Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Consolidado Metrados San Pedro
Consolidado Metrados San Pedro
03.04 RELLENO CON MATERIAL DE AFIRMADO M3 29.30 24.92 49.28 49.28 61.59 21.52 26.51 29.59
03.05 ELIMINACION DE DESMONTE M3 27.21 23.74 45.45 45.45 58.81 29.24 33.31 28.35
03.06 RELLENO ESTRUCTURAL M3 4.78 4.17 7.98 7.98 10.33 4.22 5.13 5.85 4.98
03.07 EXCAVACION HASTA 1.00 MT DE PROFUNDIDAD M3
PARA INSTALACIONES ELECTRICAS
04.05 GEOMEMBRANA M2 172.90 150.86 288.80 288.80 373.73 94.16 185.82 211.66 180.12
04.06 CONCRETO FC= 175 KG/CM2 PARA GRADERIAS M3
05.02 ACERO DE REFUERZO GRADO 60 ZAPATAS KG 270.08 199.68 399.36 399.36 532.48 61.44 149.04 266.24 276.72
05.03 CONCRETO F'C=210 KG/CM2. PARA COLUMNAS M3 12.43 9.25 18.28 18.28 24.12 6.59 5.61 13.06 13.27
05.04 ENCOFRADO Y DESENCOFRADO CARAVISTA M2 101.46 77.80 150.31 150.31 196.80 47.68 102.93 119.75 116.18
COLUMNAS
05.05 ACERO DE REFUERZO GRADO 60 COLUMNAS KG 2087.64 1594.13 3141.20 3141.20 4146.10 1196.70 815.68 2180.61 2268.82
05.06 CONCRETO F'C=210 KG/CM2 PARA VIGAS DE M3 6.63 5.48 9.89 9.89 13.42 3.48 6.81 6.66
CIMENTACION
05.07 ACERO DE REFUERZO GRADO 60 VIGAS DE KG 560.24 461.44 903.50 903.50 1180.45 277.50 640.30 633.02
CIMENTACION
05.08 CONCRETO F'C=210 KG/CM2. PARA VIGAS M3 13.40 10.76 18.59 18.59 24.30 4.18 6.30 12.76 12.41
05.09 ENCOFRADO Y DESENCOFRADO CARAVISTA VIGAS M2 129.72 103.50 178.87 178.87 233.74 31.92 49.59 125.71 123.38
05.10 ACERO DE REFUERZO GRADO 60 VIGAS KG 1086.69 889.80 1482.24 1482.24 1951.45 431.04 .450.42 1076.58 1050.11
05.11 CONCRETO F'C=210 KG/CM2 PARA LOSA ALIGERADA M3 9.54 7.16 15.71 15.71 20.95 0.73 4.79 9.54 9.54
Y LOSA MACIZA
05.12 ENCOFRADO Y DESENCOFRADO PARA LOSAS M2 108.43 81.32 169.24 169.24 225.65 4.84 54.38 108.43 108.43
ALIGERADAS Y LOZA MACIZA
05.13 ACERO DE REFUERZO GRADO 60 LOSA ALIGERADA Y KG 253.09 222.20 391.86 391.86 489.11 26.40 168.72 295.90 295.90
LOZA MACIZA
05.14 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA UND 900.00 675.00 1404.00 1404.00 1872.00 44.00 453.00 899.00 899.00
