQUILER PIEZA DIA 1.00 S/. 2,559.04 S/. 511.81 04/07 - 02/08 S/. 2,047.23 APD

3006 GBL LIQ. 30311 REPARACION Y LIMPIEZA 1.00 S/. 5,035.46 S/. 1,007.09 04/07 - 02/08 S/. 4,028.37 RYL

3006 GBL LIQ. 30312 VENTA ROTO 1.00 S/. 716.62 S/. 143.32 04/07 - 02/08 S/. 573.30 VRT

3006 GBL LIQ. 30313 VENTA ROTO 1.00 S/. 5,820.90 S/. 1,164.18 04/07 - 02/08 S/. 4,656.72 VRT

3006 GBL LIQ. 30692 AGOSTO ALQUILER 1.00 S/. 7,522.02 S/. 0.00 03/08 - 01/09 S/. 7,522.02 ALQ

3006 GBL LIQ. 30693 AGOSTO ALQUILER PIEZA DIA 1.00 S/. 6,426.09 S/. 1,285.22 03/08 - 01/09 S/. 5,140.87 APD

3006 GBL LIQ. 31068 SETIEMBRE ALQUILER 1.00 S/. 997.53 S/. 0.00 02/09 - 01/10 S/. 997.53 ALQ

3006 GBL LIQ. 31069 SETIEMBRE ALQUILER PIEZA DIA 1.00 S/. 13,603.12 S/. 2,720.62 02/09 - 01/10 S/. 10,882.50 APD

3006 GBL LIQ. 30557 REPARACION Y LIMPIEZA 1.00 S/. 611.10 S/. 122.22 02/09 - 01/10 S/. 488.88 RYL

3006 GBL LIQ. 31506 OCTUBRE ALQUILER 1.00 S/. 14,417.47 S/. 2,883.49 02/10 - 31/10 S/. 11,533.98 ALQ

3006 GBL LIQ. 31510 REPARACION Y LIMPIEZA 1.00 S/. 116.16 S/. 23.23 02/10 - 31/10 S/. 92.93 RYL

3006 GBL LIQ. 31511 VENTA ROTO 1.00 S/. 1,043.66 S/. 208.73 02/10 - 31/10 S/. 834.93 VRT

MATERIAL DADO DE BAJA (DICIEMBRE) Pendiente envio de liq. Por


3006 GBL 1.00 S/. 5,413.16 S/. 1,082.63 01/11 - 30/11 S/. 4,330.53 BAJ
parte de Peri

PRECIOS MAS IGV


FORMA DE PAGO VALORIZACIONES MENSUALES

PLAZO DE ENTREGA (DIAS CALENDARIOS)

S/.172,458.58 S/.152,603.11

A FAVOR DE HUARCAYA S/.19,855.47

MONTO
ASIGNACION S/. 152,603.11
MARGEN A NIVEL DE PPTO META 11.51% 19,855.47
MARGEN A NIVEL PPTO CONTRACTUAL 19.61% 37,222.21
NOTAS :
- EXPRESADO EN NUEVOS SOLES
- NO INCLUYE EL I.G.V
- VALORIZACIONES MENSUALES
- EL ALQUILER POR PIEZA DIA DEBE SER EQUIVALENTE AL ALQUILER POR SOLUCION
- LAS VALORIZACIONES SE REALIZARAN POR MES O SU FRACCION SEGÚN LA PERMANENCIA EN OBRA.

NOMBRE NOMBRE
OFICINA TECNICA DE OBRA RESIDENTE DE OBRA

NOMBRE NOMBRE
JEFE DE PROYECTO GERENTE DE OPERACIONES
APUS DE PARTIDAS DONDE SE HA CONSIDERADO ENCOFRADO Y ANDAMIOS

Partida 01.03.03.03.03 ENCOFRADO Y DESENCOFRADO

Rendimiento m2/DIA 9.0000 EQ. 9.0000 Costo unitario directo por : m2 45.06

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0147010002 OPERARIO hh 1.0000 0.8889 19.30 17.16
0147010004 PEON hh 1.0000 0.8889 14.56 12.94
30.10
Materiales
0202000008 ALAMBRE NEGRO RECOCIDO # 8 Kg 0.0500 3.20 0.16
0202010005 CLAVOS CON CABEZA PROMEDIO Kg 0.0500 3.50 0.18
0243040000 MADERA TORNILLO PARA ENCOFRADO (p2) ft2 0.1500 3.00 0.45
0244030002 TRIPLAY LUPUNA DE 4' X 8' X 16 mm pl 0.0169 71.00 1.20
1.99
Equipos
0337010001 HERRAMIENTAS MANUALES %MO 3.0000 30.10 0.90
0348090002 ANDAMIO METAL TABLAS ALQUILER est 0.6500 3.00 1.95
0348990080 ENCOFRADO METALICO m2 1.1500 8.80 10.12
12.97

Partida 01.03.03.07.02 ENCOFRADO Y DESENCOFRADO

Rendimiento m2/DIA 12.0000 EQ. 12.0000 Costo unitario directo por : m2 35.48

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0147010002 OPERARIO hh 1.0000 0.6667 19.30 12.87
0147010004 PEON hh 1.0000 0.6667 14.56 9.71
22.58
Materiales
0202020007 CLAVOS PARA CEMENTO DE ACERO CON CABEZA PROME Kg 0.0300 3.50 0.11
0243040000 MADERA TORNILLO PARA ENCOFRADO (p2) ft2 0.2000 3.00 0.60
0244030002 TRIPLAY LUPUNA DE 4' X 8' X 16 mm pl 0.0220 71.00 1.56
2.27
Equipos
0337010001 HERRAMIENTAS MANUALES %MO 5.0000 22.58 1.13
0348090002 ANDAMIO METAL TABLAS ALQUILER est 0.5000 3.00 1.50
0348990074 ENCOFRADO METALICO PLACAS m2 1.0000 8.00 8.00
10.63

