MINISTERIO DE TRANSPORTES Y COMUNICACIONES

PROVIAS NACIONAL

METRADO DE MUROS DE CONTENCION

TUBERIA PVC-
PROGRESIVA (Km.) Hefect. JUNTAS DE RELLENO MAT.
RELLENO C 140 C 175 C 210 ACERO ENCOFRADO GEOTEXTIL SAP
MURO LADO TIPO LONGITUD (m) EXCAV. (m3) POLIESTIRENO FILTRO
(m3) (m3) (m3) (m3) (Kg) (m2) (m2) C-10 D=4"
(m) (m2) (m3)
INICIO FINAL (m)
1 1+590.0 1+700.0
1+600.0 1+620.0 I CICLOPEO 3.00 20.00 240.00 19.16 88.50 0.00 0.00 148.04 4.425 17.28 76.74 20.00
1+620.0 1+622.0 I CICLOPEO 3.50 2.00 31.50 2.23 11.62 0.00 0.00 17.08 5.810 2.05 8.73 2.00
1+622.0 1+640.0 I CICLOPEO 4.00 18.00 360.00 22.99 136.62 0.00 0.00 174.62 7.590 21.46 88.63 18.00
1+640.0 1+660.0 I CICLOPEO 3.50 20.00 315.00 22.35 116.20 0.00 0.00 170.80 5.810 20.50 87.30 20.00
1+660.0 1+680.0 I CICLOPEO 2.50 20.00 175.00 15.96 66.40 0.00 0.00 125.44 3.320 13.36 64.00 20.00
1+680.0 1+695.0 I CICLOPEO 3.50 15.00 236.25 16.76 87.15 0.00 0.00 128.10 5.810 15.38 65.48 15.00

2 10+060.0 10+100.0
10+060.0 10+100.0 I CICLOPEO 3.00 40.00 480.00 38.31 177.00 0.00 0.00 296.08 4.425 34.56 153.48 40.00

3 12+930.0 12+975.0
12+930.0 12+935.0 I CICLOPEO 2.50 5.00 43.75 3.99 16.60 0.00 0.00 31.36 3.320 3.34 16.00 5.00
12+935.0 12+940.0 I CICLOPEO 3.00 5.00 60.00 4.79 22.13 0.00 0.00 37.01 4.425 4.32 19.19 5.00
12+940.0 12+960.0 I CICLOPEO 4.00 20.00 400.00 25.54 151.80 0.00 0.00 194.02 7.590 23.84 98.48 20.00
12+960.0 12+970.0 I CICLOPEO 5.50 10.00 357.50 17.56 147.25 0.00 0.00 131.91 14.725 16.95 65.99 10.00
12+970.0 12+975.0 I CICLOPEO 2.00 5.00 30.00 3.19 12.37 0.00 0.00 26.18 2.474 2.72 13.82 5.00

4 15+137.0 15+143.0
15+137.0 15+143.0 D CICLOPEO 3.50 6.60 103.95 7.37 38.35 0.00 0.00 56.36 5.810 6.77 28.81 6.60

5 15+960.0 15+984.5
15+964.5 15+971.5 D CICLOPEO 3.50 7.10 111.83 7.93 41.25 0.00 0.00 60.63 5.810 7.28 30.99 7.10
15+971.5 15+979.5 D CICLOPEO 5.50 8.00 286.00 14.05 117.80 0.00 0.00 105.53 14.725 13.56 52.79 8.00
15+979.5 15+984.5 D CICLOPEO 3.50 5.10 80.33 5.70 29.63 0.00 0.00 43.55 5.810 5.23 22.26 5.10