TECHO ALIGERADO
05.15 CONCRETO F'C=210 KG/CM2 PARA SOBRECIMIENTO M3 1.79 1.89 1.89
ARMADO
05.16 ENCOFRADO Y DESENCOFRADO PARA M2
SOBRECIMIENTO ARMADO
05.17 ACERO DE REFUERZO GRADO 60 SOBRECIMIENTO KG 43.86 43.47 43.47
ARMADO
05.21 CONCRETO F'C=210 KG/CM2. PARA VIGAS SOLERAS M3
09.00 ALBAILERIA
09.01 MURO LADR.K.K. MEZC.C:A 1.5, TIPO IV, P.TARRAJ. M2 23.60 15.84 33.06 33.06 43.86 13.12 49.91 21.80 22.10
DE SOGA
09.02 MURO LADR.K.K. MEZC.C:A 1.5, TIPO IV, P.TARRAJ. M2 47.60 47.60 95.20 95.20 119.00 105.84 68.25 81.88
DE CABEZA
09.03 MURO LADR.K.K. MEZC.C:A 1.5, TIPO IV, P. TARRAJ. M2 27.18 10.22
DE CANTO
09.05 LADRILLO KK PARA INSTALACION ELECTRICA UND
10 REVOQUES
10.01 TARRAJEO FINO EN MUROS MEZC.C:A 1:5 E=1.5 CM M2 133.73 128.67 301.32 301.32 370.06 26.24 244.43 230.81 213.58
INCL.ARRIOSTRE
10.02 TARRAJEO COLUMNAS MEZ.C:A 1.5,E=1.5CM (X1/2) M2 55.48 41.61 83.22 83.22 110.96 55.10 55.18 36.67
10.03 TARRAJEO VIGAS Y SOLERAS MEZ.C:A 1.5,E=1.5CM M2 39.70 33.46 95.20 95.20 119.79 45.60 67.38 67.38
(X1/2)
10.04 TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENA M2 146.76 22.60 1.11
10.05 BRUAS DE 1.0 CM (SOLO M.O., LOS MAT. ESTAN EN M 359.24 391.54 713.24 713.24 870.60 62.39 260.30 416.97 502.59
TARRAJEO)
10.06 TARRAJEO CON IMPERMEABILIZANTE PARA M2 89.04
CISTERNAY TANQUE ELEVADO
10.07 VESTIDURA DE DERRAMES M
10.08 TARRAJEO FROTACHADO EN BANCA M2 1.39 4.16
11 CIELORRASOS
11.01 CIELORASO CON MEZCLA C:A 1:5 CON CINTAS E=1.5 M2 107.12 80.29 176.72 176.72 235.62 16.80 57.67 111.37 111.37
CM
MODULOS
Item Descripcin UND A B C D E F G H I
12 PISOS
12.02 PISO DE TERRAZO OSCURO M2 113.59 84.73 183.65 183.65 244.86 111.37 111.37
12.04 RAMPA DE CONCRETO F'C= 175 KG/CM2 M2
13 CONTRAZOCALOS
13.01 CONTRAZOCALO DE CEMENTO SIN COLOREAR M
PULIDO MEZC.1:5 H=0.10M
13.02 CONTRAZOCALO DE CEMENTO SIN COLOREAR M 45.50 39.70 60.10 60.10 74.00 34.15 43.90 35.60
PULIDO MEZC.1:5 H=0.20M.
13.03 CONTRAZOCALO DE CEMENTO SIN COLOREAR M 11.90
PULIDO MEZC.1:5 H=0.30M.