Partida 01.04.03.04.02 ENCOFRADO Y DESENCOFRADO

Rendimiento m2/DIA 9.0000 EQ. 9.0000 Costo unitario directo por : m2 67.79

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0147010002 OPERARIO hh 1.0000 0.8889 19.30 17.16
0147010004 PEON hh 1.0000 0.8889 14.56 12.94
30.10
Materiales
0202010005 CLAVOS CON CABEZA PROMEDIO Kg 0.0200 3.50 0.07
0243040000 MADERA TORNILLO PARA ENCOFRADO (p2) ft2 1.8500 3.00 5.55
0244030002 TRIPLAY LUPUNA DE 4' X 8' X 16 mm pl 0.0141 71.00 1.00
6.62
Equipos
0337010001 HERRAMIENTAS MANUALES %MO 3.0000 30.10 0.90
0348990075 ENCOFRADO METALICO SOPORTE DE VIGA m 1.0200 21.00 21.42
0348990076 ENCOFRADO METALICO LATERALES DE VIGA m2 0.2500 35.00 8.75
31.07

Partida 01.04.03.05.02 ENCOFRADO Y DESENCOFRADO

Rendimiento m2/DIA 10.5000 EQ. 10.5000 Costo unitario directo por : m2 46.12

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0147010002 OPERARIO hh 1.0000 0.7619 19.30 14.70
0147010004 PEON hh 1.0000 0.7619 14.56 11.09
25.79
Materiales
0202000008 ALAMBRE NEGRO RECOCIDO # 8 Kg 0.1000 3.20 0.32
0202020007 CLAVOS PARA CEMENTO DE ACERO CON CABEZA PROME Kg 0.1400 3.50 0.49
0243040000 MADERA TORNILLO PARA ENCOFRADO (p2) ft2 0.5000 3.00 1.50
0244030039 PANEL FENOLICO 1.20X2.40M (e=18mm) pza 0.0456 98.00 4.47
0244030049 SOPORTE DE LOSA H=3.00M m2 1.0500 9.15 9.61
16.39
Equipos
0337010001 HERRAMIENTAS MANUALES %MO 2.0000 25.79 0.52
0348090002 ANDAMIO METAL TABLAS ALQUILER est 0.2500 3.00 0.75
0349140028 PUNTAL METALICO TELESCOPICO # 1 d 4.0000 0.3810 7.00 2.67
3.94

Partida 01.04.03.07.03 ENCOFRADO Y DESENCOFRADO

Rendimiento m2/DIA 12.0000 EQ. 12.0000 Costo unitario directo por : m2 35.48

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0147010002 OPERARIO hh 1.0000 0.6667 19.30 12.87
0147010004 PEON hh 1.0000 0.6667 14.56 9.71
22.58
Materiales
0202020007 CLAVOS PARA CEMENTO DE ACERO CON CABEZA PROME Kg 0.0300 3.50 0.11
0243040000 MADERA TORNILLO PARA ENCOFRADO (p2) ft2 0.2000 3.00 0.60
0244030002 TRIPLAY LUPUNA DE 4' X 8' X 16 mm pl 0.0220 71.00 1.56
2.27
Equipos
0337010001 HERRAMIENTAS MANUALES %MO 5.0000 22.58 1.13
0348090002 ANDAMIO METAL TABLAS ALQUILER est 0.5000 3.00 1.50
0348990074 ENCOFRADO METALICO PLACAS m2 1.0000 8.00 8.00
10.63

Partida 01.07.04.02.01.02 ENCOFRADO Y DESENCOFRADO

Rendimiento m2/DIA 9.0000 EQ. 9.0000 Costo unitario directo por : m2 45.20

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0147010002 OPERARIO hh 1.0000 0.8889 19.30 17.16
0147010004 PEON hh 1.0000 0.8889 14.56 12.94
30.10
Materiales
0202000008 ALAMBRE NEGRO RECOCIDO # 8 Kg 0.0500 3.20 0.16
0202010005 CLAVOS CON CABEZA PROMEDIO Kg 0.0500 3.50 0.18
0243040000 MADERA TORNILLO PARA ENCOFRADO (p2) ft2 0.6430 3.00 1.93
0244030002 TRIPLAY LUPUNA DE 4' X 8' X 16 mm pl 0.0169 71.00 1.20
3.47
Equipos
0337010001 HERRAMIENTAS MANUALES %MO 5.0000 30.10 1.51
0348990080 ENCOFRADO METALICO m2 1.1500 8.80 10.12
11.63
APU FINAL DE PINTURA CONSIDERADO PARA EL PROYECTO APU CONTRACTUAL DE PINTURA
Partida 01.01.04.03.01 Acabados de muro M1 esmalte sintético opaco color blanco color blanco RAL 9010 (S0500-N) por el interior Partida 01.01.04.03.01 Acabados de muro M1 esmalte sintético opaco color blanco color blanco RAL 9010 (S0500-N) por el interior

