PLANILLA DE METRADOS (ESTRUCTURAS )

MEJORAMIENTO DE LOS SERVICIOS EDUCATIVO DEL NIVEL SECUNDARIOEN LA I.E. TUPAC AMARU EN LA
Proyecto
LOCALIDAD DE PALCA DISTRITO DE PALCA -HUANCAVELICA -HUANCAVELICA
Respon. : ING. ANGEL CHOQUE CONTRERAS Y EQUIPO TECNICO Provincia : HUANCAVELICA
Fecha : NOVIEMBRE 2013 Distrito : PALCA
Formula : COMPONENTE AREA PEDAGOGICA (AULAS) Lugar : PALCA

LARGO ANCHO ALTO PARCI


ITEM PARTIDA DESCRIPCION UBICACIN DE ELEMENTO CANT TOTAL UND
(m) (m) (m) AL

01.00.00 ESTRUCTURAS
01.01 OBRAS PROVICIONALES
01.01.01 GUARDIANIA DEPOSITO Y ALMACEN ### 1.00 1.00 GLB

01.01.02 CARTEL DE OBRA (GIGANTOGRAFIA) ### 1.00 1.00 GLB

01.01.03 SEGURIDAD E HEGIENE EN OBRAS ### 1.00 1.00 GLB

01.01.04 CERCO CON ARPILLERA Y ROLLIZOS ### 181.00 181.00 ML

01.01.05 CONSUMO ENERGIA ELECTRICA PARA LA OBRA ### 8.00 8.00 MES

01.01.06 CONSUMO DE AGUA EN OBRA ### 8.00 8.00 MES

01.02.00 TRABAJOS PRELIMINARES


01.02.01 LIMPIEZA DE TERRENO MANUAL 312.00 M2
### ACAD= 312.00 312.00

01.02.02 TRAZO, NIVELACION Y REPLANTEO PRELIMINAR 312.00 M2


### ACAD= 312.00 312.00

01.02.03 TRAZO, NIVELACION Y REPLANTEO DURANTE EL PROCESO 312.00 M2


### ACAD= 312.00 312.00

01.03.00 MOVIMIENTO DE TIERRAS


01.03.01 EXCAVACION PARA ZAPATAS DE 1.00m A 2.10m DE PROFUNDIDAD EN TERRENO NORM 274.54 M3
ZAPATAS Z-01 ### 6.90 2.20 2.20 33.40
Z-02 ### 7.15 2.60 2.20 40.90
Z-03 ### 2.80 2.80 2.20 17.25
Z-04 ### 7.10 2.20 2.20 34.36
Z-05 ### 3.00 2.30 2.20 15.18
Z-06 ### 3.00 2.30 2.20 15.18
Z-07 ### ACAD= 18.77 2.20 41.29
Z-08 ### 3.00 2.30 2.20 15.18
Z-09 ### 2.30 2.30 2.20 11.64
Z-10 ### 3.00 2.30 2.20 15.18
Z-11 ### ACAD= 15.90 2.20 34.98

01.03.02 EXCAVACION PARA CIMIENTOS HASTA 1.00m DE PROFUNDIDAD EN TERRENO NORMAL 5.97 M3
EJE 1-1 TRAMO E-G ### 4.00 0.50 0.85 1.70
EJE 4-4 TRAMO E-G ### 0.78 0.50 0.85 0.33
EJE 7-7 TRAMO E-G ### 4.00 0.50 0.85 1.70
EJE 8-8 TRAMO E-G ### 0.78 0.50 0.85 0.33

EJE E-E TRAMO 3-4 ### 2.00 0.40 0.85 0.68


TRAMO 5-6 ### 1.93 0.40 0.85 0.66
TRAMO 6-7 ### 1.67 0.40 0.85 0.57

01.03.03 RELLENO Y COMPACTADO CON MATERIAL PROPIO 158.98 M3


ZAPATAS Z-01 ### 6.90 2.20 1.50 22.77
### ACAD= 3.05 1.50 -4.58
Z-02 ### 7.15 2.20 1.50 23.60
### ACAD= 3.60 1.50 -5.40
Z-03 ### 2.80 2.80 1.50 11.76
### ACAD= 1.20 1.50 -1.80
Z-04 ### 7.10 2.20 1.50 23.43
### ACAD= 3.13 1.50 -4.70
Z-05 ### 3.00 2.30 1.50 10.35
### ACAD= 0.71 1.50 -1.07
Z-06 ### 3.00 2.30 1.50 10.35
### ACAD= 0.16 1.50 -0.24
Z-07 ### ACAD= 18.77 1.50 28.16
### ACAD= 1.86 1.50 -2.79
Z-08 ### 3.00 2.30 1.50 10.35
### ACAD= 0.16 1.50 -0.24
Z-09 ### 3.00 2.30 1.50 10.35
### ACAD= 0.16 1.60 -0.26
Z-10 ### 3.00 2.30 1.50 10.35
### ACAD= 0.71 1.50 -1.07
Z-11 ### ACAD= 15.90 1.50 23.85
### ACAD= 2.80 1.50 -4.20

01.03.04 RELLENO Y COMPACTADO CON MATERIAL AFIRMADO 38.99 M3


AULA 01 ### ACAD= 55.80 0.15 8.37
SUM ### ACAD= 86.34 0.15 12.95
DEPOSITO ### ACAD= 29.20 0.15 4.38
PASADIZO ### ACAD= 64.84 0.15 9.73
PODIUM SUM ### ACAD= 8.90 0.40 3.56

01.03.05 NIVELACION INTERIOR Y APISONADO CON EQUIPO 236.18 M2


AULA 01 ### ACAD= 55.80 55.80
SUM ### ACAD= 86.34 86.34
DEPOSITO ### ACAD= 29.20 29.20
PASADIZO ### ACAD= 64.84 64.84
PLANILLA DE METRADOS (ESTRUCTURAS )
MEJORAMIENTO DE LOS SERVICIOS EDUCATIVO DEL NIVEL SECUNDARIOEN LA I.E. TUPAC AMARU EN LA
Proyecto
LOCALIDAD DE PALCA DISTRITO DE PALCA -HUANCAVELICA -HUANCAVELICA
Respon. : ING. ANGEL CHOQUE CONTRERAS Y EQUIPO TECNICO Provincia : HUANCAVELICA
Fecha : NOVIEMBRE 2013 Distrito : PALCA
Formula : COMPONENTE AREA PEDAGOGICA (AULAS) Lugar : PALCA

LARGO ANCHO ALTO PARCI


ITEM PARTIDA DESCRIPCION UBICACIN DE ELEMENTO CANT TOTAL UND
(m) (m) (m) AL

01.03.06 ACARREO MATERIAL EXEDENTE HASTA UNA DISTANCIA PROMEDIO DE 30.00 ML 151.90 M3
### 121.52 1.25 151.90

01.03.07 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO PESADO 151.90 M3


1.00 151.90 151.90

01.04.00 OBRAS DE CONCRETO SIMPLE


01.04.01 SOLADO DE CONCRETO C:H 1:12 E=4" PARA ZAPATAS 126.40 M2
ZAPATAS Z-01 ### 6.90 2.20 15.18
Z-02 ### 7.15 2.60 18.59
Z-03 ### 2.80 2.80 7.84
Z-04 ### 7.10 2.20 15.62
Z-05 ### 3.00 2.30 6.90
Z-06 ### 3.00 2.30 6.90
Z-07 ### ACAD= 18.77 18.77
Z-08 ### 3.00 2.30 6.90
Z-09 ### 3.00 2.30 6.90
Z-10 ### 3.00 2.30 6.90
Z-11 ### ACAD= 15.90 15.90

01.04.02 CONCRETO PARA CIMIENTO CORRIDO C:H-1:10 + 30% P.G. 14.03 M3


EJE 1-1 TRAMO E-G ### 5.70 0.50 0.85 2.42
EJE 4-4 TRAMO E-G ### 2.60 0.50 0.85 1.11
EJE 7-7 TRAMO E-G ### 5.70 0.50 0.85 2.42
EJE 8-8 TRAMO E-G ### 2.60 0.50 0.85 1.11

EJE E-E TRAMO 1-3 ### 2.45 0.40 0.85 0.83


TRAMO 3-4 ### 4.35 0.40 0.85 1.48
TRAMO 4-5 ### 2.73 0.40 0.85 0.93
TRAMO 5-6 ### 4.36 0.40 0.85 1.48
TRAMO 6-7 ### 4.18 0.40 0.85 1.42
TRAMO 7-8 ### 2.45 0.40 0.85 0.83

01.04.03 CONCRETO PARA SOBRECIMIENTO C:H-1:18 + 25% P.M. 4.12 M3


EJE 1-1 TRAMO E-G ### 5.70 0.25 0.50 0.71
EJE 4-4 TRAMO E-G ### 2.60 0.25 0.50 0.33
EJE 7-7 TRAMO E-G ### 4.75 0.25 0.50 0.59
EJE 8-8 TRAMO E-G ### 2.60 0.25 0.50 0.33

EJE E-E TRAMO 1-3 ### 2.45 0.15 0.85 0.31


TRAMO 3-4 ### 3.15 0.15 0.85 0.40
TRAMO 4-5 ### 1.54 0.15 0.85 0.20
TRAMO 5-6 ### 4.36 0.15 0.85 0.56
TRAMO 6-7 ### 3.00 0.15 0.85 0.38
TRAMO 7-8 ### 2.45 0.15 0.85 0.31

01.04.04 ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTO H=0.50CM 44.47 M3


EJE 1-1 TRAMO E-G ### 5.70 0.50 5.70
EJE 4-4 TRAMO E-G ### 2.60 0.50 2.60
EJE 7-7 TRAMO E-G ### 4.75 0.50 4.75
EJE 8-8 TRAMO E-G ### 2.60 0.50 2.60

EJE E-E TRAMO 1-3 ### 2.45 0.85 4.17


TRAMO 3-4 ### 3.15 0.85 5.36
TRAMO 4-5 ### 1.54 0.85 2.62
TRAMO 5-6 ### 4.36 0.85 7.41
TRAMO 6-7 ### 3.00 0.85 5.10
TRAMO 7-8 ### 2.45 0.85 4.17

01.04.05 FALSO PISO DE CONCRETO 1:12 DE E=4" 236.18 M2


AULA 01 ### ACAD= 55.80 55.80
SUM ### ACAD= 86.34 86.34
DEPOSITO ### ACAD= 29.20 29.20
PASADIZO ### ACAD= 64.84 64.84

01.04.06 CONCRETO EN PODIUM F'C=140KG/CM2 10.14 M3


PODIUM ### ACAD= 8.45 0.15 10.14

7.68 M3
01.04.07 ENCOFRADO Y DESENCOFRADO DE PODIUM PODIUM ### LONG= 6.40 0.15 7.68

02.00.00 CONCRETO ARMADO


02.01.00 ZAPATAS
02.01.01 CONCRETO PARA ZAPATAS f'c=210 kg/cm2 76.44 M3
ZAPATAS Z-01 ### 6.90 2.20 0.60 9.11
Z-02 ### 7.15 2.60 0.60 11.15
Z-03 ### 2.80 2.80 0.60 4.70
Z-04 ### 7.10 2.20 0.60 9.37
Z-05 ### 3.00 2.30 0.60 4.14
Z-06 ### 3.00 2.30 0.60 4.14
Z-07 ### ACAD= 19.77 0.60 11.86
Z-08 ### 3.00 2.30 0.60 4.14
Z-09 ### 3.00 2.30 0.60 4.14
PLANILLA DE METRADOS (ESTRUCTURAS )
MEJORAMIENTO DE LOS SERVICIOS EDUCATIVO DEL NIVEL SECUNDARIOEN LA I.E. TUPAC AMARU EN LA
Proyecto
LOCALIDAD DE PALCA DISTRITO DE PALCA -HUANCAVELICA -HUANCAVELICA
Respon. : ING. ANGEL CHOQUE CONTRERAS Y EQUIPO TECNICO Provincia : HUANCAVELICA
Fecha : NOVIEMBRE 2013 Distrito : PALCA
Formula : COMPONENTE AREA PEDAGOGICA (AULAS) Lugar : PALCA

LARGO ANCHO ALTO PARCI


ITEM PARTIDA DESCRIPCION UBICACIN DE ELEMENTO CANT TOTAL UND
(m) (m) (m) AL

Z-10 ### 3.00 2.30 0.60 4.14


Z-11 ### ACAD= 15.90 0.60 9.54

02.01.02 ACERO DE REFUERZO F'Y=4200 KG/CM2 GRADO 60 P/ZAPATAS VER CUADRO DE METRADOS ### KG

02.02. SOBRECIMIENTO REFORZADO


02.02.01 CONCRETO PARA SOBRECIMIENTO REFORZADO f'c=210 kg/cm2 1.68 M3
PODIUM SUM MURETE ### 5.80 AREA= 0.24 1.39
ESCALERA ### ACAD= 0.15 0.95 0.29

02.02.02 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO REFORZADO 10.18 M2


PODIUM SUM MURETE ### 5.80 0.55 6.38
ESCALERA ### ACAD= 0.95 3.80

VER
CUADRO DE 62.73 KG
02.02.03 ACERO DE REFUERZO F'Y=4200 KG/CM2 METRADOS

02.03.00 PLACAS
02.03.01 CONCRETO PARA PLACAS f'c=210 kg/cm2 36.53 M3
PLACAS( 1 PISO) EJE 4-4 TRAMO F-G ### 2.60 0.25 4.00 2.60
EJE 8-8 TRAMO F-G ### 2.60 0.25 4.00 2.60
EJE E-E TRAMO 1-3 ### 1.63 0.25 4.10 1.67
TRAMO 4-5 ### 1.50 0.25 4.10 1.54
TRAMO 7-8 ### 1.85 0.25 4.10 1.90

EJE G-G TRAMO 4-5 ### 1.50 0.25 ### 1.54


TRAMO 7-8 ### 2.00 0.25 ### 2.05

PLACAS( 2 PISO) EJE 4-4 TRAMO F-G ### 2.60 0.25 2.50 1.63
EJE 8-8 TRAMO F-G ### 2.60 0.25 2.50 1.63
EJE E-E TRAMO 1-3 ### 1.63 0.25 2.50 1.02
TRAMO 4-5 ### 1.50 0.25 2.50 0.94
TRAMO 7-8 ### 1.85 0.25 2.50 1.16

EJE G-G TRAMO 4-5 ### 1.50 0.25 ### 0.98


TRAMO 7-8 ### 2.00 0.25 ### 1.30

PLACAS( 3 PISO) EJE 4-4 TRAMO F-G ### 2.60 0.15 2.50 0.98
EJE 8-8 TRAMO F-G ### 2.60 0.15 2.50 0.98
EJE E-E TRAMO 1-3 ### 1.63 0.25 2.50 1.02
TRAMO 4-5 ### 1.50 0.25 2.50 0.94
TRAMO 7-8 ### 1.85 0.25 2.50 1.16

EJE G-G TRAMO 4-5 ### 1.50 0.15 ### 0.59


TRAMO 7-8 ### 2.00 0.15 ### 0.78

PLACAS( 4 PISO) EJE 4-4 TRAMO F-G ### ACAD= 7.82 0.15 1.17
EJE 8-8 TRAMO F-G ### ACAD= 7.82 0.15 1.17
EJE E-E TRAMO 1-3 ### 1.63 0.25 2.50 1.02
TRAMO 4-5 ### 1.50 0.25 2.50 0.94
TRAMO 7-8 ### 1.85 0.25 2.50 1.16

EJE G-G TRAMO 4-5 ### 1.50 0.15 ### 0.59


TRAMO 7-8 ### 2.00 0.15 ### 0.78

EJE E-E TRAMO 1-3 ### 1.63 0.25 0.60 0.24


TRAMO 4-5 ### 1.50 0.25 0.60 0.23
TRAMO 7-8 ### 1.85 0.25 0.60 0.28

02.03.02 ENCOFRADO Y DESENCOFRADO DE COLUMNAS 326.70 M2


PLACAS( 1 PISO) EJE 4-4 TRAMO F-G ### 2.60 4.00 20.80
EJE 8-8 TRAMO F-G ### 2.60 4.00 20.80
EJE E-E TRAMO 1-3 ### 1.63 4.10 13.37
TRAMO 4-5 ### 1.50 4.10 12.30
TRAMO 7-8 ### 1.85 4.10 15.17

EJE G-G TRAMO 4-5 ### 1.50 ### 12.30


TRAMO 7-8 ### 2.00 ### 16.40

PLACAS( 2 PISO) EJE 4-4 TRAMO F-G ### 2.60 2.50 13.00
EJE 8-8 TRAMO F-G ### 2.60 2.50 13.00
EJE E-E TRAMO 1-3 ### 1.63 2.50 8.15
TRAMO 4-5 ### 1.50 2.50 7.50
TRAMO 7-8 ### 1.85 2.50 9.25

EJE G-G TRAMO 4-5 ### 1.50 ### 7.80


TRAMO 7-8 ### 2.00 ### 10.40

PLACAS( 3 PISO) EJE 4-4 TRAMO F-G ### 2.60 2.50 13.00
EJE 8-8 TRAMO F-G ### 2.60 2.50 13.00
EJE E-E TRAMO 1-3 ### 1.63 2.50 8.15
TRAMO 4-5 ### 1.50 2.50 7.50
TRAMO 7-8 ### 1.85 2.50 9.25
PLANILLA DE METRADOS (ESTRUCTURAS )
MEJORAMIENTO DE LOS SERVICIOS EDUCATIVO DEL NIVEL SECUNDARIOEN LA I.E. TUPAC AMARU EN LA
Proyecto
LOCALIDAD DE PALCA DISTRITO DE PALCA -HUANCAVELICA -HUANCAVELICA
Respon. : ING. ANGEL CHOQUE CONTRERAS Y EQUIPO TECNICO Provincia : HUANCAVELICA
Fecha : NOVIEMBRE 2013 Distrito : PALCA
Formula : COMPONENTE AREA PEDAGOGICA (AULAS) Lugar : PALCA

LARGO ANCHO ALTO PARCI


ITEM PARTIDA DESCRIPCION UBICACIN DE ELEMENTO CANT TOTAL UND
(m) (m) (m) AL

EJE G-G TRAMO 4-5 ### 1.50 ### 7.80


TRAMO 7-8 ### 2.00 ### 10.40

PLACAS( 4 PISO) EJE 4-4 TRAMO F-G ### ACAD= 7.82 15.64
EJE 8-8 TRAMO F-G ### ACAD= 7.82 15.64
EJE E-E TRAMO 1-3 ### 1.63 2.50 8.15
TRAMO 4-5 ### 1.50 2.50 7.50
TRAMO 7-8 ### 1.85 2.50 9.25

