PLANILLA DE METRADOS

1.00 TRABAJOS PRELIMINARES

1.01 LIMPIEZA DE TERRENO MANUAL (M2) 140.00

1.02 TRAZO NIVELACIN Y REPLANTEO (M2) 140.00


METRADOS - MOVIMIENTO DE TIERRAS

02.00.00 MOVIMIENTO DE TIERRAS

02.01.00 EXCAVACIN DE ZANJAS Unidad: M3


Largo Ancho Altura
Metrado
Grfico Descripcin Cantidad (m) (m) (m) Parcial
VIVIENDA BI-FAMILIAR

Excavaciones para zapatas


z1 4.00 1.70 1.50 1.25 12.75
z2 2.00 1.50 1.30 1.25 4.88
z3 6.00 1.20 1.00 1.25 9.00
z4 1.00 1.50 1.50 1.25 2.81
Excavaciones para vigas de conexin
EJE 3-3 1.00 3.63 0.30 0.65 0.71
EJE 4-4 1.00 4.00 0.30 0.65 0.78
EJE 6-6 1.00 4.00 0.30 0.65 0.78
Excavaciones para cimiento corrido
EJE 1-1 1.00 1.94 0.50 1.00 0.97
1.00 1.86 0.50 1.00 0.93
DETALLE TIPICO DE ZAPATA EJE 2-2 1.00 0.58 0.50 1.00 0.29
EJE 3-3 1.00 0.27 0.50 1.00 0.14
EJE 7-7 1.00 1.05 0.50 1.00 0.53
1.00 0.30 0.50 1.00 0.15
1.00 1.65 0.50 1.00 0.83
EJE 8-8 1.00 1.05 0.50 1.00 0.53
1.00 1.18 0.50 1.00 0.59
1.00 0.58 0.50 1.00 0.29
1.00 2.30 0.50 3.00 3.45
EJE A-A 1.00 7.50 0.50 1.00 3.75
1.00 2.80 0.50 1.00 1.40
1.00 1.12 0.50 1.00 0.56

CORTE 1 - 1 1.00 1.58 0.50 1.00 0.79


EJE B-B 1.00 2.25 0.50 1.00 1.13
1.00 3.68 0.50 1.00 1.84
EJE C-C 1.00 3.55 0.50 1.00 1.78
1.00 2.45 0.50 1.00 1.23
1.00 2.80 0.50 1.00 1.40
1.00 1.12 0.50 1.00 0.56
1.00 0.53 0.50 1.00 0.27
1.00 2.25 0.50 3.00 3.38
ENTRE EJES A y B CON EJES 1 y 3 1.00 3.80 0.50 1.00 1.90
Excavaciones para Escalera
1.00 1.10 0.50 0.95 0.52
Excavaciones para Cisterna
2.00 2.30 0.50 3.10 7.13

