Está en la página 1de 11

LOSA ALIGERADA 1D

Datos:

Enlucido = 70 Kg/m2 f'c = 210 Kg/cm2


Contrapiso = 80 Kg/m2
Tab. Rep. = 100.00 Kg/m2 f'y = 4200 Kg/cm2
Peso de Losa = 350 Kg/m2
S/C = 200 Kg/m2 h= 25 cm

Pm = 240.00 Kg/m2/vig rec = 2 cm


Pv = 80.00 Kg/m2/vig
d= 21.415 cm
W= 0.472 Tn/m/vig
Cuadro de Momentos segn Varillas de Acero:

As 10 cm 40 cm

a Mu a Mu
3/8" 0.713 cm2 1.677 cm 0.554 Tn.m 0.419 cm 0.571 Tn.m

2 - 3/8" 1.425 cm2 3.353 cm 1.063 Tn.m 0.838 cm 1.131 Tn.m

1/2" 1.267 cm2 2.981 cm 0.954 Tn.m 0.745 cm 1.008 Tn.m

1/2" + 3/8" 1.979 cm2 4.657 cm 1.428 Tn.m 1.164 cm 1.559 Tn.m

2 - 1/2" 2.534 cm2 5.961 cm 1.765 Tn.m 1.490 cm 1.980 Tn.m

Planilla para Jugar con Momentos ltimos - Acero Necesario:

*Para b= 40 cm *Para b= 10 cm

Mu = 0.2630 Tn.m Mu = 0.700 Tn.m

26300 = 3467032.821 cm *w*(1-0.59w) 70000 = 866758.20525 cm *w*(1-0.59w)

0.59 w2 -1 w + 0.00759 = 0 0.59 w2 -1 w + 0.08076 = 0

w1 = 1.6873 = 0.0004 w1 = 1.6099 = 0.0043

w2 = 0.0076 As = 0.326 cm2 w2 = 0.0850 As = 0.910 cm2


Planilla para Jugar con Cortantes y Verificar que Cumpla:

0.672

Vc (10) = 1.645 Tn

f * Vc (10) = 1.398 Tn

Vc (12.5) = 2.056 Tn x 0.584

f * Vc (12.5) = 1.748 Tn 2.475

x= 1.324 m Vud = 0.5633

Tramo 5 :

0.425 Tn.m As (necesaria) = 0.529 cm2 1 3/8"

3.55

0.838

Vud = 0.7369 CUMPLE


0.838

Tramo 7 :

0.793 Tn.m As (necesaria) = 0.993 cm2 2 3/8"

4.85

1.145

Vud = 1.0439 CUMPLE

1.145
Tramo 1 :

1.331 Tn.m As (necesaria) = 1.828 cm2 1 1/2"


1 3/8"

0.793 Tn.m 0.920 Tn.m

4.850 5.225

0.993 cm2 1.155 cm2 As (necesaria)

2 3/8" 2 3/8"

1.145 1.418

1.316 1.233
Vud = 1.0363 1.3093

CUMPLE CUMPLE

Tramo 9 y Tramo 2:

0.931 Tn.m As (necesaria) = 1.234 cm2 1 1/2"

0.425 Tn.m 0.801 Tn.m

3.550 4.875

0.529 cm2 1.003 cm2 As (necesaria)

1 3/8" 2 3/8"

0.838 1.323

0.963 1.151
Vud = 0.7290 1.2143

CUMPLE CUMPLE

Tramo 3:
1 1/2" 1 1/2" 1 1/2"
1 3/8" 1 3/8"

As (necesaria) 1.626 cm2 1.555 cm2 1.039 cm2

1.198 Tn.m 1.151 Tn.m 0.793 Tn.m

0.793 Tn.m 0.805 Tn.m 0.638 Tn.m 0.425 Tn.m

4.850 5.225 4.650 3.550

As (necesaria) 0.993 cm2 1.008 cm2 0.797 cm2 0.529 cm2

2 3/8" 2 3/8" 2 3/8" 1 3/8"

1.145 1.233 1.097 0.963


1.316 1.233 1.097 0.838

Vud = 1.0363 1.1319 0.9960 0.8544

CUMPLE CUMPLE CUMPLE CUMPLE

Tramo 6 :

0.500 Tn.m As (necesaria) = 0.640 cm2 1 1/2"

0.587 Tn.m 0.263 Tn.m

3.70 2.475

0.733 cm2 0.326 cm2 As (necesaria)

2 3/8" 1 3/8"

0.873 0.672
1.004 0.584

Vud = 0.7644 0.5633

CUMPLE CUMPLE

Tramo 8 :

0.351 Tn.m As (necesaria) = 0.444 cm2 1 1/2"

0.587 Tn.m 0.093 Tn.m

3.70 1.475

0.733 cm2 0.115 cm2 As (necesaria)

2 3/8" 1 3/8"

0.873 0.400
1.004 0.348

Vud = 0.7644 0.2914

CUMPLE CUMPLE

Tramo 4:
1 1/2" 1 1/2"
1 3/8"

As (necesaria) 1.626 cm2 0.910 cm2

1.198 Tn.m 0.700 Tn.m

0.793 Tn.m 0.805 Tn.m 0.263 Tn.m

4.85 5.225 2.475

As (necesaria) 0.993 cm2 1.008 cm2 0.326 cm2

2 3/8" 2 3/8" 1 3/8"

1.145 1.233 0.672


1.316 1.233 0.584

Vud = 1.0363 1.1319 0.5633

CUMPLE CUMPLE CUMPLE