PLANILLA DE METRADOS

OBRA CREACION DEL PUENTE HUACULLANI


FECHA : FEBRERO 2016

DIMENSIONES
ITEM DESCRIPCION UND CANT PARCIAL TOTAL
LARGO ANCHO ALTURA

1 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD EN OBRA


1.1 OBRAS PROVISIONALES
1.1.1 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 x 2.40 m. und 1.00 1.00 1.00

1.1.2 OFICINA DE RESIDENTE ALMACEN Y GUARDIANIA m2 1.00 12.00 8.000 96.00 96.00

1.1.3 SUMINISTRO PROVISIONAL DE ENERGIA ELECTRICA mes 3.00 3.00 3.00

1.1.4 SUMINSTRO PROVISIONAL DE AGUA EN CAMPAMENTO mes 3.00 3.00 3.00

1.1.5 MOVILIZACION Y DESMOVILIZACION DE EQUIPO glb 1.00 1.00 1.00

1.2 OBRAS PRELIMINARES


1.2.1 TRAZO Y REMPLANTEO INICIAL m2 155.98
2.00 AREA = 77.990 155.98

1.2.2 LIMPIEZA DE TERRENO MANUAL m2 155.98


2.00 AREA = 77.990 155.98

1.2.3 LIMPIEZA FINAL DE OBRA m2 155.98


2.00 AREA = 77.990 155.98

1.3 PLAN DE SEGURIDAD EN OBRA

1.3.1 PLAN DE SEGURIDAD EN OBRA GLB 1.00 1.00 1.00

1.3.2 EQUIPO DE PROTECCION INDIVIDUAL GLB 1.00 1.00 1.00

1.3.3 EQUIPO DE PROTECCION COLECTIVO GLB 1.00 1.00 1.00

1.3.4 SEALIZACION TEMPORAL DE SEGURIDAD GLB 1.00 1.00 1.00

1.3.5 CAPACITACION DE SEGURIDAD Y SALUD AMBIENTAL GLB 1.00 1.00 1.00

2 MOVIMIENTO DE TIERRAS
2.1 EXCAVACION DE TALUD BAJO EL AGUA m3 762.76
ESTRIBO DERECHO 1.00 AREA = 21.514 17.16 369.18

ESTRIBO IZQUIERDO 1.00 AREA = 20.563 17.16 352.86

PILOTES 2.00 AREA 1.131 18.00 40.72

2.2 REFINE Y NIVELACION INTERIOR m2 279.02


ESTRIBO DERECHO 1.00 17.16 4.79 82.20
1.00 17.16 3.53 60.57

ESTRIBO IZQUIERDO 1.00 17.16 3.53 60.57


1.00 17.16 4.41 75.68

2.3 RELLENO Y COMPACTADO CON MATERIAL CLASIFICADO PROPIOm3 543.73


ESTRIBO DERECHO 1.00 AREA = 9.238 17.16 158.52
1.00 AREA = 6.970 17.16 119.61

ESTRIBO IZQUIERDO 1.00 AREA = 7.089 17.16 121.65


1.00 AREA = 8.389 17.16 143.96

2.4 CONFORMACION DE TERRAPLENES m3 1.00 VOL = 638.420 638.42 638.42


2.5 CONFORMACION DE PEDRAPLENES m3 1.00 VOL = 493.510 493.51 493.51

2.6 ACARREO DE MATERIAL EXCEDENTE HASTA 30 m. DE DISTANCIAm3 %ESP 262.83


1.00 VOL = 219.026 1.20 262.83

2.7 ELIMINACION DE MATERIAL EXCEDENTE m3 262.83


1.00 VOL = 262.831 262.83
PLANILLA DE METRADOS
OBRA CREACION DEL PUENTE HUACULLANI
FECHA : FEBRERO 2016

DIMENSIONES
ITEM DESCRIPCION UND CANT PARCIAL TOTAL
LARGO ANCHO ALTURA

3 OBRAS DE CONCRETO ARMADO


3.1 ZAPATAS
3.1.1 CONCRETO EN ZAPATAS F'C=210 KG/CM2 m3 140.38
2.00 AREA = 77.990 0.90 140.38

3.1.2 ENCOFRADO Y DESENCOFRADO m2 73.31


2.00 PERIM = 40.726 0.90 73.31

3.1.3 ACERO DE REFUERZO fy=4200 Kg/cm2 kg 8,853.17

REFUERZO HORIZONTAL POSITIVO L= KG/ML


D = 3/4 @ 0.20 2 1.00 10.00 17.780 2.24 796.54
D = 3/4 @ 0.21 2 1.00 16.00 13.890 2.24 995.64
REFUERZO HORIZONTAL NEGATIVO KG/ML
D = 3/4 @ 0.20 2 1.00 10.00 17.780 2.24 796.54
D = 3/4 @ 0.21 2 1.00 16.00 13.890 2.24 995.64

REFUERZO VERTICAL POSITIVO L= KG/ML


D = 1 @ 0.20 2 2.00 20.00 4.085 3.97 1,297.40
D = 1 @ 0.21 2 1.00 46.00 5.670 3.97 2,070.91
REFUERZO VERTICAL NEGATIVO KG/ML
D = 3/4 @ 0.20 2 2.00 20.00 4.085 2.24 732.03
D = 3/4 @ 0.21 2 1.00 46.00 5.670 2.24 1,168.47