CORTE 5 - 5 2.00 0.85 0.50 3.10 2.64


1.00 1.30 0.85 2.70 2.98

Metrado
Total
73.62

02.02.00 CORTE DE TERRENO Unidad: M3


Area Alto Metrado
Grfico Descripcin Cant. (m2) (m) Parcial
Area Interna de terreno 1.00 84.95 0.15 12.74
Metrado
Total
12.74
02.03.00 RELLENO CON MATERIAL PROPIO Unidad: M3
Largo Ancho Alto
Metrado
Grfico Descripcin Cantidad (m) (m) (m) Parcial
VIVIENDA BI-FAMILIAR
zapatas
z1 4.00 1.40 1.35 0.40 3.02
z2 2.00 1.15 1.20 0.40 1.10
z3 6.00 1.20 0.85 0.40 2.45
z4 1.00 1.50 1.35 0.40 0.81
cimiento corrido
EJE 1-1 1.00 1.94 0.50 0.05 0.05
1.00 1.86 0.50 0.05 0.05
EJE 2-2 1.00 0.58 0.35 0.05 0.01
EJE 3-3 1.00 0.27 0.50 0.05 0.01
EJE 7-7 1.00 1.05 0.50 0.05 0.03
1.00 0.30 0.50 0.05 0.01
1.00 1.65 0.50 0.05 0.04
DETALLE TIPICO DE ZAPATA EJE 8-8 1.00 1.05 0.35 0.05 0.02
1.00 1.18 0.35 0.05 0.02
1.00 0.58 0.50 0.05 0.01
1.00 2.30 0.35 0.15 0.12
EJE A-A 1.00 6.25 0.35 0.05 0.11
1.00 2.80 0.35 0.05 0.05
1.00 1.12 0.35 0.05 0.02
1.00 1.58 0.35 0.05 0.03
EJE B-B 1.00 2.25 0.35 0.05 0.04
1.00 3.68 0.35 0.05 0.06
EJE C-C 1.00 3.55 0.35 0.05 0.06
1.00 2.45 0.35 0.05 0.04
1.00 2.80 0.35 0.05 0.05
CORTE 1 - 1
1.00 1.12 0.35 0.05 0.02
1.00 0.53 0.35 0.05 0.01
1.00 2.25 0.35 0.15 0.12
ENTRE EJES A y B CON EJES 1 y 3 1.00 3.80 0.35 0.05 0.07
Cisterna area
1.00 3.62 0.25 0.90
Metrado
Total
9.33

02.04.00 ELIMINACION DE MATERIAL EXCEDENTE Unidad: M3


Factor
expan
Metrado
Grfico Descripcin Cant. (m3) 1.30 Parcial
VOLUMEN DE EXCAVACION 1.00 73.62

VOLUMEN DE CORTE 1.00 12.74

(-) VOLUMEN DE RELLENO 1.00 9.33

SUBTOTAL 102.95 1.3 102.95


Metrado
Total
102.95
METRADO DE CONCRETO SIMPLE

Largo Ancho Altura


CODIGO Descripcin Cantidad (m) (m) (m) Metrado Parcial

VIVINDA BI-FAMILIAR
03.00.00 OBRAS DE CONCRETO SIMPLE
03.01.00 SOLADO (e = 0.10 m. ) m2 31.29
Solado para Zapatas
Z-1 4.00 1.70 1.50 10.20
Z-2 2.00 1.50 1.30 3.90
Z-3 6.00 1.20 1.00 7.20
Z-4 1.00 1.50 1.50 2.25
VIGAS DE CONEXIN
EJE 3-3 1.00 3.63 0.30 1.09
EJES 4-4 Y 6-6 2.00 4.00 0.30 2.40
CISTERNA 1.00 1.85 2.30 4.26

03.02.00 CONCRETO EN CIMIENTO CORRIDO m3 23.83


EJE 1-1 1.00 1.94 0.50 0.80 0.78
1.00 1.86 0.50 0.80 0.74
EJE 2-2 1.00 0.58 0.50 0.80 0.23
EJE 3-3 1.00 0.27 0.50 0.80 0.11
EJE 7-7 1.00 1.05 0.50 0.80 0.42
1.00 0.30 0.50 0.80 0.12
1.00 1.65 0.50 0.80 0.66
EJE 8-8 1.00 1.05 0.50 0.80 0.42
1.00 1.18 0.50 0.80 0.47
1.00 0.58 0.50 0.80 0.23
1.00 2.30 0.50 2.80 3.22
EJE A-A 1.00 7.50 0.50 0.80 3.00
1.00 2.80 0.50 0.80 1.12
1.00 1.12 0.50 0.80 0.45
1.00 1.58 0.50 0.80 0.63
EJE B-B 1.00 2.25 0.50 0.80 0.90
1.00 3.68 0.50 0.80 1.47
EJE C-C 1.00 3.55 0.50 0.80 1.42
1.00 2.45 0.50 0.80 0.98
1.00 2.80 0.50 0.80 1.12
1.00 1.12 0.50 0.80 0.45
1.00 0.53 0.50 0.80 0.21
1.00 2.25 0.50 2.80 3.15
ENTRE EJES A y B CON EJES 1 y 3 1.00 3.80 0.50 0.80 1.52

