PLANILLA DE METRADOS

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - A

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN UND

01.00.00 OBRAS PROVISIONALES


01.01.00 Cartel de indentificacin de Obra de 3.60 x 8.50 m. und

01.02.00 Alquiler de Almacn y Oficina mes

02.00.00 PAVIMENTOS

02.01.00 TRABAJOS PRELIMINARES


02.01.01 Limpieza de Terreno Manual m2
Jr. Ricardo Palma

Jr. Abrahan Valdelomar

Jr. Jos Glvez

Av. Mariano Melgar

Jr. Pedro Ruz

02.01.02 Trazo, Nivel y Replanteo m2


Jr. Ricardo Palma

Jr. Abrahan Valdelomar

Jr. Jos Glvez

Av. Mariano Melgar

Jr. Pedro Ruz


PLANILLA DE METRADOS

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - A

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN UND

02.02.00 MOVIMIENTO DE TIERRAS


02.02.01 Corte con Maquinaria en terreno natural hasta H=1.00 m m3

02.02.02 Perfilado, Nivelacin y compactacin de la subrasante en zonas de corte m2


Jr. Ricardo Palma

Jr. Abrahan Valdelomar

Jr. Jos Glvez

Av. Mariano Melgar

Jr. Pedro Ruz

02.02.03 Mejoramiento de subrasante con over menor a 4" e=20cm m2


Jr. Ricardo Palma

Jr. Abrahan Valdelomar

Jr. Jos Glvez

Av. Mariano Melgar

Jr. Pedro Ruz

02.02.04 Base Granular e=20cm m2


Jr. Ricardo Palma
PLANILLA DE METRADOS

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - A

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN UND

Jr. Abrahan Valdelomar

Jr. Jos Glvez

Av. Mariano Melgar

Jr. Pedro Ruz

02.03.00 CONCRETO SIMPLE


02.03.01 Losa de Rodadura, Concreto f'c = 210 Kg/cm2, e=0.20 m. m2
Jr. Ricardo Palma

Jr. Abrahan Valdelomar

Jr. Jos Glvez

Av. Mariano Melgar

Jr. Pedro Ruz

02.03.02 Concreto en Uas para Pavimento Rgido, Concreto f'c = 210 Kg/cm2 m3
Jr. Ricardo Palma

cuadra 06
PLANILLA DE METRADOS

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - A

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN UND

cuadra 07
0.50

Jr. Abrahan Valdelomar

0.40

cuadra 06
0.25

Jr. Jos Glvez

cuadra 06

Av. Mariano Melgar

cuadra 14

cuadra 15

cuadra 15
PLANILLA DE METRADOS

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - A

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN UND

Jr. Pedro Ruz

cuadra 03

02.03.03 Encofrado y Desencofrado de Losa de Rodadura m2


Jr. Ricardo Palma

cuadra 06

cuadra 07

Jr. Abrahan Valdelomar

cuadra 06

Jr. Jos Glvez

cuadra 06

Av. Mariano Melgar

cuadra 14
PLANILLA DE METRADOS

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - A

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN UND

cuadra 15

cuadra 16

Jr. Pedro Ruz

cuadra 03

02.03.04 Levantamiento de Buzones Existentes a nivel de rasante und

BUZONES 7 AOS DE ANTIGEDAD


AV. MARIANO MELGAR
JR. PEDRO RUIZ
JR. ABRAHAN VALDELOMAR
JR. RICARDO PALMA

BUZONES 4 AOS DE ANTIGEDAD


JR. JOSE GALVEZ
MARIANO MELGAR - PEDRO RUIZ
JR- RICARDO PALMA

02.04.00 CURADO
02.04.01 Curado de Losa de Rodadura, durante 7 dias - 4 veces x dia m2

