CA01 CONEXIONES

1 01.003 .4.01 EXCAVACION ZANJA A MANO H=0.00-2.75m (EN TIm3 464.1


2 01.005 .4.01 RELLENO COMPACTADO (MATERIAL DE EXCAVACIOm3 458.61
3 01.007 .4.02 ACARREO MECANICO HASTA 1 km (carga,transporte
m3 5.49
4 01.007 .4.03 SOBREACARREO (transporte/medios mecanicos) m3-km 27.45
5 03.004 .4.01 TUBERIA PLASTICA UE ALCANTARILLADO D.N.I. 1 m 273
6 03.006 .4.04 SILLA YEE 250 X 200MM (MAT/TRAN/INST) u 17
7 03.006 .4.07 SILLA YEE 400 X 160MM (MAT/TRAN/INST) u 2
8 03.006 .4.27 SILLA YEE 300*160 mm (MAT/TRANS/INST) u 2
9 03.006 .4.29 SILLA YEE 700*160mm (MAT/TRANS/INST) u 4
10 03.006 .4.30 SILLA YEE 800 X 160MM (MAT/TRAN/INST) u 2
11 03.006 .4.31 SILLA YEE 500 X 160MM (MAT/TRAN/INST) u 4
12 03.006 .4.33 SILLA YEE 600 X 160MM (MAT/TRAN/INST) u 4
13 03.006 .4.34 SILLA YEE 900 X 160MM (MAT/TRAN/INST) u 1
14 03.006 .4.36 SILLA YEE 450 X 160MM (MAT/TRAN/INST) u 4
15 03.008 .4.01 CAJA DOMICILIARIA H=0.60-1.50M CON TAPA H.A.u 39
16 03.014 .4.04 EMPATE A TUBERIA PLASTICA u 40
CA02 MOVIMIENTO DE TIERRAS
17 01.001 .4.02 REPLANTEO Y NIVELACION m 1204.96
18 01.002 .4.01 DESBROCE Y LIMPIEZA m2 1000
19 01.003 .4.01 EXCAVACION ZANJA A MANO H=0.00-2.75m (EN TIm3 347.61
20 01.003 .4.02 EXCAVACION ZANJA A MANO H=2.76-3.99m (EN TIm3 95.33
21 01.003 .4.03 EXCAVACION ZANJA A MANO H=4.00-6.00m (EN TIm3 21.13
22 01.003 .4.24 EXCAVACION ZANJA A MAQUINA H=0.00-2.75m (EN m3 2754.79
23 01.003 .4.25 EXCAVACION ZANJA A MAQUINA H=2.76-3.99m (EN m3 686.57
24 01.003 .4.26 EXCAVACION ZANJA A MAQUINA H=4.00-6.00m (EN m3 312.75
25 01.003 .4.27 EXCAVACION ZANJA A MAQUINA H>6.00m (EN TIEm3 32.31
26 01.003 .4.28 EXCAVACION ZANJA A MAQUINA H=0.00-2.75m m3 983.85
27 01.003 .4.29 EXCAVACION ZANJA A MAQUINA H=2.76-3.99m m3 245.2
28 01.003 .4.3 EXCAVACION ZANJA A MAQUINA H>6.00m (CON m3 11.54
29 01.003 .4.31 EXCAVACION ZANJA A MAQUINA H=4.00-6.00m m3 111.7
30 01.003 .4.42 EXCAVACION ZANJA A MAQUINA H=0.00-2.75m (Rm3 196.77
31 01.003 .4.43 EXCAVACION ZANJA A MAQUINA H=2.76-3.99m (Rm3 49.04
32 01.003 .4.44 EXCAVACION ZANJA A MAQUINA H=4.00-6.00m (Rm3 22.34
33 01.003 .4.45 EXCAVACION ZANJA A MAQUINA H>6.00m (ROCA)m3 2.31
34 01.004 .4.01 RASANTEO DE ZANJA A MANO m2 1436.5
35 01.005 .4.01 RELLENO COMPACTADO (MATERIAL DE EXCAVACIOm3 4239.72
36 01.007 .4.02 ACARREO MECANICO HASTA 1 km (carga,transporte
m3 1125.31
37 01.007 .4.03 SOBREACARREO (transporte/medios mecanicos) m3-km 16879.67
38 01.008 .4.01 ENTIBADO (APUNTALAMIENTO) ZANJA m2 1204.96
CA03 TUBERIAS
39 03.004 .4.03 TUBERIA PLASTICA UE ALCANTARILLADO D.N.I. 2 m 256.72