03.03.00 SOBRECIMIENTO
03.03.01 CONCRETO EN SOBRECIMIENTO m3 3.64
EJE 2-2 1.00 1.10 0.15 0.45 0.07
EJE 3-3 1.00 0.40 0.15 0.45 0.03
EJE 7-7 1.00 1.28 0.15 0.45 0.09
1.00 1.50 0.15 0.45 0.10
EJE 8-8 1.00 2.93 0.15 0.45 0.20
1.00 2.75 0.15 0.45 0.19
EJE A-A 1.00 17.15 0.15 0.45 1.16
EJE B-B 1.00 5.70 0.15 0.45 0.38
EJE C-C 1.00 17.38 0.15 0.45 1.17
ENTRE EJE A y B CON 1 y 3 1.00 3.80 0.15 0.45 0.26
03.03.02 ENCOFRADO EN SOBRECIMIENTO m2 48.59
EJE 2-2 2.00 1.10 0.45 0.99
EJE 3-3 2.00 0.40 0.45 0.36
EJE 7-7 2.00 1.28 0.45 1.15
2.00 1.50 0.45 1.35
EJE 8-8 2.00 2.93 0.45 2.64
2.00 2.75 0.45 2.48
EJE A-A 2.00 17.15 0.45 15.44
EJE B-B 2.00 5.70 0.45 5.13
EJE C-C 2.00 17.38 0.45 15.64
ENTRE EJE A y B CON 1 y 3 2.00 3.80 0.45 3.42

03.04.00 FALSO PISO DE 4" C:H 1:8 m2 125.36


AREA
AREA INTERNA 1.00 125.36 125.36
METRADO DE ELEMENTOS DE CONCRETO ARMADO

ELEMENTO CONCRETO ENCOFRADO ACERO POR ELEMENTO ACERO TOTAL POR DIAMETROS (ml.)
DESCRIPCIN CANT. MEDIDAS VOLUMEN MEDIDAS AREA CANT. Long. Rep. Detalle LONG.
1/4" 3/8" 1/2" 5/8" 3/4" 1"
VIVIENDA BI-FAMILIAR N Long. Anch. H N*L*A*H N Ae NxAe N Parc. #Var. Lf TOTAL
0.25 0.56 1.02 1.55 2.24 3.97
04.00.00. OBRAS DE CONCRETO ARMADO
04.01.00. ZAPATAS
04.01.01. CONCRETO EN ZAPATAS (m3) 14.13
4.00 1.70 1.50 0.6 6.12 4.00 1.55 8 1/2" 49.60 50.6 50.59
Z-1 4.00 1.35 9 1/2" 48.60 49.6 49.57

2.00 1.30 1.50 0.6 2.34 2.00 1.15 8 1/2" 18.40 18.8 18.77
Z-2 2.00 1.35 6 1/2" 16.20 16.5 16.52

6.00 1.00 1.20 0.6 4.32 6.00 0.85 6 1/2" 30.60 31.2 31.21
Z-3 6.00 1.05 5 1/2" 31.50 32.1 32.13

1.00 1.50 1.50 0.6 1.35 1.00 1.35 8 1/2" 10.80 11.0 11.02
Z-4 1.00 1.35 8 1/2" 10.80 11.0 11.02

04.01.02. ACERO EN ZAPATAS (Kg.) 220.83

04.02.00. VIGA DE CONEXIN


04.02.01. CONCRETO EN VIGA DE CONEXIN (m3) 2.06
EJE 3-3 1.00 4.95 0.30 0.40 0.59 1.000 1.059 1.06
As Long. 1.00 6.37 4 5/8" 25.48 39.5 39.49
As Transv. 1.00 1.40 25 3/8" 35.00 19.6 19.60
EJE 4-4 1.00 6.10 0.30 0.40 0.73 1.000 1.680 1.68
As Long. 1.00 7.62 4 5/8" 30.48 47.2 47.24
As Transv. 1.00 1.40 31 3/8" 43.40 24.3 24.30
EJE 6-6 1.00 6.10 0.30 0.40 0.73 1.000 1.680 1.68
As Long. 1.00 7.62 4 5/8" 30.48 47.2 47.24
As Transv. 1.00 1.40 31 3/8" 43.40 24.3 24.30
04.02.02. ENCOFRADO EN VIGA DE CONEXIN (m2) 4.42
04.02.03. ACERO EN VIGA DE CONEXIN (Kg.) 202.19
04.03.00. COLUMNAS
04.03.01. CONCRETO EN COLUMNAS (m3) 17.53
C-1 4.00 9.50 0.30 0.45 5.13 4.000 14.250 57.00
As. Long. 4.00 11.84 4 3/4" 189.36 424.2 424.17
As. Long. 4.00 11.54 2 5/8" 92.28 143.0 143.03
Estribos 4.00 1.500 81 3/8" 486.00 272.2 272.16