02.05.00 JUNTAS
02.05.01 Juntas de contraccin e=6mm m
PLANILLA DE METRADOS

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - A

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN UND

02.05.02 Juntas de contruccin de 3/4" c/ pasajuntas m

AV. MARIANO MELGAR


C 14 - 15 - 16

JR. JOSE GALVEZ


C-4

JR. PEDRO RUIZ


C-5; C-4; C-3

JR. A. VALDELOMAR

JR. RICARDO PALMA

02.05.03 Juntas de contruccin de 3/4" sin pasajuntas en la interseccin de calles m

INTERS. M- MELGAR - JOSE B. ALCEDO

INTERS. M. MELGAR - JOSE GALVEZ

INTERS. M. MELGAR - F. VILLARREAL

INTERS. M. MELGAR - PEDRO RUIZ

INTERS. PEDRO RUIZ - A. VALDELOMAR

INTERS. PEDRO RUIZ - RICARDO PALMA

INTERS. PEDRO RUIZ - AV. CHACHAPOYAS

INTERS. R. PALMA - F. VILLARREAL

INTERS. A. VALDELOMAR - F. VILLARREAL

02.05.04 Juntas asflticas en pavimentos h=20 cm, e=1" m

M. MELGAR C-14
M. MELGAR C-15
M. MELGAR C-16
JOSE GALVEZ
PEDRO RUIZ C -5
PEDRO RUIZ C -4
PLANILLA DE METRADOS

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - A

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN UND

PEDRO RUIZ C -3
A. VALDELOMAR C-6
RICARDO PALMA

02.06.00 ACERO LISO


02.06.01 Dowels transversales con acero liso de 3/4" m

AV. MARIANO MELGAR

JR. JOSE GALVEZ

JR. F. VILLARREAL

JR. PEDRO RUIZ

JR. A. VALDELOMAR

JR. RICARDO PALMA

02.06.02 Barras de amarre longitudinal con acero corrugado de 3/4" m

AV. MARIANO MELGAR


C-14
C-15
C-16

JR. JOSE GALVEZ


C-4

JR. F. VILLAREAL

JR . PEDRO RUIZ
C-5
C-4; C-3

JR. A VLADELOMAR
C-6

JR. RICARDO PALMA


C-6
C-7

02.07.00 SEALIZACION
02.07.01 SEALIZACION HORIZONTAL
PLANILLA DE METRADOS

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - A

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN UND

02.07.01.01 Pintado de Franjas en Pavimento - Sealizacion m2

LINEA CONTINUA
AV. MARIANO MELGAR C.14
AV. MARIANO MELGAR C.15
AV. MARIANO MELGAR C.16
JR. JOSE GALVEZ C. 4
JR.PEDRO RUIZ 5
JR.PEDRO RUIZ 4
JR.PEDRO RUIZ 3
JR.ABRAHAM VALDELOMAR C.6
JR.RICARDO PALMA C.6
JR.RICARDO PALMA C.7

LINEAS DE PASO PEATONAL


AV. MARIANO MELGAR C.14
AV. MARIANO MELGAR C.15
AV. MARIANO MELGAR C.16
JR. JOSE GALVEZ C. 4
JR.PEDRO RUIZ 5
JR.PEDRO RUIZ 4
JR.PEDRO RUIZ 3
JR.ABRAHAM VALDELOMAR C.6
JR.RICARDO PALMA C.6
JR.RICARDO PALMA C.7

LINEA DE PARE
AV. MARIANO MELGAR C.14

AV. MARIANO MELGAR C.15

AV. MARIANO MELGAR C.16

JR. JOSE GALVEZ C. 4

JR.PEDRO RUIZ 5

JR.PEDRO RUIZ 4

JR.PEDRO RUIZ 3

JR.ABRAHAM VALDELOMAR C.6

JR.RICARDO PALMA C.6

JR.RICARDO PALMA C.7

FLECHAS DIRECCIONALES CON GIRO


AV. MARIANO MELGAR C.14
AV. MARIANO MELGAR C.15
PLANILLA DE METRADOS

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - A

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN UND

AV. MARIANO MELGAR C.16


JR. JOSE GALVEZ C. 4
JR.PEDRO RUIZ 5
JR.PEDRO RUIZ 4
JR.PEDRO RUIZ 3
JR.ABRAHAM VALDELOMAR C.6
JR.RICARDO PALMA C.6
JR.RICARDO PALMA C.7