EJE G-G TRAMO 4-5 ### 1.50 ### 7.80


TRAMO 7-8 ### 2.00 ### 10.40

EJE E-E TRAMO 1-3 ### 1.63 0.60 0.98


TRAMO 4-5 ### 1.50 0.60 0.90
TRAMO 7-8 ### 1.85 0.60 1.11
VER
02.03.03 ACERO DE REFUERZO F'Y=4200 KG/CM2 P/ LAVADERO CUADRO DE ### KG
METRADOS
02.04.00 COLUMNAS
02.04.01 CONCRETO PARA COLUMNAS f'c=210 kg/cm2 38.97 M3
EJE E/TRAMO 1-
COLUMNA(1,2,3,4,5,6,7) ### 0.55 0.30 14.85 17.15
8
COLUMNA (17,18) ### 0.25 0.25 1.00 0.13
EJE F/TRAMO 3-
COLUMNA ( 8,9 ) ### 0.50 0.30 14.32 4.30
COLUMNA 8
EJE G/TRAMO 1-
### 0.55 0.30 13.71 15.84
(10,11,12,13,14,15,16 )
COLUMNA(20,21,22,23,24,25,2 8
EJE I/ TRAMO
### ACAD= 0.07 1.90 0.13
6) 1/8
### ACAD= 0.07 2.36 0.17
### ACAD= 0.07 2.80 0.20
### ACAD= 0.07 3.20 0.22
### ACAD= 0.07 3.70 0.26
### ACAD= 0.07 4.20 0.59

02.04.02 ENCOFRADO Y DESENCOFRADO DE COLUMNAS 408.93 M2


EJE E/TRAMO 1-
COLUMNA(1,2,3,4,5,6,7) ### 1.70 14.85 176.72
8
COLUMNA (17,18) ### 1.00 1.00 2.00
EJE F/TRAMO 3-
COLUMNA ( 8,9 ) ### 1.60 14.32 45.82
COLUMNA 8
EJE G/TRAMO 1-
### 1.70 13.71 163.15
(10,11,12,13,14,15,16 ) 8
COLUMNA(20,21,22,23,24,25,2 EJE I/ TRAMO
### 0.95 1.90 1.81
6) 1/8
### 0.95 2.36 2.24
### 0.95 2.80 2.66
### 0.95 3.20 3.04
### 0.95 3.70 3.52
### 0.95 4.20 7.98

VER
02.04.03 ACERO DE REFUERZO F'Y=4200 KG/CM2 P/COLUMNAS CUADRO DE ### KG
METRADOS

02.05.00 COLUMNETAS DE AMARRE


02.05.01 CONCRETO EN COLUMNETAS f'c=175 kg/cm2 3.70 M3
PRIMER PISO (CA 0.15x0.15) EJE E-E TRAMO 1-8 ### 0.15 0.15 1.10 0.07
(CA 0.15x0.15) EJE E-E TRAMO 1-8 ### 0.15 0.15 2.15 0.29
(CA 0.25x0.15) EJE E-E TRAMO 1-8 ### 0.25 0.15 2.15 0.40

SEGUNDO PISO (CA 0.15x0.15) EJE E-E TRAMO 1-8 ### 0.15 0.15 1.55 0.10
(CA 0.15x0.15) EJE E-E TRAMO 1-8 ### 0.15 0.15 2.55 0.34
(CA 0.25x0.15) EJE E-E TRAMO 1-8 ### 0.25 0.15 2.55 0.48

TERCER PISO (CA 0.15x0.15) EJE E-E TRAMO 1-8 ### 0.15 0.15 1.55 0.10
(CA 0.15x0.15) EJE E-E TRAMO 1-8 ### 0.15 0.15 2.55 0.34
(CA 0.25x0.15) EJE E-E TRAMO 1-8 ### 0.25 0.15 2.55 0.48

CUARTO PISO (CA 0.15x0.15) EJE E-E TRAMO 1-8 ### 0.15 0.15 1.94 0.13
(CA 0.15x0.15) EJE E-E TRAMO 1-8 ### 0.15 0.15 2.94 0.40
(CA 0.25x0.15) EJE E-E TRAMO 1-8 ### 0.25 0.15 2.94 0.55

02.05.02 ENCOFRADO Y DESENCOFRADO DE COLUMNETAS 49.34 M2


PRIMER PISO (CA 0.15x0.15) EJE E-E TRAMO 1-8 ### 0.30 1.10 0.99
(CA 0.15x0.15) EJE E-E TRAMO 1-8 ### 0.30 2.15 3.87
(CA 0.25x0.15) EJE E-E TRAMO 1-8 ### 0.50 2.15 5.38

SEGUNDO PISO (CA 0.15x0.15) EJE E-E TRAMO 1-8 ### 0.30 1.55 1.40
(CA 0.15x0.15) EJE E-E TRAMO 1-8 ### 0.30 2.55 4.59
(CA 0.25x0.15) EJE E-E TRAMO 1-8 ### 0.50 2.55 6.38

TERCER PISO (CA 0.15x0.15) EJE E-E TRAMO 1-8 ### 0.30 1.55 1.40
(CA 0.15x0.15) EJE E-E TRAMO 1-8 ### 0.30 2.55 4.59
(CA 0.25x0.15) EJE E-E TRAMO 1-8 ### 0.50 2.55 6.38

CUARTO PISO (CA 0.15x0.15) EJE E-E TRAMO 1-8 ### 0.30 1.94 1.75
(CA 0.15x0.15) EJE E-E TRAMO 1-8 ### 0.30 2.94 5.29
(CA 0.25x0.15) EJE E-E TRAMO 1-8 ### 0.50 2.94 7.35

VER
02.05.03 ACERO DE REFUERZO F'Y=4200 KG/CM2 P/COLUMNETA CUADRO DE 543.70 KG
METRADOS
PLANILLA DE METRADOS (ESTRUCTURAS )
MEJORAMIENTO DE LOS SERVICIOS EDUCATIVO DEL NIVEL SECUNDARIOEN LA I.E. TUPAC AMARU EN LA
Proyecto
LOCALIDAD DE PALCA DISTRITO DE PALCA -HUANCAVELICA -HUANCAVELICA
Respon. : ING. ANGEL CHOQUE CONTRERAS Y EQUIPO TECNICO Provincia : HUANCAVELICA
Fecha : NOVIEMBRE 2013 Distrito : PALCA
Formula : COMPONENTE AREA PEDAGOGICA (AULAS) Lugar : PALCA

LARGO ANCHO ALTO PARCI


ITEM PARTIDA DESCRIPCION UBICACIN DE ELEMENTO CANT TOTAL UND
(m) (m) (m) AL

02.06.00 VIGAS
02.06.01 CONCRETO PARA VIGAS f'c=210 kg/cm2 86.90 M3
1 PISO
EJE 1-3-4-5-6-7-8-
TRAMO D-E ### 2.35 0.25 ### ###
9
### 2.35 0.30 ### ###
### 3.05 0.30 ### ###

TRAMO E-G ### 5.70 0.30 ### ###


### 6.20 0.30 ### ###

EJE
TRAMO RAMAPA ### 1.50 0.25 ### ###
1,3,4,5,6,7,8,9

EJE D-D TRAMO 1-8 ### ### 0.20 ### ###

EJE E-E TRAMO 1-8 ### ### 0.30 ### ###

EJE G-G TRAMO 1-8 ### ### 0.30 ### ###


TRAMO RAMPA
EJE H-H TRAMO 1-8 ### ### 0.20 ### ###

EJE I-I TRAMO 1-8 ### ### 0.25 ### ###

EJE J-J TRAMO 1-8 ### ### 0.20 ### ###

2 PISO
EJE 1-3-4-5-6-7-8-
TRAMO D-E ### 2.35 0.25 ### ###
9
### 2.35 0.30 ### ###

TRAMO E-G ### 5.70 0.30 ### ###

EJE D-D TRAMO 1-8 ### ### 0.20 ### ###

EJE E-E TRAMO 1-8 ### ### 0.30 ### ###

EJE G-G TRAMO 1-8 ### ### 0.30 ### ###

3 PISO
EJE 1-3-4-5-6-7-8-
TRAMO D-E ### 2.35 0.25 ### ###
9
### 2.35 0.30 ### ###

TRAMO E-G ### 5.70 0.30 ### ###

EJE D-D TRAMO 1-8 ### ### 0.20 ### ###

EJE E-E TRAMO 1-8 ### ### 0.30 ### ###

EJE G-G TRAMO 1-8 ### ### 0.30 ### ###

4 PISO
EJE 1-3-4-5-6-7-8-
TRAMO D-E ### 2.08 0.20 ### ###
9
### 2.08 0.25 ### ###

TRAMO E-G ### 6.40 0.20 ### ###


### 5.78 0.25 ### ###
### 5.78 0.30 ### ###

TRAMO G-H ### 1.22 0.20 ### ###


### 1.22 0.25 ### ###
### 1.25 0.30 ### ###

EJE D-D VIGA CANAL TRAMO1-8 ### ### ACAD= ### ###
EJE E-E TRAMO1-8 ### ### 0.25 ### ###
### ### 0.25 ### ###
EJE G-G TRAMO 1-8 ### ### 0.25 ### ###
EJE HH VIGA CANAL TRAMO 1-8 ### ### ACAD= ### ###

02.06.02 ENCOFRADO Y DESENCOFRADO NORMAL DE VIGAS 596.65 M2


1 PISO
EJE 1-3-4-5-6-7-8-
TRAMO D-E EXTRIOR ### 2.35 ### ###
9
INTERIOR ### 2.35 ### ###
BASE ### 2.35 0.20 ###
### 2.35 0.30 ###
### 2.35 0.25 ###
-
TRAMO E-G EXTERIOR ### 6.80 ### ###
### 6.80 ### ###
INTERIOR ### 6.20 ### ###
### 6.20 ### ###
BASE ### 6.20 ### ###

TRAMO E-G INTERIOR ### 0.75 ###


ACAD=
### 1.30 ### ###
PLANILLA DE METRADOS (ESTRUCTURAS )
MEJORAMIENTO DE LOS SERVICIOS EDUCATIVO DEL NIVEL SECUNDARIOEN LA I.E. TUPAC AMARU EN LA
Proyecto
LOCALIDAD DE PALCA DISTRITO DE PALCA -HUANCAVELICA -HUANCAVELICA
Respon. : ING. ANGEL CHOQUE CONTRERAS Y EQUIPO TECNICO Provincia : HUANCAVELICA
Fecha : NOVIEMBRE 2013 Distrito : PALCA
Formula : COMPONENTE AREA PEDAGOGICA (AULAS) Lugar : PALCA

LARGO ANCHO ALTO PARCI


ITEM PARTIDA DESCRIPCION UBICACIN DE ELEMENTO CANT TOTAL UND
(m) (m) (m) AL

BASE ### 1.30 0.30 ###

2 PISO
EJE 1-3-4-5-6-7-8-
TRAMO D-E EXTERIOR ### 2.35 ### ###
9
INTERIOR ### 2.35 ### ###
FONDO ### 2.35 0.25 ###

TRAMO E-G EXTERIOR ### 6.80 ### ###


### 6.20 ### ###
### 6.20 0.25 ###
### 6.20 0.30 ###

EJE D-D TRAMO 1-8 EXTERIOR ### ### ### ###


INTERIOR ### ### ### ###
BASE ### ### 0.20 ###

EJE E-E TRAMO 1-8 INTERIOR ### ### ### ###


BASE ### ### 0.25 ###

EJE G-G TRAMO 1-8 EXTERIOR ### ### ### ###


INTERIOR ### ### ### ###
### ### 0.25 ###

3 PISO
EJE 1-3-4-5-6-7-8-
TRAMO D-E EXTERIOR ### 2.35 ### ###
9
INTERIOR ### 2.35 ### ###
FONDO ### 2.35 0.25 ###

TRAMO E-G EXTERIOR ### 6.80 ### ###


### 6.20 ### ###
### 6.20 0.25 ###
### 6.20 0.30 ###

EJE D-D TRAMO 1-8 EXTERIOR ### ### ### ###


INTERIOR ### ### ### ###
BASE ### ### 0.20 ###

EJE E-E TRAMO 1-8 INTERIOR ### ### ### ###


BASE ### ### 0.25 ###

EJE G-G TRAMO 1-8 EXTERIOR ### ### ### ###


INTERIOR ### ### ### ###
### ### 0.25 ###

4 PISO
EJE 1-3-4-5-6-7-8-
TRAMO D-E EXTERIOR ### 2.08 ### ###
9
INTERIOR ### 1.82 ### ###
FONDO ### 1.82 0.25 ###
### 1.82 0.20 ###

TRAMO E-G EXTERIOR ### 8.11 ### ###


INTERIOR ### 5.80 ### ###
### 0.95 ### ###
### 5.80 0.25 ###
### 0.95 0.25

EJE D-D TRAMO 1-8 VIGA CANAL ### ### 2.80 ###
-
EJE E-E TRAMO 1-8 INTERIOR ### ### ### ###
FONDO ### ### 0.25 ###
-
EXTERIOR ### ### ### ###
INTERIOR ### ### ### ###
BASE ### ### 0.25 ###

EJE G-G TRAMO 1-8 INTERIOR ### ### ### ###


FONDO ### ### 0.25 ###

EJE H-H TRAMO 1-8 VIGA CANAL ### ### 2.80 ###

VER
CUADRO DE ### KG
02.06.03 ACERO DE REFUERZO F'Y=4200 KG/CM2 P/VIGAS METRADOS

02.07.00 VIGUETAS DE AMARRE


02.07.01 CONCRETO PARA VIGUETAS AMARRE f'c=175 kg/cm2 0.66 M3
PRIMER NIVEL EJE E-E ### 2.45 0.15 ### ###

SEGUNDO NIVEL EJE E-E ### 2.45 0.15 ### ###

TERCER NIVEL EJE E-E ### 2.45 0.15 ### ###

CUARTO NIVEL EJE E-E ### 2.45 0.15 ### ###


PLANILLA DE METRADOS (ESTRUCTURAS )
MEJORAMIENTO DE LOS SERVICIOS EDUCATIVO DEL NIVEL SECUNDARIOEN LA I.E. TUPAC AMARU EN LA
Proyecto
LOCALIDAD DE PALCA DISTRITO DE PALCA -HUANCAVELICA -HUANCAVELICA
Respon. : ING. ANGEL CHOQUE CONTRERAS Y EQUIPO TECNICO Provincia : HUANCAVELICA
Fecha : NOVIEMBRE 2013 Distrito : PALCA
Formula : COMPONENTE AREA PEDAGOGICA (AULAS) Lugar : PALCA

LARGO ANCHO ALTO PARCI


ITEM PARTIDA DESCRIPCION UBICACIN DE ELEMENTO CANT TOTAL UND
(m) (m) (m) AL

02.07.02 ENCOFRADO Y DESENCOFRADO EN VIGUETAS DE AMARRE 8.82 M2


PRIMER NIVEL EJE E-E ### 2.45 ### ###

SEGUNDO NIVEL EJE E-E ### 2.45 ### ###

TERCER NIVEL EJE E-E ### 2.45 ### ###

CUARTO NIVEL EJE E-E ### 2.45 ### ###

VER
CUADRO DE 66.67 KG
02.07.03 ACERO DE REFUERZO F'Y=4200 KG/CM2 METRADOS

02.08.00 LOSA ALIGERADA


02.08.01 CONCRETO PARA LOSA ALIGERADA f'c=210 kg/cm2 76.87 M3
1 PISO T-01 LOSA ### ACAD= 57.12 0.05 2.86
VIGUETA ### 27.35 0.10 0.15 2.05

T-02 LOSA ### ACAD= 165.53 0.05 8.28


VIGUETA ### 27.35 0.10 0.15 6.15

2 PISO T-01 LOSA ### ACAD= 55.37 0.05 2.77


VIGUETA ### 25.85 0.10 0.15 1.94

T-02 LOSA ### ACAD= 158.09 0.05 7.90


VIGUETA ### 25.85 0.10 0.15 5.82

3 PISO T-01 LOSA ### ACAD= 55.37 0.05 2.77


VIGUETA ### 25.85 0.10 0.15 1.94

T-02 LOSA ### ACAD= 158.09 0.05 7.90


VIGUETA ### 25.85 0.10 0.15 5.82

TECHO T-01 LOSA ### ACAD= 51.02 0.05 2.55


VIGUETA ### 28.30 0.10 0.15 1.70

T-02 LOSA ### ACAD= 201.27 0.05 10.06


VIGUETA ### 28.30 0.10 0.15 6.37

02.08.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA ALIGUERADA 901.86 M2


1 PISO T-01 LOSA ### ACAD= 57.12 57.12
T-02 LOSA ### ACAD= 165.53 165.53

2 PISO T-01 LOSA ### ACAD= 55.37 55.37


T-02 LOSA ### ACAD= 158.09 158.09

3 PISO T-01 LOSA ### ACAD= 55.37 55.37


T-02 LOSA ### ACAD= 158.09 158.09

TECHO T-01 LOSA ### ACAD= 51.02 51.02


T-02 LOSA ### ACAD= 201.27 201.27

VER
02.08.03 ACERO DE REFUERZO F'Y=4200 KG/CM2 CUADRO DE ### KG
METRADOS

02.08.04 LADRILLOS HUECO DE ARCULLA 15x30x30 cm P/TECHOALIGERADO ### UND


FACTO
R
1 PISO T-01 LOSA ### ACAD= 57.12 8.33 475.81
T-02 LOSA ### ACAD= 165.53 8.33 ###

2 PISO T-01 LOSA ### ACAD= 55.37 8.33 461.23


T-02 LOSA ### ACAD= 158.09 8.33 ###

3 PISO T-01 LOSA ### ACAD= 55.37 8.33 461.23


T-02 LOSA ### ACAD= 158.09 8.33 ###

TECHO T-01 LOSA ### ACAD= 51.02 8.33 425.00


T-02 LOSA ### ACAD= 201.27 8.33 ###

02.09.00 RAMPA LOSA MACIZA


02.09.01 CONCRETO PARA LOSA MACIZA f'c=210 kg/cm2 3.45 M3
RAMPA ### ACAD= 23.02 0.15 3.45

02.09.02 ENCOFRADO Y DESENCOFRADO EN RAMPA 23.02 M3


### ACAD= 23.02 23.02
VER
02.09.03 ACERO DE REFUERZO F'Y=4200 KG/CM2 CUADRO DE 257.52 KG
METRADOS
PLANILLA DE METRADOS (ESTRUCTURAS )
MEJORAMIENTO DE LOS SERVICIOS EDUCATIVO DEL NIVEL SECUNDARIOEN LA I.E. TUPAC AMARU EN LA
Proyecto
LOCALIDAD DE PALCA DISTRITO DE PALCA -HUANCAVELICA -HUANCAVELICA
Respon. : ING. ANGEL CHOQUE CONTRERAS Y EQUIPO TECNICO Provincia : HUANCAVELICA
Fecha : NOVIEMBRE 2013 Distrito : PALCA
Formula : COMPONENTE AREA PEDAGOGICA (AULAS) Lugar : PALCA