C-2 2.00 9.50 0.30 0.40 2.28 2.000 13.300 26.60


As. Long. 2.00 11.54 6 5/8" 138.42 214.6 214.55
Estribos 2.00 1.400 78 3/8" 218.40 122.3 122.30

C-3 3.00 9.50 0.25 0.25 1.78 3.000 9.500 28.50


As. Long. 3.00 11.54 4 5/8" 138.42 214.6 214.55
As. Long. 3.00 11.34 2 1/2" 68.01 69.4 69.37
Estribos 3.00 1.000 75 3/8" 225.00 126.0 126.00

C-4 3.00 9.50 0.25 0.25 1.78 3.000 9.500 28.50


As. Long. 3.00 11.54 6 5/8" 207.63 321.8 321.83
Estribos 3.00 1.000 69 1/4" 207.00 51.8 51.75

C-5 1.00 9.50 0.40 0.15 0.57 1.000 15.200 15.20


1.00 9.50 0.25 0.15 0.36
As. Long. 1.00 11.34 6 1/2" 68.01 69.4 69.37
As. Long. 1.00 11.24 2 3/8" 22.47 12.6 12.58
Estribos 1.00 1.100 72 1/4" 79.20 19.8 19.80
Estribos 1.00 1.100 72 1/4" 79.20 19.8 19.80

C-6 8.00 9.50 0.15 0.40 4.56 8.000 10.450 83.60

As. Long. 8.00 11.34 6 1/2" 544.08 555.0 554.96


Estribos 8.00 1.100 72 1/4" 633.60 158.4 158.40
C-7 3.00 9.50 0.25 0.15 1.07 3.000 7.600 22.80
As. Long. 3.00 11.24 4 3/8" 134.82 75.5 75.50
Estribos 3.00 0.800 69 1/4" 165.60 41.4 41.40

04.03.02. ENCOFRADO EN COLUMNAS (m2) 262.20


04.03.03. ACERO EN COLUMNAS (Kg.) 2911.53

04.04.00. VIGAS
04.04.01. CONCRETO EN VIGAS (m3) 19.75
PRIMER NIVEL
VOLADO
VD (.15x.20) 1.00 6.35 0.15 0.20 0.19 1.000 2.223 2.22
As. Long. 1.00 7.32 4 1/2" 29.28 29.9 29.87
Estribos 1.00 0.700 34 3/8" 23.80 13.3 13.33

EJE 1-1
VP -2 1.00 5.00 0.25 0.40 0.50 1.000 3.250 3.25
As. Long. 1.00 7.52 4 5/8" 30.08 46.6 46.62
Estribos 1.00 1.300 47 3/8" 61.10 34.2 34.22

ENTRE EJES 1-1 Y 2-2


VD (.15x.20) 1.00 1.10 0.15 0.20 0.03 1.000 0.385 0.39
As. Long. 1.00 1.72 4 1/2" 6.88 7.0 7.02
Estribos 1.00 0.700 9 3/8" 6.30 3.5 3.53

