HOJA DE METRADOS - ESTRUCTURAS

CREACION DE LA INFRAESTRUCTURA DE FORTALECIMIENTO EN GESTION COMUNITARIA EN EL CENTRO POBLADO DE SAN ISIDRO DE


Obra
ACOBAMABA, DISTRITO DE SAN MARCOS DE ROCCHAC-TAYACAJA-HUANCAVELICA"

Localidad
Distrito SAN MARCOS DE ROCCHAC
Provincia TAYACAJA
Regin HUANCAVELICA
Cliente MUNICIPALIDAD DISTRITAL DE SAN MARCOS DE ROCCHAC Fecha AGO-2016
Descripcin ESTRUCTURAS Hecho B.L.S.G

METRADOS
PARTIDA DESCRIPCION
UND. VECES LARGO ANCHO ALTO AREA PARCIAL
01 ESTRUCTURAS
01.01 PRIMER NIVEL
01.01.01 OBRAS PROVISIONALES
01.01.01.01 CONSTRUCCIONES PROVISIONALES
01.01.01.01.01 OFICINA TCNICA GLB
1.00 1.00

01.01.01.01.02 ALMACEN DE OBRA GLB


1.00 1.00

01.01.01.01.03 CASETA DE GUARDIANA GLB


1.00 1.00

01.01.01.01.04 CERCO PROVISIONAL PERIMTRICO CON BASTIDORES DE MADERA m PERIMETRO


1.00 29.00 29.00

01.01.01.01.05 CARTEL DE IDENTIFICACIN DE LA OBRA 3.60mX2.40m UND


1.00 1.00

01.01.01.02 INSTALACIONES PROVISIONALES


01.01.01.02.01 AGUA PARA LA CONSTRUCCIN GLB
1.00 1.00

01.01.01.02.02 DESAGE PARA LA CONSTRUCCIN GLB


1.00 1.00

01.01.01.02.03 ENERGA ELCTRICA PROVISIONAL GLB


1.00 1.00

01.01.02. TRABAJOS PRELIMINARES


01.01.02.01 LIMPIEZA Y MANUAL DE TERRENO m2
AREA TOTAL 1.00 36.04 36.04
01.01.02.02 TRAZOS, NIVELES Y REPLANTEO PRELIMINAR m2
1.00 36.04 36.04
01.01.02.03 TRAZO Y REPLANTEO DURANTE EL PROCESO m2
(4 pisos) 4.00 36.04 144.16
01.01.02.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Glb
1.00 1.00
01.01.02.05 FLETE TERRESTRE Glb
(4 pisos) 1.00 1.00
01.01.03 SEGURIDAD Y SALUD
01.01.03.01 ELABORACIN, IMPLEMENTACIN Y ADMINISTRACIN DEL PLAN DE SEGURIDAD Y GLB 1.00 1.00

01.01.03.02 EQUIPOS DE PROTECCIN INDIVIDUAL UND 10.00 10.00

01.01.03.03 EQUIPOS DE PROTECCIN COLECTIVA GLB 1.00 1.00

01.01.03.04 SEALIZACION TEMPORAL DE SEGURIDAD GLB 1.00 1.00

01.01.03.05 CAPACITACIN EN SEGURIDAD Y SALUD GLB 1.00 1.00

01.01.03.06 RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD DUR GLB 1.00 1.00
01.01.04 MITIGACION AMBIENTAL
01.01.04.01 ACONDICIONAMIENTO DE BOTADEROS DE MATERIAL EXCEDENTE GLB 1.00 1.00

01.01.04.02 MANEJO DE RESIDUOS SOLIDOS GLB 1.00 1.00


01.01.04 MOVIMIENTO DE TIERRAS
01.01.04.01 EXCAVACIONES
01.01.04.01.01 EXCAVACIN MANUAL DE ZANJAS PARA ZAPATAS EN TERRENO NORMAL m3
Z1 1.00 2.20 2.40 1.20 6.34
Z2 1.00 1.20 8.01 9.61
Z3 1.00 3.95 3.15 1.20 14.93
Z4 1.00 2.70 2.60 1.20 8.42
Z5 1.00 2.40 2.20 1.20 6.34
Z6 1.00 2.00 1.80 1.20 4.32
Z7 1.00 1.20 6.58 7.90
Z8 1.00 3.45 2.10 1.20 8.69
Z9 1.00 1.95 1.85 1.20 4.33
Z10 1.00 1.95 1.70 1.20 3.98
01.01.04.01.02 EXCAVACION MANUAL DE ZANJAS PARA CIMIENTOS EN TERRENO NORMAL m3