LARGO ANCHO ALTO PARCI


ITEM PARTIDA DESCRIPCION UBICACIN DE ELEMENTO CANT TOTAL UND
(m) (m) (m) AL

02.10.00 ENSAYO DE LABORATORIO


02.10.01 DISEO DE MAZCLA F'C = 140KG/CM2, F'C=175KG7CM2, F'c 210KG/CM2 3.00 UND.
### 1.00 3.00

02.10.01 PRUEBA DE CONTROL DE CALIDAD DE CONCRETO(PRUEBA A LA COMPRESION) 101.00 UND.


ZAPATAS 1.00 76.44 20.00
PLACAS 1.00 36.53 12.00
COLUMNAS 1.00 38.97 12.00
COLUMNETAS 1.00 3.70 3.00
VIGAS 1.00 86.90 24.00
LOSA ALIGERADA 1.00 76.87 30.00
PLANILLA DE METRADOS (ESTRUCTURAS )

Proyecto EXAMEN PARCIAL DE METRADOS DE OBRA - CONSTRUCCION CIVIL TERCER CICLO

Nombre. Instituci : I.E.S.T.P.H


Fecha : HUANCAVELICA 2017 Distrito : ASCENSION
Formula : COMPONENTE VIVIENDA Lugar : Av. Santos villa N

DESCRIPCI UBICACIN DE LARGO ANCHO ALTO PARCI


ITEM PARTIDA CANT TOTAL UND
ON ELEMENTO (m) (m) (m) AL

01.00.00 OBRAS PROVISIONALES


01.01.00 ADECUACION DE ALMACEN 55.00 m2
### 11.00 5.00 55.00

01.02.00 CERCO PERIMETRICO DE OBRA 48.00 ML


CERCO PERIMETRICO EN HACHADA ### 14.00 14.00
CERCO PERIMETRICO POSTERIOR ### 14.00 14.00
CERCO PERIMETRICO ENTRANDO A LA
### 10.00 10.00
IZQUIERDA
CERCO PERIMETRICO ENTRANDO A LA DERECHA ### 10.00 10.00

01.03.00 AGUA PARA LA CONSTRUCCION 2.00 mes


### 2.00

01.04.00 DESAGUE PARA LA CONSTRUCCION 1.00 und


### ###

01.05.00 ENERGIA ELECTRICA 2.00 mes


### 2.00

02.00.00 OBRAS PRELIMINARES


02.01.00 ESTRUCTURAS
02.01.01 LIMPIEZA DE TERRENO 420.00 m2
### 10.00 6.00 240.00
### 10.00 6.00 180.00

02.01.02 MOVIMIENTO DE TIERRAS


EXCAVACION DE ZANJAS EN ZAPATAS Hprom.
02.01.02.0 10.87 m3
max=1.20
Z1 EJE AA-22 ### 1.10 1.10 1.20 1.45
EJE BB-22 ### 1.10 1.10 1.20 1.45
EJE CC-22 ### 1.10 1.10 1.20 1.45

Z2 EJE AA-11 ### 1.00 1.00 1.20 1.20


EJE BB-11 ### 1.00 1.00 1.20 1.20
EJE CC-11 ### 1.00 1.00 1.20 1.20

Z3 EJE AA-33 ### 0.90 0.90 1.20 0.97


EJE BB-33 ### 0.90 0.90 1.20 0.97
EJE CC-33 ### 0.90 0.90 1.20 0.97

EXCAVACION DE ZANJAS EN CIMIENTOS


02.01.02.0 4.94 m3
CORRIDOS Hprom. max=0.50
EJE 1-AB ### 3.50 0.40 0.50 0.70
EJE 1-BC ### 3.50 0.40 0.50 0.70
EJE 2-BC ### 3.50 0.40 0.40 0.56
EJE 3-AB ### 3.65 0.40 0.50 0.73
EJE 3-BC ### 3.65 0.40 0.50 0.73
ENTRE EJES 2y3- EJES
### 3.58 0.40 0.40 0.57
AB 2y3- EJES
ENTRE EJES
### 1.83 0.40 0.40 0.29
BC
EJE C-1y2 ### 2.17 0.40 0.50 0.43
EJE A-2y3 ### 0.63 0.40 0.50 0.13
ENTRE EJES BC- EJES
### 0.61 0.40 0.40 KJJHJ
2y3
EJE C-2y3 ### 0.61 0.40 0.40 0.10

03.00.00 CONCRETO SIMPLE 9.06 M2


CONCRETOfc=100kg/cm2e=10cm. Para
03.01.00
solados
Z1 EJE AA-22 ### 1.10 1.10 1.21
EJE BB-22 ### 1.10 1.10 1.21
EJE CC-22 ### 1.10 1.10 1.21

Z2 EJE AA-11 ### 1.00 1.00 1.00


EJE BB-11 ### 1.00 1.00 1.00
EJE CC-11 ### 1.00 1.00 1.00

Z3 EJE AA-33 ### 0.90 0.90 0.81


EJE BB-33 ### 0.90 0.90 0.81
EJE CC-33 ### 0.90 0.90 0.81

CONCRETO PARA CIMIENTO CORRIDO C:H-1:10 +


03.02.00 30% P.G. 6.67 M3
EJE 1-AB ### 4.63 0.40 0.50 0.93
EJE 1-BC ### 4.63 0.40 0.50 0.93
EJE 2-BC ### 3.93 0.40 0.40 0.63
EJE 3-AB ### 4.63 0.40 0.50 0.93
EJE 3-BC ### 4.63 0.40 0.50 0.93
ENTRE EJES 2y3- EJES
### 3.58 0.40 0.40 0.57
AB 2y3- EJES
ENTRE EJES
### 1.83 0.40 0.40 0.29
BC
EJE C-1y2 ### AREA 1.32 0.50 0.66
EJE A-2y3 ### 1.06 0.40 0.50 0.21
ENTRE EJES BC- EJES
### 1.01 0.40 0.40 0.16
2y3
EJE C-2y3 ### 1.03 0.40 0.40 0.16
EJE B-2y3 ### 0.91 0.40 0.40 0.15
EJE A-1y2 ### AREA 0.26 0.50 0.13
PLANILLA DE METRADOS (ESTRUCTURAS )

Proyecto EXAMEN PARCIAL DE METRADOS DE OBRA - CONSTRUCCION CIVIL TERCER CICLO

Nombre. Instituci : I.E.S.T.P.H


Fecha : HUANCAVELICA 2017 Distrito : ASCENSION
Formula : COMPONENTE VIVIENDA Lugar : Av. Santos villa N

DESCRIPCI UBICACIN DE LARGO ANCHO ALTO PARCI


ITEM PARTIDA CANT TOTAL UND
ON ELEMENTO (m) (m) (m) AL

CONCRETO PARA SOBRECIMIENTO C:H-1:18 + 25%


03.03.00 P.M. 2.61 M3
EJE 1-AB ### 4.63 0.23 0.40 0.43
EJE 1-BC ### 4.63 0.23 0.40 0.43
EJE 2-BC ### 3.93 0.13 0.40 0.20
EJE 3-AB ### 4.63 0.23 0.40 0.43
EJE 3-BC ### 4.63 0.23 0.40 0.43
ENTRE EJES 2y3- EJES
### 3.58 0.13 0.40 0.19
AB 2y3- EJES
ENTRE EJES
### 1.83 0.13 0.40 0.10
BC
EJE C-1y2 ### 3.35 0.13 0.40 0.17
EJE A-2y3 ### 1.06 0.13 0.40 0.06
ENTRE EJES BC- EJES
### 1.01 0.13 0.40 0.05
2y3
EJE C-2y3 ### 1.03 0.13 0.40 0.05
EJE B-2y3 ### 0.91 0.13 0.40 0.05
EJE A-1y2 ### 0.71 0.13 0.40 0.04

28.74 M2
EJE 1-AB ### 4.63 0.40 3.70
EJE 1-BC ### 4.63 0.40 3.70
EJE 2-BC ### 3.93 0.40 3.14
EJE 3-AB ### 4.63 0.40 3.70
EJE 3-BC ### 4.63 0.40 3.70
ENTRE EJES 2y3- EJES
### 3.58 0.40 2.86
AB
ENTRE EJES 2y3- EJES
### 1.83 0.40 1.46
BC
EJE C-1y2 ### 3.35 0.40 2.68
EJE A-2y3 ### 1.06 0.40 0.85
ENTRE EJES BC- EJES
### 1.01 0.40 0.81
2y3
EJE C-2y3 ### 1.03 0.40 0.82
EJE B-2y3 ### 0.91 0.40 0.73
EJE A-1y2 ### 0.71 0.40 0.57

concreto para zapatas f,c=210 kg/cm2 Z1 EJE AA-22 ### 1.10 1.10 0.50 0.61 4.53 m3
EJE BB-22 ### 1.10 1.10 0.50 0.61
EJE CC-22 ### 1.10 1.10 0.50 0.61

Z2 EJE AA-11 ### 1.00 1.00 0.50 0.50


EJE BB-11 ### 1.00 1.00 0.50 0.50
EJE CC-11 ### 1.00 1.00 0.50 0.50

Z3 EJE AA-33 ### 0.90 0.90 0.50 0.41


EJE BB-33 ### 0.90 0.90 0.50 0.41
EJE CC-33 ### 0.90 0.90 0.50 0.41
PLANILLA DE METRADOS (ESTRUCTURAS )

Proyecto EXAMEN PARCIAL DE METRADOS DE OBRA - CONSTRUCCION CIVIL TERCER CICLO

Nombre. Instituci : I.E.S.T.P.H


Fecha : HUANCAVELICA 2017 Distrito : ASCENSION
Formula : COMPONENTE VIVIENDA Lugar : Av. Santos villa N

DESCRIPCI UBICACIN DE LARGO ANCHO ALTO PARCI


ITEM PARTIDA CANT TOTAL UND
ON ELEMENTO (m) (m) (m) AL
PLANILLA DE METRADOS (ESTRUCTURAS )

Proyecto EXAMEN PARCIAL DE METRADOS DE OBRA - CONSTRUCCION CIVIL TERCER CICLO

Nombre. Instituci : I.E.S.T.P.H


Fecha : HUANCAVELICA 2017 Distrito : ASCENSION
Formula : COMPONENTE VIVIENDA Lugar : Av. Santos villa N

DESCRIPCI UBICACIN DE LARGO ANCHO ALTO PARCI


ITEM PARTIDA CANT TOTAL UND
ON ELEMENTO (m) (m) (m) AL
PLANILLA DE METRADOS (ESTRUCTURAS )

Proyecto EXAMEN PARCIAL DE METRADOS DE OBRA - CONSTRUCCION CIVIL TERCER CICLO

Nombre. Instituci : I.E.S.T.P.H


Fecha : HUANCAVELICA 2017 Distrito : ASCENSION
Formula : COMPONENTE VIVIENDA Lugar : Av. Santos villa N

DESCRIPCI UBICACIN DE LARGO ANCHO ALTO PARCI


ITEM PARTIDA CANT TOTAL UND
ON ELEMENTO (m) (m) (m) AL
PLANILLA DE METRADOS (ESTRUCTURAS )

Proyecto EXAMEN PARCIAL DE METRADOS DE OBRA - CONSTRUCCION CIVIL TERCER CICLO

Nombre. Instituci : I.E.S.T.P.H


Fecha : HUANCAVELICA 2017 Distrito : ASCENSION
Formula : COMPONENTE VIVIENDA Lugar : Av. Santos villa N

DESCRIPCI UBICACIN DE LARGO ANCHO ALTO PARCI


ITEM PARTIDA CANT TOTAL UND
ON ELEMENTO (m) (m) (m) AL
PLANILLA DE METRADOS (ESTRUCTURAS )

Proyecto EXAMEN PARCIAL DE METRADOS DE OBRA - CONSTRUCCION CIVIL TERCER CICLO

Nombre. Instituci : I.E.S.T.P.H


Fecha : HUANCAVELICA 2017 Distrito : ASCENSION
Formula : COMPONENTE VIVIENDA Lugar : Av. Santos villa N

DESCRIPCI UBICACIN DE LARGO ANCHO ALTO PARCI


ITEM PARTIDA CANT TOTAL UND
ON ELEMENTO (m) (m) (m) AL
PLANILLA DE METRADOS (ESTRUCTURAS )

Proyecto EXAMEN PARCIAL DE METRADOS DE OBRA - CONSTRUCCION CIVIL TERCER CICLO

Nombre. Instituci : I.E.S.T.P.H


Fecha : HUANCAVELICA 2017 Distrito : ASCENSION
Formula : COMPONENTE VIVIENDA Lugar : Av. Santos villa N

DESCRIPCI UBICACIN DE LARGO ANCHO ALTO PARCI


ITEM PARTIDA CANT TOTAL UND
ON ELEMENTO (m) (m) (m) AL
PLANILLA DE METRADOS (ESTRUCTURAS )

Proyecto EXAMEN PARCIAL DE METRADOS DE OBRA - CONSTRUCCION CIVIL TERCER CICLO

Nombre. Instituci : I.E.S.T.P.H


Fecha : HUANCAVELICA 2017 Distrito : ASCENSION
Formula : COMPONENTE VIVIENDA Lugar : Av. Santos villa N

DESCRIPCI UBICACIN DE LARGO ANCHO ALTO PARCI


ITEM PARTIDA CANT TOTAL UND
ON ELEMENTO (m) (m) (m) AL

01.00.00 OBRAS PROVISIONALES


01.01.00 ADECUACION DE ALMACEN
### 11.00 5.00 55.00 55.00 m2

01.02.00 CERCO PERIMETRICO DE OBRA ML


CERCO PERIMETRICO EN HACHADA ### 14.00 14.00 48.00
CERCO PERIMETRICO POSTERIOR ### 14.00 14.00
CERCO PERIMETRICO ENTRANDO A LA
### 10.00 10.00
IZQUIERDA
CERCO PERIMETRICO ENTRANDO A LA
### 10.00 10.00
DERECHA

01.03.00 AGUA PARA LA CONSTRUCCION ### 2.00 mes

01.04.00 DESAGUE PARA LA CONSTRUCCION ### und

01.05.00 ENERGIA ELECTRICA ### mes

02.00.00 OBRAS PRELIMINARES


02.01.00 ESTRUCTURAS
02.01.01 LIMPIEZA DE TERRENO ### 10.00 6.00 240.00 420.00 m2
### 10.00 6.00 180.00

02.01.02 MOVIMIENTO DE TIERRAS


EXCAVACION DE ZANJAS EN ZAPATAS
15.62 m3
Hprom. max=1.20

EXCAVACION DE ZANJAS EN CIMIENTOS


4.36 m3
CORRIDOS Hprom. max=0.50
CONCRETO SIMPLE
CONCRETOfc=100kg/cm2e=10cm. Para
13.02
solados
CONCRETO PARA CIMIENTO CORRIDO C:H-1:10 +
30% P.G. 6.49
PLANILLA DE METRADOS (ESTRUCTURAS )

Proyecto EXAMEN PARCIAL DE METRADOS DE OBRA - CONSTRUCCION CIVIL TERCER CICLO

Nombre. Instituci : I.E.S.T.P.H


Fecha : HUANCAVELICA 2017 Distrito : ASCENSION
Formula : COMPONENTE VIVIENDA Lugar : Av. Santos villa N

DESCRIPCI UBICACIN DE LARGO ANCHO ALTO PARCI


ITEM PARTIDA CANT TOTAL UND
ON ELEMENTO (m) (m) (m) AL
PLANILLA DE METRADOS (ESTRUCTURAS )

Proyecto EXAMEN PARCIAL DE METRADOS DE OBRA - CONSTRUCCION CIVIL TERCER CICLO

Nombre. Instituci : I.E.S.T.P.H


Fecha : HUANCAVELICA 2017 Distrito : ASCENSION
Formula : COMPONENTE VIVIENDA Lugar : Av. Santos villa N

DESCRIPCI UBICACIN DE LARGO ANCHO ALTO PARCI


ITEM PARTIDA CANT TOTAL UND
ON ELEMENTO (m) (m) (m) AL
PLANILLA DE METRADOS (ESTRUCTURAS )

Proyecto EXAMEN PARCIAL DE METRADOS DE OBRA - CONSTRUCCION CIVIL TERCER CICLO

Nombre. Instituci : I.E.S.T.P.H


Fecha : HUANCAVELICA 2017 Distrito : ASCENSION
Formula : COMPONENTE VIVIENDA Lugar : Av. Santos villa N

DESCRIPCI UBICACIN DE LARGO ANCHO ALTO PARCI


ITEM PARTIDA CANT TOTAL UND
ON ELEMENTO (m) (m) (m) AL
PLANILLA DE METRADOS (ESTRUCTURAS )

Proyecto EXAMEN PARCIAL DE METRADOS DE OBRA - CONSTRUCCION CIVIL TERCER CICLO

Nombre. Instituci : I.E.S.T.P.H


Fecha : HUANCAVELICA 2017 Distrito : ASCENSION
Formula : COMPONENTE VIVIENDA Lugar : Av. Santos villa N

DESCRIPCI UBICACIN DE LARGO ANCHO ALTO PARCI


ITEM PARTIDA CANT TOTAL UND
ON ELEMENTO (m) (m) (m) AL
PLANILLA DE METRADOS (ESTRUCTURAS )