Rendimiento m2/DIA 21.0000 EQ. 21.0000 Costo unitario directo por : m2 15.50 Rendimiento m2/DIA 21.0000 EQ. 21.0000 Costo unitario directo por : m2 15.55

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/. Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra Mano de Obra
0147010002 OPERARIO hh 1.0000 0.3810 19.30 7.35 0147010002 OPERARIO hh 1.0000 0.3810 19.30 7.35
0147010003 OFICIAL hh 0.5000 0.1905 16.12 3.07 0147010003 OFICIAL hh 0.5000 0.1905 16.12 3.07
10.42 10.42
Materiales Materiales
0253050007 DISOLVENTE THINER gal 0.0250 12.00 0.30 0253050007 DISOLVENTE THINER gal 0.0250 12.00 0.30
0254010001 PINTURA ESMALTE SINTETICO gal 0.0480 45.00 2.16 0254010001 PINTURA ESMALTE SINTETICO gal 0.0480 45.00 2.16
2.46 2.46
Equipos Equipos
0349020008 COMPRESORA NEUMATICA 87 HP 250-330 PCM hm 1.0000 0.3810 2.00 0.76 0349020008 COMPRESORA NEUMATICA 87 HP 250-330 PCM hm 1.0000 0.3810 7.00 2.67
0349020008 ANDAMIOS est 0.6187 3.00 1.86
2.62 2.67

APU FINAL DE PINTURA CONSIDERADO PARA EL PROYECTO APU CONTRACTUAL DE PINTURA


Partida 01.03.05.01 ESTRUCTURA METÁLICA (VALOR PROFORMA) Partida 01.03.05.01 ESTRUCTURA METÁLICA (VALOR PROFORMA)

Rendimiento kg/DIA 400.0000 EQ. 400.0000 Costo unitario directo por : kg 8.93 Rendimiento kg/DIA 400.0000 EQ. 400.0000 Costo unitario directo por : kg 8.93

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/. Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra Mano de Obra
0147010002 OPERARIO hh 1.0000 0.0200 19.30 0.39 0147010002 OPERARIO hh 1.0000 0.0200 19.30 0.39
0147010003 OFICIAL hh 1.0000 0.0200 16.12 0.32 0147010003 OFICIAL hh 1.0000 0.0200 16.12 0.32
0147010004 PEON hh 1.0000 0.0200 14.56 0.29 0147010004 PEON hh 1.0000 0.0200 14.56 0.29
1.00 1.00
Materiales Materiales
0229500091 SOLDADURA Kg 0.0500 18.00 0.90 0229500091 SOLDADURA Kg 0.0500 18.00 0.90
0251330001 ACERO ESTRUCTURAL A-36 Kg 1.0500 2.52 2.65 0251330001 ACERO ESTRUCTURAL A-36 Kg 1.0500 2.52 2.65
0254060000 PINTURA ANTICORROSIVA gal 0.0255 120.00 3.06 0254060000 PINTURA ANTICORROSIVA gal 0.0255 120.00 3.06
6.61 6.61
Equipos Equipos
0337030000 CIZALLA PARA ACERO CONSTRUCCION HASTA 1" u 0.0308 6.00 0.18 0337030000 CIZALLA PARA ACERO CONSTRUCCION HASTA 1" u 0.0308 6.00 0.18
0348950001 EQUIPO DE ARENADO Y PINTURA hm 1.0000 0.0200 12.00 0.24 0348950001 EQUIPO DE ARENADO Y PINTURA hm 1.0000 0.0200 12.00 0.24
0349180019 ANDAMIOS est 0.3000 3.00 0.90 0349180019 GRUA FRICC PLUMA CELOSIA 335 HP 70 ton 40' hm 0.1500 0.0030 300.00 0.90
1.32 1.32

NOMBRE NOMBRE
OFICINA TECNICA DE OBRA RESIDENTE DE OBRA

NOMBRE NOMBRE
JEFE DE PROYECTO GERENTE DE OPERACIONES
DETALLE DE LIQUIDACIONES DE ALQUILER POR SOLUCION A

SEGÚN LIQUIDACION 29443


CANTIDAD DIAS PERIODO
ENCOFRADOS VERTICALES LIWA
ENCOFRADO DE COLUMNAS HMAX=4.00 70.00 26 5-May 30-May
ENCOFRADO DE MURO 02 CARAS CISTERNA H=4.50 205.70 4 31-May 3-Jun
ENCOFRADO DE PLACA 02 CARAS PL-03 H=6.00 77.00 30 5-May 3-Jun

SOPORTE LOSA Hmax = 4.50 m


SOPORTE LOSA NIVEL + 4.25 m 257.00 17 18-May 3-Jun
SOPORTE LOSA NIVEL + 8.10 m 284.00 9 26-May 3-Jun
SOPORTE LOSA UTILITIES 10.7 - 8.3 96.00 4 31-May 3-Jun
SOPORTE LOSA UTILITIES 10.7 - 10.23 85.50 3 1-Jun 3-Jun

SOPORTE VIGA Hmax = 4.50 m


SOPORTE LOSA NIVEL + 4.25 m 179.00 17 18-May 3-Jun
SOPORTE LOSA NIVEL + 8.10 m 148.00 9 26-May 3-Jun
SOPORTE LOSA UTILITIES 10.7 - 8.3 66.80 4 31-May 3-Jun
SOPORTE LOSA UTILITIES 10.7 - 10.23 57.60 3 1-Jun 3-Jun