40 03.004 .4.04 TUBERIA PLASTICA UE ALCANTARILLADO D.N.I. 3 m 106
41 03.004 .4.05 TUBERIA PLASTICA UE ALCANTARILLADO D.N.I. 4 m 154.31
42 03.004 .4.06 TUBERIA PLASTICA UE ALCANTARILLADO D.N.I. 4 m 129.43
43 03.004 .4.08 TUBERIA PLASTICA UE ALCANTARILLADO D.N.I. 6 m 217.18
44 03.004 .4.09 TUBERIA PLASTICA UE ALCANTARILLADO D.N.I. 7 m 150.19
45 03.004 .4.1 TUBERIA PLASTICA UE ALCANTARILLADO D.N.I. 8 m 58.49
46 03.004 .4.31 TUBERIA PLASTICA UE ALCANTARILLADO D.N.I. 9 m 70.01
CA04 POZOS DE REVISION TIPO B1
47 03.007 .4.42 POZO REVISION H.S. H=1.76-2.25M (TAPA CERCO u 11
48 03.007 .4.43 POZO REVISION H.S. H=2.26-2.75M (TAPA CERCO u 11
49 03.007 .4.44 POZO REVISION H.S. H=3.26-3.75M (TAPA CERCO u 5
50 03.007 .4.45 POZO REVISION H.S. H=3.76-4.25M (TAPA CERCO u 1
51 03.007 .4.46 POZO REVISION H.S. H=4.26-4.75M (TAPA CERCO u 3
52 03.007 .4.47 POZO REVISION H.S. H=4.76-5.25M (TAPA CERCO u 3
53 03.007 .4.48 POZO REVISION H.S. H=5.26-5.75M (TAPA CERCO u 1
54 03.007 .4.49 POZO REVISION H.S. H=6.76-7.25M TAPA CERCO Hu 1
55 03.007 .4.50 POZO REVISION H.S. H=2.76-3.25M (TAPA CERCO u 4
56 03.007 .4.51 POZO REVISION H.S. H=5.76-6.25M (TAPA CERCO u 1
57 03.007 .4.54 POZO REVISION H.S. H=7.76-8.25M (TAPA CERCO u 1
CA05 POZOS DE SALTO H=2.00 m
58 01.009 .4.01 ACERO REFUERZO fy=4200 kg/cm2 (SUMINISTRO, kg 787.6
59 01.010 .4.07 ENCOFRADO/DESENCOFRADO TABLERO CONTRACm2 77
60 01.011 .4.05 HORMIGON SIMPLE f'c=240 kg/cm2 m3 18.7
61 01.011 .4.37 HORMIGON SIMPLE REPLANTILLO f'c=140KG/CM2m3 0.66
62 01.012 .4.03 JUNTAS IMPERMEABLES PVC 18 CM m 17.6
63 01.025 .4.01 ESTRIBO DE POZO FI 16mm (PROVISION Y MONTAJu 26.4
64 03.010 .4.44 TAPA CON CERCO HIERRO DUCTIL D=600MM (MAT,u 2
CA06 POZOS DE SALTO H=1.5
65 01.009 .4.01 ACERO REFUERZO fy=4200 kg/cm2 (SUMINISTRO, kg 332
66 01.010 .4.07 ENCOFRADO/DESENCOFRADO TABLERO CONTRACm2 30
67 01.011 .4.05 HORMIGON SIMPLE f'c=240 kg/cm2 m3 7.5
68 01.011 .4.37 HORMIGON SIMPLE REPLANTILLO f'c=140KG/CM2m3 0.3
69 01.012 .4.03 JUNTAS IMPERMEABLES PVC 18 CM m 8
70 01.025 .4.01 ESTRIBO DE POZO FI 16mm (PROVISION Y MONTAJu 12
71 03.010 .4.44 TAPA CON CERCO HIERRO DUCTIL D=600MM (MAT,u 1
CA07 POZOS DE SALTO H=1.0
72 01.009 .4.01 ACERO REFUERZO fy=4200 kg/cm2 (SUMINISTRO, kg 710.2
73 01.010 .4.07 ENCOFRADO/DESENCOFRADO TABLERO CONTRACm2 50
74 01.011 .4.05 HORMIGON SIMPLE f'c=240 kg/cm2 m3 16
75 01.011 .4.37 HORMIGON SIMPLE REPLANTILLO f'c=140KG/CM2m3 1
76 01.012 .4.03 JUNTAS IMPERMEABLES PVC 18 CM m 18
77 01.025 .4.01 ESTRIBO DE POZO FI 16mm (PROVISION Y MONTAJu 24