Proyecto EXAMEN PARCIAL DE METRADOS DE OBRA - CONSTRUCCION CIVIL TERCER CICLO

Nombre. Instituci : I.E.S.T.P.H


Fecha : HUANCAVELICA 2017 Distrito : ASCENSION
Formula : COMPONENTE VIVIENDA Lugar : Av. Santos villa N

DESCRIPCI UBICACIN DE LARGO ANCHO ALTO PARCI


ITEM PARTIDA CANT TOTAL UND
ON ELEMENTO (m) (m) (m) AL
PLANILLA DE METRADOS (ESTRUCTURAS )

Proyecto EXAMEN PARCIAL DE METRADOS DE OBRA - CONSTRUCCION CIVIL TERCER CICLO

Nombre. Instituci : I.E.S.T.P.H


Fecha : HUANCAVELICA 2017 Distrito : ASCENSION
Formula : COMPONENTE VIVIENDA Lugar : Av. Santos villa N

DESCRIPCI UBICACIN DE LARGO ANCHO ALTO PARCI


ITEM PARTIDA CANT TOTAL UND
ON ELEMENTO (m) (m) (m) AL
PLANILLA DE METRADOS (ESTRUCTURAS )

Proyecto EXAMEN PARCIAL DE METRADOS DE OBRA - CONSTRUCCION CIVIL TERCER CICLO

Nombre. Instituci : I.E.S.T.P.H


Fecha : HUANCAVELICA 2017 Distrito : ASCENSION
Formula : COMPONENTE VIVIENDA Lugar : Av. Santos villa N

DESCRIPCI UBICACIN DE LARGO ANCHO ALTO PARCI


ITEM PARTIDA CANT TOTAL UND
ON ELEMENTO (m) (m) (m) AL

01.00.00 OBRAS PROVISIONALES


01.01.00 ADECUACION DE ALMACEN
### 11.00 5.00 55.00 55.00 m2

01.02.00 CERCO PERIMETRICO DE OBRA ML


CERCO PERIMETRICO EN HACHADA ### 14.00 14.00 48.00
CERCO PERIMETRICO POSTERIOR ### 14.00 14.00
CERCO PERIMETRICO ENTRANDO A LA
### 10.00 10.00
IZQUIERDA
CERCO PERIMETRICO ENTRANDO A LA
### 10.00 10.00
DERECHA

01.03.00 AGUA PARA LA CONSTRUCCION ### 2.00 mes

01.04.00 DESAGUE PARA LA CONSTRUCCION ### und

01.05.00 ENERGIA ELECTRICA ### mes

02.00.00 OBRAS PRELIMINARES


02.01.00 ESTRUCTURAS
02.01.01 LIMPIEZA DE TERRENO ### 10.00 6.00 240.00 420.00 m2
### 10.00 6.00 180.00

02.01.02 MOVIMIENTO DE TIERRAS


EXCAVACION DE ZANJAS EN ZAPATAS
10.87 m3
Hprom. max=1.20
Z1 EJE AA-22 ### 1.10 1.10 1.20 1.45
EJE BB-22 ### 1.10 1.10 1.20 1.45
EJE CC-22 ### 1.10 1.10 1.20 1.45

Z2 EJE AA-11 ### 1.00 1.00 1.20 1.20


EJE BB-11 ### 1.00 1.00 1.20 1.20
EJE CC-11 ### 1.00 1.00 1.20 1.20

Z3 EJE AA-33 ### 0.90 0.90 1.20 0.97


EJE BB-33 ### 0.90 0.90 1.20 0.97
EJE CC-33 ### 0.90 0.90 1.20 0.97

EXCAVACION DE ZANJAS EN CIMIENTOS


4.13 m3
CORRIDOS Hprom. max=0.50
### 3.50 0.40 0.50 0.70
### 3.50 0.40 0.50 0.70
### 3.35 0.40 0.40 0.54
### 3.35 0.40 0.40 0.54
### 3.05 0.40 0.50 0.61
### 3.05 0.40 0.50 0.61
### 2.17 0.40 0.50 0.43

SOLADOS 11.70 M2
Z1 ### 1.00 1.00 3.00

Z2 ### 1.10 1.10 3.63

Z3 ### 1.30 1.30 5.07


PLANILLA DE METRADOS (ESTRUCTURAS )

Proyecto EXAMEN PARCIAL DE METRADOS DE OBRA - CONSTRUCCION CIVIL TERCER CICLO

Nombre. Instituci : I.E.S.T.P.H


Fecha : HUANCAVELICA 2017 Distrito : ASCENSION
Formula : COMPONENTE VIVIENDA Lugar : Av. Santos villa N

DESCRIPCI UBICACIN DE LARGO ANCHO ALTO PARCI


ITEM PARTIDA CANT TOTAL UND
ON ELEMENTO (m) (m) (m) AL
PLANILLA DE METRADOS (ESTRUCTURAS )

Proyecto EXAMEN PARCIAL DE METRADOS DE OBRA - CONSTRUCCION CIVIL TERCER CICLO

Nombre. Instituci : I.E.S.T.P.H


Fecha : HUANCAVELICA 2017 Distrito : ASCENSION
Formula : COMPONENTE VIVIENDA Lugar : Av. Santos villa N

DESCRIPCI UBICACIN DE LARGO ANCHO ALTO PARCI


ITEM PARTIDA CANT TOTAL UND
ON ELEMENTO (m) (m) (m) AL
PLANILLA DE METRADOS (ESTRUCTURAS )

Proyecto EXAMEN PARCIAL DE METRADOS DE OBRA - CONSTRUCCION CIVIL TERCER CICLO

Nombre. Instituci : I.E.S.T.P.H


Fecha : HUANCAVELICA 2017 Distrito : ASCENSION
Formula : COMPONENTE VIVIENDA Lugar : Av. Santos villa N

DESCRIPCI UBICACIN DE LARGO ANCHO ALTO PARCI


ITEM PARTIDA CANT TOTAL UND
ON ELEMENTO (m) (m) (m) AL
PLANILLA DE METRADOS (ESTRUCTURAS )

Proyecto EXAMEN PARCIAL DE METRADOS DE OBRA - CONSTRUCCION CIVIL TERCER CICLO

Nombre. Instituci : I.E.S.T.P.H


Fecha : HUANCAVELICA 2017 Distrito : ASCENSION
Formula : COMPONENTE VIVIENDA Lugar : Av. Santos villa N

DESCRIPCI UBICACIN DE LARGO ANCHO ALTO PARCI


ITEM PARTIDA CANT TOTAL UND
ON ELEMENTO (m) (m) (m) AL
PLANILLA DE METRADOS (ESTRUCTURAS )

Proyecto EXAMEN PARCIAL DE METRADOS DE OBRA - CONSTRUCCION CIVIL TERCER CICLO

Nombre. Instituci : I.E.S.T.P.H


Fecha : HUANCAVELICA 2017 Distrito : ASCENSION
Formula : COMPONENTE VIVIENDA Lugar : Av. Santos villa N

DESCRIPCI UBICACIN DE LARGO ANCHO ALTO PARCI


ITEM PARTIDA CANT TOTAL UND
ON ELEMENTO (m) (m) (m) AL
PLANILLA DE METRADOS (ESTRUCTURAS )

Proyecto EXAMEN PARCIAL DE METRADOS DE OBRA - CONSTRUCCION CIVIL TERCER CICLO

Nombre. Instituci : I.E.S.T.P.H


Fecha : HUANCAVELICA 2017 Distrito : ASCENSION
Formula : COMPONENTE VIVIENDA Lugar : Av. Santos villa N

DESCRIPCI UBICACIN DE LARGO ANCHO ALTO PARCI


ITEM PARTIDA CANT TOTAL UND
ON ELEMENTO (m) (m) (m) AL
PLANILLA DE METRADOS (ESTRUCTURAS )

Proyecto EXAMEN PARCIAL DE METRADOS DE OBRA - CONSTRUCCION CIVIL TERCER CICLO

Nombre. Instituci : I.E.S.T.P.H


Fecha : HUANCAVELICA 2017 Distrito : ASCENSION
Formula : COMPONENTE VIVIENDA Lugar : Av. Santos villa N

DESCRIPCI UBICACIN DE LARGO ANCHO ALTO PARCI


ITEM PARTIDA CANT TOTAL UND
ON ELEMENTO (m) (m) (m) AL
PLANILLA DE METRADOS (ACERO EN ZAPATAS)

MEJORAMIENTO DE LOS SERVICIOS EDUCATIVO DEL NIVEL SECUNDARIOEN LA I.E. TUPAC AMARU EN LA LOCALIDAD DE PALCA DISTRITO DE PALCA
Proyecto:
-HUANCAVELICA -HUANCAVELICA
Respon. : ING. ANGEL CHOQUE CONTRERAS Y EQUIPO TECNICO Provincia : HUANCAVELICA
Fecha : NOVIEMBRE 2013 Distrito : PALCA
Formula : COMPONENTE AREA PEDAGOGICA (AULAS) Localidad : PALCA

LONG. CANT. DE N DE
ITEM PARTIDA DESCRIPCION TIPO 1" 3/4" 5/8" 1/2" 3/8" 1/4"
PARCIAL ELEMENTOS VECES

02.01.02 ACERO FY=4,200KG/CM2, GRADO 60


ZAPATAS ZAPATA ( Z - 01)
HORZ. 5/8" 2.10 40.00 1.00 84.00
VERT. 5/8" 6.80 13.00 1.00 88.40

1/2" 6.80 11.00 1.00 74.80


3/8" 2.10 35.00 1.00 73.50
ZAPATA ( Z - 02)
HORZ. 5/8" 2.50 41.00 1.00 102.50
VERT. 5/8" 7.05 15.00 1.00 105.75
ZAPATA ( Z - 03)
HORZ. 5/8" 2.70 16.00 1.00 43.20
VERT. 5/8" 2.70 16.00 1.00 43.20

ZAPATA ( Z - 04)
HORZ. 5/8" 2.10 41.00 1.00 86.10
VERT. 5/8" 7.00 13.00 1.00 91.00

3/8" 2.50 36.00 1.00 90.00


1/2" 7.00 11.00 1.00 77.00

ZAPATA ( Z - 05)
HORZ. 5/8" 2.20 17.00 1.00 37.40
VERT. 5/8" 2.90 13.00 1.00 37.70
ZAPATA ( Z - 06)
HORZ. 5/8" 2.20 17.00 1.00 37.40
VERT. 5/8" 2.90 13.00 1.00 37.70
ZAPATA ( Z - 07)
HORZ. 5/8" 2.70 22.00 1.00 59.40
PLANILLA DE METRADOS (ACERO EN ZAPATAS)

MEJORAMIENTO DE LOS SERVICIOS EDUCATIVO DEL NIVEL SECUNDARIOEN LA I.E. TUPAC AMARU EN LA LOCALIDAD DE PALCA DISTRITO DE PALCA
Proyecto:
-HUANCAVELICA -HUANCAVELICA
Respon. : ING. ANGEL CHOQUE CONTRERAS Y EQUIPO TECNICO Provincia : HUANCAVELICA
Fecha : NOVIEMBRE 2013 Distrito : PALCA
Formula : COMPONENTE AREA PEDAGOGICA (AULAS) Localidad : PALCA

LONG. CANT. DE N DE
ITEM PARTIDA DESCRIPCION TIPO 1" 3/4" 5/8" 1/2" 3/8" 1/4"
PARCIAL ELEMENTOS VECES
VERT. 5/8" 5.65 16.00 1.00 90.40

5/8" 4.00 7.00 1.00 28.00


5/8" 1.90 7.00 1.00 13.30

ZAPATA ( Z - 08)
HORZ. 5/8" 2.20 17.00 1.00 37.40
VERT. 5/8" 2.90 13.00 1.00 37.70

ZAPATA ( Z - 09)
HORZ. 5/8" 2.20 13.00 1.00 28.60
VERT. 5/8" 2.90 17.00 1.00 49.30

ZAPATA ( Z - 10)
HORZ. 5/8" 2.20 17.00 1.00 37.40
VERT. 5/8" 2.90 13.00 1.00 37.70

ZAPATA ( Z - 11)
HORZ. 5/8" 3.70 11.00 1.00 40.70
VERT. 5/8" 1.90 9.00 1.00 17.10

5/8" 2.10 22.00 1.00 46.20


5/8" 5.70 13.00 1.00 74.10

TOTAL (ML) 0.00 0.00 ### 151.80 163.50 0.00


4.04 2.26 1.60 1.02 0.58 0.25
TOTAL 0.00 0.00 ### 154.84 94.83 0.00
(KG)
PLANILLA DE METRADOS (ACERO EN ZAPATAS)

MEJORAMIENTO DE LOS SERVICIOS EDUCATIVO DEL NIVEL SECUNDARIOEN LA I.E. TUPAC AMARU EN LA LOCALIDAD DE PALCA DISTRITO DE PALCA
Proyecto:
-HUANCAVELICA -HUANCAVELICA
Respon. : ING. ANGEL CHOQUE CONTRERAS Y EQUIPO TECNICO Provincia : HUANCAVELICA
Fecha : NOVIEMBRE 2013 Distrito : PALCA
Formula : COMPONENTE AREA PEDAGOGICA (AULAS) Localidad : PALCA

LONG. CANT. DE N DE
ITEM PARTIDA DESCRIPCION TIPO TOTAL 1" 3/4" 5/8" 1/2" 3/8" 1/4"
PARCIAL ELEMENTOS VECES
(KG)
###
PLANILLA DE METRADOS (ACERO EN SOBRECIMIENTO REFORZADO)

MEJORAMIENTO DE LOS SERVICIOS EDUCATIVO DEL NIVEL SECUNDARIOEN LA I.E. TUPAC AMARU EN LA
Proyecto:
LOCALIDAD DE PALCA DISTRITO DE PALCA -HUANCAVELICA -HUANCAVELICA
Respon. : ING. ANGEL CHOQUE CONTRERAS Y EQUIPO TECNICO Provincia : HUANCAVELICA
Fecha : NOVIEMBRE 2013 Distrito : PALCA
Formula : COMPONENTE AREA PEDAGOGICA (AULAS) Localidad : PALCA

CANT.
LONG. DE N DE
ITEM PARTIDA DESCRIPCION TIPO 1" 3/4" 5/8" 1/2" 3/8" 1/4"
PARCIAL ELEMEN VECES
TOS

02.02.03 ACERO FY= 4200KG/CM2 / GRADO 60

Horizontal 1/2" 6.00 5.00 1.00 ###


Vertical 1/2" 1.05 30.00 1.00 ###

TOTAL (ML) 0.00 0.00 0.00 61.50 0.00 0.00


4.04 2.26 1.60 1.02 0.58 0.25
TOTAL 0.00 0.00 0.00 62.73 0.00 0.00
(KG)
62.73
PLANILLA DE METRADOS (ACERO EN PLACA )

MEJORAMIENTO DE LOS SERVICIOS EDUCATIVO DEL NIVEL SECUNDARIOEN LA I.E. TUPAC AMARU EN LA LOCALIDAD DE
Proyecto:
PALCA DISTRITO DE PALCA -HUANCAVELICA -HUANCAVELICA
Respon. : ING. ANGEL CHOQUE CONTRERAS Y EQUIPO TECNICO Provincia : HUANCAVELICA
Fecha : NOVIEMBRE 2013 Distrito : PALCA
Formula : COMPONENTE AREA PEDAGOGICA (AULAS) Localidad : PALCA
CANT. DE
LONG. N DE
ITEM PARTIDA DESCRIPCION TIPO ELEMENTO 1" 3/4" 5/8" 1/2" 3/8" 1/4"
PARCIAL VECES
S
02.03.03 ACERO FY= 4200KG/CM2 / GRADO 60

PLACA EJE E-E


Longitudinal 5/8" 15.20 18.00 3.00 ###
Transversal 3/8" 5.80 62.00 3.00 ###

PLACA NIVEL 4-8


Longitudinal 3/4" 8.16 60.00 2.00 ###
Transversal 1/2" 8.32 26.00 2.00 ###
3/8" 8.32 26.00 2.00 ###

PLACA-EJE G-G
Longitudinal 5/8" 15.20 18.00 3.00 ###
Transversal 3/8" 5.80 62.00 3.00 ###

TOTAL (ML) 0.00 979.20 1,641.60 432.64 2,590.24 0.00


4.04 2.26 1.60 1.02 0.58 0.25
TOTAL (KG) 0.00 2,212.99 2,626.56 441.29 1,502.34 0.00
6,783.18
PLANILLA DE METRADOS (ACERO EN COLUMNAS)

MEJORAMIENTO DE LOS SERVICIOS EDUCATIVO DEL NIVEL SECUNDARIOEN LA I.E. TUPAC AMARU EN LA LOCALIDAD DE
Proyecto:
PALCA DISTRITO DE PALCA -HUANCAVELICA -HUANCAVELICA
Respon. : ING. ANGEL CHOQUE CONTRERAS Y EQUIPO TECNICO Provincia : HUANCAVELICA
Fecha : NOVIEMBRE 2013 Distrito : PALCA
Formula : COMPONENTE AREA PEDAGOGICA (AULAS) Localidad : PALCA

LONG. CANT. DE N DE
ITEM PARTIDA DESCRIPCION TIPO 1" 3/4" 5/8" 1/2" 3/8" 1/4"
PARCIAL ELEMENTOS VECES

02.04.03 ACERO FY=4200KG/CM2 GRADO 60


EJE E-E
COLUMNA C-01
5/8" 16.80 12.00 1.00 201.60
ESTRIBOS 3/8" 1.70 85.00 1.00 144.50

COLUMNA C-02
5/8" 16.80 10.00 1.00 168.00
ESTRIBOS 3/8" 1.70 85.00 1.00 144.50

COLUMNA C-03 5/8" 16.80 10.00 1.00 168.00


ESTRIBOS 3/8" 1.70 85.00 1.00 144.50

COLUMNA C-04
5/8" 16.80 10.00 1.00 168.00
3/8" 1.70 85.00 1.00 144.50

COLUMNA C-05
5/8" 16.80 10.00 1.00 168.00
3/8" 1.70 85.00 1.00 144.50

COLUMNA C-06
5/8" 16.80 10.00 1.00 168.00
3/8" 1.70 85.00 1.00 144.50

COLUMNA C-07
5/8" 16.80 12.00 1.00 201.60
3/8" 1.70 85.00 1.00 144.50

COLUMNA C-08
3/4" 16.20 14.00 1.00 226.80
3/8" 1.70 79.00 1.00 134.30

COLUMNA C-09
PLANILLA DE METRADOS (ACERO EN COLUMNAS)