02.07.02 SEALIZACION VERTICAL


02.07.02.01 Sealizacin Preventiva de lado 0.60 x 0.60 und

AV. MARIANO MELGAR C.14


AV. MARIANO MELGAR C.15
AV. MARIANO MELGAR C.16
JR. JOSE GALVEZ C. 4
JR.PEDRO RUIZ 5
JR.PEDRO RUIZ 4
JR.PEDRO RUIZ 3
JR.ABRAHAM VALDELOMAR C.6
JR.RICARDO PALMA C.6
JR.RICARDO PALMA C.7

02.08.00 ELIMINACION DE MATERIAL EXCEDENTE


02.08.01 Eliminacin de Material Excedente a una Distancia = 5 Km + 25% esponjamiento c/ volquete m3

03.00.00 VEREDAS

03.01.00 TRABAJOS PRELIMINARES


03.01.01 Limpieza de Terreno Manual m2

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
JR.RICARDO PALMA C.6-A
PLANILLA DE METRADOS

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - A

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN UND

JR.RICARDO PALMA C.6-B


JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B

AV. MARIANO MELGAR C.14-A

AV. MARIANO MELGAR C.14-B

AV. MARIANO MELGAR C.15-A

AV. MARIANO MELGAR C.15-B

AV. MARIANO MELGAR C.16-A

AV. MARIANO MELGAR C.16-B

JR. JOSE GALVEZ C. 4-A

JR. JOSE GALVEZ C. 4-B

JR.PEDRO RUIZ 5-A

JR.PEDRO RUIZ 5-B

JR.PEDRO RUIZ 4-A

JR.PEDRO RUIZ 4-B

JR.PEDRO RUIZ 3-A

JR.PEDRO RUIZ 3-B

JR.ABRAHAM VALDELOMAR C.6-A

JR.ABRAHAM VALDELOMAR C.6-B

JR.RICARDO PALMA C.6-A


PLANILLA DE METRADOS

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - A

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN UND

JR.RICARDO PALMA C.6-B

JR.RICARDO PALMA C.7-A

JR.RICARDO PALMA C.7-B

03.01.02 Trazo, Nivel y Replanteo m2

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B

AV. MARIANO MELGAR C.14-A

AV. MARIANO MELGAR C.14-B

AV. MARIANO MELGAR C.15-A

AV. MARIANO MELGAR C.15-B

AV. MARIANO MELGAR C.16-A

AV. MARIANO MELGAR C.16-B


PLANILLA DE METRADOS

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - A

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN UND

JR. JOSE GALVEZ C. 4-A

JR. JOSE GALVEZ C. 4-B

JR.PEDRO RUIZ 5-A

JR.PEDRO RUIZ 5-B

JR.PEDRO RUIZ 4-A

JR.PEDRO RUIZ 4-B

JR.PEDRO RUIZ 3-A

JR.PEDRO RUIZ 3-B

JR.ABRAHAM VALDELOMAR C.6-A

JR.ABRAHAM VALDELOMAR C.6-B

JR.RICARDO PALMA C.6-A

JR.RICARDO PALMA C.6-B

JR.RICARDO PALMA C.7-A

JR.RICARDO PALMA C.7-B

03.01.03 Demolicin de Vereda existente de concreto simple m2

CA. MARIANO MELGAR CUADRA 14


Lado Izquierdo (A1)
Lado Derecho (A2 + A3 + A4)
A2
A3
PLANILLA DE METRADOS

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - A

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN UND

A4

CA. MARIANO MELGAR CUADRA 15


Lado Izquierdo (A12 +A13)
A12
A13
Lado Derecho (A14 + A15)
A14
A15

CA. MARIANO MELGAR CUADRA 16


Lado Izquierdo (A16)
Lado Derecho (A17)

CA. JOSE GALVEZ CUADRA 4


Lado Izquierdo (A5 +A6 +A7)
A5
A6
A7

Lado Derecho (A8 +A9 +A10 +A11)