78 03.010 .4.44 TAPA CON CERCO HIERRO DUCTIL D=600MM (MAT,u 2
CA08 SEPARADOR S1 (PZ106)
79 01.009 .4.01 ACERO REFUERZO fy=4200 kg/cm2 (SUMINISTRO, kg 294.5
80 01.010 .4.07 ENCOFRADO/DESENCOFRADO TABLERO CONTRACm2 50
81 01.011 .4.05 HORMIGON SIMPLE f'c=240 kg/cm2 m3 6.3
82 01.011 .4.37 HORMIGON SIMPLE REPLANTILLO f'c=140KG/CM2m3 0.5
83 01.012 .4.03 JUNTAS IMPERMEABLES PVC 18 CM m 5
84 01.025 .4.01 ESTRIBO DE POZO FI 16mm (PROVISION Y MONTAJu 13
85 02.031 .4.32 PERNOS DE ANCLAJE HILTI 1" (MAT/TRANS/INST) u 4
86 03.010 .4.44 TAPA CON CERCO HIERRO DUCTIL D=600MM (MAT,u 1
CA09 POZO DE BANDEJAS
87 01.009 .4.01 ACERO REFUERZO fy=4200 kg/cm2 (SUMINISTRO, kg 6470
88 01.010 .4.07 ENCOFRADO/DESENCOFRADO TABLERO CONTRACm2 200
89 01.011 .4.37 HORMIGON SIMPLE REPLANTILLO f'c=140KG/CM2m3 2
90 01.011 .4.72 HORMIGON SIMPLE f'c=250 kg/cm2 SUBTERRAN m3 84
91 01.012 .4.03 JUNTAS IMPERMEABLES PVC 18 CM m 17
92 01.025 .4.01 ESTRIBO DE POZO FI 16mm (PROVISION Y MONTAJu 30
93 03.010 .4.44 TAPA CON CERCO HIERRO DUCTIL D=600MM (MAT,u 2
94 05.012 .4.02 EXCAVACION POZO 0-6M TIERRA (INCL.ELEVACIO m3 100.86
95 05.012 .4.06 EXCAVACION POZO 6-15M TIERRA (INCL.ELEVACI m3 147.1
CA10 POZO DE REVISION ARMADO EN POZOS DE SALTO
96 01.009 .4.01 ACERO REFUERZO fy=4200 kg/cm2 (SUMINISTRO, kg 90.6
97 01.010 .4.12 ENCOFRADO/DESENCOFRADO METALICO POZO DEm2 22.5
98 01.011 .4.05 HORMIGON SIMPLE f'c=240 kg/cm2 m3 2.4
99 01.025 .4.01 ESTRIBO DE POZO FI 16mm (PROVISION Y MONTAJu 8
CA11 ACUEDUCTO 1
100 01.009 .4.01 ACERO REFUERZO fy=4200 kg/cm2 (SUMINISTRO, kg 100
101 01.010 .4.07 ENCOFRADO/DESENCOFRADO TABLERO CONTRACm2 22
102 01.011 .4.07 HORMIGON CICLOPEO 40% PIEDRA (f'c=180 KG/C m3 12
103 01.011 .4.33 HORMIGON LANZADO f'c=210 E=10CM INCLUYE MA m2 40
104 01.011 .4.37 HORMIGON SIMPLE REPLANTILLO f'c=140KG/CM2m3 1
105 01.037 .4.08 ACERO ESTRUCTURA PUENTE (FABRICACION Y MOkg 1990
106 02.002 .4.13 TUBERIA ACERO RECUBIERTA 24" (MAT/TRANS/INSm 38.4
107 02.018 .4.13 UNION DRESSER 24" ESTILO 38 (MAT/TRANS/INST)u 6
108 02.021 .4.12 PASAMUROS ACERO 24" (MAT/TRANS/INST) u 2
109 02.026 .4.03 CORDON SUELDA ELECTRICA TIPO 3 m 20
110 02.026 .4.05 CORTE TUBERIA ACERO EN CAMPO m 20
CA12 ACUEDUCTO 2
111 01.009 .4.01 ACERO REFUERZO fy=4200 kg/cm2 (SUMINISTRO, kg 100
112 01.010 .4.07 ENCOFRADO/DESENCOFRADO TABLERO CONTRACm2 22
113 01.011 .4.07 HORMIGON CICLOPEO 40% PIEDRA (f'c=180 KG/C m3 12
114 01.011 .4.33 HORMIGON LANZADO f'c=210 E=10CM INCLUYE MA m2 40
115 01.011 .4.37 HORMIGON SIMPLE REPLANTILLO f'c=140KG/CM2m3 1