MEJORAMIENTO DE LOS SERVICIOS EDUCATIVO DEL NIVEL SECUNDARIOEN LA I.E. TUPAC AMARU EN LA LOCALIDAD DE
Proyecto:
PALCA DISTRITO DE PALCA -HUANCAVELICA -HUANCAVELICA
Respon. : ING. ANGEL CHOQUE CONTRERAS Y EQUIPO TECNICO Provincia : HUANCAVELICA
Fecha : NOVIEMBRE 2013 Distrito : PALCA
Formula : COMPONENTE AREA PEDAGOGICA (AULAS) Localidad : PALCA

LONG. CANT. DE N DE
ITEM PARTIDA DESCRIPCION TIPO 1" 3/4" 5/8" 1/2" 3/8" 1/4"
PARCIAL ELEMENTOS VECES
5/8" 16.20 12.00 1.00 194.40
3/8" 1.70 79.00 1.00 134.30

COLUMNA C-10
5/8" 15.80 10.00 1.00 158.00
3/8" 1.70 70.00 1.00 119.00

COLUMNA C-11
5/8" 15.80 10.00 1.00 158.00
3/8" 1.15 46.00 1.00 52.90

COLUMNA C-12
5/8" 15.80 12.00 1.00 189.60
3/8" 1.70 70.00 1.00 119.00

COLUMNA C-13
5/8" 15.80 10.00 1.00 158.00
3/8" 1.15 46.00 1.00 52.90

COLUMNA C-14
5/8" 15.80 10.00 1.00 158.00
3/8" 1.15 46.00 1.00 52.90

COLUMNA C-15
5/8" 15.80 10.00 1.00 158.00
3/8" 1.15 46.00 1.00 52.90

COLUMNA C-16
5/8" 15.80 14.00 1.00 221.20
3/8" 1.15 46.00 1.00 52.90

COLUMNA C-17-C-18
5/8" 5.10 6.00 2.00 61.20
3/8" 0.90 30.00 2.00 54.00
PLANILLA DE METRADOS (ACERO EN COLUMNAS)

MEJORAMIENTO DE LOS SERVICIOS EDUCATIVO DEL NIVEL SECUNDARIOEN LA I.E. TUPAC AMARU EN LA LOCALIDAD DE
Proyecto:
PALCA DISTRITO DE PALCA -HUANCAVELICA -HUANCAVELICA
Respon. : ING. ANGEL CHOQUE CONTRERAS Y EQUIPO TECNICO Provincia : HUANCAVELICA
Fecha : NOVIEMBRE 2013 Distrito : PALCA
Formula : COMPONENTE AREA PEDAGOGICA (AULAS) Localidad : PALCA

LONG. CANT. DE N DE
ITEM PARTIDA DESCRIPCION TIPO 1" 3/4" 5/8" 1/2" 3/8" 1/4"
PARCIAL ELEMENTOS VECES

COLUMNAS EN RAMPA

C-20 3/4" 3.20 8.00 1.00 25.60


3/8" 1.10 15.00 1.00 16.50

C-21 5/8" 3.70 6.00 1.00 22.20


3/8" 1.10 17.00 1.00 18.70

C-22 1/2" 4.10 6.00 1.00 24.60


3/8" 1.10 21.00 1.00 23.10

C-23 1/2" 4.50 6.00 1.00 27.00


3/8" 1.10 23.00 1.00 25.30

C-24 1/2" 5.00 6.00 1.00 30.00


3/8" 1.10 23.00 1.00 25.30

C-25/C-26 1/2" 5.50 6.00 2.00 66.00


3/8" 1.10 25.00 2.00 55.00

TOTAL (ML) 0.00 252.40 ### 147.60 ### 0.00


4.04 2.26 1.60 1.02 0.58 0.25
TOTAL (KG) 0.00 570.42 ### 150.55 ### 0.00
6,236.15
PLANILLA DE METRADOS (ACERO EN COLUMNETAS)

MEJORAMIENTO DE LOS SERVICIOS EDUCATIVO DEL NIVEL SECUNDARIOEN LA I.E. TUPAC AMARU EN LA LOCALIDAD DE
Proyecto:
PALCA DISTRITO DE PALCA -HUANCAVELICA -HUANCAVELICA

Respon. : ING. ANGEL CHOQUE CONTRERAS Y EQUIPO TECNICO Provincia : HUANCAVELICA


Fecha : NOVIEMBRE 2013 Distrito : PALCA
Formula : COMPONENTE AREA PEDAGOGICA (AULAS) Localidad : PALCA

LONG. CANT. DE N DE
ITEM PARTIDA DESCRIPCION TIPO 1" 3/4" 5/8" 1/2" 3/8" 1/4"
PARCIAL ELEMENTOS VECES
02.05.03 ACERO FY=4200KG/CM2 GRADO 60
PRIMER PISO COLUMNETA K-1
EJE E-E 3/8" 3.50 4.00 3.00 42.00
ESTRIBOS 1/4" 0.60 13.00 3.00 23.40

3/8" 4.25 4.00 6.00 102.00


1/4" 0.60 16.00 6.00 57.60

COLUMNETA K-2 3/8" 4.25 4.00 5.00 85.00


1/4" 0.60 16.00 5.00 48.00

SEGUNDO PISO COLUMNETA K-1


EJE E-E 3/8" 2.00 4.00 3.00 24.00
ESTRIBOS 1/4" 0.60 13.00 3.00 23.40

3/8" 3.00 4.00 6.00 72.00


1/4" 0.60 16.00 6.00 57.60

COLUMNETA K-2 3/8" 3.00 4.00 5.00 60.00


1/4" 0.60 16.00 5.00 48.00

TERCERO PISO COLUMNETA K-1


EJE E-E 3/8" 2.00 4.00 3.00 24.00
ESTRIBOS 1/4" 0.60 13.00 3.00 23.40

3/8" 3.00 4.00 6.00 72.00


1/4" 0.60 16.00 6.00 57.60

COLUMNETA K-2 3/8" 3.00 4.00 5.00 60.00


1/4" 0.60 16.00 5.00 48.00
PLANILLA DE METRADOS (ACERO EN COLUMNETAS)

MEJORAMIENTO DE LOS SERVICIOS EDUCATIVO DEL NIVEL SECUNDARIOEN LA I.E. TUPAC AMARU EN LA LOCALIDAD DE
Proyecto:
PALCA DISTRITO DE PALCA -HUANCAVELICA -HUANCAVELICA

Respon. : ING. ANGEL CHOQUE CONTRERAS Y EQUIPO TECNICO Provincia : HUANCAVELICA


Fecha : NOVIEMBRE 2013 Distrito : PALCA
Formula : COMPONENTE AREA PEDAGOGICA (AULAS) Localidad : PALCA

LONG. CANT. DE N DE
ITEM PARTIDA DESCRIPCION TIPO 1" 3/4" 5/8" 1/2" 3/8" 1/4"
PARCIAL ELEMENTOS VECES
CUARTOO PISO COLUMNETA K-1
EJE E-E 3/8" 2.50 4.00 3.00 30.00
ESTRIBOS 1/4" 0.60 13.00 3.00 23.40

3/8" 3.50 4.00 6.00 84.00


1/4" 0.60 16.00 6.00 57.60

COLUMNETA K-2 3/8" 3.00 4.00 5.00 60.00


1/4" 0.60 16.00 5.00 48.00

TOTAL (ML) 0.00 0.00 0.00 0.00 715.00 516.00


4.04 2.26 1.60 1.02 0.58 0.25
TOTAL (KG) 0.00 0.00 0.00 0.00 414.70 129.00
543.70
PLANILLA DE METRADOS (ACERO EN VIGAS)

MEJORAMIENTO DE LOS SERVICIOS EDUCATIVO DEL NIVEL SECUNDARIOEN LA I.E. TUPAC AMARU EN LA LOCALIDAD
Proyecto:
DE PALCA DISTRITO DE PALCA -HUANCAVELICA -HUANCAVELICA
Respon. : ING. ANGEL CHOQUE CONTRERAS Y EQUIPO TECNICO Provincia : HUANCAVELICA
Fecha : NOVIEMBRE 2013 Distrito : PALCA
Formula : COMPONENTE AREA PEDAGOGICA (AULAS) Localidad : PALCA

LONG. CANT. DE N DE
ITEM PARTIDA DESCRIPCION TIPO 1" 3/4" 5/8" 1/2" 3/8" 1/4"
PARCIAL ELEMENTOS VECES

02.06.03 ACERO FY= 4200KG/CM2 / GRADO 60

RAMPA
PRTICO EJE 8- 8
VP-108-25X40
As Superior 1/2" 2 2 1 4.00
As Intermedio 1/2" 1.6 2 1 3.20
As Inferior 1/2" 2 2 1 4.00
Estribos Trm: 1 3/8" 1.19 7 1 8.33
Estribos Trm: 2 3/8" 1.19 7 1 8.33

PRTICO EJE 7- 7
VP-107-25X40
As Superior 1/2" 2 2 1 4.00
As Intermedio 1/2" 1.6 2 1 3.20
As Inferior 1/2" 2 2 1 4.00
Estribos Trm: 1 3/8" 1.19 7 1 8.33
Estribos Trm: 2 3/8" 1.19 7 1 8.33

PRTICO EJE 6- 6
VP-106-25X30
As Superior 1/2" 1.8 2 1 3.60
As Intermedio 1/2" 1.5 2 1 3.00
As Inferior 1/2" 1.8 2 1 3.60
Estribos Trm: 1 3/8" 0.99 7 1 6.93
Estribos Trm: 2 3/8" 0.99 7 1 6.93

PRTICO EJE 5- 5
VP-105-25X30
As Superior 1/2" 1.8 2 1 3.60
As Intermedio 1/2" 1.5 2 1 3.00
As Inferior 1/2" 1.8 2 1 3.60
Estribos Trm: 1 3/8" 0.99 7 1 6.93
Estribos Trm: 2 3/8" 0.99 7 1 6.93

PRTICO EJE 4- 4
VP-104-25X30
PLANILLA DE METRADOS (ACERO EN VIGAS)

MEJORAMIENTO DE LOS SERVICIOS EDUCATIVO DEL NIVEL SECUNDARIOEN LA I.E. TUPAC AMARU EN LA LOCALIDAD
Proyecto:
DE PALCA DISTRITO DE PALCA -HUANCAVELICA -HUANCAVELICA
Respon. : ING. ANGEL CHOQUE CONTRERAS Y EQUIPO TECNICO Provincia : HUANCAVELICA
Fecha : NOVIEMBRE 2013 Distrito : PALCA
Formula : COMPONENTE AREA PEDAGOGICA (AULAS) Localidad : PALCA

LONG. CANT. DE N DE
ITEM PARTIDA DESCRIPCION TIPO 1" 3/4" 5/8" 1/2" 3/8" 1/4"
PARCIAL ELEMENTOS VECES
As Superior 1/2" 1.8 2 1 3.60
As Intermedio 1/2" 1.5 2 1 3.00
As Inferior 1/2" 1.8 2 1 3.60
Estribos Trm: 1 3/8" 0.99 6 1 5.94
Estribos Trm: 2 3/8" 0.99 7 1 6.93

PRTICO EJE 3- 3
VP-103-25X30
As Superior 1/2" 1.8 2 1 3.60
As Intermedio 1/2" 1.5 2 1 3.00
As Inferior 1/2" 1.8 2 1 3.60
Estribos Trm: 1 3/8" 0.99 7 1 6.93
Estribos Trm: 2 3/8" 0.99 7 1 6.93

PRTICO EJE 2-2


VP-102-25X30
As Superior 1/2" 1.8 2 1 3.60
As Intermedio 1/2" 1.5 2 1 3.00
As Inferior 1/2" 1.8 2 1 3.60
Estribos Trm: 1 3/8" 0.99 6 1 5.94
Estribos Trm: 2 3/8" 0.99 7 1 6.93

PRTICO EJE 1- 1
VP-101-25X30
As Superior 1/2" 1.8 2 1 3.60
As Intermedio 1/2" 1.5 2 1 3.00
As Inferior 1/2" 1.8 2 1 3.60
Estribos Trm: 1 3/8" 0.99 7 1 6.93
Estribos Trm: 2 3/8" 0.99 7 1 6.93

PRTICO EJE F'- F'


VS-104-20X30
As Superior 3/8" 30.85 2 1 61.70
As Intermedio 3/8" 30.55 2 1 61.10
As Inferior 3/8" 30.85 2 1 61.70
Estribos Trm: 1 3/8" 0.89 25 1 22.25
Estribos Trm: 2 3/8" 0.89 23 1 20.47
Estribos Trm: 3 3/8" 0.89 7 1 6.23
PLANILLA DE METRADOS (ACERO EN VIGAS)

MEJORAMIENTO DE LOS SERVICIOS EDUCATIVO DEL NIVEL SECUNDARIOEN LA I.E. TUPAC AMARU EN LA LOCALIDAD
Proyecto:
DE PALCA DISTRITO DE PALCA -HUANCAVELICA -HUANCAVELICA
Respon. : ING. ANGEL CHOQUE CONTRERAS Y EQUIPO TECNICO Provincia : HUANCAVELICA
Fecha : NOVIEMBRE 2013 Distrito : PALCA
Formula : COMPONENTE AREA PEDAGOGICA (AULAS) Localidad : PALCA

LONG. CANT. DE N DE
ITEM PARTIDA DESCRIPCION TIPO 1" 3/4" 5/8" 1/2" 3/8" 1/4"
PARCIAL ELEMENTOS VECES
Estribos Trm: 4 3/8" 0.89 7 1 6.23
Estribos Trm: 5 3/8" 0.89 23 1 20.47
Estribos Trm: 6 3/8" 0.89 27 1 24.03
Estribos Trm: 7 3/8" 0.89 25 1 22.25
Estribos Trm: 8 3/8" 0.89 25 1 22.25
Estribos Trm: 9 3/8" 0.89 13 1 11.57

PRTICO EJE F2- F2


VP-100-25X40
As Superior 1/2" 31.15 3 1 93.45
As Intermedio 1/2" 30.75 2 1 61.50
As Inferior 1/2" 31.15 3 1 93.45
Estribos Trm: 1 3/8" 1.19 28 1 33.32
Estribos Trm: 2 3/8" 1.19 27 1 32.13
Estribos Trm: 3 3/8" 1.19 3 1 3.57
Estribos Trm: 4 3/8" 1.19 7 1 8.33
Estribos Trm: 5 3/8" 1.19 23 1 27.37
Estribos Trm: 6 3/8" 1.19 31 1 36.89
Estribos Trm: 7 3/8" 1.19 28 1 33.32
Estribos Trm: 8 3/8" 1.19 25 1 29.75
Estribos Trm: 9 3/8" 1.19 13 1 15.47

PRTICO EJE F1- F1


VS-103-20X30
As Superior 3/8" 30.85 2 1 61.70
As Intermedio 3/8" 30.55 2 1 61.10
As Inferior 3/8" 30.85 2 1 61.70
Estribos Trm: 1 3/8" 0.89 25 1 22.25
Estribos Trm: 2 3/8" 0.89 23 1 20.47
Estribos Trm: 3 3/8" 0.89 10 1 8.90
Estribos Trm: 4 3/8" 0.89 8 1 7.12
Estribos Trm: 5 3/8" 0.89 22 1 19.58
Estribos Trm: 6 3/8" 0.89 25 1 22.25
Estribos Trm: 7 3/8" 0.89 25 1 22.25
Estribos Trm: 8 3/8" 0.89 25 1 22.25
Estribos Trm: 9 3/8" 0.89 13 1 11.57

PORTICOS PRINCIPALES
PLANILLA DE METRADOS (ACERO EN VIGAS)

MEJORAMIENTO DE LOS SERVICIOS EDUCATIVO DEL NIVEL SECUNDARIOEN LA I.E. TUPAC AMARU EN LA LOCALIDAD
Proyecto:
DE PALCA DISTRITO DE PALCA -HUANCAVELICA -HUANCAVELICA
Respon. : ING. ANGEL CHOQUE CONTRERAS Y EQUIPO TECNICO Provincia : HUANCAVELICA
Fecha : NOVIEMBRE 2013 Distrito : PALCA
Formula : COMPONENTE AREA PEDAGOGICA (AULAS) Localidad : PALCA

LONG. CANT. DE N DE
ITEM PARTIDA DESCRIPCION TIPO 1" 3/4" 5/8" 1/2" 3/8" 1/4"
PARCIAL ELEMENTOS VECES
PRTICO EJE F1- F1
VIGA: ( 25x45 )
As Superior 1/2" 31.15 1 1 31.15
As Superior 1/2" 31.2 1 1 31.20
As Intermedio 3/8" 30.55 2 1 61.10
As Inferior 1/2" 31.1 2 1 62.20
As Inferior 1/2" 31.1 2 1 62.20
Vert. Canal 3/8" 1.25 205 1 255.83
Hor. Canal 3/8" 31.3 8 1 250.40
Estribos Trm: 1 3/8" 1.33 27 1 35.91
Estribos Trm: 2 3/8" 1.33 27 1 35.91
Estribos Trm: 3 3/8" 1.33 27 1 35.91
Estribos Trm: 4 3/8" 1.33 27 1 35.91
Estribos Trm: 5 3/8" 1.33 27 1 35.91
Estribos Trm: 6 3/8" 1.33 27 1 35.91
Estribos Trm: 7 3/8" 1.33 15 1 19.95

Portico EJE 1'-1'


VS-400-20X40
As Superior 1/2" 7.95 1 1 7.95
As Superior 1/2" 8.25 1 1 8.25
As Intermedio 1/2" 8.1 2 1 16.20
As Inferior 1/2" 8.25 2 1 16.50
Estribos Trm: 1 3/8" 1.13 10 1 11.30
Estribos Trm: 2 3/8" 1.13 33 1 37.29

Portico EJE 1'-1'


VS-401-20X40
As Superior 1/2" 2.8 2 1 5.60
As Intermedio 1/2" 2.4 2 1 4.80
As Inferior 1/2" 2.8 1 1 2.80
As Inferior 1/2" 2.85 1 1 2.85
Estribos Trm: 1 3/8" 1.13 16 1 18.08

Portico EJE 1-1


VP-100-25X50
As Superior 3/4" 2.65 1 1 2.65
As Superior 3/4" 2.85 1 1 2.85
PLANILLA DE METRADOS (ACERO EN VIGAS)