C 6-6, ENTRE EJE 1'y1 1.00 6.72 0.50 1.20 4.03


C 3-3, EJE 3-3 1.00 1.30 0.50 1.20 0.78
C 2-2, EJE 7-7 1.00 2.79 0.50 1.20 1.67
C 1-1, EJE 8'-8' 1.00 5.92 0.50 1.20 3.55
C 2-2, EJE 8-8 1.00 7.22 0.60 1.20 5.20
ENSANCHAMIENTO DE CIMENTACION, EJE 8-8 1.00 1.10 0.90 1.20 1.19
C 1-1, EJE 9-9 1.00 6.99 0.50 1.20 4.19
C EJE 9-9 1.00 0.44 0.32 1.20 0.17
C 1-1, EJE 10-10 1.00 1.93 0.50 1.20 1.16
C 1-1, EJE 11-11 1.00 5.10 0.50 1.20 3.06
C 4-4, 5-5 EJE B',C,DyE 1.00 11.87 0.50 1.20 7.12
C 4-4,ENTRE EJE AyB 1.00 3.81 0.50 1.20 2.29
C 1-1, ENTRE EJE B' y C 1.00 1.19 0.50 1.20 0.71
C 5-5, EJE D-D 1.00 1.44 0.50 1.20 0.86
C 1-1, EJE D-D 1.00 4.94 0.50 1.20 2.96
C 6-6, EJE E-E 1.00 5.29 0.60 1.20 3.81
C 2-2, 3-3 EJE E-E 1.00 8.09 0.50 1.20 4.85
C 1-1, EJE F-F 1.00 3.02 0.50 1.20 1.81
C 1-1,3-3 ENTRE EJES FyG 1.00 3.54 0.50 1.20 2.12
C 1-1, EJE G-G 1.00 4.62 0.60 1.20 3.33
C 7-7, EJE G-G 1.00 6.41 0.80 1.20 6.15
C 7-7, EJE G-G 1.00 0.37 0.90 1.20 0.40
C 8-8, ENTRE EJES CyD 2.00 0.40 0.50 1.20 0.48
01.01.04.01.03 EXCAVACION MANUAL DE ZANJAS PARA VIGAS DE CIMENTACION EN TERRE m3
VCM-1, EJE 1-1 1.00 3.10 0.25 0.50 0.39
VCM-1, EJE 2-2 1.00 2.52 0.25 0.50 0.32
VCM-1, EJE 5-5 1.00 8.13 0.25 0.50 1.02
VCM-2, EJE 5-5 1.00 4.73 0.25 0.65 0.77
VCM-1, EJE 7-7 1.00 3.96 0.25 0.50 0.50
VCM-2, EJE 7-7 1.00 5.07 0.25 0.65 0.82
01.01.04.02. RELLENOS
01.01.04.02.01 RELLENO MANUAL CON MATERIAL PROPIO m3
Z3 s/EJE AYB EJES 1Y4 4.00 Area = 0.35 1.00 1.40
Z1 s/EJE B EJES 2Y3 2.00 Area = 1.80 1.00 3.60
Z2 s/EJE A EJES 2Y3 2.00 Area = 0.69 1.00 1.38
CA-A EJE A-A 1.00 10.80 0.35 0.20 0.76
CA-A EJE 1-1 1.00 2.60 0.35 0.20 0.18
CA-A EJE 4-4 1.00 2.20 0.35 0.20 0.15
CA-A EJE B-B 1.00 12.80 0.35 0.20 0.90
CB-B EJE B-B 1.00 2.00 0.50 0.20 0.20
Z3 4.00 Area = 0.75 0.40 1.20
Z2 2.00 Area = 0.45 0.40 0.36
Z1 2.00 Area = 0.90 0.40 0.72
01.01.04.03 NIVELACIONES
01.01.04.03.01 NIVELADO CON EQUIPO m2
AREA TOTAL 1.00 36.04 36.04
AREA DE COLUMNAS (-) -8.00 0.40 0.25 -0.80
CA-A EJE A-A -1.00 9.95 0.15 -1.49
CA-A EJE 1-1 -1.00 2.60 0.15 -0.39
CA-A EJE 4-4 -1.00 2.20 0.15 -0.33
CA-A EJE B-B -1.00 8.05 0.15 -1.21
01.01.04.04 ELIMINACION DE MATERIAL EXCEDENTE
01.01.04.04.01 ACARREO DE MATERIAL EXCEDENTE HASTA 10.00ML m3 FACTOR
De Item 01.01.04.01 + 20% de Esponjamiento 1.00 140.58 1.20 168.69
Menos relleno del Item 04.01.04.02 -1.00 10.85 1.33 -14.43
01.01.04.04.02 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO PESADO A DIST. PROM. 2.5 m3
De Item 01.01.04.01 + 20% de Esponjamiento 1.00 140.58 1.20 168.69
Menos relleno del Item 04.01.04.02 -1.00 10.85 1.33 -14.43
01.01.05 OBRAS DE CONCRETO SIMPLE
01.01.05.01 SOLADOS
01.01.05.01.01 SOLADO DE CONCRETO C:H-1:12, e=0.10m PARA ZAPATAS m2
Z-1 2.00 1.40 2.00 5.60
Z-2 2.00 1.00 1.40 2.80
Z-3 4.00 1.20 1.00 4.80
01.01.05.02 CIMIENTOS CORRIDOS
01.01.05.02.01 CONCRETO PARA CIMIENTOS CORRIDOS C:H-1:10+25% P.G. m3
CA-A EJE A-A 1.00 11.30 0.50 0.60 3.39
C1(-) S/EJE A-A -4.00 0.40 0.25 0.60 -0.24
CA-A Y CB-B EJE B-B 1.00 11.30 0.50 0.60 3.39
C1(-) S/EJE B-B -4.00 0.40 0.25 0.60 -0.24
CA-A EJE 1-1 1.00 2.40 0.50 0.60 0.72
CA-A EJE 4-4 1.00 2.00 0.50 0.60 0.60
01.01.05.03 SOBRECIMIENTOS
01.01.05.03.01 CONCRETO PARA SOBRECIMIENTOS C:H-1:8+25% P.M. m3
CA-A EJE A-A 1.00 10.00 0.15 0.55 0.83
CA-A EJE 1-1 1.00 2.60 0.15 0.55 0.21
CA-A EJE 4-4 1.00 2.20 0.15 0.55 0.18
CA-A EJE B-B 1.00 8.00 0.15 0.55 0.66
01.01.05.03.02 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2
CA-A EJE A-A 2.00 10.00 0.55 11.00
CA-A EJE 1-1 2.00 2.60 0.55 2.86
CA-A EJE 4-4 2.00 2.20 0.55 2.42
CA-A EJE B-B 2.00 8.00 0.55 8.80
01.01.05.04 GRADAS
01.01.05.04.01 CONCRETO EN GRADAS fc=175 kg/cm2 m3
gradas 1.00 area= 1.93 0.18 0.17
1.00 area= 1.29 0.18 0.12
01.01.05.04.01 ENCOFRADO Y DESENCOFRADO DE GRADAS m2
1.00 4.00 0.18 0.36
1.00 4.24 0.18 0.76
01.01.05.05 VEREDAS
01.01.05.04.01 CONCRETO EN VEREDAS fc=175 kg/cm2 m3
veredas 1.00 11.35 0.20 1.20 1.36
01.01.05.04.01 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2
1.00 13.75 0.20 1.38
01.01.05.06 FALSO PISO
01.01.05.06.01 FALSO PISO DE CONCRETO C:H-1:12 DE e=0.10m m2
AREA TOTAL 1.00 36.04 36.04
AREA DE COLUMNAS (-) -8.00 0.40 0.25 -0.80
CA-A EJE A-A -1.00 9.95 0.15 -1.49
CA-A EJE 1-1 -1.00 2.60 0.15 -0.39
CA-A EJE 4-4 -1.00 2.20 0.15 -0.33
CA-A EJE B-B -1.00 8.05 0.15 -1.21
TOTAL