6 16+832.4 16+838.4
16+832.4 16+838.4 I CICLOPEO 4.00 6.10 122.00 7.79 46.30 0.00 0.00 59.18 7.590 7.27 30.04 6.10

7 17+310.0 17+390.0
17+310.0 17+320.0 I CICLOPEO 4.50 10.00 247.50 14.37 94.98 0.00 0.00 108.40 9.498 13.53 54.56 10.00
17+320.0 17+330.0 I CICLOPEO 4.50 10.00 247.50 14.37 94.98 0.00 0.00 108.40 9.498 13.53 54.56 10.00
17+330.0 17+340.0 I CICLOPEO 4.50 10.00 247.50 14.37 94.98 0.00 0.00 108.40 9.498 13.53 54.56 10.00
17+340.0 17+350.0 I CICLOPEO 3.50 10.00 157.50 11.17 58.10 0.00 0.00 85.40 5.810 10.25 43.65 10.00
17+350.0 17+360.0 I CICLOPEO 3.00 10.00 120.00 9.58 44.25 0.00 0.00 74.02 4.425 8.64 38.37 10.00
17+360.0 17+370.0 I CICLOPEO 4.00 10.00 200.00 12.77 75.90 0.00 0.00 97.01 7.590 11.92 49.24 10.00
17+370.0 17+380.0 I CICLOPEO 4.50 10.00 247.50 14.37 94.98 0.00 0.00 108.40 9.498 13.53 54.56 10.00
17+380.0 17+390.0 I CICLOPEO 4.00 10.00 200.00 12.77 75.90 0.00 0.00 97.01 7.590 11.92 49.24 10.00

8 19+250.0 19+260.0
19+250.0 19+253.6 I CICLOPEO 3.00 3.70 44.40 3.54 16.37 0.00 0.00 27.39 4.425 3.20 14.20 3.70
19+253.6 19+257.6 I CICLOPEO 4.00 4.00 80.00 5.11 30.36 0.00 0.00 38.80 7.590 4.77 19.70 4.00
19+257.6 19+260.0 I CICLOPEO 2.50 2.50 21.88 2.00 8.30 0.00 0.00 15.68 3.320 1.67 8.00 2.50

INFORME FINAL
Estudio Definitivo para la Rehabilitacin y Mantenimiento de la carretera TRUJILLO - SHIRAN - HUAMACHUCO
TRAMO ALTO CHICAMA (CALLACUYAN) - HUAMACHUCO
MINISTERIO DE TRANSPORTES Y COMUNICACIONES

PROVIAS NACIONAL

METRADO DE MUROS DE CONTENCION

TUBERIA PVC-
PROGRESIVA (Km.) Hefect. JUNTAS DE RELLENO MAT.
RELLENO C 140 C 175 C 210 ACERO ENCOFRADO GEOTEXTIL SAP
MURO LADO TIPO LONGITUD (m) EXCAV. (m3) POLIESTIRENO FILTRO
(m3) (m3) (m3) (m3) (Kg) (m2) (m2) C-10 D=4"
(m) (m2) (m3)
INICIO FINAL (m)

9 20+665.0 20+690.0
20+665.0 20+690.0 D CICLOPEO 4.00 25.00 500.00 31.93 189.75 0.00 0.00 242.53 7.590 29.80 123.10 25.00

10 20+860.0 20+880.0
20+810.0 20+820.0 D CICLOPEO 3.00 10.00 120.00 9.58 44.25 0.00 0.00 74.02 4.425 8.64 38.37 10.00
20+820.0 20+830.0 D CICLOPEO 3.00 10.00 120.00 9.58 44.25 0.00 0.00 74.02 4.425 8.64 38.37 10.00
20+830.0 20+840.0 D CICLOPEO 3.00 10.00 120.00 9.58 44.25 0.00 0.00 74.02 4.425 8.64 38.37 10.00
20+840.0 20+850.0 D CICLOPEO 3.00 10.00 120.00 9.58 44.25 0.00 0.00 74.02 4.425 8.64 38.37 10.00
20+850.0 20+860.0 D CICLOPEO 3.00 10.00 120.00 9.58 44.25 0.00 0.00 74.02 4.425 8.64 38.37 10.00
20+860.0 20+870.0 D CICLOPEO 3.00 10.00 120.00 9.58 44.25 0.00 0.00 74.02 4.425 8.64 38.37 10.00

11 21+480.0 21+510.0
21+480.0 21+510.0 D CICLOPEO 3.00 30.00 360.00 28.73 132.75 0.00 0.00 222.06 4.425 25.92 115.11 30.00