MEJORAMIENTO DE LOS SERVICIOS EDUCATIVO DEL NIVEL SECUNDARIOEN LA I.E. TUPAC AMARU EN LA LOCALIDAD
Proyecto:
DE PALCA DISTRITO DE PALCA -HUANCAVELICA -HUANCAVELICA
Respon. : ING. ANGEL CHOQUE CONTRERAS Y EQUIPO TECNICO Provincia : HUANCAVELICA
Fecha : NOVIEMBRE 2013 Distrito : PALCA
Formula : COMPONENTE AREA PEDAGOGICA (AULAS) Localidad : PALCA

LONG. CANT. DE N DE
ITEM PARTIDA DESCRIPCION TIPO 1" 3/4" 5/8" 1/2" 3/8" 1/4"
PARCIAL ELEMENTOS VECES
As Superior 3/4" 10.4 1 1 10.40
As Superior 3/4" 10.45 1 1 10.45
As Intermedio 1/2" 9.75 2 1 19.50
As Inferior 3/4" 2.9 1 1 2.90
As Inferior 3/4" 3.35 2 1 6.70
As Inferior 3/4" 7.35 2 1 14.70
Estribos Trm: 1 3/8" 1.43 46 1 65.78
Estribos Trm: 2 3/8" 1.23 22 1 27.06

Portico EJE 1-1


VP-200-25X50
As Superior 3/4" 2.65 1 1 2.65
As Superior 3/4" 2.85 1 1 2.85
As Superior 3/4" 10.4 1 1 10.40
As Superior 3/4" 10.45 1 1 10.45
As Intermedio 1/2" 9.75 2 1 19.50
As Inferior 3/4" 2.9 1 1 2.90
As Inferior 3/4" 3.35 2 1 6.70
As Inferior 3/4" 7.35 2 1 14.70
Estribos Trm: 1 3/8" 1.43 46 1 65.78
Estribos Trm: 2 3/8" 1.23 22 1 27.06

Portico EJE 1-1


VP-300-25X50
As Superior 3/4" 2.65 1 1 2.65
As Superior 3/4" 2.85 2 1 5.70
As Superior 3/4" 10.4 1 1 10.40
As Superior 3/4" 10.45 1 1 10.45
As Intermedio 1/2" 9.75 2 1 19.50
As Inferior 3/4" 2.9 1 1 2.90
As Inferior 3/4" 3.35 2 1 6.70
As Inferior 3/4" 7.35 2 1 14.70
Estribos Trm: 1 3/8" 1.43 46 1 65.78
Estribos Trm: 2 3/8" 1.23 22 1 27.06

Portico EJE 1-1


VP-400-25X50
As Superior 1/2" 2.7 1 1 2.70
PLANILLA DE METRADOS (ACERO EN VIGAS)

MEJORAMIENTO DE LOS SERVICIOS EDUCATIVO DEL NIVEL SECUNDARIOEN LA I.E. TUPAC AMARU EN LA LOCALIDAD
Proyecto:
DE PALCA DISTRITO DE PALCA -HUANCAVELICA -HUANCAVELICA
Respon. : ING. ANGEL CHOQUE CONTRERAS Y EQUIPO TECNICO Provincia : HUANCAVELICA
Fecha : NOVIEMBRE 2013 Distrito : PALCA
Formula : COMPONENTE AREA PEDAGOGICA (AULAS) Localidad : PALCA

LONG. CANT. DE N DE
ITEM PARTIDA DESCRIPCION TIPO 1" 3/4" 5/8" 1/2" 3/8" 1/4"
PARCIAL ELEMENTOS VECES
As Superior 1/2" 3.9 3 1 11.70
As Superior 1/2" 8.75 2 1 17.50
As Intermedio 1/2" 8.2 2 1 16.40
As Inferior 1/2" 5.15 1 1 5.15
As Inferior 1/2" 8.35 2 1 16.70
Estribos Trm: 1 3/8" 1.43 14 1 20.02
Estribos Trm: 2 3/8" 1.43 45 1 64.35

Portico EJE 1-1


VP-402-25X40
As Superior 1/2" 2.5 3 1 7.50
As Intermedio 3/8" 2.45 2 1 4.90
As Inferior 1/2" 2.5 2 1 5.00
Estribos Trm: 1 3/8" 1.23 14 1 17.22

Portico EJE 3-3


VP-101-25X50
As Superior 3/4" 2.65 1 1 2.65
As Superior 3/4" 3.2 2 1 6.40
As Superior 3/4" 10.4 1 1 10.40
As Superior 3/4" 10.45 1 1 10.45
As Intermedio 1/2" 9.75 2 1 19.50
As Inferior 3/4" 3.35 2 1 6.70
As Inferior 3/4" 7.35 2 1 14.70
Estribos Trm: 1 3/8" 1.43 46 1 65.78
Estribos Trm: 2 3/8" 1.23 22 1 27.06

Portico EJE 3-3


VP-201-25X50
As Superior 3/4" 2.65 2 1 5.30
As Superior 3/4" 3.2 3 1 9.60
As Superior 3/4" 10.4 1 1 10.40
As Superior 3/4" 10.45 1 1 10.45
As Intermedio 1/2" 9.75 2 1 19.50
As Inferior 3/4" 3.35 2 1 6.70
As Inferior 3/4" 7.35 2 1 14.70
Estribos Trm: 1 3/8" 1.43 46 1 65.78
Estribos Trm: 2 3/8" 1.23 22 1 27.06
PLANILLA DE METRADOS (ACERO EN VIGAS)

MEJORAMIENTO DE LOS SERVICIOS EDUCATIVO DEL NIVEL SECUNDARIOEN LA I.E. TUPAC AMARU EN LA LOCALIDAD
Proyecto:
DE PALCA DISTRITO DE PALCA -HUANCAVELICA -HUANCAVELICA
Respon. : ING. ANGEL CHOQUE CONTRERAS Y EQUIPO TECNICO Provincia : HUANCAVELICA
Fecha : NOVIEMBRE 2013 Distrito : PALCA
Formula : COMPONENTE AREA PEDAGOGICA (AULAS) Localidad : PALCA

LONG. CANT. DE N DE
ITEM PARTIDA DESCRIPCION TIPO 1" 3/4" 5/8" 1/2" 3/8" 1/4"
PARCIAL ELEMENTOS VECES

Portico EJE 3-3


VP-301-25X50
As Superior 3/4" 2.65 2 1 5.30
As Superior 3/4" 3.2 3 1 9.60
As Superior 3/4" 10.4 1 1 10.40
As Superior 3/4" 10.45 1 1 10.45
As Intermedio 1/2" 9.75 2 1 19.50
As Inferior 3/4" 3.35 2 1 6.70
As Inferior 3/4" 7.35 2 1 14.70
Estribos Trm: 1 3/8" 1.43 46 1 65.78
Estribos Trm: 2 3/8" 1.23 22 1 27.06

Portico EJE 3-3


VP-401-25X45
As Superior 1/2" 2.7 1 1 2.70
As Superior 1/2" 3.9 2 1 7.80
As Superior 1/2" 8.75 2 1 17.50
As Intermedio 1/2" 8.2 2 1 16.40
As Inferior 1/2" 6.4 1 1 6.40
As Inferior 1/2" 8.65 2 1 17.30
Estribos Trm: 1 3/8" 1.33 11 1 14.63
Estribos Trm: 2 3/8" 1.43 45 1 64.35

Portico EJE 3-3


VP-402-25X40
As Superior 1/2" 2.5 3 1 7.50
As Intermedio 3/8" 2.45 2 1 4.90
As Inferior 1/2" 2.5 2 1 5.00
Estribos Trm: 1 3/8" 1.23 15 1 18.45

Portico EJE 4-4


VP-102-30X50
As Superior 3/4" 1.8 1 1 1.80
As Superior 3/4" 2.2 2 1 4.40
As Superior 3/4" 10.4 1 1 10.40
As Superior 3/4" 10.45 1 1 10.45
As Intermedio 1/2" 9.75 2 1 19.50
PLANILLA DE METRADOS (ACERO EN VIGAS)

MEJORAMIENTO DE LOS SERVICIOS EDUCATIVO DEL NIVEL SECUNDARIOEN LA I.E. TUPAC AMARU EN LA LOCALIDAD
Proyecto:
DE PALCA DISTRITO DE PALCA -HUANCAVELICA -HUANCAVELICA
Respon. : ING. ANGEL CHOQUE CONTRERAS Y EQUIPO TECNICO Provincia : HUANCAVELICA
Fecha : NOVIEMBRE 2013 Distrito : PALCA
Formula : COMPONENTE AREA PEDAGOGICA (AULAS) Localidad : PALCA

LONG. CANT. DE N DE
ITEM PARTIDA DESCRIPCION TIPO 1" 3/4" 5/8" 1/2" 3/8" 1/4"
PARCIAL ELEMENTOS VECES
As Inferior 3/4" 1.85 1 1 1.85
As Inferior 3/4" 3.35 2 1 6.70
As Inferior 3/4" 7.35 2 1 14.70
Estribos Trm: 1 3/8" 1.53 22 1 33.66
Estribos Trm: 2 3/8" 1.53 22 1 33.66
Estribos Trm: 3 3/8" 1.33 22 1 29.26

Portico EJE 4-4


VP-202-30X50
As Superior 3/4" 2.2 2 1 4.40
As Superior 3/4" 4.8 1 1 4.80
As Superior 3/4" 10.4 1 1 10.40
As Superior 3/4" 10.45 1 1 10.45
As Intermedio 1/2" 9.75 2 1 19.50
As Inferior 3/4" 3.35 2 1 6.70
As Inferior 3/4" 4.3 1 1 4.30
As Inferior 3/4" 7.35 2 1 14.70
Estribos Trm: 1 3/8" 1.53 22 1 33.66
Estribos Trm: 2 3/8" 1.53 22 1 33.66
Estribos Trm: 3 3/8" 1.33 22 1 29.26

Portico EJE 4-4


VP-302-30X50
As Superior 3/4" 2.2 2 1 4.40
As Superior 3/4" 4.8 1 1 4.80
As Superior 3/4" 10.4 1 1 10.40
As Superior 3/4" 10.45 1 1 10.45
As Intermedio 1/2" 9.75 2 1 19.50
As Inferior 3/4" 1.6 1 1 1.60
As Inferior 3/4" 3.35 2 1 6.70
As Inferior 3/4" 4.3 1 1 4.30
As Inferior 3/4" 7.35 2 1 14.70
Estribos Trm: 1 3/8" 1.53 23 1 35.19
Estribos Trm: 2 3/8" 1.53 22 1 33.66
Estribos Trm: 3 3/8" 1.33 22 1 29.26

Portico EJE 4-4


VP-403-30X45
PLANILLA DE METRADOS (ACERO EN VIGAS)

MEJORAMIENTO DE LOS SERVICIOS EDUCATIVO DEL NIVEL SECUNDARIOEN LA I.E. TUPAC AMARU EN LA LOCALIDAD
Proyecto:
DE PALCA DISTRITO DE PALCA -HUANCAVELICA -HUANCAVELICA
Respon. : ING. ANGEL CHOQUE CONTRERAS Y EQUIPO TECNICO Provincia : HUANCAVELICA
Fecha : NOVIEMBRE 2013 Distrito : PALCA
Formula : COMPONENTE AREA PEDAGOGICA (AULAS) Localidad : PALCA

LONG. CANT. DE N DE
ITEM PARTIDA DESCRIPCION TIPO 1" 3/4" 5/8" 1/2" 3/8" 1/4"
PARCIAL ELEMENTOS VECES
As Superior 5/8" 2.55 1 1 2.55
As Superior 5/8" 4.3 1 1 4.30
As Superior 5/8" 8.75 2 1 17.50
As Intermedio 5/8" 8.2 2 1 16.40
As Inferior 5/8" 4.3 1 1 4.30
As Inferior 5/8" 8.65 2 1 17.30
Estribos Trm: 1 3/8" 1.43 20 1 28.60
Estribos Trm: 2 3/8" 1.53 23 1 35.19
Estribos Trm: 3 3/8" 1.53 23 1 35.19

Portico EJE 4-4


VP-404-30X40
As Superior 5/8" 1.25 1 1 1.25
As Superior 5/8" 1.9 1 1 1.90
As Superior 5/8" 3.05 2 1 6.10
As Intermedio 1/2" 2.65 2 1 5.30
As Inferior 5/8" 3.1 2 1 6.20
Estribos Trm: 1 3/8" 1.33 15 1 19.95

Portico EJE 5-5


VP-103-25X50
As Superior 3/4" 2.65 1 1 2.65
As Superior 3/4" 3.2 2 1 6.40
As Superior 3/4" 10.4 1 1 10.40
As Superior 3/4" 10.45 1 1 10.45
As Intermedio 1/2" 9.75 2 1 19.50
As Inferior 3/4" 3.35 2 1 6.70
As Inferior 3/4" 7.35 2 1 14.70
Estribos Trm: 1 3/8" 1.43 46 1 65.78
Estribos Trm: 2 3/8" 1.23 22 1 27.06

Portico EJE 5-5


VP-203-25X50
As Superior 3/4" 2.65 2 1 5.30
As Superior 3/4" 3.2 2 1 6.40
As Superior 3/4" 10.4 1 1 10.40
As Superior 3/4" 10.45 1 1 10.45
As Intermedio 1/2" 9.75 2 1 19.50
PLANILLA DE METRADOS (ACERO EN VIGAS)

MEJORAMIENTO DE LOS SERVICIOS EDUCATIVO DEL NIVEL SECUNDARIOEN LA I.E. TUPAC AMARU EN LA LOCALIDAD
Proyecto:
DE PALCA DISTRITO DE PALCA -HUANCAVELICA -HUANCAVELICA
Respon. : ING. ANGEL CHOQUE CONTRERAS Y EQUIPO TECNICO Provincia : HUANCAVELICA
Fecha : NOVIEMBRE 2013 Distrito : PALCA
Formula : COMPONENTE AREA PEDAGOGICA (AULAS) Localidad : PALCA

LONG. CANT. DE N DE
ITEM PARTIDA DESCRIPCION TIPO 1" 3/4" 5/8" 1/2" 3/8" 1/4"
PARCIAL ELEMENTOS VECES
As Inferior 3/4" 3.35 2 1 6.70
As Inferior 3/4" 7.35 2 1 14.70
Estribos Trm: 1 3/8" 1.43 46 1 65.78
Estribos Trm: 2 3/8" 1.23 22 1 27.06

Portico EJE 5-5


VP-303-30X50
As Superior 3/4" 2.2 3 1 6.60
As Superior 3/4" 2.65 2 1 5.30
As Superior 3/4" 10.4 1 1 10.40
As Superior 3/4" 10.45 1 1 10.45
As Intermedio 1/2" 9.75 2 1 19.50
As Inferior 3/4" 3.35 2 1 6.70
As Inferior 3/4" 5.15 1 1 5.15
As Inferior 3/4" 7.35 2 1 14.70
Estribos Trm: 1 3/8" 1.53 46 1 70.38
Estribos Trm: 2 3/8" 1.33 22 1 29.26

Portico EJE 5-5


VP-405-25X45
As Superior 1/2" 2.7 2 1 5.40
As Superior 1/2" 3.9 2 1 7.80
As Superior 1/2" 8.75 2 1 17.50
As Intermedio 1/2" 8.2 2 1 16.40
As Inferior 1/2" 8.65 3 1 25.95
Estribos Trm: 1 3/8" 1.33 13 1 17.29
Estribos Trm: 2 3/8" 1.43 45 1 64.35

Portico EJE 5-5


VP-406-25X40
As Superior 1/2" 1.9 1 1 1.90
As Superior 1/2" 3.05 2 1 6.10
As Intermedio 1/2" 2.65 2 1 5.30
As Inferior 1/2" 3.1 2 1 6.20
Estribos Trm: 1 3/8" 1.23 15 1 18.45

Portico EJE 6-6


VP-104-25X50
PLANILLA DE METRADOS (ACERO EN VIGAS)

MEJORAMIENTO DE LOS SERVICIOS EDUCATIVO DEL NIVEL SECUNDARIOEN LA I.E. TUPAC AMARU EN LA LOCALIDAD
Proyecto:
DE PALCA DISTRITO DE PALCA -HUANCAVELICA -HUANCAVELICA
Respon. : ING. ANGEL CHOQUE CONTRERAS Y EQUIPO TECNICO Provincia : HUANCAVELICA
Fecha : NOVIEMBRE 2013 Distrito : PALCA
Formula : COMPONENTE AREA PEDAGOGICA (AULAS) Localidad : PALCA

LONG. CANT. DE N DE
ITEM PARTIDA DESCRIPCION TIPO 1" 3/4" 5/8" 1/2" 3/8" 1/4"
PARCIAL ELEMENTOS VECES
As Superior 3/4" 2.65 1 1 2.65
As Superior 3/4" 3.2 2 1 6.40
As Superior 3/4" 10.4 1 1 10.40
As Superior 3/4" 10.45 1 1 10.45
As Intermedio 1/2" 9.75 2 1 19.50
As Inferior 3/4" 3.35 2 1 6.70
As Inferior 3/4" 7.35 2 1 14.70
Estribos Trm: 1 3/8" 1.43 46 1 65.78
Estribos Trm: 2 3/8" 1.23 22 1 27.06

Portico EJE 6-6


VP-204-25X50
As Superior 3/4" 2.65 1 1 2.65
As Superior 3/4" 3.2 2 1 6.40
As Superior 3/4" 10.4 1 1 10.40
As Superior 3/4" 10.45 1 1 10.45
As Intermedio 1/2" 9.75 2 1 19.50
As Inferior 3/4" 3.35 2 1 6.70
As Inferior 3/4" 7.35 2 1 14.70
Estribos Trm: 1 3/8" 1.43 46 1 65.78
Estribos Trm: 2 3/8" 1.23 22 1 27.06

Portico EJE 6-6


VP-304-25X50
As Superior 3/4" 2.65 2 1 5.30
As Superior 3/4" 3.2 3 1 9.60
As Superior 3/4" 10.4 1 1 10.40
As Superior 3/4" 10.45 1 1 10.45
As Intermedio 1/2" 9.75 2 1 19.50
As Inferior 3/4" 2.9 1 1 2.90
As Inferior 3/4" 3.35 2 1 6.70
As Inferior 3/4" 7.35 2 1 14.70
Estribos Trm: 1 3/8" 1.43 46 1 65.78
Estribos Trm: 2 3/8" 1.23 22 1 27.06

