NOMBRE DEL PROYECTO: MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DEL SERVICIO DE DEPOSICION SANITARIA DE EXCRETAS EN
LOCALIDAD: PARCOY
DISTRITO: CAYNA
Fc= 5.6
Fc= 5.6m
0.35
1.4
CL
a) DISEO DE PENDOLAS
Peso de tuberia 8 " 10 kg/m
Peso accesorios (grapas, otros) 5.0 kg/m
SE ADOPTARA:
0.75
1.9
1.9
1.8
Tmax.ser*SEN(o) Tmax.ser
Wp
o
Tmax.ser*COS(o)
Wp 0.3
b/2= d + e
d=(Wp*b/2-Tmax.ser*SEN(o)*b/4-Tmax.ser*COS(o)*3H/4)
Wp-Tmax.ser*SEN(o)
d= 0.64 m
Factor de importancia U= 1
45 o o2 15
Factor de suelo S= 1.5
0.35
Ht 7.4 m
0.25
1.8
0.7
1.8
Fs3 =0.08
Ht/3
Fs2 =0.05
Ht/3
Ht= 7.4
Fs1=0.03
Ht/3
Nivel hi wi*hi Fs ( i )
3 7.4 7.563 0.08 Ton
2 4.9 5.042 0.05 Ton
1 2.5 2.521 0.03 Ton
15.13
Ht/3
Ht/3
Ht= 7.4 Wp
Fs1=0.03
Ht/3
Wz
b/3 b/2
b =1.8
e d
b/2
b/2= d + e
d= 0.454 m
Ht/3
Ht/3
Ht= 7.4
Wp
Fs1=0.03
0.25
Ht/3
0.35
A A
Tmax.rot/columna=1.5*Tmax.ser/columna
Mu=( Tmax.rot*COS(o2)-Tmax.rot*COS(o))*Ht+Fs3*Ht+Fs2*Ht*2/3+Fs1*Ht/3
MU= 4 Ton-m
CORTE A-A
2 var 1/2"
2 var 1/2"
3 var 1/2"
corte
A-A
Pn(max)=0.80*(0.85*fc*(b*h-Ast)+Ast*fy)
Pn(max)= 116 Ton
Tmax.rot/columna=1.7*Tmax.ser/columna
Pu=Wp + Tmax.rot*SEN(o2)+Tmax.rot*SEN(o)
Pu= 3.1 Ton
Tmax.rot/columna=1.5*Tmax.ser/columna
VU (cortante ultimo)
Vu= Tmax.rot*COS(o2)-Tmax.rot*COS(o)+Fs3+Fs2+Fs1
V que absorve acero = Vace= Vu - Vcon= Vace= -3.4 Ton NO REQUIERE REFUERZO POR CORTE
ADOPTE EL MINIMO
S= Av*fy*b/Vace
S= 30 cm
2 var 1/2"
3 var 1
3 var 1 0.7
1.4 m
0.5 m 0.5m
0.35 0.35
cable 3/8"
Fc= 5.6
1.8
45
0.75
0.7
6.17 50 6.17
CL
Ecuacin cable: 4f x H Torre libre
y= ( 1x )
l2 X
o
f= 1.70
x= 1.77
l= 15.96
0.35
0.36
0.39
0.43
0.48
###
Longitud de pndolas: 4
y=s+ x 2( f + f ' )
l2
DATOS DE INGRESO:
Luz l= 31.00 m
Flecha f = 1.05 m
contaflech.f'= 0.05 m H Torre libre:
pnd.cen s = 0.35 m 2.00
Separac. D = 1.20 m
Abscisas H Pendolas
del centro
x y
0.000 0.35
0.600 0.35
1.800 0.36
3.000 0.39
4.200 0.43
5.400 0.48
6.600 0.55
7.800 0.63
9.000 0.72