ANDAMIOS
ANDAMIO PARA COLUMNAS H = 4.00 + 1.00 5.00 30 5-May 3-Jun
ANDAMIO PARA MUROS H = 4.00 + 1.00 50.00 30 5-May 3-Jun
ANDAMIO PARA MUROS H = 6.25 + 1.00 87.00 17 18-May 3-Jun
ANDAMIO PARA MUROS H = 6.25 + 1.00 87.00 3 1-Jun 3-Jun

ENCOFRADOS VERTICALES DOMINO


ENCOFRADO DE COLUMNAS HMAX= 3.75 m 30.00 9 26-May 3-Jun
ER POR SOLUCION APROBADA

SEGÚN LO SOLICITADO
ALQUILER PARCIAL CANTIDAD ALQUILER PARCIAL Del 05/05 al 03/06
dias computados
S/. 54.883 S/. 3,329.57 70.00 S/. 54.883 S/. 3,329.57
S/. 37.231 S/. 1,021.12 185.48 S/. 37.231 S/. 920.75
S/. 42.729 S/. 3,290.13 77.00 S/. 42.729 S/. 3,290.13

S/. 15.961 S/. 2,324.45 257.00 S/. 15.961 S/. 2,324.45


S/. 15.961 S/. 1,359.88 284.00 S/. 15.961 S/. 1,359.88
S/. 15.961 S/. 204.30 96.00 S/. 15.961 S/. 204.30
S/. 15.961 S/. 136.47 85.50 S/. 15.961 S/. 136.47

S/. 33.573 S/. 3,405.42 179.00 S/. 33.573 S/. 3,405.42


S/. 33.573 S/. 1,490.64 148.00 S/. 33.573 S/. 1,490.64
S/. 33.573 S/. 299.02 66.80 S/. 33.573 S/. 299.02
S/. 33.573 S/. 193.38 57.60 S/. 33.573 S/. 193.38

S/. 561.351 S/. 2,806.76 5.00 S/. 561.351 S/. 2,806.76


S/. 17.067 S/. 853.35 50.00 S/. 17.067 S/. 853.35
S/. 17.068 S/. 841.45 87.00 S/. 17.068 S/. 841.45
S/. 17.068 S/. 148.49 87.00 S/. 17.068 S/. 148.49

dias computados
S/. 72.790 S/. 655.11 30.00 S/. 72.790 S/. 655.11

SUBTOTAL S/. 22,359.55 SUBTOTAL S/. 22,259.17


DSCTO S/. 0.00 DSCTO S/. 0.00 NOTA DE CREDITO
TOTAL S/. 22,359.55 TOTAL S/. 22,259.17 S/. 100.37

MONTO APROBADO
05/05 al 03/06
30

30
LIQUIDACIONES APROBADAS DEL PERIODO

LIQ CONCEPTO INICIO FINAL MONTO N/C MONTO OBSERVACIONES


APROBADO
29443 ALQUILER 5-May 3-Jun S/. 22,359.55 S/. 100.37 S/. 22,259.17 DESCONTAR EL METRADO OBSERVADO

APLICA DESCUENTO DEL 20%. ALQUILER PIEZA DIA DEBE SER IGUAL AL
29895 ALQUILER PIEZA DIA 5-May 3-Jun S/. 78.57 S/. 15.71 S/. 62.86 ALQUILER POR SOLUCION

