Está en la página 1de 4

Hoja de Control de Maquinaria Pesada y Material para la Sub Base

Obra: MEJORAMIENTO DEL JIRON SAN PEDRO CUADRAS 1 Y 2 DEL BARRIO ALTO LLAVINI DE LA CIUDAD DE PUNO, PROVINCIA DE

RELACION DE MAQUINARIA EMPLEADA EN OBRA (H-m)

FEBRERO MARZO
PRECIO A TOTAL COSTO

2/22/2016

2/23/2016

2/24/2016

2/25/2016

2/26/2016

2/29/2016
MAQUINARIA UTILIZADA EN OBRA TODO

3/1/2016

3/2/2016

3/7/2016
3/8/2016
HORAS MES TOTAL MES
COSTO

MOTONIVELADORA GD511A - KOMATSU S/. 197.00 3:30 3:30 S/. 689.50 2:30
CARGADOR FRONTAL WA180 - KOMATSU S/. 192.00 5:00 0:30 2:00 4:00 11:30 S/. 2,208.00 4:00
TRACTOR ORUGA D6MXL - CATERPILLAR S/. 202.00 4:30 0:45 1:30 4:15 11:00 S/. 2,222.00 3:00 0:30
RODILLO VIBRATORIO CA 152 - DYNAPAC S/. 162.00 0:00 S/. - 4:00 0:40 5:00
VOLQUETE DE 15M³ S/. 149.00 1:00 3:30 7:00 13:45 1:15 S/. 3,762.25 13:00
RETROEXCAVADORA 420E - CATERPILLAR S/. 120.00 0:00 S/. -
TOTAL MES= S/. 8,881.75

MAQUINARIA SEGÚN EXPEDIENTE TÉCNICO PRECIO H-m PARCIAL


CAMION VOLQUETE 6M³ S/. 125.00 2.00 S/. 250.00
CAMION VOLQUETE 12M³ S/. 220.00 42.00 S/. 9,240.00
RODILLO LISO VIBRATORIO 101-135HP 12T S/. 300.00 4.00 S/. 1,200.00
MOTONIVELADORA DE 125 HP S/. 280.00 9.76 S/. 2,732.46
VOLQUETE DE 6M³ S/. 80.00 100.00 S/. 8,000.00
TOTAL= S/. 21,422.46

RELACION DE MATERIAL EMPLEADO EN OBRA (m³)

FEBRERO MARZO

PRECIO TOTAL COSTO


MATERIAL EMPLEADO EN OBRA UNITARIO VOLQUETES TOTAL MES
Hoja de Control de Maquinaria Pesada y Material para la Sub Base
Obra: MEJORAMIENTO DEL JIRON SAN PEDRO CUADRAS 1 Y 2 DEL BARRIO ALTO LLAVINI DE LA CIUDAD DE PUNO, PROVINCIA DE

PRECIO TOTAL COSTO

2/22/2016

2/23/2016

2/24/2016

2/25/2016

2/26/2016

2/29/2016
MATERIAL EMPLEADO EN OBRA

3/1/2016

3/2/2016

3/3/2016

3/4/2016
UNITARIO VOLQUETES TOTAL MES

PIEDRA FRACTURADA S/. 30.00 0.00 S/. - 1.00 2.00


MATERIAL PREPARADO PARA SUB BASE S/. 50.00 0.00 S/. -
TOTAL MES= S/. -

MATERIAL SEGÚN EXPEDIENTE TÉCNICO PRECIO m³ PARCIAL


MATERIAL GRANULAR A1A-A1B AASHTO S/. 45.00 256.00 S/. 11,520.00
AFIRMADO S/. 45.00 81.00 S/. 3,645.00
TOTAL= S/. 15,165.00
aria Pesada y Material para la Sub Base
DEL BARRIO ALTO LLAVINI DE LA CIUDAD DE PUNO, PROVINCIA DE PUNO - PUNO

MARZO

TOTAL COSTO TOTAL

3/11/2016

3/12/2016
3/14/2016

3/15/2016

3/19/2016
HORAS MES MES

3:30 3:45 9:45 S/. 1,920.75


3:15 4:45 1:00 13:00 S/. 2,496.00
3:30 S/. 707.00
3:30 2:30 3:45 19:25 S/. 3,145.50
6:20 19:20 S/. 2,880.67
4:00 4:00 S/. 480.00
TOTAL MES= S/. 11,629.92

TOTAL OBRA= S/. 20,511.67

REQUERIMIENTO= S/. 21,422.46

SALDO= S/. 910.80

MARZO

TOTAL COSTO TOTAL


VOLQUETES MES
aria Pesada y Material para la Sub Base
DEL BARRIO ALTO LLAVINI DE LA CIUDAD DE PUNO, PROVINCIA DE PUNO - PUNO

TOTAL COSTO TOTAL

3/11/2016

3/12/2016

3/14/2016
3/7/2016

3/8/2016
VOLQUETES MES

3.00 S/. 1,350.00


1.00 16.00 4.00 21.00 S/. 15,750.00
TOTAL MES= S/. 17,100.00

TOTAL OBRA= S/. 17,100.00

REQUERIMIENTO= S/. 15,165.00

SALDO= S/. -1,935.00