13.04 CONTRAZOCALO DE TERRAZO OSCURO H = 20 CM M 45.90 37.30 90.30 90.30 120.40 59.95 59.30
15 REVESTIMIENTOS
15.01 REVESTIMIENTO C/MAYOLICA BLANCA 1RA. 20X20 M2 146.76 22.16 1.11
CM
16 COBERTURAS
16.01 CUBIERTA LADR.PASTELERO ASEN.C/BARRO 3.0CM; M2 125.22 95.00 203.77 203.77 271.01 21.80 67.65 125.22 125.22
JUNTA. 1:5 1.5 CM
16.02 CUBIERTA TEJA ARTESANAL DE ARCILLA ASENT. M2
C/MEZCLA
16.03 CUBIERTA CON LAMINA TERMOACUSTICA M2
MODULOS
Item Descripcin UND A B C D E F G H I
17 CARPINTERIA DE MADERA
17.01 TICERO DE CEDRO M 108.00 10.80 14.40 5.00 3.60
17.02 PUERTAS DE MADERA TABLEROS REBAJADOS DE M2 6.09 4.20 12.60 12.60 16.80 23.22 7.77 8.40
CEDRO
17.03 MARCO DE MADERA PARA PUERTA DE CEDRO M 13.40 10.40 31.20 31.20 41.60 60.30 20.50 20.80
17.04 VENTANA DE MADERA CON HOJAS DE CEDRO M2 36.51 22.45 45.65 45.65 60.43 9.68 30.11 29.64
20 CERRAJERIA
20.01 BISAGRA TIPO CAPUCHINA ALUMINIZADA DE 4" PZA 12.00 8.00 24.00 24.00 32.00 24.00 16.00 16.00
20.02 BISAGRA TIPO CAPUCHINA ALUMINIZADA DE 3" PZA 64.00 48.00 96.00 96.00 128.00 52.00 64.00 64.00
20.04 CERRADURA PARA PUERTA PESADA DOS GOLPES PZA 2.00 2.00 6.00 6.00 8.00 1.00 6.00 4.00 4.00
MODULOS
Item Descripcin UND A B C D E F G H I
20.05 CERROJO SOBREPONER 4" (VENTANAS Y SSHH UND 16.00 12.00 24.00 24.00 32.00 24.00 16.00 16.00
INTERNOS)
20.06 CANDADO TIPO FORTE UND 2.00
21 PINTURA
21.01 PINTURA LATEX VINILICA 2 MANOS C/IMPRIMANTE M2 133.73 114.19 287.34 287.34 370.06 137.19 229.95 201.25 199.09
P/GL EN MUROS
21.02 PINTURA DE CONTRAZOCALO C/ESMALTE M 45.50 39.70 58.25 58.25 74.50 11.90 43.90 43.90 35.60
ECONOMICO
21.03 PINTURA PARA MADERA C/BARNIZ 2 MANOS M2 36.78 26.65 45.65 45.65 77.23 39.80 39.80 38.69
21.05 PINTURA EN BARANDAS,VARILLAS DE SEGURIDAD Y M 146.55 102.90 167.10 167.10 207.70 74.60 80.95 122.35
PERFILES METALICOS
21.06 PINTURA ASFALTICA M2 8.18 5.96 13.55 13.55 18.06 8.49 8.99 8.90
21.07 PINTURA DE LINEA DEMARCATORIA (PINTURA DE M
TRAFICO)