3.1.4 CURADO DE CONCRETO CON ADITIVO m2 114.64


1.00 PERIM = 40.726 0.90 36.65
1.00 AREA = 77.990 77.99

3.2 ESTRIBO
3.2.1 CONCRETO EN ESTRIBO F'C=210 KG/CM2 m3 109.01
ESTRIBO
estribo 2 1.00 AREA = 4.090 9.30 76.07
cajuela 2 2.00 1.00 0.350 0.87 1.22
MURO DE ENCAUSAMIENTO
muros laterales 2 2.00 4.20 0.400 4.72 31.72

3.2.2 ENCOFRADO Y DESENCOFRADO m2 366.91


ESTRIBO
2 1.00 5.60 9.300 104.16
2 1.00 0.87 9.300 16.18
2 1.00 4.73 9.300 87.98

MURO DE ENCAUSAMIENTO
2 4.00 4.20 4.72 158.59

3.2.3 ACERO DE REFUERZO fy=4200 Kg/cm2 kg 7,963.57


PANTALLA
L= KG/ML
VERTICAL INTERIOR D= 3/4 2 1.00 61.00 3.710 2.24 1,013.87
2 1.00 30.00 6.250 2.24 840.00

VERTICAL EXTERIOR D= 3/4 2 1.00 30.00 6.540 2.24 878.98

HORIZONTAL INTERIOR D= 1/2 2 1.00 18.00 10.00 1.02 367.20

HORIZONTAL INTERIOR D= 1/2 2 1.00 31.00 10.00 1.02 632.40

CAJUELA
VERTICAL+ GANCHO
D = 3/4"@ 0.30 2 1.00 30.00 2.450 2.24 329.28
D = 3/4"@ 0.30 2 1.00 30.00 3.360 2.24 451.58
D = 3/4"@ 0.30 2 1.00 30.00 1.580 2.24 212.35
estribo superior losa de aprox d= 1/2 2 1.00 61.00 1.700 0.99 205.33
estribo superior base d= 1/2 2 1.00 61.00 3.100 0.99 374.42

horizontal 5/8" 2 1.00 20.00 10.000 1.56 624.00

MURO DE ENCAUSAMIENTO
HORIzONTAL + GANCHO
INTERIOR D = 1/2" 2 2.00 22.00 4.200 1.02 376.99
EXTERIOR D = 1/2" 2 2.00 22.00 4.200 1.02 376.99
VERTICAL + GANCHO
INTERIOR D = 5/8" 2 2.00 21.00 5.879 1.56 770.38
EXTERIOR D = 1/2" 2 2.00 21.00 5.950 1.02 509.80

3.2.4 CURADO DE CONCRETO CON ADITIVO m2 366.91


ESTRIBO
2 1.00 5.60 9.300 104.16
2 1.00 0.87 9.300 16.18
2 1.00 4.73 9.300 87.98

MURO DE ENCAUSAMIENTO
2 4.00 4.20 4.72 158.59

3.3 PILOTES
3.3.1 CONCRETO EN PILOTES F'C=210 KG/CM2 m3 40.72
2.00 AREA 1.131 18.00 40.72
PLANILLA DE METRADOS
OBRA CREACION DEL PUENTE HUACULLANI
FECHA : FEBRERO 2016

DIMENSIONES
ITEM DESCRIPCION UND CANT PARCIAL TOTAL
LARGO ANCHO ALTURA

3.3.2 ACERO DE REFUERZO fy=4200 Kg/cm2 KG L= KG/ML 3,942.79


LONGITUDINAL D=1" 2.00 24.00 17.750 3.97 3,382.44
ESTRIBOS ESPIRAL D = 1/2" 2 7.00 12.00 3.270 1.02 560.35

3.4 LOSA DE APROXIMACION


3.3.1 CONCRETO EN PILOTES F'C=210 KG/CM2 m3 11.70
2.00 4.50 6.000 0.20 10.80
2.00 6.00 AREA = 0.08 0.90

3.3.2 ACERO DE REFUERZO fy=4200 Kg/cm2 KG L= KG/ML 2,008.10


ACERO NEGATIVO D=3/4" @ 0.20M 2.00 30.00 5.570 2.24 748.61
ACERO POSITIVO D=3/4" @ 0.20M 2.00 30.00 4.590 2.24 616.90
TRANSVERSAL D = 1/2" 2.00 50.00 6.300 1.02 642.60

4 SUPERESTRUCTURA METALICA
4.1 ADQUISICION DE PUENTE METALICO MODULAR TIPO BAILEY LUZGLB
= 60.96 M 1.00
1.00 1.00 1.00

4.2 TRANSPORTE DE COMPONENTES METALICOS PARA SUPERESTRUCTURAS


TON 167.82
1.00 167.82 167.82

4.3 HABILITACION DE ZONA DE LANZAMIENTO DE PUENTE METALICOm2 420.00


1.00 60.00 7.000 420.00

4.4 MONTAJE Y LANZAMIENTO DE SUPERESTRUCTURA METALICO m 60.00


1.00 60.00 60.00

5 VARIOS COMPLEMENTARIOS
5.1 IMPERMEABILIZACION DE SUBESTRUCTURA m2 183.46
ESTRIBO
2 1.00 5.60 9.300 104.16

MURO DE ENCAUSAMIENTO
2 2.00 4.20 4.72 79.30

5.2 TUBO DE DRENAJE PVC SAP D=6" und 2.00


2.00 2.00