1.00

1.00

1.00

29.00

1.00

1.00

1.00
1.00

36.04

36.04

144.16

1.00

1.00

1.00

10.00

1.00

1.00

1.00

1.00

1.00

1.00

74.86
65.72
3.81

10.85

31.82

154.26

154.26
13.20

7.62

1.88

25.08

0.29

1.12

1.36

1.38
31.82
HOJA DE METRADOS - ESTRUCTURAS
CREACION DE LA INFRAESTRUCTURA DE FORTALECIMIENTO EN GESTION COMUNITARIA EN EL CENTRO POBLADO DE SAN ISIDRO DE ACOBAMABA, DISTRITO DE SAN MARCOS DE ROCCHAC-TAYACAJA-
Obra
HUANCAVELICA"
Localidad SAN ISIDRO DE ACOBAMBA
Distrito SAN MARCOS DE ROCCHAC
Provincia TAYACAJA
Regin HUANCAVELICA
Cliente MUNICIPALIDAD DISTRITAL DE SAN MARCOS DE ROCCHAC Fecha AGO-2016
Descripcin ESTRUCTURAS Hecho B.L.S.G

CONCRETO (m3) ENCOFRADO (m2) ACERO (kg)

CANTIDAD

PARCIAL

PARCIAL
CONCRETO ARMADO
3/8" 1/2" 5/8" 1/4" 8mm
L A H L A #ELEM. LONG.
ITEM DESCRIPCION 0.560 0.994 1.552 0.25 0.40

1.01 PRIMER NIVEL


01.01.06.01 ZAPATAS
Z-1 1 REA 8.01 0.60 4.81 26.00 4.80 5/8" 193.69
27.00 5.08 5/8" 212.87
9.00 1.40 5/8" 19.56
9.00 1.40 5/8" 19.56
Z-2 1 2.65 2.30 0.60 3.66 14.00 2.50 5/8" 54.32
13.00 2.15 5/8" 43.38
Z-3 1 3.15 3.95 0.60 7.47 17.00 3.00 5/8" 79.15
17.00 3.00 5/8" 79.15
21.00 3.80 5/8" 123.85
21.00 3.80 5/8" 123.85
Z-4 1 ### ### 0.60 4.21 15.00 2.45 5/8" 57.04
14.00 2.45 5/8" 53.23
Z-5 1 ### ### 0.60 3.17 13.00 2.25 5/8" 45.40
12.00 2.05 5/8" 38.18
Z-6 1 ### ### 0.60 2.16 11.00 1.85 5/8" 31.58
10.00 1.65 5/8" 25.61
Z-7 1 REA ### 0.60 3.95 29.00 5.36 5/8" 241.24
9.00 1.50 5/8" 20.95
8.00 1.15 5/8" 14.28
5/8" 0.00
Z-8 1 ### ### 0.60 4.35 18.00 3.30 5/8" 92.19
12.00 1.95 5/8" 36.32
Z-9 1 ### ### 0.60 2.16 11.00 1.80 5/8" 30.73
10.00 1.70 5/8" 26.38
Z-10 1 ### ### 0.60 1.99 11.00 1.80 5/8"
10.00 1.55 5/8" 0.00
37.92 0.00 0.00 1662.50
01.01.06.02 VIGAS DE CIMENTACION
VCM 1 - 0.25X0.50 EJE 01 1 ### ### ### 0.62 4.98 1.00 4.98 2.00 5.40 1/2" 10.74
4.00 6.40 5/8" 39.73
2.00 5.40 5/8" 16.76
25.00 1.50 3/8" 21.00
VCM 1 - 0.25X0.50 EJE 02 1 ### ### ### 0.51 4.10 1.00 4.10 2.00 4.32 1/2" 8.59
4.00 5.32 5/8" 33.03
2.00 4.32 5/8" 13.41
22.00 1.50 3/8" 18.48
VCM 1 - 0.25X0.50 EJE 05 1 ### ### ### 0.61 4.84 1.00 4.84 2.00 5.15 1/2" 10.24
4.00 6.15 5/8" 38.18
2.00 5.15 5/8" 15.99
24.00 1.30 3/8" 17.47
VCM 1 - 0.25X0.50 EJE 05 1 ### ### ### 0.69 5.55 1.00 5.55 2.00 5.97 1/2" 11.87
4.00 6.97 5/8" 43.27
2.00 5.97 5/8" 18.53
28.00 1.30 3/8" 20.38
VCM 2 - 0.25X0.65 EJE 05 1 ### ### ### 1.12 6.88 1.30 8.94 4.00 8.71 3/4"
2.00 7.31 3/4"
2.00 7.31 5/8" 22.69
2.00 7.31 1/2" 14.53
33.00 1.80 3/8" 33.26
VCM 1 - 0.25X0.50 EJE 07 1 ### ### ### 0.69 5.55 1.00 5.55 2.00 5.97 1/2" 11.87
4.00 6.97 5/8" 43.27
2.00 5.97 5/8" 18.53
28.00 1.30 3/8" 20.38
VCM 2 - 0.25X0.65 EJE 07 1 ### ### ### 1.12 6.88 1.30 8.94 4.00 9.14 3/4"
2.00 7.74 3/4"
2.00 7.74 5/8" 24.02
2.00 7.74 1/2" 15.39
35.00 1.80 3/8" 35.28
VCM 2 - 0.25X0.65 EJE C 1 ### ### ### 1.14 7.03 1.30 9.14 4.00 8.89 3/4"
2.00 7.49 3/4"
2.00 7.49 5/8" 23.25
2.00 7.49 1/2" 14.89
34.00 1.80 3/8" 34.27
6.51 52.05 200.54 98.11 350.66

