PROYECTO :
= 30 0.5 Radianes b
= 0.5
4
c= 2.4 Ton/m3 1
m= 1.8 Ton/m3 INGRESAR DATO
qs= 20.00 Ton/m2 H=
Desnivel H
Df=
b=
h1=h-0.1h
4.00 m 3 S/C=
2 4.200
h=H+Df
5.00
1 5
0.2000
Pie=h/10
0.70 m 1.60
Df
B=0.4h @ 0.6h
3.00 m
1. RESULTADOS TEORICOS Y CRITERIO DE ASUMIR :
h BASE (B) b''=.1h@.12h
PIE (h/10)min TALON d=0.1h h1 Talud()
5.00 3.00 0.700 0.7000 1.600 0.50 4.500 87.45520
RESULTADOS ASUMIDOS SOLO EN d:
h BASE (B) PIE (B/3) b''=0.1h TALON d=0.1h h1 Talud()
5.00 3.00 0.700 0.70 1.600 0.80 4.200 87.46
2. COMPONENTES DE GRAVEDAD:
N Elemento (Ton/m3) Vol y L W (Ton) Xi Mr=W*Xi
1 Triang. Muro 2.4 0.42 1.01 0.83 0.84
2 Frotal Muro 2.4 2.10 5.04 1.15 5.80
3 Relleno Talon 1.8 6.72 12.10 2.20 26.61
4 Losa Ciment. 2.4 2.40 5.76 1.50 8.64
5 Relleno Pie 1.8 0.14 0.25 0.35 0.09
6 Relleno Pie 1.8 0.00 0.00 0.70 0.00
7 s/c 0 Ton/m2 1.60 m 0.00 2.20 0.00 1
w 24.16 Mr 41.98
3. RESULTADOS TEORICOS:
1
h'
O
Ingresar
Asumir
Resultados
GRESAR DATOS:
4 m
1 m
0.5 m
0.00 Ton/m2
0.010
6
0.20
Pie=h/10 min m b
B=0.4h @ 0.6h
m b
0.20 0.50
m b
0.20 0.50
0.000
*hs/c
/=* hs/c
3
h1
2
h
Eah
1 7.50
y 1.67 m
4
* h
=* h
3.00
mpuje pasivo horizontal total sera:
ea del triangulo de presiones
=(^)/2
2.70 Ton/m
0.33 m
N PRESIONES SUELO
=/2
1=2=/
2=((62))/^2
3.55 8.05
Cumple
2=0 q1= 16.1 Ton/m2
Ton/m2/m
OR DESLIZAMIENTO