21.08 PINTURA PARA PIZARRA CON 2 MANOS M2 4.32 12.96 12.96 17.28 6.00 4.32
21.09 PINTURA EN CIELORASOS M2 107.12 80.29 176.72 176.72 235.62 16.80 57.67 111.37 11.37
22 VIDRIOS
22.01 VIDRIOS SEMIDOBLES INCOLORO CRUDO P2 115.76 241.56 491.19 491.19 650.23 104.16 323.98 318.93.
23 JUNTAS
23.01 JUNTA DE 1" CON POLIETILENO EXPANDIDO M 48.42 42.10 56.94 56.94 75.92 20.10 63.71 54.59
(ANCHO=0.25 M)
23.02 JUNTAS ASFALTICAS DE 1"X4" M 97.40 115.52 178.42 178.42 217.62 18.12 102.77 114.82 95.22
23.03 JUNTAS 1" JEBE MICROPOROSO M 4.10
J K L PARCIAL
0.00
0.00
0.00
0.00
0.00
2.63 6.05 1.82 42.34
0.00
0.00
0.00
0.00
10.80 18.65 131.78
899.00 9,449.00
1.89 7.46
0.00
43.47 174.27
0.00
0.00
0.00
J K L PARCIAL
12.56
80.26
579.37
5.83
43.69
300.12
0.00
0.00
23.60 74.92 10.72 365.59
37.40
0.00
42.37 42.37
0.00
0.00
250.42 327.48 21.45 2,549.51
55.48 576.92
72.12 635.83
3.25 173.72
89.04
0.00
2.77 8.32
0.00
0.00
111.37 6.58 1,191.63
0.00
J K L PARCIAL
0.00
111.74 1,144.96
0.00
0.00
0.00
0.00
11.90
59.30 562.75
25.16 37.36
0.00
0.00
3.00
11.00
2.00
6.00
2.00
12.00
2.00
14.00
18.00
28.00
1.00
0.00
0.00
3.25 173.28
0.00
0.00
1,238.66
0.00
14.49 21.51
14.98
0.00
0.00
7.54 7.54
0.00
3.36
1.28
11.40
8.44 9.49
2.24
0.00
0.00
0.00
82.02 82.02
47.55 47.55
541.20 541.20
44.80 226.50
80.95 826.80
0.00
0.00
16.00 12.00 4.00 188.00
67.00
2.00
0.00
0.00
205.13 327.48 27.13 2,519.88
0.00
123.35 1,192.60
4.32 62.16
111.37 1,085.05
0.00
0.00
466.34 6.46 2,890.87
0.00
0.00
48.42 93.01 560.15
S10
Ing. Javier Galdos Ballon
CONSOLIDADO DE METRADOS - OBRAS EXTERIORES
Obra INSTITUCION EDUCATIVA SAN PEDRO
Cliente MINISTERIO DE EDUCACION-OINFE
09.00 ALBAILERIA
09.01 MURO LADR.K.K. MEZC.C:A 1.5, TIPO IV, P.TARRAJ. DE M2 648.80 15.64
SOGA
09.02 MURO LADR.K.K. MEZC.C:A 1.5, TIPO IV, P.TARRAJ. DE M2 1.78
CABEZA
10 REVOQUES
10.01 TARRAJEO FINO EN MUROS MEZC.C:A 1:5 E=1.5 CM M2 1,305.36 17.42 1.40
INCL.ARRIOSTRE
15
13 CONTRAZOCALOS
13.03 CONTRAZOCALO DE CEMENTO SIN COLOREAR PULIDO M 760.00
MEZC.1:5 H=0.30M.
16 COBERTURAS
16.02 CUBIERTA TEJA ARTESANAL DE ARCILLA ASENT. M2 2.12
C/MEZCLA
21 PINTURA
21.01 PINTURA LATEX VINILICA 2 MANOS C/IMPRIMANTE M2 1,608.22 43.07
P/GL EN MUROS
21.02 PINTURA DE CONTRAZOCALO C/ESMALTE ECONOMICO M 760.00
23 JUNTAS
23.01 JUNTA DE 1" CON POLIETILENO EXPANDIDO M 120.35
(ANCHO=0.25 M)
23.02 JUNTAS ASFALTICAS DE 1"X4" M 486.00 1.60 360.00
24 INSTALACIONES SANITARIAS
24.01.03 TUBERIA PVC SAL 6" M
24.01.01 TUBERIA PVC SAL 3" M
16
1.00
5.00
9,735.00
632.78
351.86 10,086.86
182.41 300.18
1,460.25
9,735.00
1,370.97
55.96 2,069.62
680.00 680.00
16.10 16.10
43.15 43.15
21.67 21.67
39.80
497.45
9.88