EJE 3-3
VP -1 1.00 6.05 0.30 0.45 0.82 1.000 4.840 4.84
As. Long. 1.00 7.62 4 3/4" 30.48 68.3 68.28
1.00 5.47 2 5/8" 10.94 17.0 16.96
1.00 3.65 2 5/8" 7.30 11.3 11.32
Estribos 1.00 1.500 42 3/8" 63.00 35.3 35.28
EJES 4-4 y 6-6
VP (.30x.50) 2.00 6.10 0.30 0.50 1.83 2.000 5.490 10.98
As. Long. 2.00 7.62 5 3/4" 76.20 170.7 170.69
2.00 4.82 2 5/8" 19.28 29.9 29.88
2.00 4.80 1 3/4" 9.60 21.5 21.50
2.00 4.80 2 5/8" 19.20 29.8 29.76
Estribos 2.00 1.600 36 3/8" 115.20 64.5 64.51

EJE 7-7
VCH (.40x.20) 1.00 6.25 0.40 0.20 0.50 1.000 2.500 2.50
As. Long. 1.00 7.52 6 5/8" 45.12 69.9 69.94
Estribos 1.00 1.200 43 3/8" 51.60 28.9 28.90

ENTRE EJES 7-7 y 8-8


VD (.15x.20) 1.00 3.28 0.15 0.20 0.10 1.000 1.148 1.15
As. Long. 1.00 3.85 4 1/2" 15.40 15.7 15.71
Estribos 1.00 0.700 17 3/8" 11.90 6.7 6.66

EJE 8-8
V - P3 1.00 2.93 0.15 0.40 0.18 1.000 2.198 2.20
As. Long. 1.00 4.05 6 1/2" 24.30 24.8 24.79
Estribos 1.00 1.100 21 1/4" 23.10 5.8 5.78

VR (.15x.20) 1.00 2.75 0.15 0.20 0.08 1.000 0.963 0.96


As. Long. 1.00 3.57 2 3/8" 7.14 4.0 4.00
Estribos 1.00 0.252 14 1/4" 3.53 0.9 0.88

EJE A-A
VD (.15x.20) 1.00 0.80 0.15 0.20 0.02 1.000 0.280 0.28
As. Long. 1.00 1.52 4 1/2" 6.08 6.2 6.20
Estribos 1.00 0.700 7 3/8" 4.90 2.7 2.74

V-P3 1.00 4.45 0.15 0.40 0.27 1.000 3.338 3.34


As. Long. 1.00 5.97 6 1/2" 35.82 36.5 36.54
Estribos 1.00 1.100 32 1/4" 35.20 8.8 8.80

V-A (.25x.20) 1.00 12.70 0.25 0.20 0.64 1.000 5.715 5.72
As. Long. 1.00 15.57 4 1/2" 62.28 63.5 63.53
Estribos 1.00 0.900 94 3/8" 84.60 47.4 47.38
ENTRE EJES A-A y B-B
V-V (.25x.20) 1.00 0.80 0.25 0.20 0.04 1.000 0.360 0.36
As. Long. 1.00 1.37 4 5/8" 5.48 8.5 8.49
1.00 1.37 1 1/2" 1.37 1.4 1.40
Estribos 1.00 0.900 7 3/8" 6.30 3.5 3.53

V-P3 1.00 8.45 0.15 0.40 0.51 1.000 6.338 6.34


As. Long. 1.00 10.62 6 1/2" 63.72 65.0 64.99
Estribos 1.00 1.100 55 1/4" 60.50 15.1 15.13

EJE B-B
V-A (.25x.20) 1.00 3.10 0.25 0.20 0.16 1.000 1.395 1.40
As. Long. 1.00 3.82 4 1/2" 15.28 15.6 15.59
Estribos 1.00 0.900 22 3/8" 19.80 11.1 11.09

EJE C-C
V-V (.25x.20) 1.00 0.80 0.25 0.20 0.04 1.000 0.360 0.36
As. Long. 1.00 1.37 4 5/8" 5.48 8.5 8.49
1.00 1.37 1 1/2" 1.37 1.4 1.40
Estribos 1.00 0.900 7 3/8" 6.30 3.5 3.53

V-P3 1.00 4.45 0.15 0.40 0.27 1.000 3.338 3.34


As. Long. 1.00 5.97 6 1/2" 35.82 36.5 36.54
Estribos 1.00 1.100 32 1/4" 35.20 8.8 8.80

