Está en la página 1de 1

CONCRETO HIDRAULICO MAC ESTABILIZACION SUBBASE GRANULA BASE GRNULAR AFIRMADO RELLENO

EMULSION CEMENTO(AGREGADO GRUESO)


ENSAYOS MIN MAX MIN MAX ENSAYOS MIN MAX MIN MAX ENSAYOS MIN MAX MIN MAX ENSAYOS MIN MAX MIN MAX
CBR CBR CBR 40% 80% (TRAFICO <10 80%
6) IP NP NP NP 9%
AS AS 40% ABS 50% 40% ABS 20% 50%
#200 3% 35% #200 10% LL 25% EA 75% 30% 50%
IP NP NP NP NP IP NP 8% IP 4% 2% IOG ACEPTABLE
ABS 5% 20% 70% ABS 15% 40% EA 35% 45% DUR 15%
EA 75% 90% EA 35% 60% CHT 20% 15% TA 3%
PE PE FRT (UNA CARA) 80% LIG 0.50%
PUG PUG FRT (DOS CARAS) 50% PH 6 8
PU PUG DUR (GRUESO) 18% ST 0.01 0.1
CHT NT 10% 10% CHT NT 12% 15% DUR (FINO) 15% SO- 0.001 0.01
FRT 85% 90% 90%/70% DUR (GRUESO) 10% 14% 18% ST 1% CL- 0.001 0.01
DUR 1% 10% 15% GRUESO DUR (FINO) 18%
IDP 65% 85% 35% IOG ACEPTABLE
IDA 65% 85% 35% PH 6 8
ANG 40% 45% 40% ST 0.01 0.1%
TA NT 1% SO- 0.001 0.01%
LIG NT NT CL- 0.0001 0.01%
IOG ACEPTABLE FRT 60%
PH 5.5 7.5 TA 3%
ST 0.01 0.1 LIG 0.50%
SO- 0.001 0.01
CL- 0.001 0.01
RWS(PEN) 4-5 8-9
RWC(PEN) 6-7 9-10
RWS(EMUL) 2-3 6-7
RWC(EMUL) 4-5 8-9
RWS(RC) 4-5 8-9
RWC(RC) 5-6 9-10
ADHS(PEN) +95 +95 +95
ADHC(PEN) +95 +95
ADHS(RC) +95 +95
ADHC(RC) +95 +95
AZUL DE METILENO 8

También podría gustarte