Portico EJE 6-6


VP-407-25X45
As Superior 1/2" 2.7 1 1 2.70
PLANILLA DE METRADOS (ACERO EN VIGAS)

MEJORAMIENTO DE LOS SERVICIOS EDUCATIVO DEL NIVEL SECUNDARIOEN LA I.E. TUPAC AMARU EN LA LOCALIDAD
Proyecto:
DE PALCA DISTRITO DE PALCA -HUANCAVELICA -HUANCAVELICA
Respon. : ING. ANGEL CHOQUE CONTRERAS Y EQUIPO TECNICO Provincia : HUANCAVELICA
Fecha : NOVIEMBRE 2013 Distrito : PALCA
Formula : COMPONENTE AREA PEDAGOGICA (AULAS) Localidad : PALCA

LONG. CANT. DE N DE
ITEM PARTIDA DESCRIPCION TIPO 1" 3/4" 5/8" 1/2" 3/8" 1/4"
PARCIAL ELEMENTOS VECES
As Superior 1/2" 2.95 1 1 2.95
As Superior 1/2" 3.9 1 1 3.90
As Superior 1/2" 8.75 2 1 17.50
As Intermedio 1/2" 8.2 2 1 16.40
As Inferior 1/2" 8.65 3 1 25.95
Estribos Trm: 1 3/8" 1.33 13 1 17.29
Estribos Trm: 2 3/8" 1.43 45 1 64.35

Portico EJE 6-6


VP-408-25X40
As Superior 1/2" 1.9 1 1 1.90
As Superior 1/2" 3.05 2 1 6.10
As Intermedio 1/2" 2.65 2 1 5.30
As Inferior 1/2" 3.1 2 1 6.20
Estribos Trm: 1 3/8" 1.23 15 1 18.45

Portico EJE 7-7


VP-105-25X50
As Superior 3/4" 2.65 1 1 2.65
As Superior 3/4" 3.2 2 1 6.40
As Superior 3/4" 10.4 1 1 10.40
As Superior 3/4" 10.45 1 1 10.45
As Intermedio 1/2" 9.75 2 1 19.50
As Inferior 3/4" 3.35 2 1 6.70
As Inferior 3/4" 7.35 2 1 14.70
Estribos Trm: 1 3/8" 1.43 46 1 65.78
Estribos Trm: 2 3/8" 1.23 22 1 27.06

Portico EJE 7-7


VP-205-25X50
As Superior 3/4" 2.65 1 1 2.65
As Superior 3/4" 3.2 2 1 6.40
As Superior 3/4" 10.4 1 1 10.40
As Superior 3/4" 10.45 1 1 10.45
As Intermedio 1/2" 9.75 2 1 19.50
As Inferior 3/4" 3.35 2 1 6.70
As Inferior 3/4" 7.35 2 1 14.70
Estribos Trm: 1 3/8" 1.43 46 1 65.78
PLANILLA DE METRADOS (ACERO EN VIGAS)

MEJORAMIENTO DE LOS SERVICIOS EDUCATIVO DEL NIVEL SECUNDARIOEN LA I.E. TUPAC AMARU EN LA LOCALIDAD
Proyecto:
DE PALCA DISTRITO DE PALCA -HUANCAVELICA -HUANCAVELICA
Respon. : ING. ANGEL CHOQUE CONTRERAS Y EQUIPO TECNICO Provincia : HUANCAVELICA
Fecha : NOVIEMBRE 2013 Distrito : PALCA
Formula : COMPONENTE AREA PEDAGOGICA (AULAS) Localidad : PALCA

LONG. CANT. DE N DE
ITEM PARTIDA DESCRIPCION TIPO 1" 3/4" 5/8" 1/2" 3/8" 1/4"
PARCIAL ELEMENTOS VECES
Estribos Trm: 2 3/8" 1.23 22 1 27.06

Portico EJE 7-7


VP-305-25X50
As Superior 3/4" 2.65 1 1 2.65
As Superior 3/4" 3.2 2 1 6.40
As Superior 3/4" 10.4 1 1 10.40
As Superior 3/4" 10.45 1 1 10.45
As Intermedio 1/2" 9.75 2 1 19.50
As Inferior 3/4" 3.35 2 1 6.70
As Inferior 3/4" 7.35 2 1 14.70
Estribos Trm: 1 3/8" 1.43 46 1 65.78
Estribos Trm: 2 3/8" 1.23 22 1 27.06

Portico EJE 7-7


VP-409-25X45
As Superior 1/2" 2.7 2 1 5.40
As Superior 1/2" 2.95 1 1 2.95
As Superior 1/2" 3.9 1 1 3.90
As Superior 1/2" 8.65 2 1 17.30
As Intermedio 1/2" 8.2 2 1 16.40
As Inferior 1/2" 7.55 1 1 7.55
As Inferior 1/2" 8.65 2 1 17.30
Estribos Trm: 1 3/8" 1.33 13 1 17.29
Estribos Trm: 2 3/8" 1.43 45 1 64.35

Portico EJE 7-7


VP-410-25X40
As Superior 1/2" 1.9 1 1 1.90
As Superior 1/2" 3.1 2 1 6.20
As Intermedio 1/2" 2.65 2 1 5.30
As Inferior 1/2" 3.1 2 1 6.20
Estribos Trm: 1 3/8" 1.23 15 1 18.45

Portico EJE 8-8


VP-106-30X50
As Superior 5/8" 4.85 1 1 4.85
As Superior 5/8" 10.3 2 1 20.60
PLANILLA DE METRADOS (ACERO EN VIGAS)

MEJORAMIENTO DE LOS SERVICIOS EDUCATIVO DEL NIVEL SECUNDARIOEN LA I.E. TUPAC AMARU EN LA LOCALIDAD
Proyecto:
DE PALCA DISTRITO DE PALCA -HUANCAVELICA -HUANCAVELICA
Respon. : ING. ANGEL CHOQUE CONTRERAS Y EQUIPO TECNICO Provincia : HUANCAVELICA
Fecha : NOVIEMBRE 2013 Distrito : PALCA
Formula : COMPONENTE AREA PEDAGOGICA (AULAS) Localidad : PALCA

LONG. CANT. DE N DE
ITEM PARTIDA DESCRIPCION TIPO 1" 3/4" 5/8" 1/2" 3/8" 1/4"
PARCIAL ELEMENTOS VECES
As Intermedio 5/8" 9.9 2 1 19.80
As Inferior 5/8" 2.9 1 1 2.90
As Inferior 5/8" 3.35 2 1 6.70
As Inferior 5/8" 7.35 2 1 14.70
Estribos Trm: 1 3/8" 1.53 22 1 33.66
Estribos Trm: 2 3/8" 1.53 22 1 33.66
Estribos Trm: 3 3/8" 1.33 22 1 29.26

Portico EJE 8-8


VP-206-25X50
As Superior 5/8" 1.85 1 1 1.85
As Superior 5/8" 2.2 2 1 4.40
As Superior 5/8" 10.25 1 1 10.25
As Superior 5/8" 10.3 1 1 10.30
As Intermedio 3/8" 9.7 2 1 19.40
As Inferior 5/8" 1.85 1 1 1.85
As Inferior 5/8" 3.35 2 1 6.70
As Inferior 5/8" 7.35 2 1 14.70
Estribos Trm: 1 3/8" 1.43 22 1 31.46
Estribos Trm: 2 3/8" 1.43 21 1 30.03
Estribos Trm: 3 3/8" 1.43 22 1 31.46

Portico EJE 8-8


VP-306-25X50
As Superior 5/8" 1.85 1 1 1.85
As Superior 5/8" 2.2 2 1 4.40
As Superior 5/8" 10.25 1 1 10.25
As Superior 5/8" 10.3 1 1 10.30
As Intermedio 3/8" 9.7 2 1 19.40
As Inferior 5/8" 1.85 1 1 1.85
As Inferior 5/8" 3.35 2 1 6.70
As Inferior 5/8" 7.35 2 1 14.70
Estribos Trm: 1 3/8" 1.43 22 1 31.46
Estribos Trm: 2 3/8" 1.43 21 1 30.03
Estribos Trm: 3 3/8" 1.43 22 1 31.46

Portico EJE 8-8


VP-411-25X45
PLANILLA DE METRADOS (ACERO EN VIGAS)

MEJORAMIENTO DE LOS SERVICIOS EDUCATIVO DEL NIVEL SECUNDARIOEN LA I.E. TUPAC AMARU EN LA LOCALIDAD
Proyecto:
DE PALCA DISTRITO DE PALCA -HUANCAVELICA -HUANCAVELICA
Respon. : ING. ANGEL CHOQUE CONTRERAS Y EQUIPO TECNICO Provincia : HUANCAVELICA
Fecha : NOVIEMBRE 2013 Distrito : PALCA
Formula : COMPONENTE AREA PEDAGOGICA (AULAS) Localidad : PALCA

LONG. CANT. DE N DE
ITEM PARTIDA DESCRIPCION TIPO 1" 3/4" 5/8" 1/2" 3/8" 1/4"
PARCIAL ELEMENTOS VECES
As Superior 1/2" 1.6 1 1 1.60
As Superior 1/2" 2.65 2 1 5.30
As Superior 1/2" 8.75 2 1 17.50
As Intermedio 3/8" 8.2 2 1 16.40
As Inferior 1/2" 2.65 2 1 5.30
As Inferior 1/2" 8.65 2 1 17.30
Estribos Trm: 1 3/8" 1.43 14 1 20.02
Estribos Trm: 2 3/8" 1.43 23 1 32.89
Estribos Trm: 3 3/8" 1.43 23 1 32.89

Portico EJE 8-8


VP-412-25X40
As Superior 1/2" 1.9 2 1 3.80
As Superior 1/2" 3.1 2 1 6.20
As Intermedio 1/2" 2.65 2 1 5.30
As Inferior 1/2" 1.35 1 1 1.35
As Inferior 1/2" 3.1 2 1 6.20
Estribos Trm: 1 3/8" 1.23 15 1 18.45

Portico EJE 9-9


VS-100-30X40
As Superior 1/2" 1.45 2 1 2.90
As Superior 1/2" 2.4 1 1 2.40
As Superior 1/2" 11.65 2 1 23.30
As Intermedio 1/2" 11.25 2 1 22.50
As Inferior 1/2" 3.1 1 1 3.10
As Inferior 1/2" 11.6 2 1 23.20
Estribos Trm: 1 3/8" 1.33 26 1 34.58
Estribos Trm: 2 3/8" 1.33 32 1 42.56
Estribos Trm: 3 3/8" 1.33 13 1 17.29

Portico EJE 9-9


VS-402-20X40
As Superior 1/2" 2.8 2 1 5.60
As Intermedio 3/8" 2.4 2 1 4.80
As Inferior 1/2" 2.8 2 1 5.60
Estribos Trm: 1 3/8" 1.13 17 1 19.21
PLANILLA DE METRADOS (ACERO EN VIGAS)

MEJORAMIENTO DE LOS SERVICIOS EDUCATIVO DEL NIVEL SECUNDARIOEN LA I.E. TUPAC AMARU EN LA LOCALIDAD
Proyecto:
DE PALCA DISTRITO DE PALCA -HUANCAVELICA -HUANCAVELICA
Respon. : ING. ANGEL CHOQUE CONTRERAS Y EQUIPO TECNICO Provincia : HUANCAVELICA
Fecha : NOVIEMBRE 2013 Distrito : PALCA
Formula : COMPONENTE AREA PEDAGOGICA (AULAS) Localidad : PALCA

LONG. CANT. DE N DE
ITEM PARTIDA DESCRIPCION TIPO 1" 3/4" 5/8" 1/2" 3/8" 1/4"
PARCIAL ELEMENTOS VECES
Portico EJE 9-9
VS-403-20X40
As Superior 1/2" 8.5 1 1 8.50
As Superior 1/2" 8.55 1 1 8.55
As Intermedio 3/8" 8.1 2 1 16.20
As Inferior 1/2" 8.45 2 1 16.90
Estribos Trm: 1 3/8" 1.13 35 1 39.55
Estribos Trm: 2 3/8" 1.13 11 1 12.43

Portico EJE D-D


VS-101-20X40
As Superior 3/8" 1.85 1 1 1.85
As Superior 3/8" 2.2 1 1 2.20
As Superior 3/8" 29.35 2 1 58.70
As Intermedio 3/8" 28.95 2 1 57.90
As Inferior 3/8" 29.35 2 1 58.70
Estribos Trm: 1 3/8" 1.13 27 1 30.51
Estribos Trm: 2 3/8" 1.13 27 1 30.51
Estribos Trm: 3 3/8" 1.13 27 1 30.51
Estribos Trm: 4 3/8" 1.13 29 1 32.77
Estribos Trm: 5 3/8" 1.13 27 1 30.51
Estribos Trm: 6 3/8" 1.13 27 1 30.51

Portico EJE D-D


VS-200-20X40
As Superior 3/8" 2.2 1 1 2.20
As Superior 3/8" 29.35 2 1 58.70
As Intermedio 3/8" 28.95 2 1 57.90
As Inferior 3/8" 29.35 2 1 58.70
Estribos Trm: 1 3/8" 1.13 27 1 30.51
Estribos Trm: 2 3/8" 1.13 27 1 30.51
Estribos Trm: 3 3/8" 1.13 27 1 30.51
Estribos Trm: 4 3/8" 1.13 29 1 32.77
Estribos Trm: 5 3/8" 1.13 27 1 30.51
Estribos Trm: 6 3/8" 1.13 27 1 30.51

Portico EJE D-D


VS-300-20X40
PLANILLA DE METRADOS (ACERO EN VIGAS)

MEJORAMIENTO DE LOS SERVICIOS EDUCATIVO DEL NIVEL SECUNDARIOEN LA I.E. TUPAC AMARU EN LA LOCALIDAD
Proyecto:
DE PALCA DISTRITO DE PALCA -HUANCAVELICA -HUANCAVELICA
Respon. : ING. ANGEL CHOQUE CONTRERAS Y EQUIPO TECNICO Provincia : HUANCAVELICA
Fecha : NOVIEMBRE 2013 Distrito : PALCA
Formula : COMPONENTE AREA PEDAGOGICA (AULAS) Localidad : PALCA

LONG. CANT. DE N DE
ITEM PARTIDA DESCRIPCION TIPO 1" 3/4" 5/8" 1/2" 3/8" 1/4"
PARCIAL ELEMENTOS VECES
As Superior 3/8" 2.2 1 1 2.20
As Superior 3/8" 29.35 2 1 58.70
As Intermedio 3/8" 28.95 2 1 57.90
As Inferior 3/8" 29.35 2 1 58.70
Estribos Trm: 1 3/8" 1.13 27 1 30.51
Estribos Trm: 2 3/8" 1.13 27 1 30.51
Estribos Trm: 3 3/8" 1.13 27 1 30.51
Estribos Trm: 4 3/8" 1.13 29 1 32.77
Estribos Trm: 5 3/8" 1.13 27 1 30.51
Estribos Trm: 6 3/8" 1.13 27 1 30.51

Portico EJE D-D


VS-404-25X45
As Superior 1/2" 2.15 1 1 2.15
As Superior 1/2" 32.8 2 1 65.60
As Intermedio 1/2" 32.35 2 1 64.70
Vert. Canal 3/8" 1.25 205 1 255.83
Hor. Canal 3/8" 31.3 8 1 250.40
Estribos Trm: 1 3/8" 1.23 15 1 18.45
Estribos Trm: 2 3/8" 1.23 27 1 33.21
Estribos Trm: 3 3/8" 1.23 28 1 34.44
Estribos Trm: 4 3/8" 1.23 26 1 31.98
Estribos Trm: 5 3/8" 1.23 29 1 35.67
Estribos Trm: 6 3/8" 1.23 25 1 30.75
Estribos Trm: 7 3/8" 1.23 27 1 33.21
Estribos Trm: 8 3/8" 1.23 14 1 17.22

Portico EJE E-E


VS-102-30X40
As Superior 3/4" 3.15 1 1 3.15
As Superior 3/4" 4.6 1 1 4.60
As Superior 3/4" 5.7 1 1 5.70
As Superior 3/4" 6.3 1 1 6.30
As Superior 3/4" 31.75 2 1 63.50
As Intermedio 5/8" 30.9 2 1 61.80
As Inferior 3/4" 31.75 2 1 63.50
Estribos Trm: 1 3/8" 1.33 30 1 39.90
Estribos Trm: 2 3/8" 1.33 26 1 34.58
PLANILLA DE METRADOS (ACERO EN VIGAS)

MEJORAMIENTO DE LOS SERVICIOS EDUCATIVO DEL NIVEL SECUNDARIOEN LA I.E. TUPAC AMARU EN LA LOCALIDAD
Proyecto:
DE PALCA DISTRITO DE PALCA -HUANCAVELICA -HUANCAVELICA
Respon. : ING. ANGEL CHOQUE CONTRERAS Y EQUIPO TECNICO Provincia : HUANCAVELICA
Fecha : NOVIEMBRE 2013 Distrito : PALCA
Formula : COMPONENTE AREA PEDAGOGICA (AULAS) Localidad : PALCA

LONG. CANT. DE N DE
ITEM PARTIDA DESCRIPCION TIPO 1" 3/4" 5/8" 1/2" 3/8" 1/4"
PARCIAL ELEMENTOS VECES
Estribos Trm: 3 3/8" 1.33 29 1 38.57
Estribos Trm: 4 3/8" 1.33 27 1 35.91
Estribos Trm: 5 3/8" 1.33 27 1 35.91
Estribos Trm: 6 3/8" 1.33 37 1 49.21
Estribos Trm: 7 3/8" 1.33 14 1 18.62

Portico EJE E-E


VS-201-25X40
As Superior 3/4" 2.1 1 1 2.10
As Superior 3/4" 2.15 1 1 2.15
As Superior 3/4" 3.15 1 1 3.15
As Superior 3/4" 3.2 1 1 3.20
As Superior 3/4" 4.6 1 1 4.60
As Superior 3/4" 5.45 1 1 5.45
As Superior 3/4" 30.3 2 1 60.60
As Intermedio 1/2" 29.15 2 1 58.30
As Inferior 3/4" 30.3 2 1 60.60
Estribos Trm: 1 3/8" 1.23 36 1 44.28
Estribos Trm: 2 3/8" 1.23 27 1 33.21
Estribos Trm: 3 3/8" 1.23 30 1 36.90
Estribos Trm: 4 3/8" 1.23 27 1 33.21
Estribos Trm: 5 3/8" 1.23 27 1 33.21
Estribos Trm: 6 3/8" 1.23 39 1 47.97