12 23+880.0 23+890.0
23+880.0 23+890.0 D CICLOPEO 3.50 10.00 157.50 11.17 58.10 0.00 0.00 85.40 5.810 10.25 43.65 10.00

13 23+900.0 23+910.0
23+900.0 23+910.0 D CICLOPEO 3.50 10.00 157.50 11.17 58.10 0.00 0.00 85.40 5.810 10.25 43.65 10.00

14 23+950.0 23+985.0
23+950.0 23+960.0 D CICLOPEO 3.50 10.10 159.08 11.29 58.68 0.00 0.00 86.25 5.810 10.35 44.09 10.10
23+960.0 23+970.0 D CICLOPEO 5.00 10.00 300.00 15.96 117.60 0.00 0.00 120.02 11.760 15.21 60.15 10.00
23+970.0 23+980.0 D CICLOPEO 3.00 10.10 121.20 9.67 44.69 0.00 0.00 74.76 4.425 8.73 38.75 10.10

15 24+125.0 24+135.0
24+125.0 24+127.5 D CICLOPEO 2.00 2.50 15.00 1.60 6.19 0.00 0.00 13.09 2.474 1.36 6.91 2.50
24+127.5 24+130.0 D CICLOPEO 4.00 2.50 50.00 3.19 18.98 0.00 0.00 24.25 7.590 2.98 12.31 2.50
24+130.0 24+132.0 D CICLOPEO 4.00 2.00 40.00 2.55 15.18 0.00 0.00 19.40 7.590 2.38 9.85 2.00
24+132.0 24+135.0 D CICLOPEO 2.00 3.00 18.00 1.92 7.42 0.00 0.00 15.71 2.474 1.63 8.29 3.00

16 24+268.0 24+288.0
24+273.0 24+278.0 D CICLOPEO 3.50 5.00 78.75 5.59 29.05 0.00 0.00 42.70 5.810 5.13 21.83 5.00
24+278.0 24+283.0 D CICLOPEO 3.00 5.00 60.00 4.79 22.13 0.00 0.00 37.01 4.425 4.32 19.19 5.00

17 24+388.5 24+403.5
24+388.5 24+392.0 D CICLOPEO 2.00 3.50 21.00 2.23 8.66 0.00 0.00 18.33 2.474 1.90 9.67 3.50
24+392.0 24+395.0 D CICLOPEO 4.00 3.00 60.00 3.83 22.77 0.00 0.00 29.10 7.590 3.58 14.77 3.00
24+395.0 24+400.0 D CICLOPEO 4.00 5.00 100.00 6.39 37.95 0.00 0.00 48.51 7.590 5.96 24.62 5.00
24+400.0 24+403.5 D CICLOPEO 2.00 3.50 21.00 2.23 8.66 0.00 0.00 18.33 2.474 1.90 9.67 3.50

INFORME FINAL
Estudio Definitivo para la Rehabilitacin y Mantenimiento de la carretera TRUJILLO - SHIRAN - HUAMACHUCO
TRAMO ALTO CHICAMA (CALLACUYAN) - HUAMACHUCO
MINISTERIO DE TRANSPORTES Y COMUNICACIONES

PROVIAS NACIONAL

METRADO DE MUROS DE CONTENCION

TUBERIA PVC-
PROGRESIVA (Km.) Hefect. JUNTAS DE RELLENO MAT.
RELLENO C 140 C 175 C 210 ACERO ENCOFRADO GEOTEXTIL SAP
MURO LADO TIPO LONGITUD (m) EXCAV. (m3) POLIESTIRENO FILTRO
(m3) (m3) (m3) (m3) (Kg) (m2) (m2) C-10 D=4"
(m) (m2) (m3)
INICIO FINAL (m)

18 24+740.0 24+760.0
24+746.0 24+748.0 D CICLOPEO 5.00 2.00 60.00 3.19 24.00 23.52 0.00 0.00 24.00 11.760 3.04 12.03 2.00
24+748.0 24+750.0 D CICLOPEO 5.50 2.00 71.50 3.51 36.00 29.45 0.00 0.00 26.38 14.725 3.39 13.20 2.00
24+750.0 24+755.0 D CICLOPEO 5.00 5.00 150.00 7.98 90.00 58.80 0.00 0.00 60.01 11.760 7.61 30.08 5.00

19 25+140.0 25+160.0
25+140.0 25+160.0 D CICLOPEO 4.00 20.00 400.00 25.54 151.80 0.00 0.00 194.02 7.590 23.84 98.48 20.00