01.01.06.03 COLUMNAS RECTANGULARES


C1-0.25X0.25 2 0.25 0.25 5.45 0.68 5.45 0.75 8.18 2.00 7.08 5/8" 43.95
29.00 1.00 3/8" 32.48
1 0.25 0.25 5.45 0.34 5.45 0.25 1.36 1.00 6.91 5/8" 21.45
29.00 1.00 3/8" 32.48
1 0.25 0.25 5.45 0.34 5.45 0.50 2.73 1.00 6.91 5/8" 21.45
29.00 1.00 3/8" 32.48
C2-0.25X0.36 1 0.25 0.36 5.45 0.49 5.45 0.67 3.65 4.00 6.91 5/8" 42.90
29.00 1.30 3/8" 21.11
2.00 6.61 5/8" 20.52
29.00 0.38 3/8" 6.17
C3-0.15X0.40 1 0.15 0.40 4.50 0.27 4.10 0.80 3.28 4.00 5.96 1/2" 23.70
2.00 6.61 1/2" 13.14
25.00 1.10 3/8" 15.40
25.00 0.30 3/8" 4.20
1 0.15 0.40 4.50 0.27 4.10 0.55 2.26 4.00 5.96 1/2" 23.70
2.00 6.61 1/2" 13.14
25.00 1.10 3/8" 15.40
25.00 0.30 3/8" 4.20
C4-0.15X0.30 2 ### ### 4.50 0.41 4.10 1.10 9.02 4.00 6.22 1/2" 49.46
2.00 5.66 1/2" 22.50
25.00 0.90 3/8" 25.20
25.00 0.30 3/8" 8.40
2 ### ### 4.50 0.41 4.10 0.60 4.92 4.00 5.96 1/2" 47.39
2.00 5.66 1/2" 22.50
25.00 0.90 3/8" 25.20
25.00 0.30 3/8" 8.40
5 ### ### 4.50 1.01 4.10 0.45 9.23 4.00 5.96 1/2" 118.48
2.00 5.66 1/2" 56.26
25.00 0.90 3/8" 63.00
25.00 0.30 3/8" 21.00
1 ### ### 4.50 0.20 4.10 0.50 2.05 4.00 5.96 1/2" 23.70
2.00 5.66 1/2" 11.25
25.00 0.90 3/8" 12.60
25.00 0.30 3/8" 4.20
C9-0.15X0.30 1 ### ### 5.10 0.23 4.30 1 3.23 4.00 6.90 1/2" 27.43
2.00 6.26 1/2" 12.44
27.00 0.90 3/8" 13.61
27.00 0.30 3/8" 4.54
C10-0.25X0.65 1 ### ### ### 0.83 ### ### 6.45 4.00 6.66 5/8" 41.35
6.00 6.36 5/8" 59.22
27.00 1.80 3/8" 27.22
27.00 1.04 3/8" 15.72
27.00 0.38 3/8" 5.75
1 ### ### 5.10 0.83 ### ### 5.59 4.00 6.66 5/8" 41.35
6.00 6.36 5/8" 59.22
27.00 1.80 3/8" 27.22
27.00 1.04 3/8" 15.72
27.00 0.38 3/8" 5.75
C12-0.25X0.37 2 ### ### ### 0.60 ### ### 3.67 4.00 3.36 5/8" 41.72
2.00 3.06 1/2" 12.17
14.00 1.24 3/8" 19.44
1 ### ### ### 0.30 ### ### 1.06 4.00 3.36 5/8" 20.86
2.00 3.06 1/2" 6.08
14.00 1.24 3/8" 9.72
01.01.06.03 COLUMNAS
C5-0.25X0.25X0.25X0.25X0.25 1 AREA ### ### 1.30 ### ### 6.60 4.00 6.06 5/8" 37.62
12.00 5.76 5/8" 107.27
25.00 2.00 3/8"
25.00 1.50 3/8" 21.00
25.00 1.00 3/8" 14.00
75.00 0.38 3/8" 15.96
C6-0.15X0.40X0.15X0.40 2 AREA ### ### 1.66 ### ### 18.20 4.00 8.96 1/2" 71.25
7.00 8.66 1/2" 120.51
41.00 1.10 3/8" 50.51
41.00 1.10 3/8" 50.51
82.00 0.30 3/8" 27.55
C7-0.15X0.45X0.15X0.38 1 AREA ### ### 0.57 ### ### 7.10 2.00 7.05 1/2" 14.02
9.00 6.71 1/2" 60.03
29.00 1.20 3/8" 19.49
29.00 1.06 3/8" 17.21
58.00 0.30 3/8" 9.74
C8-0.15X0.51X0.15X0.51 1 AREA ### ### 1.08 ### ### 12.63 2.00 7.81 1/2"
10.00 7.51 1/2"
32.00 1.43 3/8"
32.00 1.41 3/8"
64.00 0.30 3/8"

