CALCULO DE ARMADURA DE RESERVORIO

DATOS
PROYECTO : AGUA POTABLE COCHARCAS ACERO MUROS
EXPEDIENTE COCHARCAS ACERO VERTICAL = 1/2 Pulg.
ZONAL : APURIMAC DIAMETRO = 1.270 Cms.
EVALUADOR : CARLOS L AREA = 1.267 Cms2.
FECHA : 4-Jun-17 PESO = 0.994 Kg/ml
ACERO HORIZONTAL = 1/2 Pulg.
DIAMETRO = 1.270 Cms.
CARACTERISTICAS GEOMETRICAS AREA = 1.267 Cms2.
VOLUMEN RESERVORIO = 5.00 m3 PESO = 0.994 Kg/ml
ALTURA UTIL RESERVORI = 1.25 mts.
LADO UTIL RESERVORIO = 2.00 mts. ACERO LOSA DE TECHO
ESPECIFICACIONES ACERO HORIZONTAL = 1/2 Pulg.
CONCRETO f'c = 210 Kg/cm2 DIAMETRO = 1.270 Cms.
SOBRECARGA EN LOSA = 150 Kg/m2 AREA = 1.267 Cms2.
ACERO fy = 4,200 Kg/cm2 PESO = 0.994 Kg/ml
RESISTENCIA DEL SUELO = 1.00 Kg/cm2 ACERO LOSA DE FONDO
COEF. SISMICO = 0.12 ACERO HORIZONTAL = 1/2 Pulg.
RECUBRIMIENTO r = = 5.00 Cm DIAMETRO = 1.270 Cms.
fs = 2,100 Kg/cm2 AREA = 1.267 Cms2.
fc = 94.5 Kg/cm2 PESO = 0.994 Kg/ml

0.20 0.15 1.00

1.35

1.35

Sc Wc
SL 0.10
A' B'
0.30
WL NIVEL DE AGUA

S1

1.25
Ea

1.85 1.80 W1 0.42

0.98 Wa

A B

S2 0.20

0.10
C D

W2

0.28

0.68

0.85
CALCULOS

W1= Pc x V1 558.00 Kg
W2 = Pc x V2 648.00 Kg
Wa = Pa x Va 1250.00 Kg
WL = Pc x VL 276.00 Kg
Ws = Sc x A 172.50 Kg
S1 = 0,12 x W1 100.44 Kg
S2 = 0,12 x W2 116.64 Kg
SL = 0,12 x WL 49.68 Kg
Ss = 0,12 x Ws 37.26 Kg
Ea = 1,12 x 0,5 x Pa x H12 1312.50 Kg

VERIFICACION DEL ESFUERZO CORTANTE EN LA BASE AB

V = Fh / A 1.00 Kg/cm2

Vc = 0,29 ( f'c )^1/2 4.20 Kg/cm2

V= 1.00 Kg/cm2 < Vc = 4.20 Kg/cmBIEN !!

CALCULO DE LA ARMADURA

ACERO VERTICAL CARA B'-B

MOMENTO MAXIMO EN LA BASE A-B

Mu 765.68 Kg-mts.
d = t1 - r - D/2 9.37 Cms.

AREA DE ACERO
As1 = 77.38 Cms2
As2 = 2.23 Cms2 SE ASUME : 2.23 Cms2

CUANTIA = As / t1 x b 0.0015

CUANTIA MINIMA POR FLEXION 0.0012 < 0.0015 BIEN!!

USAR : 1 1/2 @ 0.30 mts.

ACERO HORIZONTAL B'B

ASUMIR CUANTIA MINIMA PARA EL ACERO HORIZONTAL, CONSIDERANDO P = 0,0018

As = P x b x t1 2.70 Cms2

USAR : 1 1/2 @ 0.30 mts.

ACERO EN LA ZAPATA

ASUMIR EL AREA DE ACERO HALLADA PARA LA BASE DE MURO

USAR : 1 1/2 @ 0.30 mts.

ACERO EN LA LOSA DE FONDO

P1 1904.4
P2 3850.2
P3 3348.00
P4 5248.80
P5 7500.00

LUEGO: WuD : 4130.70


WuL : 270.00

Wu : 4400.70
CALCULO DEL MOMENTO ULTIMO

Mu = 0,0513 * Wu * L2 1194.25 Kg--mts


d = t1 - r - D/2 14.37 Cms.
AREA DE ACERO
As1 = 119.86 Cms2
As2 = 2.24 Cms2 SE ASUME : 2.24 Cms2

CUANTIA = As / t1 x b 0.00112

CUANTIA MINIMA POR FLEXION 0.0012 > 0.0011 MAL!!

USAR : 1 1/2 @ 0.25 mts.