Portico EJE E-E


VS-301-25X40
As Superior 3/4" 2.2 1 1 2.20
As Superior 3/4" 3.3 1 1 3.30
As Superior 3/4" 4.6 1 1 4.60
As Superior 3/4" 30.3 2 1 60.60
As Intermedio 1/2" 29.15 2 1 58.30
As Inferior 3/4" 2.1 1 1 2.10
As Inferior 3/4" 2.2 2 1 4.40
As Inferior 3/4" 30.3 2 1 60.60
Estribos Trm: 1 3/8" 1.23 44 1 54.12
Estribos Trm: 2 3/8" 1.23 27 1 33.21
Estribos Trm: 3 3/8" 1.23 37 1 45.51
Estribos Trm: 4 3/8" 1.23 27 1 33.21
PLANILLA DE METRADOS (ACERO EN VIGAS)

MEJORAMIENTO DE LOS SERVICIOS EDUCATIVO DEL NIVEL SECUNDARIOEN LA I.E. TUPAC AMARU EN LA LOCALIDAD
Proyecto:
DE PALCA DISTRITO DE PALCA -HUANCAVELICA -HUANCAVELICA
Respon. : ING. ANGEL CHOQUE CONTRERAS Y EQUIPO TECNICO Provincia : HUANCAVELICA
Fecha : NOVIEMBRE 2013 Distrito : PALCA
Formula : COMPONENTE AREA PEDAGOGICA (AULAS) Localidad : PALCA

LONG. CANT. DE N DE
ITEM PARTIDA DESCRIPCION TIPO 1" 3/4" 5/8" 1/2" 3/8" 1/4"
PARCIAL ELEMENTOS VECES
Estribos Trm: 5 3/8" 1.23 27 1 33.21
Estribos Trm: 6 3/8" 1.23 38 1 46.74

Portico EJE E-E


VS-406-25X40
As Superior 3/4" 3.3 1 1 3.30
As Superior 3/4" 3.55 1 1 3.55
As Superior 3/4" 5.6 1 1 5.60
As Superior 3/4" 33.35 2 1 66.70
As Intermedio 1/2" 32.2 2 1 64.40
As Inferior 3/4" 33.35 2 1 66.70
Estribos Trm: 1 3/8" 1.23 15 1 18.45
Estribos Trm: 2 3/8" 1.23 31 1 38.13
Estribos Trm: 3 3/8" 1.23 27 1 33.21
Estribos Trm: 4 3/8" 1.23 27 1 33.21
Estribos Trm: 5 3/8" 1.23 27 1 33.21
Estribos Trm: 6 3/8" 1.23 27 1 33.21
Estribos Trm: 7 3/8" 1.23 43 1 52.89
Estribos Trm: 8 3/8" 1.23 12 1 14.76

Portico EJE E-E


VS-405-25X40
As Superior 3/4" 3.3 1 1 3.30
As Superior 3/4" 3.55 1 1 3.55
As Superior 3/4" 33.35 2 1 66.70
As Intermedio 1/2" 32.2 2 1 64.40
As Inferior 3/4" 33.35 2 1 66.70
Estribos Trm: 1 3/8" 1.23 11 1 13.53
Estribos Trm: 2 3/8" 1.23 31 1 38.13
Estribos Trm: 3 3/8" 1.23 27 1 33.21
Estribos Trm: 4 3/8" 1.23 30 1 36.90
Estribos Trm: 5 3/8" 1.23 27 1 33.21
Estribos Trm: 6 3/8" 1.23 27 1 33.21
Estribos Trm: 7 3/8" 1.23 34 1 41.82
Estribos Trm: 8 3/8" 1.23 15 1 18.45

Portico EJE G-G


VS-103-30X40
PLANILLA DE METRADOS (ACERO EN VIGAS)

MEJORAMIENTO DE LOS SERVICIOS EDUCATIVO DEL NIVEL SECUNDARIOEN LA I.E. TUPAC AMARU EN LA LOCALIDAD
Proyecto:
DE PALCA DISTRITO DE PALCA -HUANCAVELICA -HUANCAVELICA
Respon. : ING. ANGEL CHOQUE CONTRERAS Y EQUIPO TECNICO Provincia : HUANCAVELICA
Fecha : NOVIEMBRE 2013 Distrito : PALCA
Formula : COMPONENTE AREA PEDAGOGICA (AULAS) Localidad : PALCA

LONG. CANT. DE N DE
ITEM PARTIDA DESCRIPCION TIPO 1" 3/4" 5/8" 1/2" 3/8" 1/4"
PARCIAL ELEMENTOS VECES
As Superior 5/8" 3.5 2 1 7.00
As Superior 5/8" 4.8 2 1 9.60
As Superior 5/8" 31.3 2 1 62.60
As Intermedio 5/8" 30.9 2 1 61.80
As Inferior 5/8" 2.15 1 1 2.15
As Inferior 5/8" 3.55 1 1 3.55
As Inferior 5/8" 31.3 2 1 62.60
Estribos Trm: 1 3/8" 1.33 27 1 35.91
Estribos Trm: 2 3/8" 1.33 27 1 35.91
Estribos Trm: 3 3/8" 1.33 56 1 74.48
Estribos Trm: 4 3/8" 1.33 27 1 35.91
Estribos Trm: 5 3/8" 1.33 27 1 35.91
Estribos Trm: 6 3/8" 1.33 46 1 61.18
Estribos Trm: 7 3/8" 1.33 17 1 22.61

Portico EJE G-G


VS-202-25X40
As Superior 5/8" 3.3 2 1 6.60
As Superior 5/8" 3.5 3 1 10.50
As Superior 5/8" 29.85 2 1 59.70
As Intermedio 1/2" 29.15 2 1 58.30
As Inferior 5/8" 2.15 2 1 4.30
As Inferior 5/8" 3.55 2 1 7.10
As Inferior 5/8" 29.85 2 1 59.70
Estribos Trm: 1 3/8" 1.23 27 1 33.21
Estribos Trm: 2 3/8" 1.23 27 1 33.21
Estribos Trm: 3 3/8" 1.23 47 1 57.81
Estribos Trm: 4 3/8" 1.23 27 1 33.21
Estribos Trm: 5 3/8" 1.23 27 1 33.21
Estribos Trm: 6 3/8" 1.23 46 1 56.58

Portico EJE G-G


VS-302-25X40
As Superior 3/4" 2.05 1 1 2.05
As Superior 3/4" 3.25 1 1 3.25
As Superior 3/4" 3.3 1 1 3.30
As Superior 3/4" 3.5 2 1 7.00
As Superior 3/4" 30.3 2 1 60.60
PLANILLA DE METRADOS (ACERO EN VIGAS)

MEJORAMIENTO DE LOS SERVICIOS EDUCATIVO DEL NIVEL SECUNDARIOEN LA I.E. TUPAC AMARU EN LA LOCALIDAD
Proyecto:
DE PALCA DISTRITO DE PALCA -HUANCAVELICA -HUANCAVELICA
Respon. : ING. ANGEL CHOQUE CONTRERAS Y EQUIPO TECNICO Provincia : HUANCAVELICA
Fecha : NOVIEMBRE 2013 Distrito : PALCA
Formula : COMPONENTE AREA PEDAGOGICA (AULAS) Localidad : PALCA

LONG. CANT. DE N DE
ITEM PARTIDA DESCRIPCION TIPO 1" 3/4" 5/8" 1/2" 3/8" 1/4"
PARCIAL ELEMENTOS VECES
As Intermedio 1/2" 29.15 2 1 58.30
As Inferior 3/4" 1.7 1 1 1.70
As Inferior 3/4" 2.1 1 1 2.10
As Inferior 3/4" 30.3 2 1 60.60
Estribos Trm: 1 3/8" 1.23 27 1 33.21
Estribos Trm: 2 3/8" 1.23 27 1 33.21
Estribos Trm: 3 3/8" 1.23 65 1 79.95
Estribos Trm: 4 3/8" 1.23 27 1 33.21
Estribos Trm: 5 3/8" 1.23 27 1 33.21
Estribos Trm: 6 3/8" 1.23 64 1 78.72

Portico EJE G-G


VS-407-25X40
As Superior 5/8" 3.5 2 1 7.00
As Superior 5/8" 3.55 2 1 7.10
As Superior 5/8" 32.9 2 1 65.80
As Intermedio 1/2" 32.2 2 1 64.40
As Inferior 5/8" 32.9 2 1 65.80
Estribos Trm: 1 3/8" 1.23 13 1 15.99
Estribos Trm: 2 3/8" 1.23 27 1 33.21
Estribos Trm: 3 3/8" 1.23 27 1 33.21
Estribos Trm: 4 3/8" 1.23 47 1 57.81
Estribos Trm: 5 3/8" 1.23 27 1 33.21
Estribos Trm: 6 3/8" 1.23 27 1 33.21
Estribos Trm: 7 3/8" 1.23 46 1 56.58
Estribos Trm: 8 3/8" 1.23 13 1 15.99

TOTAL (ML) 0.00 ### 812.15 ### ### 0.00


4.04 2.26 1.60 1.02 0.58 0.25
TOTAL (KG) 0.00 ### ### ### ### 0.00
12,806.88
PLANILLA DE METRADOS (ACERO EN VIGUETA )

MEJORAMIENTO DE LOS SERVICIOS EDUCATIVO DEL NIVEL SECUNDARIOEN LA I.E. TUPAC AMARU EN LA
Proyecto:
LOCALIDAD DE PALCA DISTRITO DE PALCA -HUANCAVELICA -HUANCAVELICA
Respon. : ING. ANGEL CHOQUE CONTRERAS Y EQUIPO TECNICO Provincia : HUANCAVELICA
Fecha : NOVIEMBRE 2013 Distrito : PALCA
Formula : COMPONENTE AREA PEDAGOGICA (AULAS) Localidad : PALCA

CANT. DE
LONG. N DE
ITEM PARTIDA DESCRIPCION TIPO ELEMENT 1" 3/4" 5/8" 1/2" 3/8" 1/4"
PARCIAL VECES
OS

02.07.03 ACERO FY=4200KG/CM2 GRADO 60

TOTAL EJE E-E


3/8" 2.85 2.00 12.00 68.40
ESTRIBO 1/4" 0.60 15.00 12.00 108.00

TOTAL (ML) 0.00 0.00 0.00 0.00 68.40 108.00


4.04 2.26 1.60 1.02 0.58 0.25
TOTAL (KG) 0.00 0.00 0.00 0.00 39.67 27.00
66.67
-
PLANILLA DE METRADOS (LOSA ALIGERADA )

MEJORAMIENTO DE LOS SERVICIOS EDUCATIVO DEL NIVEL SECUNDARIOEN LA I.E. TUPAC AMARU EN LA
Proyecto:
LOCALIDAD DE PALCA DISTRITO DE PALCA -HUANCAVELICA -HUANCAVELICA
Respon. : ING. ANGEL CHOQUE CONTRERAS Y EQUIPO TECNICO Provincia : HUANCAVELICA
Fecha : NOVIEMBRE 2013 Distrito : PALCA
Formula : COMPONENTE AREA PEDAGOGICA (AULAS) Localidad : PALCA
CANT. DE
LONG. N DE
ITEM PARTIDA DESCRIPCION TIPO ELEMENT 1" 3/4" 5/8" 1/2" 3/8" 1/4"
PARCIAL VECES
OS
02.08.03 ACERO FY=4200KG/CM2 GRADO 60
1 PISO
L0SA ALIGERADA AULAS INFERIOR 1/2" 32.00 15.00 1.00 480.00
REF SUPERIOR 1/2" 1.80 15.00 1.00 27.00
3/8" 1.80 15.00 1.00 27.00
1/2" 3.10 15.00 5.00 232.50
3/8" 3.10 15.00 5.00 232.50
1/2" 3.30 15.00 1.00 49.50
3/8" 3.30 15.00 1.00 49.50
ESTRIBO V 1/4" 0.30 15.00 15.00 67.50

LOSA ALIGERADA PASADIZO


INFERIOR 1/2" 32.00 5.00 1.00 160.00
3/8" 32.00 5.00 5.00 800.00
REF SUPERIOR 1/2" 1.80 5.00 1.00 9.00
3/8" 1.80 5.00 1.00 9.00
1/2" 3.10 5.00 5.00 77.50
3/8" 3.10 5.00 5.00 77.50
1/2" 3.30 5.00 1.00 16.50
3/8" 3.30 5.00 1.00 16.50
ESTRIBO V 1/4" 0.30 15.00 5.00 22.50

2 PISO
LOSA ALIGERADA AULAS
INFERIOR 1/2" 30.00 15.00 1.00 450.00
REF SUPERIOR 1/2" 1.80 15.00 2.00 54.00
3/8" 1.80 4.00 1.00 7.20
REF SUPERIOR 1/2" 3.10 15.00 5.00 232.50
PLANILLA DE METRADOS (LOSA ALIGERADA )

MEJORAMIENTO DE LOS SERVICIOS EDUCATIVO DEL NIVEL SECUNDARIOEN LA I.E. TUPAC AMARU EN LA
Proyecto:
LOCALIDAD DE PALCA DISTRITO DE PALCA -HUANCAVELICA -HUANCAVELICA
Respon. : ING. ANGEL CHOQUE CONTRERAS Y EQUIPO TECNICO Provincia : HUANCAVELICA
Fecha : NOVIEMBRE 2013 Distrito : PALCA
Formula : COMPONENTE AREA PEDAGOGICA (AULAS) Localidad : PALCA
CANT. DE
LONG. N DE
ITEM PARTIDA DESCRIPCION TIPO ELEMENT 1" 3/4" 5/8" 1/2" 3/8" 1/4"
PARCIAL VECES
OS
3/8" 3.10 4.00 1.00 12.40
ESTRIBO V 1/4" 0.30 15.00 15.00 67.50

LOSA ALIGERADA PASADIZO


INFERIOR 1/2" 30.00 15.00 1.00 450.00
3/8" 30.00 15.00 1.00 450.00
REF SUPERIOR 1/2" 1.80 15.00 2.00 54.00
3/8" 1.80 4.00 1.00 7.20
REF SUPERIOR 1/2" 3.10 15.00 5.00 232.50
3/8" 3.10 4.00 1.00 12.40
ESTRIBO V 1/4" 0.30 15.00 15.00 67.50

3 PISO
LOSA ALIGERADA AULAS
INFERIOR 1/2" 30.00 15.00 1.00 450.00
REF SUPERIOR 1/2" 1.80 15.00 2.00 54.00
3/8" 1.80 4.00 1.00 7.20
REF SUPERIOR 1/2" 3.10 15.00 5.00 232.50
3/8" 3.10 4.00 1.00 12.40
ESTRIBO V 1/4" 0.30 15.00 15.00 67.50

LOSA ALIGERADA PASADIZO


INFERIOR 1/2" 30.00 15.00 1.00 450.00
3/8" 30.00 15.00 1.00 450.00
REF SUPERIOR 1/2" 1.80 15.00 2.00 54.00
3/8" 1.80 4.00 1.00 7.20
REF SUPERIOR 1/2" 3.10 15.00 5.00 232.50
3/8" 3.10 4.00 1.00 12.40
ESTRIBO V 1/4" 0.30 15.00 15.00 67.50
PLANILLA DE METRADOS (LOSA ALIGERADA )

MEJORAMIENTO DE LOS SERVICIOS EDUCATIVO DEL NIVEL SECUNDARIOEN LA I.E. TUPAC AMARU EN LA
Proyecto:
LOCALIDAD DE PALCA DISTRITO DE PALCA -HUANCAVELICA -HUANCAVELICA
Respon. : ING. ANGEL CHOQUE CONTRERAS Y EQUIPO TECNICO Provincia : HUANCAVELICA
Fecha : NOVIEMBRE 2013 Distrito : PALCA
Formula : COMPONENTE AREA PEDAGOGICA (AULAS) Localidad : PALCA
CANT. DE
LONG. N DE
ITEM PARTIDA DESCRIPCION TIPO ELEMENT 1" 3/4" 5/8" 1/2" 3/8" 1/4"
PARCIAL VECES
OS
TECHO
LOSA ALIGERADA AULAS
TECHO
INFERIOR 1/2" 34.00 21.00 1.00 714.00
REF SUPERIOR 1/2" 3.20 21.00 2.00 134.40
REF SUPERIOR 1/2" 3.10 21.00 5.00 325.50
ESTRIBO V 1/4" 0.30 15.00 15.00 67.50

ACERO DE TEMPERATURA
PRIMER PISO
1/4" 29.20 54.00 4.00 ###

TOTAL (ML) 0.00 0.00 0.00 ### ### ###


4.04 2.26 1.60 1.02 0.58 0.25
TOTAL (KG) 0.00 0.00 0.00 ### ### ###
8,229.45
###
PLANILLA DE METRADOS (ACERO EN LOSA MACIZA )

Proyecto MEJORAMIENTO DE LOS SERVICIOS EDUCATIVO DEL NIVEL SECUNDARIOEN LA I.E. TUPAC AMARU
: EN LA LOCALIDAD DE PALCA DISTRITO DE PALCA -HUANCAVELICA -HUANCAVELICA
Respon. : ING. ANGEL CHOQUE CONTRERAS Y EQUIPO TECNICO Provincia : HUANCAVELICA
Fecha : NOVIEMBRE 2013 Distrito : PALCA
Formula : COMPONENTE AREA PEDAGOGICA (AULAS) Localidad : PALCA

CANT. DE
DESCRIPC LONG. N DE
ITEM PARTIDA TIPO ELEMENT 1" 3/4" 5/8" 1/2" 3/8" 1/4"
ION PARCIAL VECES
OS

02.09.03 ACERO FY=4200KG/C

TOTAL RAMPA
HORIZONT
3/8" 31.20 1.00 8.00
AL 249.60
TRANSVER
3/8" 1.62 1.00 120.00
SAL 194.40

TOTAL (ML) 0.00 0.00 0.00 0.00 444.00 0.00


4.04 2.26 1.60 1.02 0.58 0.25
TOTAL (KG) 0.00 0.00 0.00 0.00 257.52 0.00
257.52
-