11.81 111.18 702.59 749.17 558.88


01.01.06.04 PLACAS
PL-1 1 AREA 0.40 7.35 2.94 7.35 4.10 30.14 4.00 7.51 1/2" 29.86
38.00 1.00 3/8" 21.28
8.00 7.51 1/2" 59.72
38.00 1.40 3/8" 29.79
64.00 0.30 3/8" 10.75
8.00 7.51 5/8" 93.24
38.00 1.20 3/8" 25.54
38.00 1.20 3/8" 25.54
8.00 7.51 1/2" 59.72
38.00 2.30 3/8" 48.94
38.00 2.00 3/8" 42.56
PL-2 1 AREA 0.40 7.35 2.94 7.35 4.20 30.87 8.00 7.51 1/2" 59.72
38.00 1.40 3/8" 29.79
64.00 0.30 3/8" 10.75
4.00 7.51 5/8" 46.62
38.00 1.00 3/8"
10.00 7.51 1/2" 74.65
38.00 3.20 3/8" 68.10
PL-3 1 AREA 0.38 6.55 2.46 6.15 4.80 29.52 8.00 6.85 5/8" 85.05
70.00 1.00 3/8" 39.20
4.00 6.85 5/8" 42.52
35.00 0.80 3/8" 15.68
33.00 2.10 3/8"
33.00 3.10 1/2" 101.69
PL-4 1 AREA 0.55 6.55 3.60 6.15 6.50 39.98 12.00 6.85 5/8" 127.57
105.00 1.00 3/8" 58.80
4.00 6.85 5/8" 42.52
35.00 0.80 3/8" 15.68
20.00 6.85 3/8"
33.00 3.10 1/2" 101.69
PL-5 1 AREA 0.53 6.55 3.45 6.15 4.87 29.97 10.00 6.85 5/8" 106.31
35.00 1.90 3/8" 37.24
105.00 0.38 3/8" 22.34
11.00 6.85 5/8" 42.20
35.00 1.50 3/8" 29.40
35.00 1.20 3/8" 23.52
70.00 0.38 3/8" 14.90
8.00 6.85 1/2" 54.47
33.00 4.50 3/8" 83.16
PL-6 1 AREA 0.51 5.20 2.65 5.20 4.55 23.66 16.00 5.80 5/8" 144.03
68.00 1.50 3/8" 57.12
68.00 1.00 3/8" 38.08
10.00 5.80 1/2" 57.65
28.00 5.10 3/8" 79.97
PL-7 1 AREA 0.56 5.20 2.92 5.20 5.00 25.99 16.00 5.80 5/8" 144.03
68.00 1.50 3/8" 57.12
68.00 1.00 3/8" 38.08
12.00 5.80 1/2" 69.18
28.00 5.00 3/8" 78.40
20.96 210.13 1043.92 668.35 831.90
01.01.06.05 VIGAS
1V-3 (0.25x0.50/0.90x0.20) 1 4.98 0.25 0.50 0.62 7.47 1.05 7.84 4.00 8.39 5/8" 52.09
7.47 ### 0.20 1.34 7.47 0.85 6.35 2.00 7.39 5/8" 22.94
2.00 7.39 3/8" 8.28
30.00 1.50 3/8" 25.20
2.00 8.39 5/8" 26.04
6.00 7.39 5/8" 68.82
30.00 2.20 3/8" 36.96
1V-2 (0.15x0.50/0.55x0.20) 1 4.10 0.15 0.50 0.31 5.55 ### 5.27 4.00 6.47 5/8" 40.17
5.55 0.40 0.20 0.44 5.55 ### 4.16 2.00 5.47 5/8" 16.98
2.00 5.47 3/8" 6.13
26.00 1.30 3/8" 18.93
2.00 6.47 5/8" 20.08
4.00 5.47 5/8" 33.96
26.00 1.50 3/8" 21.84
1V-1 (0.15x0.50/0.50x0.20) 1 2.95 0.15 0.50 0.22 ### ### 3.29 4.00 4.38 5/8" 27.19
3.46 0.40 0.20 0.28 ### ### 1.90 2.00 3.38 5/8" 10.49
20.00 1.30 3/8" 14.56
2.00 4.38 5/8" 13.60
2.00 3.38 5/8" 10.49
14.00 1.40 3/8" 10.98
1V-4 (0.25x0.55) 1 ### ### ### 1.43 ### ### 11.96 2.00 20.10 3/4"
7.89 ### ### 1.28 7.89 ### 10.65 2.00 11.82 5/8" 36.69
2.00 11.48 1/2" 22.82
1.00 2.70 1/2" 2.68
1.00 3.35 5/8" 5.20
1.00 2.41 5/8" 3.74
1.00 3.50 1/2" 3.48
1.00 4.65 3/4"
3.00 4.65 5/8" 21.65
2.00 7.77 1/2" 15.45
2.00 9.21 3/4"
2.00 4.48 5/8" 13.91
2.00 2.33 5/8" 7.23
73.00 1.60 3/8" 65.41
48.00 1.80 3/8" 48.38
VC-1 (0.25x0.55) 1 4.08 0.25 0.55 0.56 4.08 0.60 2.45 4.00 4.85 1/2" 19.28
21.00 1.60 1/4" 8.40
VD-1 (0.15x0.50) 1 1.75 0.15 0.50 0.13 1.75 0.75 1.31 4.00 2.21 5/8" 13.72
2.00 1.21 3/8" 1.36
11.00 1.30 1/4" 3.58
1V-6 (0.25x0.55) 1 ### ### ### 0.80 5.80 0.95 5.51 2.00 16.74 3/4"
### ### ### 1.27 7.82 0.45 0.00 2.00 6.35 1/2" 12.62
2.00 6.89 5/8" 21.39
1.00 2.32 1/2" 2.31
1.00 4.65 3/4"
3.00 4.65 5/8" 21.65