A8
A9
A10
A11

CA. PEDRO RUIZ CUADRA 3


Lado Izquierdo (A37 + A38)
A37
A38
Lado Derecho (A39)
A39

CA. PEDRO RUIZ CUADRA 4


Lado Izquierdo (A28)
Lado Derecho (A29 + A430)
A29
A30

CA. PEDRO RUIZ CUADRA 5


Lado Izquierdo (A19 +A20 + A21 )
A19
A20
A21
Lado Derecho (A22 )
PLANILLA DE METRADOS

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - A

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN UND

CA. ABRAHAM VALDEROMAR CUADRA 6


Lado Izquierdo (A26 +A27)
A26
A27
Lado Derecho (A25)

CA. RICARDO PALMA CUADRA 6


Lado Izquierdo (A33)
Lado Derecho (A31 +A32)
A31
A32

CA. RICARDO PALMA CUADRA 7


Lado Izquierdo (A36)
Lado Derecho (A34 + A35)
A34
A35

03.01.04 Demolicin de Vereda existente de concreto simple con una H= 1.00 m m2

CA. MARIANO MELGAR CUADRA 16


Lado Derecho (A18)

Lado Derecho (A23 + A24 )


A23
A24

03.02.00 MOVIMIENTO DE TIERRAS


03.02.01 Corte manual de terreno m3

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
PLANILLA DE METRADOS

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - A

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN UND

JR.RICARDO PALMA C.6-A


JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B

03.02.02 Nivelacion y Apisonado en Veredas m2

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B

03.02.03 Relleno Compactado C/ Material de prestamo (Afirmado) para base de vereda m2

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
JR.RICARDO PALMA C.6-A
PLANILLA DE METRADOS

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - A

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN UND

JR.RICARDO PALMA C.6-B


JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B

03.03.00 CONCRETO SIMPLE


03.03.01 Concreto f'c=175 Kg/cm2 en veredas, acabado frot., inc. brua. m2

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B

03.03.02 Concreto f'c=175 Kg/cm2 en rampas m2

AV. MARIANO MELGAR C.14-A

AV. MARIANO MELGAR C.14-B

AV. MARIANO MELGAR C.15-A

AV. MARIANO MELGAR C.15-B

AV. MARIANO MELGAR C.16-A

AV. MARIANO MELGAR C.16-B

JR. JOSE GALVEZ C. 4-A


PLANILLA DE METRADOS

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - A

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN UND

JR. JOSE GALVEZ C. 4-B

JR.PEDRO RUIZ 5-A

JR.PEDRO RUIZ 5-B

JR.PEDRO RUIZ 4-A

JR.PEDRO RUIZ 4-B

JR.PEDRO RUIZ 3-A

JR.PEDRO RUIZ 3-B

JR.ABRAHAM VALDELOMAR C.6-A

JR.ABRAHAM VALDELOMAR C.6-B

JR.RICARDO PALMA C.6-A

JR.RICARDO PALMA C.6-B

JR.RICARDO PALMA C.7-A

JR.RICARDO PALMA C.7-B

03.03.03 Encofrado, descencofrado de Vereda. m2

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
JR. JOSE GALVEZ C. 4-A
PLANILLA DE METRADOS

