S-3
30
VALORIZACIN N 01
Del 01 AL 31 De AGOSTO del 2015
OBRA: UBICACIN:
PROPIETARIO: FECHA:
SUPERVISOR:
A.R.A.=A.PA.
12.00 4,007.28
36.00 1,512.00 36.00 1,512.00 24.00 1,008.00 60.00
720.00 3,556.80 720.00 3,556.80 80.00 395.20 90.00
8.00 2,441.20
40.00 1,861.20
500.00 2,470.00
9.00 2,512.98
120.00 3,968.40
700.00 3,458.00
1020.00 2,723.40
OBRA: AMPLIACION
CONTRATISTA: P.B= 43,789.98
ESPECIALIDAD: ESTRUCTURAS FECHA= JULIO
AREA GEOGRAFICA: 02
ABRIL
MONOMIO DESCRIPCION SIMBOLO I.U C.I % Io
1 CEMENTO P.T 1 21 72.93 367.31
PIEDRA CHANCADA CPM 5 0.133 17.29 216.5
MAQUINARIA NACIONAL 48 9.78 354.51
2 LADRILLO ARCILLA 17 11.93 676.62
LA 0.109
ARENA GRUESA 4 88.07 899.62
3 MADERA NACIONAL P/ENCOFRADO 43 0.103 89.32 599.6
DH
HERR. 37 10.68 296.12
4 ACERO CORRUGADO F 3 0.170 100.00 505.2
5 MANO DE OBRA INC. BS J 47 0.285 100.00 523.15
6 G.G.U G.G.U 39 0.200 100.00 411.5
OBRA:
SUPERVISOR:
CONTRATISTA:
PRESUPUESTO BASE:
PRESUPUESTO CONTRATADO:
D = DEDUCCION Ka=
VRC = V x K - A x V / C (K / Ka - 1)
Rprog= Vprog(K-1)
R= V ( K-1) Rreal= Vreal(K-1)
REINTEGROS
DEDUCCIN
AMORTIZACIN
OBRA:
SUPERVISOR:
CONTRATISTA:
PRESUPUESTO BASE: 43,789.98
PRESUPUESTO CONTRATADO: 42,850.55
VALORIZACION
MONTO CONTRATADO
DESCRIPCIN
SIN IGV (S/.) ANTERIOR (S/.)
VALORIZACIN (V)
TOTAL CONTRACTUAL
Avances en porcentaje
REAJUSTES (R)
DEDUCCIONES (D)
POR ADELANTO EN EFECTIVO
POR ADELANTO PARA MATERIALES
TOTAL DEDUCCIONES
AMORTIZACIONES (A)
AMORTIZACION DEL ADELANTO EN EFECTIVO
AMORTIZACION DEL ADELANTO PARA MATERIALES
RETENCIONES ( C )
FONDOS DE GARANTIA (5% X VB)
GASTOS DE LICITACION
MULTA POR ATRASO DE OBRA
TOTAL
VALORIZACION
% DE AVANCE SALDO POR VALORIZAR
ACTUAL (S/.) ACUMULADO (S/.) ACUMULADO (S/.)
S/. 0.00