PLANILLA DE METRADOS

OBRA: Curso de Construcciones I


LUGAR Cajamarca
FECHA: 10/9/2017

1 TRABAJOS PRELIMINARES
1.01 TRAZO Y REPLANTEO
DESCRIP. LARGO ANCHO # VECES M2
A1 13.7 10 1 137.00
TOTAL (m2) 137.00

1.02 LIMPIEZA DEL TERRENO


DESCRIP. LARGO ANCHO # VECES M2
A1 13.7 10 1 137.00
TOTAL (m2) 137.00
A
02.00. 2.0 MOVIMIENTO DE TIERRAS

.02.01 2.01 EXCAVACION PARA CIMIENTOS CORRIDOS (m3)

DESCRIP. Ancho (m) Long. (m) Alto (m) # VECES


EJE 1 TRAMO A-B 0.50 2.53 1.40 1
EJE 1 TRAMO B-C 0.50 2.75 1.40 1
EJE 1 TRAMO C-D 0.50 1.13 1.40 1
EJE 1' TRAMO C-D 0.50 1.68 1.40 1
EJE 2 TRAMO A-BC' 0.50 3.88 1.40 1
EJE 2 TRAMO BC'-D 0.50 2.53 1.40 1
EJE 2' TRAMO B-BC' 0.45 1.85 1.40 1
EJE 3 TRAMO A-BC' 0.50 3.88 1.40 1
EJE 3 TRAMO BC'-D 0.50 2.53 1.40 1
EJE 3' TRAMO A-B 0.50 3.18 1.40 1
EJE 4 TRAMO BC'-D 0.50 2.53 1.40 1
EJE 4' TRAMO B-B' 0.45 0.53 1.40 1
EJE 5 TRAMO A-B 0.50 2.53 1.40 1
EJE 5 TRAMO B-C 0.50 2.50 1.40 1
EJE 5 TRAMO C-D 0.50 1.38 1.40 1
EJE A TRAMO 1-2 0.50 2.45 1.40 1
EJE A TRAMO 2-3 0.50 3.10 1.40 1
EJE A TRAMO 3-5 0.50 4.55 1.40 1
EJE B TRAMO 2-3 0.50 3.10 1.40 1
EJE B TRAMO 3-5 0.50 4.55 1.40 1
EJE B' TRAMO 2-2' 0.45 1.68 1.40 1
EJE B' TRAMO 4'-5 0.45 2.15 1.40 1
EJE BC' TRAMO 2-3 0.50 3.10 1.40 1
EJE BC' TRAMO 3-4 0.50 2.05 1.40 1
EJE C TRAMO 1-2 0.50 2.58 1.40 1
EJE C TRAMO 4-5 0.50 1.73 1.40 1
EJE D TRAMO 1-2 0.50 2.45 1.40 1
EJE D TRAMO 2-3 0.50 3.10 1.40 1
EJE D TRAMO 3-4 0.50 2.05 1.40 1
EJE D TRAMO 3-5 0.50 1.60 1.40 1
TOTAL (m3)

2.02 EXCAVACIONES PARA ZAPATAS (m3)

DESCRIP. Ancho (m) Long. (m) Alto (m) # VECES


ZAPATA 1 0.90 0.90 1.00 18
TOTAL (m3)

2.03 EXCAVACION PARA ESCALERA (m3)

DESCRIP. Ancho (m) Long. (m) Alto (m) # VECES


ESCALERA 0.50 1.00 0.80 1
TOTAL (m3)

2.04 EXCAVACION PARA CISTERNA (m3)

DESCRIP. Ancho (m) Long. (m) Alto (m) # VECES


CISTERNA 1.40 1.28 2.40 1
TOTAL (m3)

2.05 RELLENO PARA CIMIENTOS CORRIDOS CON MATERIAL PROPIO (m3)

DESCRIP. Ancho (m) Long. (m) Alto (m) # VECES


EJE 1 TRAMO A-B 0.35 2.53
EJE 1 TRAMO B-C 0.35 2.75
EJE 1 TRAMO C-D 0.35 1.13
EJE 1' TRAMO C-D 0.35 1.68
EJE 2 TRAMO A-BC' 0.35 3.88
EJE 2 TRAMO BC'-D 0.35 2.53
EJE 2' TRAMO B-BC' 0.30 1.85
EJE 3 TRAMO A-BC' 0.35
EJE 3 TRAMO BC'-D 0.35
EJE 3' TRAMO A-B 0.35
EJE 4 TRAMO BC'-D 0.35
EJE 4' TRAMO B-B' 0.30
EJE 5 TRAMO A-B 0.35
EJE 5 TRAMO B-C 0.35
EJE 5 TRAMO C-D 0.35
EJE A TRAMO 1-2 0.35
EJE A TRAMO 2-3 0.35
EJE A TRAMO 3-5 0.35
EJE B TRAMO 2-3 0.35
EJE B TRAMO 3-5 0.35
EJE B' TRAMO 2-2' 0.30
EJE B' TRAMO 4'-5 0.30
EJE BC' TRAMO 2-3 0.35
EJE BC' TRAMO 3-4 0.35
EJE C TRAMO 1-2 0.35
EJE C TRAMO 4-5 0.35
EJE D TRAMO 1-2 0.35
EJE D TRAMO 2-3 0.35
EJE D TRAMO 3-4 0.35
EJE D TRAMO 3-5 0.35
TOTAL (m3)