29904 REPARACION Y LIMPIEZA 30-Jun S/. 9,609.49 S/. 1,921.90 S/. 7,687.59 DESCUENTO DEL 20%

29903 VENTA ROTO 30-Jun S/. 8,162.79 S/. 1,632.56 S/. 6,530.23 DESCUENTO DEL 20%

TOTAL S/. 40,210.40 S/. 3,670.54

NOMBRE NOMBRE
OFICINA TECNICA DE OBRA RESIDENTE DE OBRA

NOMBRE NOMBRE
JEFE DE PROYECTO GERENTE DE OPERACIONES
MATERIALES DADOS DE BAJA DEL PERIODO

ITEM DESCRIPCION CANTID PRECIO SUBTOTAL FECHA DE BAJA OBSERVACIONES ESTADO

1 GRAPA DOBLE ORT. NK 48/48 MM: 1 S/.19.43 S/.19.43 MATERIAL PERDIDO EN OBRA PEO

2 HUSILLO BASE TR 38-70/50: 2 S/.120.25 S/.240.50 ENVIADO A ALMACEN CENTRAL GUIA xx-xxxx REP

3 SPANNSTAHL 0.50 MTR DW 15: 4 S/.7.34 S/.29.36 MATERIAL PERDIDO EN OBRA PEO

4 TUERCA MARIPOSA DISCO DW-15: 23 S/.15.77 S/.362.71 MATERIAL PERDIDO EN OBRA PEO

5 VIGA VT-20K 2.65M: 1 S/.100.54 S/.100.54 ENVIADO A ALMACEN CENTRAL GUIA xx-xxxx UTL

6 VIGA GT-24 1.80M: 3 S/.156.24 S/.468.72 ENVIADO A ALMACEN CENTRAL GUIA xx-xxxx INS

7 VIGA GT-24 3.00M: 1 S/.255.91 S/.255.91 ENVIADO A ALMACEN CENTRAL GUIA xx-xxxx UTL

8 VERTICAL BASE UVB 24: 4 S/.56.69 S/.226.76 ENVIADO A ALMACEN CENTRAL GUIA xx-xxxx REP

9 DIAGONAL A ROSETA UBK 300/200: 1 S/.207.66 S/.207.66 ENVIADO A ALMACEN CENTRAL GUIA xx-xxxx REP

10 ENGANCHE LARGUERO UHA: 2 S/.36.78 S/.73.56 ENVIADO A ALMACEN CENTRAL GUIA xx-xxxx INS

11 CORNER CONNECTOR / 2 LIWA: 1 S/.95.84 S/.95.84 ENVIADO A ALMACEN CENTRAL GUIA xx-xxxx INS

12 LEDGER UH 100: 2 S/.80.67 S/.161.34 ENVIADO A ALMACEN CENTRAL GUIA xx-xxxx REP

13 LEDGER UH 200: 1 S/.98.21 S/.98.21 ENVIADO A ALMACEN CENTRAL GUIA xx-xxxx REP

14 CERROJO LW P/COMP: 21 S/.74.25 S/.1,559.25 ENVIADO A ALMACEN CENTRAL GUIA xx-xxxx UTL

15 PANEL LIWA LWM 250x75: 1 S/.1,295.52 S/.1,295.52 ENVIADO A ALMACEN CENTRAL GUIA xx-xxxx UTL

16 BRACE CONNECTOR /2 LIWA: 1 S/.217.85 S/.217.85 ENVIADO A ALMACEN CENTRAL GUIA xx-xxxx INS

TOTAL S/.5,413.16
TOTAL INCLUYE DESC. S/.4,330.53

ESTADOS
REUTILIZABLE PARA OTRO TIPO DE SOLUCION UTL
PARA REPARACION REP
INSERVIBLE INS
PERDIDO EN OBRA PEO

NOMBRE NOMBRE
OFICINA TECNICA DE OBRA RESIDENTE DE OBRA

NOMBRE NOMBRE
JEFE DE PROYECTO GERENTE DE OPERACIONES
CUADRO DE ADJUDICACION DE GASTOS AL PERSONAL

DETALLE DEL MATERIAL DAÑADO DETALLE DESCUENTO A PERSONAL

ITEM DESCRIPCION CANT PRECIO SUBTOTAL RESPONSABLE DNI APELLIDOS NOMBRES MONTO A DEDUCIR
1 Recambio Fenólico Panel Liwa 75x25 0.19 S/. 161.11 S/. 30.21 Llampasi Yuri 40415860 ALVARADO CANALES ABRAHAM HUMBERTO S/. 47.76
2 Plataforma Acero UDI 25x300 1.00 S/. 273.42 S/. 273.42 personal de Erazo 43922276 ALVARADO CANALES WILFREDO DELFIN S/. 47.76
3 Viga VT-20K 1,45 m 2.00 S/. 58.64 S/. 117.28 personal de Erazo 32731153 BRITO BLANCO CARMEN REYNALDO S/. 47.76
4 Viga GT-24 2,10 m 2.00 S/. 181.16 S/. 362.32 personal de Erazo 45342620 CHAHUIN HUAMAN EDY HOEL S/. 47.76
5 Limpieza paneles Handset (estado: R) 10.00 S/. 3.62 S/. 36.20 personal de Erazo 44764634 CUBA GUZMAN DENNIS AMADOR S/. 47.76
6 Limpieza pieza met. chica (estado: R) 20.00 S/. 3.52 S/. 70.40 personal de Erazo 27427534 EDQUEN RAFAEL ANGEL BILMO S/. 47.76
TOTAL S/. 889.83 73487108 ERAZO ERAZO GEORGE RAUL S/. 47.76
43540446 GOMEZ OCHOA ISMAEL LUCAS S/. 47.76
10185987 GOMEZ OCHOA MOISES ESEQUIEL S/. 47.76
45251532 HIDALGO MELENDEZ JORGE VICTOR S/. 47.76
41044994 LLAMPASI CISNEROS YURI S/. 77.96
43042460 OROCHE PARANO FERNANDO CARLOS S/. 47.76
47732358 PONTE PONTE LENIN NEREO S/. 47.76
43160536 REYMUNDO PACHECO CESAR AUGUSTO S/. 47.76
46229322 RUBIO COTRINA JAIME S/. 47.76
6806037 SANGAMA CACHIQUE SEGUNDO ARTURO S/. 47.76
47770162 SAUCEDO DIAZ JOSE JEINER S/. 47.76
40800180 ERAZO GARCIA MARIO S/. 47.76
TOTAL S/. 889.83