V-A (.25x.20) 1.00 10.25 0.25 0.20 0.51 1.000 4.613 4.61
As. Long. 1.00 12.32 4 1/2" 49.28 50.3 50.27
Estribos 1.00 0.900 74 3/8" 66.60 37.3 37.30

V-V (.25x.20) 1.00 1.05 0.25 0.20 0.05 1.000 0.473 0.47
As. Long. 1.00 1.62 4 5/8" 6.48 10.0 10.04
1.00 1.62 1 1/2" 1.62 1.7 1.65
Estribos 1.00 0.900 8 3/8" 7.20 4.0 4.03

VR (.15x.20) 1.00 2.05 0.15 0.20 0.06 1.000 0.718 0.72


As. Long. 1.00 3.82 2 3/8" 7.64 4.3 4.28
Estribos 1.00 0.252 11 1/4" 2.78 0.7 0.69

SEGUNDO NIVEL
VOLADO
VD (.15x.20) 1.00 6.60 0.15 0.20 0.20 1.000 2.310 2.31
As. Long. 1.00 7.32 4 1/2" 29.28 29.9 29.87
Estribos 1.00 0.700 31 3/8" 21.70 12.2 12.15
EJE 1-1
VP -2 1.00 5.00 0.25 0.40 0.50 1.000 3.250 3.25
As. Long. 1.00 7.52 4 5/8" 30.08 46.6 46.62
Estribos 1.00 1.300 47 3/8" 61.10 34.2 34.22

EJE 3-3
VP -1 1.00 6.05 0.30 0.45 0.82 1.000 4.840 4.84
As. Long. 1.00 7.62 4 3/4" 30.48 68.3 68.28
1.00 5.47 2 5/8" 10.94 17.0 16.96
1.00 3.65 2 5/8" 7.30 11.3 11.32
Estribos 1.00 1.500 42 3/8" 63.00 35.3 35.28

EJES 4-4 y 6-6


VP (.30x.50) 2.00 6.10 0.30 0.50 1.83 2.000 5.490 10.98
As. Long. 2.00 7.62 5 3/4" 76.20 170.7 170.69
2.00 4.82 2 5/8" 19.28 29.9 29.88
2.00 4.80 1 3/4" 9.60 21.5 21.50
2.00 4.80 2 5/8" 19.20 29.8 29.76
Estribos 2.00 1.600 36 3/8" 115.20 64.5 64.51

EJE 5-5
VD (.15x.20) 1.00 2.00 0.15 0.20 0.06 1.000 0.700 0.70
As. Long. 1.00 2.72 4 1/2" 10.88 11.1 11.10
Estribos 1.00 0.700 12 3/8" 8.40 4.7 4.70

EJE 7-7
VCH (.40x.20) 1.00 6.25 0.40 0.20 0.50 1.000 2.500 2.50
As. Long. 1.00 7.52 6 5/8" 45.12 69.9 69.94
Estribos 1.00 1.200 43 3/8" 51.60 28.9 28.90

ENTRE EJES 7-7 y 8-8


VD (.15x.20) 1.00 3.28 0.15 0.20 0.10 1.000 1.148 1.15
As. Long. 1.00 3.85 4 1/2" 15.40 15.7 15.71
Estribos 1.00 0.700 17 3/8" 11.90 6.7 6.66

EJE 8-8
V - P3 1.00 2.93 0.15 0.40 0.18 1.000 2.198 2.20
As. Long. 1.00 4.05 6 1/2" 24.30 24.8 24.79
Estribos 1.00 1.100 21 1/4" 23.10 5.8 5.78
EJE A-A
VD (.15x.20) 1.00 0.80 0.15 0.20 0.02 1.000 0.280 0.28
As. Long. 1.00 1.52 4 1/2" 6.08 6.2 6.20
Estribos 1.00 0.700 7 3/8" 4.90 2.7 2.74

V-P3 1.00 4.45 0.15 0.40 0.27 1.000 3.338 3.34


As. Long. 1.00 5.97 6 1/2" 35.82 36.5 36.54
Estribos 1.00 1.100 32 1/4" 35.20 8.8 8.80