2.00 2.33 5/8" 7.23
1.00 3.35 5/8" 5.20
2.00 7.77 1/2" 15.45
2.00 10.09 3/4"
2.00 4.48 5/8" 13.91
38.00 1.60 3/8" 34.05
48.00 1.80 3/8" 48.38
VC-1 (0.25x0.55) 1 9.72 0.25 0.55 1.34 9.72 1.15 11.18 4.00 11.52 1/2" 45.80
54.00 1.60 1/4" 21.60
VD-1 (0.15x0.50) 1 2.44 0.15 0.50 0.18 2.44 0.75 1.83 4.00 3.76 5/8" 23.34
2.00 2.76 3/8" 3.09
14.00 1.30 1/4" 4.55
VC-1 (0.25x0.55) 1 3.53 0.25 0.55 0.49 3.53 0.45 1.59 4.00 4.05 1/2" 16.10
18.00 1.60 1/4" 7.20
VD-1 (0.15x0.50) 1 2.00 0.15 0.50 0.15 2.00 0.75 1.50 4.00 2.92 5/8" 18.13
2.00 1.92 3/8" 2.15
11.00 1.30 1/4" 3.58
1 2.64 0.25 0.55 0.36 2.64 0.45 1.19 4.00 3.28 1/2" 13.04
14.00 1.00 1/4" 3.50
VA (0.25X0.20) 2 2.49 0.25 0.20 0.25 2.42 0.25 1.21 2.00 2.94 1/2" 11.69
VC-1 (0.25x0.55) 2 2.91 0.25 0.55 0.80 2.68 0.45 2.41 2.00 2.51 1/2" 9.98
15.00 0.90 1/4" 6.75
15.00 1.60 1/4" 12.00
VC-1 (0.25x0.55) 1 5.00 0.25 0.55 0.69 5.00 0.45 2.25 2.00 8.27 1/2" 16.44
2.00 5.10 1/2" 10.14
28.00 0.90 1/4" 6.30
VC-1 (0.25x0.55) 1 5.10 0.25 0.55 0.70 5.10 1.15 5.87 4.00 5.62 1/2" 22.35
27.00 1.60 1/4" 10.80
VD(0.15x0.40) 1 2.00 0.15 0.40 0.12 2.00 0.75 1.50 4.00 2.26 1/2" 8.99
2.00 1.66 3/8" 1.86
9.00 1.92 3/8"
VC-1 (0.25x0.55) 1 2.12 0.25 0.55 0.29 2.12 1.15 2.44 4.00 2.64 1/2" 10.50
12.00 1.60 1/4" 4.80
1V-5 (0.15x0.50/0.38x0.20) 1 ### 0.15 0.50 0.27 3.56 0.95 3.38 4.00 4.48 5/8" 27.81
1 ### 0.38 0.20 0.27 3.56 0.23 0.82 2.00 3.48 5/8" 10.80
2.00 3.48 3/8" 3.90
15.00 1.30 3/8" 10.92
2.00 4.48 5/8" 13.91
2.92 2.00 3.48 5/8" 10.80
15.00 1.16 3/8" 9.74
VC-1 (0.25x0.55) 1 2.92 0.25 0.55 0.40 2.92 1.15 3.36 4.00 3.44 1/2" 13.68
11.00 1.60 1/4" 4.40
1V-7 (0.25x0.55) 1 7.48 0.25 0.55 1.03 7.48 0.95 7.11 4.00 8.80 3/4"
2.00 7.40 1/2" 14.71
35.00 1.60 3/8" 31.36
1V-8 (0.25x0.65) 1 9.18 0.25 0.55 1.26 9.18 1.15 10.56 4.00 12.30 3/4"
2.00 10.90 3/4"
4.00 10.90 5/8" 67.67
2.00 10.90 1/2" 21.67
44.00 1.80 3/8" 44.35
VC-1 (0.25x0.55) 1 14.55 0.25 0.55 2.00 16.35 1.15 18.80 4.00 15.07 1/2" 59.92
VD-1 (0.15x0.50) 1 1.95 0.15 0.50 0.15 1.95 0.75 1.46 83.00 1.60 1/4" 33.20
4.00 1.95 5/8" 12.11
2.00 1.95 3/8" 2.18
20.00 1.30 1/4" 6.50
VC-1 (0.25x0.55) 1 3.85 0.25 0.55 0.53 3.55 1.15 4.08 4.00 4.37 1/2" 17.38
23.00 1.60 1/4" 9.20
VD(0.15x0.40) 2 1.70 0.15 0.40 0.20 1.70 0.55 1.87 4.00 2.62 1/2" 20.83
2.00 2.02 3/8" 4.52
12.00 1.92 3/8" 25.80
VC-1 (0.25x0.55) 1 12.65 0.25 0.55 1.74 12.65 1.15 14.55 2.00 13.77 1/2" 27.37
2.00 11.36 1/2" 22.58
2.00 2.36 1/2" 4.69
53.00 1.60 1/4" 21.20
12.00 1.60 1/4" 4.80
VC-1 (0.25x0.55) 1 2.05 0.25 0.55 0.28 2.05 1.15 2.36 4.00 3.02 1/2" 12.01
11.00 1.60 1/4" 4.40
VC-1 (0.25x0.55) 1 2.64 0.25 0.55 0.36 2.64 1.15 3.04 4.00 3.16 1/2" 12.56
13.00 1.60 1/4" 5.20
2V-1 (0.15x0.40) 1 2.64 0.15 0.40 0.16 2.64 0.75 1.98 4.00 3.16 1/2" 12.56
2.00 2.56 3/8" 2.87
14.00 1.10 3/8" 8.62
2V-1 (0.15x0.40) 1 2.00 0.15 0.40 0.12 2.00 0.75 1.50 4.00 2.52 1/2" 10.02
2.00 1.92 3/8" 2.15
17.00 1.10 3/8" 10.47
VA (0.25X0.20) 1 3.40 0.25 0.20 0.17 3.40 0.25 0.85 4.00 4.37 1/2" 17.38
26.00 0.90 1/4" 5.85

