Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Presupuesto y Metrados
Presupuesto y Metrados
Parcial S/.
1,181.74
144.41
52.00
206.18
650.00
103.15
26.00
1,280.26
236.60
129.97
75.20
600.00
169.00
69.50
1,172.06
243.25
124.17
71.84
600.00
66.40
66.40
1,171.94
392.00
294.53
170.42
0.00
157.50
157.50
282.80
105.00
177.80
5,088.81
PERICIA TECNICA
TRABAJOS EN LABORATORIO
METRADO
PARCIAL TOTAL
20.63
8.38 8.38
2.00 2.00
3.88 3.88
6.38 6.38
33.88
6.38 6.38
10.38 10.38
8.38 8.38
8.75 8.75
34.75
8.00 8.00
10.38 10.38
8.00 8.00
8.38 8.38
56.00
15.00 15.00
23.50 23.50
8.75 8.75
8.75 8.75
PRESUPUESTO GENERAL D
PARTIDA DESCRIPCION EXPEDIENTE TECNICO
UND METRADO P.U.
1.00 MUROS Y TABIQUES DE ALBAILERIA
1.10 MURO DE LADRILLO KK SOGA m2 331.25 32.00
2.00 COLUMNAS
2.10 COLUMNAS- CONCRETO 210 KG/CM2 m3 1.62 307.16
2.20 COLUMNAS ENCOFRADO Y DESENCOFRADO m2 1.62 38.75
2.30 COLUMNAS ACERO FY=4,200 KG/CM2 kg 194.00 4.63
3.00 CIELO RASO
3.10 CIELO RASO CON MEXCLA CA 1:5 m2 84.70 28.30
3.20 FALSO CEILO RASO SUSPENDIDO BALDOSA DE FIERROCEMENTO m2 84.70 34.43
4.00 TARRAJEO EN MUROS INTERIORES
4.10 TARRAJEO SS.HH 1 m2 43.13 7.00
4.20 TARRAJEO SS.HH 2 m2 31.13 7.00
4.30 DORMITORIO I m2 34.75 7.00
4.40 DORMITORIO II m2 45.63 7.00
4.50 DORMITORIO III m2 45.50 7.00
5.00 TARRAJEO EN MUROS EXTERIORES
5.10 TARRAJEO m2 33.50 28.30
6.00 TARRAJEO EN CIELO RAZO
6.10 TARRAJEO SS.HH 1 m2 6.51 10.00
6.20 TARRAJEO SS.HH 2 m2 9.96 10.00
6.30 DORMITORIO I m2 13.28 10.00
6.40 DORMITORIO II m2 11.28 10.00
6.50 DORMITORIO III m2 15.04 10.00
7.00 PISO CERAMICO
7.10 TARRAJEO SS.HH 1 m2 6.51 31.50
7.20 TARRAJEO SS.HH 2 m2 9.96 31.50
7.30 DORMITORIO I m2 13.28 31.50
7.40 DORMITORIO II m2 11.28 31.50
7.50 DORMITORIO III m2 15.04 31.50
8.00 PUERTA
8.10 PUERTA DE MADERA UND 6.00 650.00
9.00 PINTURA EN MUROS INTERIORES
9.10 PINTURA SS.HH 1 m2 43.13 5.00
9.20 PINTURA SS.HH 2 m2 31.13 5.00
9.30 DORMITORIO I m2 34.75 5.00
9.40 DORMITORIO II m2 45.63 5.00
9,5 DORMITORIO III m2 45.50 5.00
10.00 PINTURA EN MUROS EXTERIORES
10.10 PINTURA m2 33.50 5.00
11.00 PINTURA EN CIELO RAZO
11.10 PINTURA SS.HH 1 m2 6.51 5.00
11.20 PINTURA SS.HH 2 m2 9.96 5.00
11.30 DORMITORIO I m2 13.28 5.00
11.40 DORMITORIO II m2 11.28 5.00
11.50 DORMITORIO III m2 15.04 5.00
TOTAL
PRESUPUESTO GENERAL DE OBRA
EXPEDIENTE TECNICO
PARCIAL S/. TOTAL S/.
10,600.00
10,600.00 0.18 1.62
1,458.59
497.60
62.78
898.22
5,313.23
2,397.01
2,916.22
1,400.98
301.91
217.91
243.25
319.41
318.50
948.05
948.05
560.70
65.10
99.60
132.80
112.80
150.40
1,766.21
205.07
313.74
418.32
355.32
473.76
3,900.00
3,900.00
1,000.70
215.65
155.65
173.75
228.15
227.50
167.50
167.50
280.35
32.55
49.80
66.40
56.40
75.20
27,396.31
5,088.81
32,485.12
PERICIA TECNICA
TRABAJOS EN LABORATORIO
METRADO
PARCIAL TOTAL
43.13
16.75 16.75
11.63 11.63
6.38 6.38
8.38 8.38
31.13
6.38 6.38
8.38 8.38
6.00 6.00
10.38 10.38
34.75
8.00 8.00
10.38 10.38
8.00 8.00
8.38 8.38
45.63
6.38 6.38
23.50 23.50
9.75 9.75
6.00 6.00
PERICIA TECNICA
PRESUPUESTO OBRAS DE MANTENIMIENTO EN EL PUESTO DE SALUD LANCHECONGA
PROPIETARIO: EL ESTADO - MINISTERIO DE SALUD
UBICACIN: DISTRITO: HUAMBOS PROVINCIA: CHOTA DEPARTAMENTO: CAJAMARCA
LUGAR:
FECHA: Dec-15
Precio
Item Descripcin Und. Metrado
Unit. S/.
MATERIALES EN ALMACEN
01.00.00 CEMENTO EXTRAFORTE Und 61.00 20.00
02.00.00 FIERRO DE DIAMETRO 1/2" Und 22.00 24.50
03.00.00 FIERRO DE DIAMETRO 3/8" Und 8.00 13.80
04.00.00 FIERRO DE DIAMETRO 1/4" Und 6.00 5.20
05.00.00 ESMALTE DE COLOR AMARILLO ORO Gln 4.00 35.00
06.00.00 CODOS DE 4" PVC Und 4.00 4.69
07.00.00 TUBOS DE PVC DE DIAMETRO 4" Und 13.00 20.00
08.00.00 TUBOS DE PVC DE DIAMETRO 2" Und 2.00 8.80
09.00.00 PEGAMENTO CERAMICO (25 Kg) Bolsa 3.00 31.90
10.00.00 PINTURA LATEX LAVABLE Gln 10.00 60.00
11.00.00 LADRILLO SOLIDO DE ARCILLA Millar 1.00 450.00
12.00.00 CERAMICO DE REVESTIMIENTO 8x30 cm Cajas 8.00 15.00
13.00.00 CERAMICO DE PISO 30x30 cm Cajas 2.00 20.00
14.00.00 PEGAMENTO PARA CERAMICO Bolsas 3.00 31.90
TOTAL
LUD LANCHECONGA
Parcial S/.
1,220.00
539.00
110.40
31.20
140.00
18.76
260.00
17.60
95.70
600.00
450.00
120.00
40.00
95.70
S/. 3,738.36
PERICIA TECNICA
Parcial S/.
1,220.00
539.00
110.40
31.20
140.00
18.76
260.00
17.60
95.70
600.00
450.00
120.00
40.00
95.70
S/. 3,738.36
OBRAS DE MANTENIMIENTO 5,088.81
MATERIALES 3738.36
TOTAL S/. 8,827.17