V-A (.25x.20) 1.00 12.70 0.25 0.20 0.64 1.000 5.715 5.72
As. Long. 1.00 15.57 4 1/2" 62.28 63.5 63.53
Estribos 1.00 0.900 94 3/8" 84.60 47.4 47.38

ENTRE EJES A-A y B-B


V-P3 1.00 3.75 0.15 0.40 0.23 1.000 2.813 2.81
As. Long. 1.00 4.67 6 1/2" 28.02 28.6 28.58
Estribos 1.00 1.100 23 1/4" 25.30 6.3 6.33

VD (.15x.20) 1.00 4.20 0.15 0.20 0.13 1.000 1.470 1.47


As. Long. 1.00 5.12 4 1/2" 20.48 20.9 20.89
Estribos 1.00 0.700 21 3/8" 14.70 8.2 8.23

EJE B-B
V-A (.25x.20) 1.00 3.10 0.25 0.20 0.16 1.000 1.395 1.40
As. Long. 1.00 3.82 4 1/2" 15.28 15.6 15.59
Estribos 1.00 0.900 22 3/8" 19.80 11.1 11.09

EJE C-C
V-V (.25x.20) 1.00 0.80 0.25 0.20 0.04 1.000 0.360 0.36
As. Long. 1.00 1.37 4 5/8" 5.48 8.5 8.49
1.00 1.37 1 1/2" 1.37 1.4 1.40
Estribos 1.00 0.900 7 3/8" 6.30 3.5 3.53

V-P3 1.00 4.45 0.15 0.40 0.27 1.000 3.338 3.34


As. Long. 1.00 5.97 6 1/2" 35.82 36.5 36.54
Estribos 1.00 1.100 32 1/4" 35.20 8.8 8.80

V-A (.25x.20) 1.00 10.25 0.25 0.20 0.51 1.000 4.613 4.61
As. Long. 1.00 12.32 4 1/2" 49.28 50.3 50.27
Estribos 1.00 0.900 74 3/8" 66.60 37.3 37.30
V-V (.25x.20) 1.00 1.05 0.25 0.20 0.05 1.000 0.473 0.47
As. Long. 1.00 1.62 4 5/8" 6.48 10.0 10.04
1.00 1.62 1 1/2" 1.62 1.7 1.65
Estribos 1.00 0.900 8 3/8" 7.20 4.0 4.03

TERCER NIVEL
VOLADO
VD (.15x.20) 1.00 6.60 0.15 0.20 0.20 1.000 2.310 2.31
As. Long. 1.00 7.32 4 1/2" 29.28 29.9 29.87
Estribos 1.00 0.700 31 3/8" 21.70 12.2 12.15

EJE 1-1
VP -2 1.00 5.00 0.25 0.40 0.50 1.000 3.250 3.25
As. Long. 1.00 7.52 4 5/8" 30.08 46.6 46.62
Estribos 1.00 1.300 47 3/8" 61.10 34.2 34.22

EJE 3-3
VP -1 1.00 6.05 0.30 0.45 0.82 1.000 4.840 4.84
As. Long. 1.00 7.62 4 3/4" 30.48 68.3 68.28
1.00 5.47 2 5/8" 10.94 17.0 16.96
1.00 3.65 2 5/8" 7.30 11.3 11.32
Estribos 1.00 1.500 42 3/8" 63.00 35.3 35.28

EJES 4-4 y 6-6


VP (.30x.50) 2.00 6.10 0.30 0.50 1.83 2.000 5.490 10.98
As. Long. 2.00 7.62 5 3/4" 76.20 170.7 170.69
2.00 4.82 2 5/8" 19.28 29.9 29.88
2.00 4.80 1 3/4" 9.60 21.5 21.50
2.00 4.80 2 5/8" 19.20 29.8 29.76
Estribos 2.00 1.600 36 3/8" 115.20 64.5 64.51