20 25+308.1 25+314.1
25+308.1 25+314.1 D CICLOPEO 3.00 6.10 73.20 5.84 26.99 0.00 0.00 45.15 4.425 5.27 23.41 6.10

21 25+420.0 25+455.0
25+420.0 25+430.0 D CICLOPEO 2.00 10.00 60.00 6.39 24.74 0.00 0.00 52.36 2.474 5.43 27.63 10.00
25+430.0 25+440.0 D CICLOPEO 3.50 10.00 157.50 11.17 58.10 0.00 0.00 85.40 5.810 10.25 43.65 10.00
25+440.0 25+450.0 D CICLOPEO 5.00 10.00 300.00 15.96 117.60 0.00 0.00 120.02 11.760 15.21 60.15 10.00
25+450.0 25+455.0 D CICLOPEO 2.00 5.00 30.00 3.19 12.37 0.00 0.00 26.18 2.474 2.72 13.82 5.00

21 25+940.0 26+010.0
25+940.0 26+010.0 D ARMADO 4.00 70.00 1050.00 90.65 0.00 333.20 9127.93 563.50 4.760 98.00 280.00 70.00

22 27+295.0 27+365.0
27+295.0 27+300.0 D CICLOPEO 3.00 5.00 60.00 4.79 22.13 0.00 0.00 37.01 4.425 4.32 19.19 5.00
27+300.0 27+320.0 D CICLOPEO 4.50 20.00 495.00 28.73 189.96 0.00 0.00 216.80 9.498 27.06 109.12 20.00
27+320.0 27+340.0 D CICLOPEO 6.00 20.00 840.00 38.31 353.70 0.00 0.00 288.46 17.685 260.32 142.66 20.00
27+340.0 27+360.0 D CICLOPEO 6.00 20.00 840.00 38.31 353.70 0.00 0.00 288.46 17.685 260.32 142.66 20.00
27+360.0 27+365.0 D CICLOPEO 4.50 5.00 123.75 7.18 47.49 0.00 0.00 54.20 9.498 6.77 27.28 5.00

23 28+700.0 28+725.0
28+700.0 28+725.0 D ARMADO 8.00 25.00 1575.00 67.38 0.00 223.75 6328.54 352.50 8.950 70.00 200.00 25.00

24 29+333.2 29+342.2
29+333.2 29+335.7 I CICLOPEO 2.50 2.60 22.75 2.08 8.63 0.00 0.00 16.31 3.320 1.74 8.32 2.60
29+335.7 29+339.7 I CICLOPEO 3.50 4.00 63.00 4.47 23.24 0.00 0.00 34.16 5.810 4.10 17.46 4.00
29+339.7 29+341.7 I CICLOPEO 2.50 2.10 18.38 1.68 6.97 0.00 0.00 13.17 3.320 1.40 6.72 2.10

25 29+453.0 29+465.0
29+453.0 29+457.0 I CICLOPEO 3.00 4.10 49.20 3.93 18.14 0.00 0.00 30.35 4.425 3.54 15.73 4.10
29+457.0 29+461.0 I CICLOPEO 4.00 4.65 93.00 5.94 35.29 0.00 0.00 45.11 7.590 5.54 22.90 4.65
29+461.0 29+465.0 I CICLOPEO 2.50 4.10 35.88 3.27 13.61 0.00 0.00 25.72 3.320 2.74 13.12 4.10

26 30+559.0 30+604.0
30+559.0 30+604.0 I ARMADO 6.00 45.00 1575.00 89.78 0.00 270.00 8590.79 452.25 6.000 94.50 270.00 45.00

INFORME FINAL
Estudio Definitivo para la Rehabilitacin y Mantenimiento de la carretera TRUJILLO - SHIRAN - HUAMACHUCO
TRAMO ALTO CHICAMA (CALLACUYAN) - HUAMACHUCO
MINISTERIO DE TRANSPORTES Y COMUNICACIONES

PROVIAS NACIONAL

METRADO DE MUROS DE CONTENCION

TUBERIA PVC-
PROGRESIVA (Km.) Hefect. JUNTAS DE RELLENO MAT.
RELLENO C 140 C 175 C 210 ACERO ENCOFRADO GEOTEXTIL SAP
MURO LADO TIPO LONGITUD (m) EXCAV. (m3) POLIESTIRENO FILTRO
(m3) (m3) (m3) (m3) (Kg) (m2) (m2) C-10 D=4"
(m) (m2) (m3)
INICIO FINAL (m)