ACERO EN LA LOSA DE TECHO

WuD = 2400 * t1 * 1,5 360


WuL = SC * 1,8 270
Wu = 630

CALCULO DEL MOMENTO ULTIMO

Mu = 0,0479 * Wu * L2 120.71 Kg--mts


d = t1 - r - D/2 4.50 Cms.
AREA DE ACERO
As1 = 37.55 Cms2
As2 = 0.72 Cms2 SE ASUME : 0.72 Cms2

CUANTIA = As / t1 x b 0.00072

CUANTIA MINIMA POR FLEXION 0.0012 > 0.0007 MAL!! SE ASUME CUANTIA MINIMA P= 0.0012

As = P * t1 * b 1.20 Cms2

USAR : 1 1/2 @ 0.25 mts


2.70

0.15 0.30

0.20 0.15 TUB. FG 3/4"


@ 0,30 Mts.

0.15

1.5 UNIONES
ELECTROSOLDADAS

0.10

2.00

ESCALINES FG
VER DETALLE
DETALLE DE ESCALINES

BUZON 0,60 x 0,60 Mts.


TAPA SANITARIA METALICA

ESPECIFICACIONES TECNICAS
0.15 RESISTENCIA DEL CONCRETO f'c = 175 Kg/cm2

FLUENCIA DEL ACERO fy = 4200 Kg/cm2

0.20 TRASLAPE MINIMO DE VARILLAS = 30 cm

0.20 0.15 2.00 0.15 0.20


TAPA SANITARIA METALICA 1/2 @ 0.25 TUBERIA DE VENTILACION FG 2"
0,60 x 0,60 mts.

0.10



0.30

NIVEL DE AGUA

1/2 @ 0.30

1/2 @ 0.30 TARRAJEO C / IMPERMEABILIZANTE 1.55



1.25

1/2 @ 0.30


1/2 @ 0.25 PENDIENTE DE FONDO 1%

1/2 @ 0.30



0.20


0.075

0.67 SOLADO DE CONCRETO

0.20 0.15 2.00 0.15 0.20


1/2 @ 0.25

2.30

2 3/8
2.30
PLANILLA DE ARMADURA RESERVORIO 5 M3

ARMADURA LOSA DE TECHO LONGITUD VECES PESO

2.24

0.07 1/2 2.38 20.4 48.26

2.24

3/8 2.24 4 8.91

ARMADURA LOSA DE FONDO LONGITUD VECES PESO

1.02

0.17 1/2 1.19 40.00 47.18

2.64

1/2 2.64 12.89 33.82

ARMADURA DE MURO LONGITUD VECES PESO

0.10

1.70 1/2 1.90 34.67 65.47

0.15
2.15 1/2 4.75 12.33 58.23

1.15
PESO TOTAL EN Kg 261.87
HOJA DE METRADOS DE RESERVORIO

CAPACIDAD : 5 M3

PROYEC.: AGUA POTABLE COCHARCAS EVALUADOR: CARLOS L


EXPED.: COCHARCAS FECHA: 6/4/2017

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA SUB-TOTAL TOTAL UNID.

6.00 RESERVORIO 5.00 M3


6.01 TRAZO Y REPLANTEO 1.00 2.70 2.70 7.29 7.29 m2
6.02 EXCAVACION MANUAL 1.00 2.70 2.70 0.80 5.83 5.83 m3
6.03 SOLADO DE CONCRETO E= 0.05 Mts. 1.00 2.70 2.70 7.29 7.29 m2
6.04 CONCRETO F'C= 175 KG/CM2 1.00 2.70 2.70 0.20 1.46 3.99 m3
2.00 2.30 0.15 1.55 1.07 m3
2.00 2.00 0.15 1.55 0.93 m3
1.00 2.30 2.30 0.10 0.53 m3
6.05 CONFOR. DE PENDIENTE DE FONDO C F'C= 175 K 1.00 2.00 2.00 4.00 4.00 m2
6.06 ENCOFRADO Y DESENCOFRADO 4.00 2.30 1.65 15.18 31.58 m2
4.00 2.00 1.55 12.40 m2
1.00 2.00 2.00 4.00 m2
6.07 ACERO FY= 4,200 KG/CM2 1.00 261.87 261.87 261.87 kg
6.08 ESCALINES DE FIERRO GALVANIZADO 2.00 2.05 4.10 5.30 ml
4.00 0.30 1.20