EJE 5-5
VD (.15x.20) 1.00 2.00 0.15 0.20 0.06 1.000 0.700 0.70
As. Long. 1.00 2.72 4 1/2" 10.88 11.1 11.10
Estribos 1.00 0.700 12 3/8" 8.40 4.7 4.70
EJE 7-7
VCH (.40x.20) 1.00 6.25 0.40 0.20 0.50 1.000 2.500 2.50
As. Long. 1.00 7.52 6 5/8" 45.12 69.9 69.94
Estribos 1.00 1.200 43 3/8" 51.60 28.9 28.90

ENTRE EJES 7-7 y 8-8


VD (.15x.20) 1.00 3.28 0.15 0.20 0.10 1.000 1.148 1.15
As. Long. 1.00 3.85 4 1/2" 15.40 15.7 15.71
Estribos 1.00 0.700 17 3/8" 11.90 6.7 6.66

EJE 8-8
V - P3 1.00 2.93 0.15 0.40 0.18 1.000 2.198 2.20
As. Long. 1.00 4.05 6 1/2" 24.30 24.8 24.79
Estribos 1.00 1.100 21 1/4" 23.10 5.8 5.78

EJE A-A
VD (.15x.20) 1.00 0.80 0.15 0.20 0.02 1.000 0.280 0.28
As. Long. 1.00 1.52 4 1/2" 6.08 6.2 6.20
Estribos 1.00 0.700 7 3/8" 4.90 2.7 2.74

V-P3 1.00 4.45 0.15 0.40 0.27 1.000 3.338 3.34


As. Long. 1.00 5.97 6 1/2" 35.82 36.5 36.54
Estribos 1.00 1.100 32 1/4" 35.20 8.8 8.80

V-A (.25x.20) 1.00 12.70 0.25 0.20 0.64 1.000 5.715 5.72
As. Long. 1.00 15.57 4 1/2" 62.28 63.5 63.53
Estribos 1.00 0.900 94 3/8" 84.60 47.4 47.38

ENTRE EJES A-A y B-B


V-P3 1.00 3.75 0.15 0.40 0.23 1.000 2.813 2.81
As. Long. 1.00 4.67 6 1/2" 28.02 28.6 28.58
Estribos 1.00 1.100 23 1/4" 25.30 6.3 6.33

VD (.15x.20) 1.00 4.20 0.15 0.20 0.13 1.000 1.470 1.47


As. Long. 1.00 5.12 4 1/2" 20.48 20.9 20.89
Estribos 1.00 0.700 21 3/8" 14.70 8.2 8.23

EJE B-B
V-A (.25x.20) 1.00 3.10 0.25 0.20 0.16 1.000 1.395 1.40
As. Long. 1.00 3.82 4 1/2" 15.28 15.6 15.59
Estribos 1.00 0.900 22 3/8" 19.80 11.1 11.09
EJE C-C
V-V (.25x.20) 1.00 0.80 0.25 0.20 0.04 1.000 0.360 0.36
As. Long. 1.00 1.37 4 5/8" 5.48 8.5 8.49
1.00 1.37 1 1/2" 1.37 1.4 1.40
Estribos 1.00 0.900 7 3/8" 6.30 3.5 3.53

V-P3 1.00 4.45 0.15 0.40 0.27 1.000 3.338 3.34


As. Long. 1.00 5.97 6 1/2" 35.82 36.5 36.54
Estribos 1.00 1.100 32 1/4" 35.20 8.8 8.80

V-A (.25x.20) 1.00 10.25 0.25 0.20 0.51 1.000 4.613 4.61
As. Long. 1.00 12.32 4 1/2" 49.28 50.3 50.27
Estribos 1.00 0.900 74 3/8" 66.60 37.3 37.30

V-V (.25x.20) 1.00 1.05 0.25 0.20 0.05 1.000 0.473 0.47
As. Long. 1.00 1.62 4 5/8" 6.48 10.0 10.04
1.00 1.62 1 1/2" 1.62 1.7 1.65
Estribos 1.00 0.900 8 3/8" 7.20 4.0 4.03

04.04.02. ENCOFRADO EN VIGAS (m2) 158.85


04.04.03. ACERO EN VIGAS (Kg.) 3504.87