27 31+190.0 31+220.0
31+190.0 31+220.0 I CICLOPEO 6.00 30.00 1260.00 57.47 530.55 0.00 0.00 432.69 17.685 390.48 213.99 30.00

28 31+250.0 31+290.0
31+250.0 31+290.0 I CICLOPEO 4.00 40.00 800.00 51.08 303.60 0.00 0.00 388.04 7.590 47.68 196.96 40.00

29 32+110.0 32+120.0
32+110.0 32+120.0 I CICLOPEO 3.00 10.00 120.00 9.58 44.25 0.00 0.00 74.02 4.425 8.64 38.37 10.00

30 32+140.0 32+170.0
32+140.0 32+170.0 I CICLOPEO 3.00 30.00 360.00 28.73 132.75 0.00 0.00 222.06 4.425 25.92 115.11 30.00

31 32+180.0 32+220.0
32+180.0 32+220.0 I CICLOPEO 4.00 40.00 800.00 51.08 303.60 0.00 0.00 388.04 7.590 47.68 196.96 40.00

32 32+220.0 32+235.0
32+220.0 32+235.0 I CICLOPEO 23.00 15.00 8280.00 110.14 265.28 0.00 0.00 216.35 17.685 195.24 107.00 15.00

33 32+620.0 32+650.0
32+620.0 32+630.0 I CICLOPEO 4.00 10.00 200.00 12.77 75.90 0.00 0.00 97.01 7.590 11.92 49.24 10.00
32+630.0 32+640.0 I CICLOPEO 6.00 10.00 420.00 19.16 176.85 0.00 0.00 144.23 17.685 130.16 71.33 10.00
32+640.0 32+650.0 I CICLOPEO 4.00 10.00 200.00 12.77 75.90 0.00 0.00 97.01 7.590 11.92 49.24 10.00
32+650.0 32+655.0 I CICLOPEO 2.50 5.00 43.75 3.99 16.60 0.00 0.00 31.36 3.320 3.34 16.00 5.00

34 33+012.0 33+028.0
33+012.0 33+017.0 I CICLOPEO 3.00 5.10 61.20 4.88 22.57 0.00 0.00 37.75 4.425 4.41 19.57 5.10
33+017.0 33+023.0 I CICLOPEO 4.00 6.00 120.00 7.66 45.54 0.00 0.00 58.21 7.590 7.15 29.54 6.00
33+023.0 33+028.0 I CICLOPEO 3.00 5.10 61.20 4.88 22.57 0.00 0.00 37.75 4.425 4.41 19.57 5.10

35 33+250.0 33+276.0
33+250.0 33+255.0 I ARMADO 4.00 5.00 75.00 6.48 0.00 23.80 708.01 40.25 4.760 7.00 20.00 5.00
33+255.0 33+260.0 I ARMADO 7.00 5.00 240.00 11.73 0.00 44.75 1200.75 70.25 8.950 12.25 35.00 5.00
33+260.0 33+266.0 I ARMADO 7.00 6.00 288.00 14.07 0.00 53.70 1419.26 84.30 8.950 14.70 42.00 6.00
33+266.0 33+271.0 I ARMADO 7.00 5.00 240.00 11.73 0.00 44.75 1200.75 70.25 8.950 12.25 35.00 5.00
33+271.0 33+276.0 I ARMADO 4.00 5.00 75.00 6.48 0.00 23.80 708.01 40.25 4.760 7.00 20.00 5.00

36 33+780.3 33+796.3
33+780.3 33+785.3 I ARMADO 5.00 5.00 120.00 8.23 0.00 30.00 872.25 50.25 6.000 8.75 25.00 5.00
33+785.3 33+791.3 I ARMADO 7.00 6.00 288.00 14.07 0.00 53.70 1419.26 84.30 8.950 14.70 42.00 6.00
33+791.3 33+796.3 I ARMADO 5.00 5.00 120.00 8.23 0.00 30.00 872.25 50.25 6.000 8.75 25.00 5.00