436.08
255.00 348.79
17
140.90
5.77 33.66
278.32 278.32
29.69
515.45
2,138.48
7.22 7.22
24.50 24.50
560.48 560.48
8.65
109.12
543.36
7.19 7.19
34.65 34.65
498.17 498.17
664.44
1.78
1,324.18
18
182.89
6,002.43
760.00
2.12
12.01
1.00
2.00
2.00
1,651.29
760.00
315.80
120.35
847.60
117.00 117.00
84.00 84.00
19
09 ALBAILERIA
09.05 LADRILLOS K.K. PARA I.E. UND 3,400.00
S10
Ing. Javier Galdos Ballon
01 OBRAS PROVISIONALES
01.01 MOVILIZACION Y DESMOVILIZACION GLB
01.02 AGUA DESAGUE Y ENERGIA ELECTRICA MES
P/OBRA POR MES
09.00 ALBAILERIA
09.01 MURO LADR.K.K. MEZC.C:A 1.5, TIPO IV, M2
P.TARRAJ. DE SOGA
09.02 MURO LADR.K.K. MEZC.C:A 1.5, TIPO IV, M2
P.TARRAJ. DE CABEZA
09.03 MURO LADR.K.K. MEZC.C:A 1.5, TIPO IV, P. M2
TARRAJ. DE CANTO
09.05 LADRILLO KK PARA INSTALACION ELECTRICA UND
10 REVOQUES
10.01 TARRAJEO FINO EN MUROS MEZC.C:A 1:5 E=1.5 M2
CM
10.02 TARRAJEO COLUMNAS MEZ.C:A 1.5,E=1.5CM M2
(X1/2)
10.03 TARRAJEO VIGAS Y SOLERAS MEZ.C:A M2
1.5,E=1.5CM (X1/2)
10.04 TARRAJEO PRIMARIO RAYADO CON CEMENTO- M2
ARENA
10.05 BRUAS DE 1.0 CM (SOLO M.O., LOS MAT. M
ESTAN EN TARRAJEO)
10.06 TARRAJEO CON IMPERMEABILIZANTE PARA M2
CISTERNAY TANQUE ELEVADO
10.07 VESTIDURA DE DERRAMES M
11 CIELORRASOS
11.01 CIELORASO CON MEZCLA C:A 1:5 CON CINTAS M2
E=1.5 CM
12 PISOS
12.02 PISO DE TERRAZO OSCURO M2
12.04 RAMPA DE CONCRETO F'C= 175 KG/CM2 M2
13 CONTRAZOCALOS
13.02 CONTRAZOCALO DE CEMENTO SIN COLOREAR M
PULIDO MEZC.1:5 H=0.20M.
13.03 CONTRAZOCALO DE CEMENTO SIN COLOREAR M
PULIDO MEZC.1:5 H=0.30M.
15 REVESTIMIENTOS
15.01 REVESTIMIENTO C/MAYOLICA BLANCA 1RA. M2
20X20 CM
16 COBERTURAS
16.01 CUBIERTA LADR.PASTELERO ASEN.C/BARRO M2
3.0CM; JUNTA. 1:5 1.5 CM
16.02 CUBIERTA TEJA ARTESANAL DE ARCILLA M2
ASENT. C/MEZCLA
16.03 CUBIERTA DE PLANCHA POLIPROPILENO M2
17 CARPINTERIA DE MADERA
17.01 TICERO DE CEDRO M
17.02 PUERTAS DE MADERA TABLEROS REBAJADOS M2
DE CEDRO
17.03 MARCO DE MADERA PARA PUERTA DE CEDRO M
18 CARPINTERIA METALICA
18.01 PUERTA METALICA ENROLLABLE M2
18.02 PUERTA DE PERFILES METALICOS M2
18.03 PUERTA DE PLANCHAS METALICAS M2
18.04 TAPA METAL LAC 1/16" C/MARCO Y M2
REFUERZOS
18.06 MALLA CON MARCO METALICO M2
18.07 INSTALACION DE ESTRUCTURA METALICA KG
21 PINTURA
21.01 PINTURA LATEX VINILICA 2 MANOS M2
C/IMPRIMANTE P/GL PARA MUROS
21.02 PINTURA DE CONTRAZOCALO C/ESMALTE M
ECONOMICO
21.03 PINTURA PARA MADERA C/BARNIZ 2 MANOS M2
22 VIDRIOS
22.01 VIDRIOS SEMIDOBLES INCOLORO CRUDO P2
23 JUNTAS
23.01 JUNTA DE 1" CON POLIETILENO EXPANDIDO M
(ANCHO=0.25 M)
23.02 JUNTAS ASFALTICAS DE 1"X4" M
23.03 JUNTAS 1" JEBE MICROPOROSO M
CONSOLIDADO DE METRADOS - MODULOS
MODULOS
B C D E F G
OS
OS
H I J K L
PARCIAL