San Cayetano, 17 of December 2015
Quality Report
By means of this document we certify that the works of Installation or
modification of the transformer, capacitor and electric ignitor of the
Lighting Systems in the Cooling Tower area, were executed in
accordance to the specified location mentioned in drawing TT2-700-
£155-00104(In this drawing each one of the modified luminaries is
specified). In the same way the corresponding quality control
inspection of the correct installation of the aforementioned electric
components of the lighting system was performed as specified and the
checking of correct functionality of each one of the luminaries (eight
luminaries).
win?
LUXYCON
aa/ac ceyM
Eng. Jhon Mosquera Eng. Felipe Palacios@ -cevm
San Cayetano, 17 of December 2015
Quality Report
By means of this document we certify that the works of Installation or
modification of the transformer, capacitor and electric ignitor of the
Lighting Systems in the Condesate Water Tank area, were executed in
accordance to the specified location mentioned in drawing TT2-700-
£155-00101 (In this drawing each one of the modified luminaries is
specified). In the same way the corresponding quality control
inspection of the correct installation of the aforementioned electric
components of the lighting system was performed as specified and the
checking of correct functionality of each one of the luminaries (three
luminaries).
the os
LUXYCON
aayac ceyM
Eng, Jhon Mosquera Eng, Felipe Palacios.@ -cevm
San Cayetano, 17 of December 2015
Quality Report
By means of this document we certify that the works of Installation or
modification of the transformer, capacitor and electric ignitor of the
Lighting Systems in the Fly Ash area, were executed in accordance to
the specified location mentioned in drawing TT2-700-E155-00201 (In
this drawing each one of the modified luminaries is specified). In the
same way the corresponding quality control inspection of the correct
installation of the aforementioned electric components of the lighting
system was performed as specified and the checking of correct
functionality of each one of the (ten luminaries).
(yi?
qayac CEYM LUXYCON
Eng. Jhon Mosquera Eng. Felipe Palacios@ -cerm
San Cayetano, 17 of December 2015
Quality Report
By means of this document we certify that the works of Installation or
modification of the transformer, capacitor and electric ignitor of the
Lighting Systems in the Water Treament area, were executed in
accordance to the specified location mentioned in drawing TT2-700-
£155-00105 (In this drawing each one of the modified luminaries is
specified). In the same way the corresponding quality control
inspection of the correct installation of the aforementioned electric
components of the lighting system was performed as specified and the
checking of correct functionality of each one of the luminaries (eight
luminaries).
wi?
qa/ac ceym LUXYCON
Eng. Jhon Mosquera Eng. Felipe Palacios@ -ceym
San Cayetano, 17 of December 2015
Quality Report
By means of this document we certify that the works of Installation or
modification of the transformer, capacitor and electric ignitor of the
Lighting Systems in the Bottom Ash area, were executed in accordance
to the specified location mentioned in drawing TT2-700-E155-00201 (In
this drawing each one of the modified luminaries is specified). In the
same way the corresponding quality control inspection of the correct
installation of the aforementioned electric components of the lighting
system was performed as specified and the checking of correct
functionality of each one of the luminaries (eight luminaries).
aajacceym LUXYcON
Eng, Jhon Mosquera Eng, Felipe Palacios@® .ceymu
San Cayetano, 17 of December 2015
Quality Report
By means of this document we certify that the works of Installation or
modification of the transformer, capacitor and electric ignitor of the
Lighting Systems in the Secondary Belt Conveyor area, were executed
in accordance to the specified location mentioned in drawing TT2-700-
£155-00202 (In this drawing each one of the modified luminaries is
specified). In the same way the corresponding quality control
inspection of the correct installation of the aforementioned electric
components of the lighting system was performed as specified and the
checking of correct functionality of each one of the luminaries (eleven
luminaries).
gals
LUXYCON
Eng. Jhon Mosquera Eng. Felipe Palacios