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - A

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN UND

JR. JOSE GALVEZ C. 4-B


JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B

AV. MARIANO MELGAR C.14-A

AV. MARIANO MELGAR C.14-B

AV. MARIANO MELGAR C.15-A

AV. MARIANO MELGAR C.15-B

AV. MARIANO MELGAR C.16-A


AV. MARIANO MELGAR C.16-B

JR.PEDRO RUIZ 5-A


JR.PEDRO RUIZ 5-B
PLANILLA DE METRADOS

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - A

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN UND

JR.PEDRO RUIZ 4-A

JR.PEDRO RUIZ 4-B

JR.PEDRO RUIZ 3-A

JR.PEDRO RUIZ 3-B

JR. JOSE GALVEZ C. 4-A


JR. JOSE GALVEZ C. 4-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B

03.04.00 JUNTAS Y BRUADO


03.04.01 Junta de dilatacin 1" x 4" de concreto asfltico a 3.0 m m

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B

03.04.02 Bruado de veredas m

AV. MARIANO MELGAR C.14-A

AV. MARIANO MELGAR C.14-B


AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
JR. JOSE GALVEZ C. 4-A

JR. JOSE GALVEZ C. 4-B


PLANILLA DE METRADOS

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - A

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN UND

JR.PEDRO RUIZ 5-A

JR.PEDRO RUIZ 5-B


JR.PEDRO RUIZ 4-A

JR.PEDRO RUIZ 4-B


JR.PEDRO RUIZ 3-A

JR.PEDRO RUIZ 3-B

JR.ABRAHAM VALDELOMAR C.6-A

JR.ABRAHAM VALDELOMAR C.6-B

JR.RICARDO PALMA C.6-A

JR.RICARDO PALMA C.6-B


JR.RICARDO PALMA C.7-A

JR.RICARDO PALMA C.7-B

MARTILLOS EN OCHAVOS
INTERS. M- MELGAR - JOSE B. ALCEDO

INTERS. M. MELGAR - JOSE GALVEZ

INTERS. M. MELGAR - F. VILLARREAL

INTERS. M. MELGAR - PEDRO RUIZ

INTERS. PEDRO RUIZ - A. VALDELOMAR

INTERS. PEDRO RUIZ - RICARDO PALMA

INTERS. PEDRO RUIZ - AV. CHACHAPOYAS

INTERS. R. PALMA - F. VILLARREAL

INTERS. A. VALDELOMAR - F. VILLARREAL


PLANILLA DE METRADOS

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - A

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN UND

03.04.03 Bruado de rampas m

AV. MARIANO MELGAR C.14-A

AV. MARIANO MELGAR C.14-B

AV. MARIANO MELGAR C.15-A

AV. MARIANO MELGAR C.15-B

AV. MARIANO MELGAR C.16-A

AV. MARIANO MELGAR C.16-B

JR. JOSE GALVEZ C. 4-A

JR. JOSE GALVEZ C. 4-B

JR.PEDRO RUIZ 5-A

JR.PEDRO RUIZ 5-B

JR.PEDRO RUIZ 4-A

JR.PEDRO RUIZ 4-B

JR.PEDRO RUIZ 3-A

JR.PEDRO RUIZ 3-B

JR.ABRAHAM VALDELOMAR C.6-A

JR.ABRAHAM VALDELOMAR C.6-B

JR.RICARDO PALMA C.6-A

JR.RICARDO PALMA C.6-B


PLANILLA DE METRADOS

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - A

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN UND

JR.RICARDO PALMA C.7-A

JR.RICARDO PALMA C.7-B

03.05.00 CURADO
03.05.01 Curado de vereda con arena fina , durante 7 dias - 4 veces x da m2

03.06.00 SUMINISTRO Y COLOCACION DE CAJAS PARA AGUA Y DESAGUE


03.06.01 Suministro y colocacin de encimado de cajas para agua und
LOTES EN TOTAL

03.06.02 Suministro y colocacin de encimado de cajas para desague und


LOTES EN TOTAL

03.07.00 ELIMINACION DE MATERIAL EXCEDENTE


03.07.01 Eliminacin de Material Excedente a una Distancia = 5 Km + 25% esponjamiento c/ volquete m3

04.00.00 SARDINEL

04.01.00 TRABAJOS PRELIMINARES


04.01.01 Limpieza de Terreno Manual m2

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
PLANILLA DE METRADOS

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - A

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN UND

JR.PEDRO RUIZ 3-B


JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B

04.01.02 Trazo, Nivel y Replanteo m2

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B

04.02.00 MOVIMIENTO DE TIERRAS


04.02.01 Excavacion de sardineles hasta h=60 cm m3

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
JR.RICARDO PALMA C.6-A
PLANILLA DE METRADOS