64.92 589.63 2592.30 1863.17 2362.72 187.80


0.1.01.06.05 LOSA ALIGERADA
LOSA m2 m3/m2 m2
1 AREA 32.58 0.0875 2.85 AREA 32.58 32.58 9.00 8.29 3/8" 74.16
9.00 1.18 3/8" 5.95
9.00 5.08 1/2"
1 AREA 48.35 0.0875 4.23 AREA ### 48.35 9.00 4.38 1/2" 39.18
9.00 3.12 3/8" 15.72
1 AREA 79.70 0.0875 6.97 AREA ### 79.70 9.00 4.38 1/2" 39.18
9.00 3.12 3/8" 15.72
1 AREA 16.02 0.0875 1.40 AREA ### 16.02 9.00 4.38 1/2" 39.18
9.00 3.12 3/8" 15.72
15.46 176.64 53.12 191.71
01.01.06.05.04 LADRILLO 0.3X0.3X0.15 LAD/m2
AREA 176.64 8.33
TOTAL 1471.44 LADRILLOS

01.01.06.06 LOSA MACIZA


LOSA MACIZA
1 AREA 4.14 0.20 0.83 4.14 0.15 0.62 3.00 3.62 3/8" 10.79
13.00 1.17 3/8" 15.12
0.83 0.62 25.91 0.00 0.00

01.01.06.07 BANCA DE CONCRETO


1.00 1.66 0.40 0.15
01.01.06.08 CANALETA DE CONCRETO
Muros Longitudinales 4 7.41 0.50 14.82 7.41 0.10 2.96
Muros Trasversal 2 0.30 0.50 0.3 0.30 0.10 0.06
2 0.40 0.75 0.6 0.40 0.10 0.08
Base 2 7.41 0.50 0.25 1.8525 7.41 0.50 7.41
30 2.00 1.00 1/2" 59.64
33 2.00 1.22 3/8" 40.99
8 1.00 7.30 1/2" 58.05
4 1.00 7.30 5/8" 90.64
17.57 10.51 40.99 117.69 90.64
01.01.06.08 LOSA MACIZA DE ESTACIONAMIENTO
1 AREA 36.54 0.20 7.31 AREA 36.54 36.54 20.00 7.40 3/8" 82.88
1.00 18.25 3/8" 10.22
1.00 18.39 3/8" 10.30
7.31 36.54 103.40
01.01.06.08 LOSA MACIZA DE PLAZA
1 1.00 150.56 3/8" 84.31
1.00 140.50 3/8" 78.68
0.00 0.00 162.99
AC-TAYACAJA-

PARCIAL

3/4"

2.24

0.00 1662.50
77.87
32.68

81.71
34.60

79.48
33.48

339.81 989.11
0.00 2010.63
0.00 2544.17
89.85

10.39

41.17

74.83

10.39

45.10
78.67

109.96
48.72
509.09 7515.08

0.00 244.83

0.00 25.91
249.32

103.40

162.99
RESUMEN DE METRADOS - ESTRUCTURAS

Obra CREACION DE LA INFRAESTRUCTURA DE FORTALECIMIENTO EN GESTION COMUNITARIA


EN EL CENTRO POBLADO DE SAN ISIDRO DE ACOBAMABA, DISTRITO DE SAN MARCOS
DE ROCCHAC-TAYACAJA-HUANCAVELICA"
Localidad SAN ISIDRO DE ACOBAMBA
Distrito SAN MARCOS DE ROCCHAC
Provincia TAYACAJA
Regin HUANCAVELICA
Cliente MUNICIPALIDAD DISTRITAL DE SAN MARCOS DE ROCCHAC
Descripcin ESTRUCTURAS