116 01.037 .4.08 ACERO ESTRUCTURA PUENTE (FABRICACION Y MOkg 1700
117 02.002 .4.12 TUBERIA ACERO RECUBIERTA 22" (MAT/TRANS/INSm 42.4
118 02.018 .4.12 UNION DRESSER 22" ESTILO 38 (MAT/TRANS/INST)u 7
119 02.021 .4.11 PASAMUROS ACERO 22" (MAT/TRANS/INST) u 2
120 02.026 .4.03 CORDON SUELDA ELECTRICA TIPO 3 m 30
121 02.026 .4.05 CORTE TUBERIA ACERO EN CAMPO m 30
CA13 COLECTOR HA S=1.00X1.00m
122 01.009 .4.01 ACERO REFUERZO fy=4200 kg/cm2 (SUMINISTRO, kg 185
123 01.010 .4.07 ENCOFRADO/DESENCOFRADO TABLERO CONTRACm2 48
124 01.011 .4.37 HORMIGON SIMPLE REPLANTILLO f'c=140KG/CM2m3 1
125 01.011 .4.72 HORMIGON SIMPLE f'c=250 kg/cm2 SUBTERRAN m3 5
126 01.012 .4.03 JUNTAS IMPERMEABLES PVC 18 CM m 10
CA14 SEALIZACION Y MITIGACION AMBIENTAL
127 01.018 .4.66 TANQUE DE TOL DE 55 GLNS (PROVISION Y MONTAu 30
128 01.022 .4.07 POLIETILENO 2 mm m2 600
129 01.024 .4.01 ROTULOS CON CARACTERISTICAS DEL PROYECTO (m2 40
130 01.024 .4.02 ROTULOS DE SEALIZACION EN TOOL, POSTES HG m 22 40
131 01.024 .4.08 CONO DE SEALIZACION VIAL u 30
132 01.024 .4.09 CINTA REFLECTIVA - ROLLO 3" X 200 PIES (CON LE u 30
133 01.032 .4.01 LIMPIEZA FINAL DE LA OBRA m2 200
134 03.016 .4.01 PASOS PEATONALES DE MADERA 1.2m ANCHO m 50
135 04.020 .4.37 CERRAMIENTO DE TOOL,ANGULO/TUBO RECT.,PING m2 100
136 07.005 .4.01 CAMPAA EDUCATIVA INICIAL glb 10
137 07.005 .4.03 CHARLA EDUCATIVA-PUBLICITARIA hora 25
138 07.005 .4.04 MENSAJE EN PROGRAMA RADIAL mes 10
139 07.005 .4.07 VOLANTE INFORMATIVO - HOJA A5 (INCLUYE DIST u 1000
CA15 TRABAJOS VARIOS
140 01.011 .4.25 HORMIGON SIMPLE BORDILLO 50, 15 (f'c=180KG m 15
141 01.016 .4.01 ROTURA ACERA/GRADAS m2 25
142 01.016 .4.02 ROTURA BORDILLOS m3 15
143 01.016 .4.06 ROTURA PAVIMENTO 1"-2" m2 9.87
144 01.016 .4.09 MATERIAL DE MEJORAMIENTO m3 100
145 01.016 .4.12 REPOSICION HORMIGON ACERAS (10cm - 180kg/cm2 25
146 01.016 .4.15 BASE CLASE 3 m3 2.96
147 01.016 .4.18 SUB-BASE CLASE 3 m3 2.96
148 01.016 .4.19 IMPRIMACION ASFALTICA m2 9.87
149 01.016 .4.2 CARPETA ASFALTICA 02" m2 9.87
150 01.016 .4.27 DESEMPEDRADO m2 475.5
151 01.016 .4.28 EMPEDRADO (INCLUYE MATERIAL) m2 95.1
152 01.016 .4.29 REEMPEDRADO (MAT. EXISTENTE) m2 380.4
153 01.030 .4.01 DERROCAMIENTO HORMIGON ARMADO (HERRAMm3 10
154 01.030 .4.02 DERROCAMIENTO HORMIGON SIMPLE (HERRAMIEm3 10
155 01.036 .4.54 ELABORACION DE PLANO AS BUILT LAMINA, TAMAu 12
156 01.037 .4.01 ESTRUCTURA METALICA (PROVISION Y MONTAJE)kg 200
157 05.007 .4.03 SAQUILLO YUTE (TIERRA ) u 3000
158 06.004 .4.06 REPARACION CONEXION DOMICILIARIA 1/2" AGUAu 20