2.06 RELLENO PARA ZAPATAS CON MATERIAL PROPIO (m3)

DESCRIP. Ancho (m) Long. (m) Alto (m) # VECES


ZAPATA 1
ZAPATA 2
ZAPATA 3
ZAPATA 4
ZAPATA 5
ZAPATA 6
ZAPATA 7
ZAPATA 8

2.07 RELLENO PARA CIMIENTOS CORRIDOS CON MATERIAL DE PRESTAMO (m3)


DESCRIP. Ancho (m) Long. (m) Alto (m) # VECES
EJE 1 TRAMO A-B
EJE 1 TRAMO B-C
EJE 1 TRAMO C-D
EJE 1' TRAMO C-D
EJE 2 TRAMO A-BC'
EJE 2 TRAMO BC'-D
EJE 2' TRAMO B-BC'
EJE 3 TRAMO A-BC'
EJE 3 TRAMO BC'-D
EJE 3' TRAMO A-B
EJE 4 TRAMO BC'-D
EJE 4' TRAMO B-B'
EJE 5 TRAMO A-B
EJE 5 TRAMO B-C
EJE 5 TRAMO C-D
EJE A TRAMO 1-2
EJE A TRAMO 2-3
EJE A TRAMO 3-5
EJE B TRAMO 2-3
EJE B TRAMO 3-5
EJE B' TRAMO 2-2'
EJE B' TRAMO 4'-5
EJE BC' TRAMO 2-3
EJE BC' TRAMO 3-4
EJE C TRAMO 1-2
EJE C TRAMO 4-5
EJE D TRAMO 1-2
EJE D TRAMO 2-3
EJE D TRAMO 3-4
EJE D TRAMO 3-5
TOTAL (m3)

2.06 RELLENO PARA ZAPATAS CON MATERIAL PROPIO (m3)

DESCRIP. Ancho (m) Long. (m) Alto (m) # VECES


ZAPATA 1
ZAPATA 2
ZAPATA 3
ZAPATA 4
ZAPATA 5
ZAPATA 6
ZAPATA 7
ZAPATA 8
.02.04 ELIMINACIN DEL MATERIAL EXCEDENTE 137.00
E
1 VOLUMEN EXCAVADO (1-E) - VOLUMEN RELLENADO (1+E/C) C
DESCRIP. Volumen(m3) Coef. # VECES
VOLUMEN EXCAVADO 1.44 0.75 1
VOLUMEN RELLENADO #REF! 1.47 1
TOTAL (m3)
01.03.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO
MODULO SS.HH.
DESCRIP. # CARAS Long. (m) Alto (m) # VECES
SS.HH. 2.00 0.00 0.40 1
Sub Total (m2)

TOTAL (m2)

01.03.05 FALSO PISO,MEZCLA 1:8 e=0.10 PARA PISOS INTERIORES


Descripcin Area (m2) # VECES
SS.HH. #REF! 1.00

TOTAL (m2)

01.04. OBRAS DE CONCRETO ARMADO


01.04.01 VIGA CIMENTACION
01.04.01.01 CONCRETO F'c = 175 Kg/cm2
DESCRIP. Ancho (m) Long. (m) Alto (m) # VECES
SS.HH: 0.15 0.00 0.30 1
Total (m3)

01.04.01.02 ENCOFRADO Y DESENCOFRADO


DESCRIP. # Caras Long. (m) Alto (m) # VECES
SS.HH: 2.00 0.00 0.30 1.00

Total (m2)

01.04.01.03 ACERO FY=42000 KG/CM2

DESCRIP. Long. (m) # Piezas # Veces


longitudinal : SS.HH. 1/2" 0.00 4.00 1.00
Sub Total (ml)
Factor 1.02 Sub Total (Kg)

DESCRIP. Long. (m) # Piezas # Veces


EstribosSS.HH. 1/4" 0.93 22.00 1.00
Sub Total (ml)
Factor 0.25 Sub Total (Kg)
TOTAL (Kg)
PARC. (m3)
1.77
1.93
0.79
1.18
2.72
1.77
1.17
2.72
1.77
2.23
1.77
0.33
1.77
1.75
0.97
1.72
2.17
3.19
2.17
3.19
1.06
1.35
2.17
1.44
1.81
1.21
1.72
2.17
1.44
1.12
52.52

PARC. (m3)
14.58
14.58

PARC. (m3)
0.40
0.40

PARC. (m3)
4.30
4.30

PARC. (m3)

PARC. (m3)
PARC. (m3)

PARC. (m3)

6.72
m3
0.25
0.85
PARC. (m3)
1.08
#REF!
#REF!
PARC. (m2)
0.00
0.00

0.00

PARC. (m2)
#REF!

#REF!

PARC. (m3)
0.00
0.00

PARC. (m2)
0.00

0.00

PARC. (ml)
0.00
0.00
0.00

PARC. (ml)
20.46
20.46
5.12
5.12