PARTIDA DESCRIPCION UND. METRADO

01 ESTRUCTURAS
01.01 PRIMER NIVEL
01.01.01 OBRAS PROVISIONALES
01.01.01.01 CONSTRUCCIONES PROVISIONALES
01.01.01.01.01 OFICINA TCNICA GLB 1.00
01.01.01.01.02 ALMACEN DE OBRA GLB 1.00
01.01.01.01.03 CASETA DE GUARDIANA GLB 1.00
01.01.01.01.04 CERCO PROVISIONAL PERIMTRICO CON BASTIDORES DE MADERA m 29.00
01.01.01.01.05 CARTEL DE IDENTIFICACIN DE LA OBRA 3.60mX2.40m UND 1.00
01.01.01.02 INSTALACIONES PROVISIONALES
01.01.01.02.01 AGUA PARA LA CONSTRUCCIN GLB 1.00
01.01.01.02.04 DESAGE PARA LA CONSTRUCCIN GLB 1.00
01.01.01.02.07 ENERGA ELCTRICA PROVISIONAL GLB 1.00
01.01.02. TRABAJOS PRELIMINARES
01.01.02.01 LIMPIEZA Y MANUAL DE TERRENO m2 36.04
01.01.02.02 TRAZOS, NIVELES Y REPLANTEO PRELIMINAR m2 36.04
01.01.02.03 TRAZO Y REPLANTEO DURANTE EL PROCESO m2 144.16
01.01.02.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIETEAS m2 1.00
01.01.02.05 FLETE TTERRESTRE m2 1.00
01.01.03 SEGURIDAD Y SALUD
ELABORACIN, IMPLEMENTACIN Y ADMINISTRACIN DEL PLAN DE
01.01.03.01
SEGURIDAD Y SALUD EN EL TRABAJO GLB 1.00
01.01.03.02 EQUIPOS DE PROTECCIN INDIVIDUAL UND 10.00
01.01.03.03 EQUIPOS DE PROTECCIN COLECTIVA GLB 1.00
01.01.03.04 SEALIZACION TEMPORAL DE SEGURIDAD GLB 1.00
01.01.03.05 CAPACITACIN EN SEGURIDAD Y SALUD GLB 1.00
01.01.03.06 RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD D GLB 1.00
01.01.04 MITIGACION AMBIENTAL
01.01.04.01 ACONDICIONAMIENTO DE BOTADEROS DE MATERIAL EXCEDENTE GLB 1.00
01.01.04.02 MANEJO DE RESIDUOS SOLIDOS GLB 1.00
01.01.04 MOVIMIENTO DE TIERRAS
01.01.04.01 EXCAVACIONES
01.01.04.01.01 EXCAVACIN MANUAL DE ZANJAS PARA ZAPATAS EN TERRENO NORMAL m3 74.86
01.01.04.01.02 EXCAVACION MANUAL DE ZANJAS PARA CIMIENTOS EN TERRENO NORMAL m3 65.72
01.01.04.02. RELLENOS
01.01.04.02.01 RELLENO MANUAL CON MATERIAL PROPIO m3 10.85
01.01.04.03 NIVELACIONES
01.01.04.03.01 NIVELADO CON EQUIPO m2 31.82
01.01.04.04 ELIMINACION DE MATERIAL EXCEDENTE
01.01.04.04.01 ACARREO DE MATERIAL EXCEDENTE HASTA 10.00ML m3 154.26
01.01.04.04.02 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO PESADO A DIST. PROM. 2.5 m3 154.26
01.01.05 OBRAS DE CONCRETO SIMPLE
01.01.05.01 SOLADOS
01.01.05.01.01 SOLADO DE CONCRETO C:H-1:12, e=0.10m PARA ZAPATAS m2 13.20
01.01.05.02 CIMIENTOS CORRIDOS

01.01.05.02.01 CONCRETO PARA CIMIENTOS CORRIDOS C:H-1:10+25% P.G. m3 7.62


01.01.05.03 SOBRECIMIENTOS
01.01.05.03.01 CONCRETO PARA SOBRECIMIENTOS C:H-1:8+25% P.M. m3 1.88
01.01.05.03.02 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 25.08
01.01.05.04 GRADAS
01.01.05.04.01 CONCRETO EN GRADAS fc=175 kg/cm2 m3 0.29
01.01.05.04.02 ENCOFRADO Y DESENCOFRADO DE GRADAS m2 1.12
01.01.05.05 VEREDAS
01.01.05.04.01 CONCRETO EN VEREDAS fc=175 kg/cm2 m3 1.36
01.01.05.04.02 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 1.38
01.01.05.06 FALSO PISO
01.01.05.06.01 FALSO PISO DE CONCRETO C:H-1:12 DE e=0.10m m2 31.82
01.01.06 OBRAS DE CONCRETO ARMADO
01.01.06.01 ZAPATAS
01.01.06.01.01 CONCRETO f'c=210 kg/cm2 PARA ZAPATAS m3 37.92
01.01.06.01.02 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 Kg. 1,662.50
01.01.06.02 VIGAS DE CIMENTACION
01.01.06.02.01 CONCRETO f'c=210 kg/cm2 PARA VIGAS DE CIMENTACION m3 6.51
01.01.06.02.02 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 PARA VIGAS DE CIMENTACION kg 989.11
01.01.06.02.03 ENCOFRADO Y DESENCOFRADO DE VIGAS DE CIMENTACION m2 52.05
01.01.06.03 COLUMNAS
01.01.06.03.01 CONCRETO f'c=210 kg/cm2 PARA COLUMNAS m3 11.81
01.01.06.03.02 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 PARA COLUMNAS kg 2,010.63
01.01.06.03.03 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 111.18
01.01.06.04 VIGAS
01.01.06.04.01 CONCRETO f'c=210 kg/cm2 PARA VIGAS m3 64.92
01.01.06.04.02 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 PARA VIGAS kg 7,515.08
01.01.06.04.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 589.63
01.01.06.05 LOSAS ALIGERADAS
01.01.06.05.01 CONCRETO f'c=210 kg/cm2 PARA LOSAS ALIGERADAS m3 15.46
01.01.06.05.02 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 PARA LOSAS kg 244.83
01.01.06.05.03 ENCOFRADO Y DESENCOFRADO DE LOSAS ALIGERADAS m2 176.64
01.01.06.05.04 LADRILLO HUECO DE ARCILLA h=15cm. PARA LOSA ALIGERADA Und. 1,471.44
01.01.06.06 LOSAS MACIZAS
01.01.06.06.01 CONCRETO f'c=210 kg/cm2 PARA LOSAS MACIZAS m3 0.83
01.01.06.06.02 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 PARA LOSAS kg 25.91
01.01.06.06.03 ENCOFRADO Y DESENCOFRADO DE LOSAS MACIZAS m2 0.62