ITEM DESCRIPCION CANTIDAD PRECIO SUBTOTAL RESPONSABLE DNI NOMBRE MONTO A DEDUCIR
1 Limpieza paneles Handset (estado: R) 6.25 S/. 3.62 S/. 22.63 personal de Taype 42400200 BENITO MAMANI, VICTOR S/. 132.14
2 Panel Liwa LWM 150 x 75 1.00 S/. 903.92 S/. 903.92 personal de Taype 44980045 CABEZAS SOTO, JHON WILLIAM S/. 132.14
3 Panel Liwa LWM 75 x 75 1.00 S/. 571.51 S/. 571.51 personal de Taype 45371505 CAJAHUARINGA DOMINGO, EDISON S/. 132.14
4 Panel Liwa LWM 250 x 75 1.00 S/. 1,295.52 S/. 1,295.52 personal de Taype 42061295 CAMPOS ESPINOZA, EUSEBIO S/. 132.14
5 BARRA DYWIDAG 085 M 45.00 S/. 12.36 S/. 556.20 personal de Taype 07654699 CARBAJAL ESPINOZA, TITO S/. 132.14
6 TUERCA MARIPOSA 44.00 S/. 28.72 S/. 1,263.68 personal de Taype 27398759 CASTILLO TUCUNANGO, CESARIO S/. 94.66
7 BARRA DYWIDAG 1.20 M 2.00 S/. 16.88 S/. 33.76 personal de Taype 40846315 CASTRO CARBAJAL, ALFREDO S/. 132.14
8 Viga VT-20K 2.65 M 3.00 S/. 100.54 S/. 301.62 personal de Taype 07455713 CERON ROJAS, FIDEL S/. 132.14
9 Viga GT-24K 1.80 M 5.00 S/. 156.24 S/. 781.20 personal de Taype 46995377 CERRON OCAÑA, ANTONIO FELIX S/. 94.66
10 Viga GT-24K 3.00 M 4.00 S/. 255.91 S/. 1,023.64 personal de Taype 46793779 CHACON HUARI, JOSE CARLOS S/. 94.66
11 LEDGER UH 3.00 4.00 S/. 125.98 S/. 503.92 personal de Taype 70776731 CHIPANA ANCCO, FELIX S/. 94.66
12 Husillo Base TR 38-70/50 3.00 S/. 120.25 S/. 360.75 personal de Taype 46167790 DAMIAN MAIRA, SEGUNDO MANUEL S/. 132.14
13 Trampilla de Acceso UAF 75 x 100 2.00 S/. 844.93 S/. 1,689.86 personal de Taype 46006159 DIAZ OLIVARES, PORFIRIO S/. 132.14
14 Escalera UAF 200 4.00 S/. 267.13 S/. 1,068.52 personal de Taype 77201290 FACUNDO CUNIA, WILMER ARTURO S/. 94.66
TOTAL S/. 6,744.87 42150316 FARIAS YOVERA, CARLOS FERNANDO S/. 132.14
42683610 FERNANDEZ YARONIZA, WILIAN S/. 132.14
45638665 GIRON ANICETO, DUVER ORLANDO S/. 94.66
42807633 GUTIERREZ MANYAVILCA, MOISES S/. 132.14
TOTAL GASTO ADJUDICADO A PERSONAL S/.7,634.70 74184189 HIDALGO RIVERA, JULIO NICOLAS S/. 132.14
10261795 HUACAUSI SALVADOR, FERMIN S/. 132.14
47429635 HUAMAN CORDOVA, HENRY S/. 94.66
46994672 HUAMANI GONZALES, JUAN CARLOS S/. 94.66
47483555 HUANCACURI LARA, GILMAR S/. 94.66
10701854 ILLATOPA SULLCA, PERCY S/. 132.14
46471541 LEON MONTORO, ALBERTO S/. 94.66
48407308 LIZANA LAVAN, DIOVER S/. 94.66
70386920 LLAMPASI CISNEROS, HERNAN S/. 94.66
10502212 LLIUYACC QUISPE, RAUL S/. 132.14
47915568 LUCHO GAMARRA, RUBEN ANIBAL S/. 94.66
10874630 MALDONADO DOMINGO, CARLOS GERARDO S/. 132.14
46201854 MALLCCO PERALTA, ANGEL ALBINO S/. 132.14
15742950 MALLQUI HIDALGO, JHON MOISES S/. 94.66
47758801 MALPARTIDA HERNANDEZ, ALEX S/. 132.14
48766651 MALPARTIDA HERNANDEZ, LISTER S/. 94.66
46362318 MANCHAY LOPEZ, ALLEN S/. 94.66
45963216 MANTILLA CHUNGUI, JHON ALBERTO S/. 132.14
42470126 MEJIA CJUMO, RENE HUMBERTO S/. 132.14
43642399 MINCHAN CHACON, CARLOS ALBERTO S/. 132.14
47112219 MORENO CHINCHAY, DENNER S/. 132.14
48508908 NUÑEZ LIZARBE, JESUS FRANCISCO S/. 132.14
47849573 OCAÑA RODRIGUEZ, JUVENAL ENRIQUE S/. 132.14
44270992 OLIVEROS NIETO, CHANVI ROJAS S/. 94.66
40970920 QUISPE LIVIZACA, ROBERT S/. 132.14
42435510 ROMERO SOTO, ALFREDO FLORIAN S/. 132.14
07359629 RUIDIAZ PAREDES, PEDRO S/. 94.66
43157283 SALINAS RODRIGUEZ, RUSVEL S/. 132.14
48621829 SANCHEZ CRUZ, EZEQUIEL S/. 94.66
48233451 SANCHEZ CRUZ, MOISES S/. 132.14
46802191 SHUAN SANCHEZ, MACEDONIO S/. 94.66
47666887 SILVA VASQUEZ, LUIS ALBERTO S/. 132.14
47607998 TAIPE BERNAOLA, ANDRES S/. 132.14
TAIPE BERNAOLA, VALENTIN S/. 132.14
46105527 TIPULA IQUISE, JOSE ANTONIO S/. 132.14
45960137 TORRES LOPEZ, JUAN FERNADO S/. 94.66
44963182 TUANAMA PANDURO, JAVIER S/. 132.14
73266532 VENTURA LLIUYACC, IVAN S/. 132.14
70931278 VENTURA MALLCCO, WILBER S/. 132.14
S/. 6,744.87