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - A

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN UND

JR.RICARDO PALMA C.6-B


JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B

04.03.00 CONCRETO SIMPLE


04.03.01 Concreto f'c = 175 Kg/cm2 vaceado con mezcladora m3

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B

04.03.02 Encofrado y Desencofrado m2

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B
PLANILLA DE METRADOS

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - A

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN UND

04.03.03 Acero Corrugado 3/8", fy=4200 kg/cm2 kg

04.03.04 Relleno de Juntas de Dilatacin con concreto asfaltico 1"x2" m en sardinel m

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B

04.03.05 Tarrajeo pulido en sardineles m2

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B
PLANILLA DE METRADOS

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - A

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN UND

04.03.06 Curado de sardinel con arena fina, durante 7 dias - 4 veces x da m2

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B

04.04.00 ELIMINACION DE MATERIAL EXCEDENTE


04.04.01 Eliminacin de Material Excedente a una Distancia = 5 Km + 25% esponjamiento c/ volquete m3

05.00.00 CUNETAS RECTANGULARES

05.01.00 TRABAJOS PRELIMINARES


05.01.00 Limpieza de Terreno Manual m2

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
UNION DE AV. M.M. C 14-A Y B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
UNION DE AV. M.M. C 15 -A Y B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
UNION DE AV. M.M. C 16 -A Y B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
UNION DE AV.J.G. C 4 -A Y B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
UNION DE JR.PEDRO RUIZ 4-A Y 5-A
UNION DE JR.PEDRO RUIZ 4-B Y 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
PLANILLA DE METRADOS

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - A

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN UND

JR.PEDRO RUIZ 3-A


JR.PEDRO RUIZ 3-B
UNION DE JR.PEDRO RUIZ 4-A Y 3-A
UNION DE JR.PEDRO RUIZ 4-B Y 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
UNION JR.ABRAHAM VALDELOMAR C.6-A Y B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B
UNION JR.RICARDO PAL,A C.7-A Y B

05.02.00 Trazo, Nivel y Replanteo m2

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
UNION DE AV. M.M. C 14-A Y B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
UNION DE AV. M.M. C 15 -A Y B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
UNION DE AV. M.M. C 16 -A Y B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
UNION DE AV.J.G. C 4 -A Y B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
UNION DE JR.PEDRO RUIZ 4-A Y 5-A
UNION DE JR.PEDRO RUIZ 4-B Y 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
UNION DE JR.PEDRO RUIZ 4-A Y 3-A
UNION DE JR.PEDRO RUIZ 4-B Y 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
UNION JR.ABRAHAM VALDELOMAR C.6-A Y B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B
UNION JR.RICARDO PAL,A C.7-A Y B

05.02.00 MOVIMIENTO DE TIERRAS


05.02.01 Excavacion de cunetas rectangulares hasta h=60 cm m3

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
PLANILLA DE METRADOS

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - A

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN UND

UNION DE AV. M.M. C 14-A Y B


AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
UNION DE AV. M.M. C 15 -A Y B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
UNION DE AV. M.M. C 16 -A Y B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
UNION DE AV.J.G. C 4 -A Y B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
UNION DE JR.PEDRO RUIZ 4-A Y 5-A
UNION DE JR.PEDRO RUIZ 4-B Y 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
UNION DE JR.PEDRO RUIZ 4-A Y 3-A
UNION DE JR.PEDRO RUIZ 4-B Y 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
UNION JR.ABRAHAM VALDELOMAR C.6-A Y B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B
UNION JR.RICARDO PAL,A C.7-A Y B

05.03.00 CONCRETO SIMPLE


05.03.01 Concreto f'c = 175 Kg/cm2 vaceado con mezcladora m3

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
UNION DE AV. M.M. C 14-A Y B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
UNION DE AV. M.M. C 15 -A Y B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
UNION DE AV. M.M. C 16 -A Y B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
UNION DE AV.J.G. C 4 -A Y B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
UNION DE JR.PEDRO RUIZ 4-A Y 5-A
UNION DE JR.PEDRO RUIZ 4-B Y 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
PLANILLA DE METRADOS

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - A

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN UND

UNION DE JR.PEDRO RUIZ 4-A Y 3-A


UNION DE JR.PEDRO RUIZ 4-B Y 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
UNION JR.ABRAHAM VALDELOMAR C.6-A Y B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B
UNION JR.RICARDO PAL,A C.7-A Y B