6.09 TARRAJEO INTERIOR CON IMPERMEABILIZANTE 4.00 2.00 1.55 12.40 16.40 m2
1.00 2.00 2.00 4.00 m2
6.10 TARRAJEO EXTERIOR MEZCLA 1:5 4.00 2.30 1.65 15.18 20.47 m2
1.00 2.30 2.30 5.29 m2
6.11 TAPA SANITARIA METALICA 0,60 x 0,60 Mts. 1.00 1.00 1.00 unid
6.12 TUBERIA DE VENTILACION FG D= 2" 1.00 1.00 1.00 unid
6.13 PRUEBA HIDRAULICA Y DESINFEC. RESERVORIO 1.00 1.00 1.00 glb
6.14 SUMINISTRO Y COLOCACION DE HIPOCLORADOR 1.00 1.00 1.00 unid
6.15 PINTADO DE MUROS EXTERIORES 4.00 2.30 1.65 15.18 20.47 m2
1.00 2.30 2.30 5.29

TIEMPO DE EJECUCION DE OBRA

PARTIDA DESCRIPCION UNID METRADO RENDI. PERSONAL PERSONAL BASE TIEMPO

6.00 RESERVORIO 5.00 M3


6.01 TRAZO Y REPLANTEO m2 7.29 200.00 1.00 1.00 0.29 Hrs.
6.02 EXCAVACION MANUAL m3 5.83 3.00 1.00 5.00 3.11 Hrs.
6.03 SOLADO DE CONCRETO E= 0.05 Mts. m3 7.29 70.00 2.00 2.00 0.83 Hrs.
6.04 CONCRETO F'C= 175 KG/CM2 m3 3.99 9.00 2.00 2.00 3.54 Hrs.
6.05 CONFOR. DE PENDIENTE DE FONDO C F'C= 175 K m2 4.00 70.00 2.00 2.00 0.46 Hrs.
6.06 ENCOFRADO Y DESENCOFRADO m2 31.58 10.00 1.00 5.00 5.05 Hrs.
6.07 ACERO FY= 4,200 KG/CM2 kg 261.87 250.00 1.00 1.00 8.38 Hrs.
6.08 ESCALINES DE FIERRO GALVANIZADO ml 5.30 15.00 1.00 1.00 2.83 Hrs.
6.09 TARRAJEO INTERIOR CON IMPERMEABILIZANTE m2 16.40 6.00 1.00 2.00 10.93 Hrs.
6.10 TARRAJEO EXTERIOR MEZCLA 1:5 m2 20.47 10.00 1.00 2.00 8.19 Hrs.
6.11 TAPA SANITARIA METALICA 0,60 x 0,60 Mts. und 1.00 5.00 1.00 1.00 1.60 Hrs.
6.12 TUBERIA DE VENTILACION FG D= 2" und 1.00 10.00 1.00 1.00 0.80 Hrs.
6.13 PRUEBA HIDRAULICA Y DESINFEC. RESERVORIO glb 1.00 10.00 1.00 1.00 0.80 Hrs.
6.14 SUMINISTRO Y COLOCACION DE HIPOCLORADOR und 1.00 10.00 1.00 1.00 0.80 Hrs.
6.15 PINTADO DE MUROS EXTERIORES m2 20.47 25.00 1.00 1.00 6.55 Hrs.

TIEMPO APROX. EJECUCION RESERVORIO. 6.77 Dias


VOLUMEN ALTURA LADO INTER VOLUMEN ASUMIDO
3.00 1.25 1.55 5.00 M3
4.00 1.25 1.80
5.00 1.25 2.00 ALTURA LADO
6.00 1.25 2.20 1.25 2.00
7.00 1.25 2.40
8.00 1.30 2.50
9.00 1.30 2.65
10.00 1.35 2.75
11.00 1.40 2.85
12.00 1.45 2.90
13.00 1.50 2.95
14.00 1.55 3.05
15.00 1.55 3.15
16.00 1.60 3.20
17.00 1.65 3.25
18.00 1.65 3.35
19.00 1.70 3.35
20.00 1.70 3.45
21.00 1.75 3.50
22.00 1.75 3.55
23.00 1.80 3.60
24.00 1.85 3.65
25.00 1.85 3.70
26.00 1.85 3.75
27.00 1.90 3.80
28.00 1.90 3.85
29.00 1.95 3.90
30.00 1.95 3.95
31.00 2.00 3.95
32.00 2.00 4.00
33.00 2.05 4.05
34.00 2.05 4.10
35.00 2.05 4.15
36.00 2.10 4.15
37.00 2.10 4.20
38.00 2.15 4.25
39.00 2.15 4.30
40.00 2.15 4.35
41.00 2.20 4.35
42.00 2.20 4.40
43.00 2.20 4.45
44.00 2.25 4.45
45.00 2.25 4.50
46.00 2.25 4.55
47.00 2.30 4.55
48.00 2.30 4.60
49.00 2.30 4.65
50.00 2.35 4.65
51.00 2.35 4.70
52.00 2.45 4.65
53.00 2.40 4.70
54.00 2.40 4.75
55.00 2.40 4.80
56.00 2.40 4.85
57.00 2.45 4.85
58.00 2.45 4.90
59.00 2.55 4.85
60.00 2.45 4.95