NOMBRE NOMBRE
OFICINA TECNICA DE OBRA RESIDENTE DE OBRA

NOMBRE NOMBRE
JEFE DE PROYECTO GERENTE DE OPERACIONES
CUADRO DE ADJUDICACION DE GASTOS A SUBCONTRATISTAS

STEELWORK
ITEM DESCRIPCION CANT PRECIO MONTO PERIODO
1 LEDGER UH 3.00 4 S/.125.98 S/.503.92 05/05 -03/06
2 Husillo Base TR 38-70/50 3 S/.120.25 S/.750.00 05/05 -03/06
3 Trampilla de Acceso UAF 75 x 100 2 S/.844.93 S/.350.00 05/05 -03/06
4 Escalera UAF 200 4 S/.267.13 S/.550.00 05/05 -03/06
TOTAL S/.2,153.92

JIMMY VARGAS
ITEM DESCRIPCION CANT PRECIO MONTO PERIODO
1 Viga GT-24 2,10 m 2 S/.181.16 S/.362.32 05/05 -03/06
2 Limpieza paneles Handset (estado: R) 10 S/.3.62 S/.750.00 05/05 -03/06
3 Limpieza pieza met. chica (estado: R) 20 S/.3.52 S/.350.00 05/05 -03/06
TOTAL S/.1,462.32

MONTO ADJUDICADO A SUBCONTRATISTA DEL PERIODO S/.3,616.24

NOMBRE NOMBRE
OFICINA TECNICA DE OBRA RESIDENTE DE OBRA

NOMBRE NOMBRE
JEFE DE PROYECTO GERENTE DE OPERACIONES
ENCOFRA
OBRA: LIMA PROJECT SANDVIK
UBICACIÓN: HUAROCHIRI

NUMERO DE GUIA
DE RECEPCION
SOLUCION : ANDAMIOS

INGRESO
COD DESCRIPCION UND 001-952 001-1053 001-1064 001-1078 001-1089 001-1010 FECHA FECHA

2-Jul 4-Jul 11-Jul 24-Sep 5-Nov 4-Dec

100719 TORNILLO M - 10 x 70 C/TUERCA UND 36 54 72 126

317000 GRAPA DOBLE GIR. DK 60/48 MM UND 24

317010 GRAPA DOBLE GIR . DK 48 / 48 mm UND 8 12 16 6

317020 GRAPA DOBLE ORT. NK 48 / 48 mm UND 6

326412 TUBO ARRIOST. 48mm 2.00m GALV. UND 4 6 8 3

326413 TUBO ARRIOST. 48mm 3.00m GALV. UND 12

400009 VERTICAL C/E UVR 200 UND 36 54 48 24 54 78

400012 VERTICAL C/E UVR 300 UND 24 36 12

400014 VERTICAL BASE UVB 24 UND 12 18 24 6 54 50

400057 DIAGONAL A HORIZ UBL 150/200 UND 12 18 24 8

400065 DIAGONAL A HORIZ UBL 250/200 UND 12 18 12 8

400088 TUBO AMARRE UWT 45 UND 6

400411 BASE REGULABLE UJB 38 - 50/30 UND 12 18 24 6 12

400572 DIAGONAL A ROSETA UBK 150/200 UND 36 12

400574 DIAGONAL A ROSETA UBK 250/200 UND 24 12

400863 FIJACION HUSILLO UJS UND 12 18 24 6

400969 DIAGONAL A ROSETA UBK 72/200 UND 36

401731 ENGANCHE LARGUERO UHA UND 16 24 48 12 72 24

401860 RUEDA UEW 12 C/HUSILLO TR - 38 UND 18 6 54 12

407002 PLATAFORMA ACERO UDI 25 x 150 UND 12 18 18

408540 PLATAFORMA ACERO UDI 25 x 250 UND 62 93 120 180

409755 TRAMPILLA ACCESO UAP 75 x 100 UND 4 6 12 3 18 6

409879 ESCALERA UAP - 200 UND 4 6 12 3 18 6

410160 RODAPIE MET. UPY 150 UND 12 18 24 8 24

410208 RODAPIE MET. UPY 250 UND 22 33 48 15 48

414124 LEDGER UH 72 UND 36

414629 LEDGER UH 75 UND 4 6 12 3 18 6

414641 LEDGER UH 150 UND 52 78 104 34 108 121

414648 LEDGER UH 250 UND 80 120 176 54 234 110

416292 GUARDRAIL POST HSGP - 2 UND 6

423771 PLATAFORMA ACERO UDG 25 X 250 UND 40

423941 CASTOR UEW 30 WITH SPINDLE UND 12

424112 PLATAFORMA ACERO UDG 25 x 150 UND 36 9 54

601860 RUEDA DE 8" UND 30

SOLUCION : PLACAS

INGRESO
COD DESCRIPCION UND FECHA FECHA FECHA FECHA FECHA FECHA FECHA FECHA
COD DESCRIPCION UND
2-Jul 4-Jul 4-Jul 11-Jul 7-Aug