05.03.02 Acero Corrugado 3/8", fy=4200 kg/cm2 kg

05.03.03 Encofrado y Desencofrado M2

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
UNION DE AV. M.M. C 14-A Y B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
UNION DE AV. M.M. C 15 -A Y B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
UNION DE AV. M.M. C 16 -A Y B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
UNION DE AV.J.G. C 4 -A Y B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
UNION DE JR.PEDRO RUIZ 4-A Y 5-A
UNION DE JR.PEDRO RUIZ 4-B Y 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
UNION DE JR.PEDRO RUIZ 4-A Y 3-A
UNION DE JR.PEDRO RUIZ 4-B Y 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
UNION JR.ABRAHAM VALDELOMAR C.6-A Y B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B
UNION JR.RICARDO PAL,A C.7-A Y B

05.03.04 Tarrajeo pulido en Canaletas m2

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
PLANILLA DE METRADOS

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - A

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN UND

UNION DE AV. M.M. C 14-A Y B


AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
UNION DE AV. M.M. C 15 -A Y B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
UNION DE AV. M.M. C 16 -A Y B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
UNION DE AV.J.G. C 4 -A Y B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
UNION DE JR.PEDRO RUIZ 4-A Y 5-A
UNION DE JR.PEDRO RUIZ 4-B Y 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
UNION DE JR.PEDRO RUIZ 4-A Y 3-A
UNION DE JR.PEDRO RUIZ 4-B Y 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
UNION JR.ABRAHAM VALDELOMAR C.6-A Y B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B
UNION JR.RICARDO PAL,A C.7-A Y B

05.03.05 Curado de sardinel y canaletas, durante 7 dias - 4 veces x da m2

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
UNION DE AV. M.M. C 14-A Y B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
UNION DE AV. M.M. C 15 -A Y B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
UNION DE AV. M.M. C 16 -A Y B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
UNION DE AV.J.G. C 4 -A Y B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
UNION DE JR.PEDRO RUIZ 4-A Y 5-A
UNION DE JR.PEDRO RUIZ 4-B Y 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
UNION DE JR.PEDRO RUIZ 4-A Y 3-A
PLANILLA DE METRADOS

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - A

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN UND

UNION DE JR.PEDRO RUIZ 4-B Y 3-B


JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
UNION JR.ABRAHAM VALDELOMAR C.6-A Y B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B
UNION JR.RICARDO PAL,A C.7-A Y B

05.03.06 Tapas de concreto para Cunetas Rectangulares m3

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
UNION DE AV. M.M. C 14-A Y B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
UNION DE AV. M.M. C 15 -A Y B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
UNION DE AV. M.M. C 16 -A Y B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
UNION DE AV.J.G. C 4 -A Y B
JR.PEDRO RUIZ 5-A
JR.PEDRO RUIZ 5-B
UNION DE JR.PEDRO RUIZ 4-A Y 5-A
UNION DE JR.PEDRO RUIZ 4-B Y 5-B
JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
UNION DE JR.PEDRO RUIZ 4-A Y 3-A
UNION DE JR.PEDRO RUIZ 4-B Y 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
UNION JR.ABRAHAM VALDELOMAR C.6-A Y B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B
UNION JR.RICARDO PAL,A C.7-A Y B