INFORME FINAL
Estudio Definitivo para la Rehabilitacin y Mantenimiento de la carretera TRUJILLO - SHIRAN - HUAMACHUCO
TRAMO ALTO CHICAMA (CALLACUYAN) - HUAMACHUCO
MINISTERIO DE TRANSPORTES Y COMUNICACIONES

PROVIAS NACIONAL

METRADO DE MUROS DE CONTENCION

TUBERIA PVC-
PROGRESIVA (Km.) Hefect. JUNTAS DE RELLENO MAT.
RELLENO C 140 C 175 C 210 ACERO ENCOFRADO GEOTEXTIL SAP
MURO LADO TIPO LONGITUD (m) EXCAV. (m3) POLIESTIRENO FILTRO
(m3) (m3) (m3) (m3) (Kg) (m2) (m2) C-10 D=4"
(m) (m2) (m3)
INICIO FINAL (m)

37 33+955.0 34+045.0
33+955.0 33+960.0 I CICLOPEO 2.00 5.00 30.00 3.19 12.37 0.00 0.00 26.18 2.474 2.72 13.82 5.00
33+960.0 33+965.0 I CICLOPEO 2.50 5.00 43.75 3.99 16.60 0.00 0.00 31.36 3.320 3.34 16.00 5.00
33+965.0 33+970.0 I CICLOPEO 3.00 5.00 60.00 4.79 22.13 0.00 0.00 37.01 4.425 4.32 19.19 5.00
33+970.0 33+980.0 I CICLOPEO 3.00 10.00 120.00 9.58 44.25 0.00 0.00 74.02 4.425 8.64 38.37 10.00
33+980.0 33+990.0 I CICLOPEO 4.00 10.00 200.00 12.77 75.90 0.00 0.00 97.01 7.590 11.92 49.24 10.00
33+990.0 34+000.0 I CICLOPEO 2.50 10.00 87.50 7.98 33.20 0.00 0.00 62.72 3.320 6.68 32.00 10.00
34+000.0 34+010.0 I CICLOPEO 1.50 10.00 37.50 4.79 18.83 0.00 0.00 41.93 1.883 3.47 20.14 10.00
34+010.0 34+020.0 I CICLOPEO 2.00 10.00 60.00 6.39 24.74 0.00 0.00 52.36 2.474 5.43 27.63 10.00
34+020.0 34+030.0 I CICLOPEO 2.50 10.00 87.50 7.98 33.20 0.00 0.00 62.72 3.320 6.68 32.00 10.00
34+030.0 34+040.0 I CICLOPEO 3.50 10.00 157.50 11.17 58.10 0.00 0.00 85.40 5.810 10.25 43.65 10.00

38 34+945.0 34+995.0
34+945.0 34+950.0 I CICLOPEO 3.50 5.00 78.75 5.59 29.05 0.00 0.00 42.70 5.810 5.13 21.83 5.00
34+950.0 34+960.0 I CICLOPEO 7.00 10.00 560.00 22.35 176.85 0.00 0.00 144.23 17.685 130.16 71.33 10.00
34+960.0 34+970.0 I CICLOPEO 6.00 10.00 420.00 19.16 176.85 0.00 0.00 144.23 17.685 130.16 71.33 10.00
34+970.0 34+980.0 I CICLOPEO 5.00 10.00 300.00 15.96 117.60 0.00 0.00 120.02 11.760 15.21 60.15 10.00
34+980.0 34+981.0 I CICLOPEO 5.50 1.00 35.75 1.76 14.73 0.00 0.00 13.19 14.725 1.70 6.60 1.00
34+981.0 34+990.0 I CICLOPEO 4.00 9.00 180.00 11.49 68.31 0.00 0.00 87.31 7.590 10.73 44.32 9.00
34+990.0 34+995.0 I CICLOPEO 4.00 5.00 100.00 6.39 37.95 0.00 0.00 48.51 7.590 5.96 24.62 5.00