328010 ESTABILIZADOR RSS - I UND 24

328030 ESTABILIZADOR RSS - III UND 6 6

328110 TIRANTE REGULABLE AV UND 24

328120 TIRANTE REGULABLE AV/RSS - III UND 6 6 24

328990 ESTABILIZADOR RS - 1000 UND 3

330010 BARRA DYWIDAG 15/17 0,85M UND 80 26

330370 TUERCA MARIP./PLACA ART. DW-15 UND 192 116 52 94

330480 BARRA DYWIDAG 1.00 MTR DW 15 UND 58 115

366000 PANEL DOMINO D - 300 * 100 UND 4

366005 PANEL DOMINO D - 300 * 50 UND 2

366008 PANEL DOMINO ESQ.EXT. DAW-300 UND 16 20

366013 DOMINO ELEMENT D - 300 x 40 UND 2

366020 PANEL DOMINO D - 250 * 100 UND 36 16 56

366022 PANEL DOMINO D - 250 * 75 UND 12 2

366025 PANEL DOMINO D - 250 * 50 UND 18 16 4

366026 PANEL DOMINO D - 250 * 25 UND 8

366028 PANEL DOMINO ESQ.EXT. DAW-250 UND 2

366029 PANEL DOMINO ESQ.ART. DGE-250 UND 4

366035 DOMINO ELEMENT D - 250 x 40 UND 4 23

366036 DOMINO ELEMENT D - 250 x 35 UND 4

366040 PANEL DOMINO D - 125 * 100 UND 4 48

366041 PANEL DOMINO D - 125 * 75 UND 4

366064 PANEL DOMINO D - 75 * 25 UND 4

366067 PANEL DOMINO ESQ.ART. DGE-75 UND 2

366080 CERROJO DOMINO DRS UND 226 366 104 143

366082 ABRAZADERA DOMINO DRA UND 12 12 3 93

366084 CORREA COMPENS.DOMINO DAR UND 32 4

366085 CONSOLA TRABAJO DOMINO DG-85 UND 8 6 38

366086 SOPORTE DE ANCLAJE DOMINO DAH UND 16

401986 DOMINO-WD-AUSGL. DWD 250/10 UND 6

402018 PLACA BASE/2 RS - 1000 UND 3

403606 PERI MULTI MONTI MMS 20 X 130 UND 6 18

406000 PLACA BASE - 2 RSS UND 6 6 12

408135 TIRANTE REGULABLE AV 210 UND 6 6

410406 ANCLAJE FRONTAL - 2 DOMINO DSA UND 32

416292 GUARDRAIL POST HSGP - 2 UND 8 38

621268 DOM.ESQUINA FLEXIBLE 90° DE-250 UND 12


ENCOFRADO PERI

NUMERO DE REMITO
DE DEVOLUCION

SALIDA
TOTAL
002-351 002-369 002-412 002-425 002-436 002-440 002-459 002-489 002-512 002-523 002-536 002-545 BAJA
INGRESO
12-Sep 16-Sep 19-Sep 22-Sep 6-Oct 15-Oct 21-Oct 28-Oct 25-Nov 12-Dec 26-Dec 13-Jan 19-Jan

288

24 24

42 4 30 1 1

6 1 2 3

21 3 11

12 4 5 1

294 83 32 133

72 7 48

164 21 67 27 39 1

62 38 5 11

50 3 26 9

6 1 1 4

72 39 20 11

48 13 12 20 1

36 11 19 10

60 44 8 6 2

36 27 9

196 46 3 2 12 4 6 38 67 12

90 10 4 4 39 6

48 8 32 8

455 120 88 197

49 15 21 11 2

49 15 20 1

86 54 32

166 103 25 38

36 27 1 4

49 2 5 26 18

497 33 103 52 224 1

774 81 261 121 241 3

6 6

40 12 22

12 5 5 1 1

99 60 26 13

30 4 10 2

SALIDA
TOTAL
002-351 002-369 002-412 002-425 002-436 002-440 002-459 002-489 002-512 002-523 002-536 002-545 002-545 BAJA
INGRESO
TOTAL
INGRESO
12-Sep 16-Sep 19-Sep 22-Sep 30-Sep 6-Oct 15-Oct 21-Oct 28-Oct 25-Nov 12-Dec 26-Dec 13-Jan 19-Jan

24 11 13

12 4 8

24 22 2

36 32 4

3 3

106 3 1 4 16 27 55

454 8 7 4 9 1 53 130 1 42 199

173 11 1 4 41 41 75

4 4

2 1 1

36 36

2 1 1

108 17 56 21 7 2 3

14 4 4 3 3

38 38

8 1 7

2 2

4 4

27 7 8 12

4 2 1 1

52 20 6 2 24

4 2 2

4 4

2 2

839 170 54 2 342 250 1 20

120 52 5 2 28 9 6 7 5 2 4

36 7 15 12 1

52 40 6 5 1

16 9 2 3 1 1

6 6

3 1 2

24 17 3 2 1 1

24 10 1 4 2 2 5

12 11 1

32 7 6 1 7 10 1

46 36 3 7

12 7 5
TOTAL
STOCK
SALIDA

0 288

24 0

36 6

6 0

14 7

10 2

248 46

55 17

155 9

54 8

38 12

6 0

70 2

46 2

40 -4

60 0

36 0

190 6

63 27

48 0

405 50

49 0

36 13

86 0

166 0

32 4

51 -2

413 84

707 67

6 0

34 6

12 0

99 0

16 14

TOTAL
FECHA STOCK
SALIDA
TOTAL
STOCK
SALIDA

24 0

12 0

24 0

36 0

3 0

106 0

454 0

173 0

4 0

2 0

36 0

2 0

106 2

14 0

38 0

8 0

2 0

4 0

27 0

4 0

52 0

4 0

4 0

2 0

839 0

120 0

35 1

52 0

16 0

6 0

3 0

24 0

24 0

12 0

32 0

46 0

12 0

También podría gustarte