39 35+815.0 35+830.0
35+815.0 35+830.0 I CICLOPEO 3.00 15.00 180.00 14.37 66.38 0.00 0.00 111.03 4.425 12.96 57.56 15.00

TOTAL 150.00 7,717.43 1,131.45 32,447.81 11,349.82 785.60 2,782.70 5,813.39 1,213.15

INFORME FINAL
Estudio Definitivo para la Rehabilitacin y Mantenimiento de la carretera TRUJILLO - SHIRAN - HUAMACHUCO
TRAMO ALTO CHICAMA (CALLACUYAN) - HUAMACHUCO
Item Descripcin Und. Metrado
600 OBRAS DE ARTE Y DRENAJE
601.A EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3
603 ELIMINACION DE ALCANTARILLAS TMC EXISTENTES m
605.A RELLENOS PARA ESTRUCTURAS m3
607 FILTRO DRENANTE m3
608.A GEOTEXTIL CLASE 2 PARA ESTRUCTURAS m2
608.B GEOTEXTIL CLASE 2 PARA ENROCADOS m2
610.C CONCRETO CLASE C (F'C = 280 KG/CM2) m3
610.D CONCRETO CLASE D (F'C = 210 KG/CM2) m3
610.E CONCRETO CLASE E (F'C = 175 KG/CM2) m3
610.G CONCRETO CLASE G (F'C = 140 KG/CM2 + 30%PG) m3
610.H CONCRETO CLASE H (F'C = 100 KG/CM2) m3
612.A ENCOFRADO Y DESENCOFRADO m2
615 ACERO DE REFUERZO FY=4200KG/CM2 kg
622.B TUBERA CORRUGADA DE ACERO GALVANIZADO CIRCULAR DE 0.90 M DE DIMETRO m
622.C TUBERA CORRUGADA DE ACERO GALVANIZADO CIRCULAR DE 1.20 M DE DIMETRO m
622.D TUBERA CORRUGADA DE ACERO GALVANIZADO CIRCULAR DE 1.50 M DE DIMETRO m
622.E TUBERA CORRUGADA DE ACERO GALVANIZADO CIRCULAR DE 1.80 M DE DIMETRO m
622.F TUBERA CORRUGADA DE ACERO GALVANIZADO MULTIPLATE MP-152 ARCO (3.00 X 1.35 M) m
635.B CUNETA REVESTIDA EN CONCRETO TIPO 2 m
635.C CUNETA REVESTIDA TIPO BATEA m
635.D CUNETA RECTANGULAR URBANA m
635.E CUNETA REVESTIDA TRAPEZOIDAL m
635.F ZANJA DE DRENAJE REVESTIDA m
635.G ZANJA DE CORONACION REVESTIDA DE CONCRETO TIPO I m
635.H ZANJA DE CORONACION REVESTIDA DE CONCRETO TIPO II m
635.I CANAL DE RIEGO TRAPEZOIDAL REVESTIDO m
635.J CANAL DE RIEGO RECTANGULAR REVESTIDO m
636.A PASE PEATONAL u
636.B PASE VEHICULAR m
637.A BORDILLO m
640.A EMBOQUILLADO DE PIEDRA E = 0.15M m2
640.B EMBOQUILLADO DE PIEDRA E = 0.35M m2
641.A LIMPIEZA DE ALCANTARILLA EXISTENTE m3
642.A LIMPIEZA DE CAUCE DE ALCANTARILLAS m3
643.A LIMPIEZA DE CANAL EXISTENTE m3
645.A DEMOLICIN DE ESTRUCTURAS m3
648.A GAVION TIPO CAJA m3
648.B GAVION TIPO COLCHON m2
648.C ELEMENTO DE MURO DE SUELO REFORZADO m3
649.B TUBO DE PVC-SAP CALSE 10, D=2" m
649.C TUBO DE PVC-SAP CLASE 10, D=4" m
649.E TUBO DE PVC-SAP CLASE 10, D=8" m
649.F TUBO DE VENTILACIN m
650.A JUNTA LONGITUDINAL DE CONSTRUCCIN m
650.B JUNTA TRANSVERSAL DE CONTRACCIN m
650.C REPARACIN DE JUNTAS EN CANAL EXISTENTE m
651.A ENROCADO CON ROCA DE CANTERA m3
651.B ROCA ACOMODADA m3
Item Descripcin Und. Metrado
651.C PIEDRA ACOMODADA m3
655.A GEOMALLA m2
655.B GEOCOMPUESTO (GEODREN) m
656.A MURO TIPO TAPIA m
657.A PUENTE COLGANTE D=10" m