05.04.00 ELIMINACION DE MATERIAL EXCEDENTE


05.04.01 Eliminacin de Material Excedente a una Distancia = 5 Km + 25% esponjamiento c/ volquete m3

06.00.00 MURO DE CONTENCION


06.01.00 TRABAJOS PRELIMINARES
PLANILLA DE METRADOS

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - A

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN UND

06.01.01 Limpieza de Terreno Manual m2

AV. MARIANO MELGAR C.16-A

JR. JOSE GALVEZ C. 4-A

06.01.02 Trazo, Nivel y Replanteo m2

AV. MARIANO MELGAR C.16-A

JR. JOSE GALVEZ C. 4-A

06.02.00 MOVIMIENTO DE TIERRAS


06.02.01 Corte de Terreno Manual para Muro de Contencin m3

MARIANO MELGAR CDA 16


LADO IZQUIERDO
MURO H=1.00M
JR.JOSE GALVEZ
LADO IZQUIERDO

06.02.02 Relleno con material de prstamo en Muro de Contencin m3

MARIANO MELGAR CDA 16


LADO IZQUIERDO
MURO H=1.00M
JR.JOSE GALVEZ
LADO IZQUIERDO

06.03.00 CONCRETO SIMPLE


06.03.01 Solado 1:10; C:A e = 4" m2

MARIANO MELGAR CDA 16


LADO IZQUIERDO
MURO H=1.00M
JR.JOSE GALVEZ
LADO IZQUIERDO

06.04.00 CONCRETO ARMADO


06.04.01 Encofrado y Desencofrado de Muro de contencin m2

MARIANO MELGAR CDA 16


LADO IZQUIERDO
MURO H=1.00M
JR.JOSE GALVEZ
LADO IZQUIERDO
PLANILLA DE METRADOS

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - A

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN UND

06.04.02 ACERO CORRUGADO, fy = 4200 Kg/cm2 -Muro de Contencion kg

06.04.03 Concreto f'c = 210 Kg/cm2 en muro de contencin m3

MARIANO MELGAR CDA 16


LADO IZQUIERDO
MURO H=1.00M
MURO H=1.00M
JR.JOSE GALVEZ
LADO IZQUIERDO

06.05.00 JUNTAS
06.05.01 Juntas de Dilatacin en Muro y Losa Inferior con water stop 6" cada 9.00 m. m

06.06.00 ELIMINACION DE MATERIAL EXCEDENTE


06.06.01 Eliminacin de Material Excedente a una Distancia = 5 Km + 25% esponjamiento c/ volquete m3

07.00.00 AREAS VERDES


07.01.00 Corte superficial para jardineras hasta 0.20 m m2

07.02.00 Acarreo de material excedente dp <=50 m m3

07.03.00 Suministro y colocacin de tierra agricola h=0.20 m m2

07.04.00 Sembrado de grass m2

AV. MARIANO MELGAR


C-14 -A
C-14 -A
C-14 - B
C-14 - B

C-15 - A
C-15 - A
C-15 - B
C-15 - B

C-16 - A
C-16 - A
C-16 - B
C-16 - B
PLANILLA DE METRADOS

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - A

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN UND

JR. JOSE GALVEZ


C-4 - A
C-4 - A
C-4 - B
C-4 - B

JR. PEDRO RUIZ


C-5 - A
C-5 - A
C-5 - B
C-5 - B

C-4 - A
C-4 - A
C-4 - B
C-4 - B

C-3 - A
C-3 - A
C-3 - B
C-3 - B

JR. A. VALDELOMAR
C-6 - A
C-6 - A
C-6 - B
C-6 - B

JR. RICARDO PALMA


C-6 - A
C-6 - A
C-6 - B
C-6 - B

C-7 - A
C-7 - A
C-7 - B
C-7 - B

07.05.00 Arborizacion con plantones und

AV. MARIANO MELGAR C.14-A


AV. MARIANO MELGAR C.14-B
AV. MARIANO MELGAR C.15-A
AV. MARIANO MELGAR C.15-B
AV. MARIANO MELGAR C.16-A
AV. MARIANO MELGAR C.16-B
JR. JOSE GALVEZ C. 4-A
JR. JOSE GALVEZ C. 4-B
JR.PEDRO RUIZ 5-A
PLANILLA DE METRADOS

OBRA CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN ALTO - PROVINCIA DE UTCUBAMBA - A

PROP. : MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA


UBIC. : BAGUA GRANDE
FECHA : JUNIO 2015

PART. DESCRIPCIN UND

JR.PEDRO RUIZ 5-B


JR.PEDRO RUIZ 4-A
JR.PEDRO RUIZ 4-B
JR.PEDRO RUIZ 3-A
JR.PEDRO RUIZ 3-B
JR.ABRAHAM VALDELOMAR C.6-A
JR.ABRAHAM VALDELOMAR C.6-B
JR.RICARDO PALMA C.6-A
JR.RICARDO PALMA C.6-B
JR.RICARDO PALMA C.7-A
JR.RICARDO PALMA C.7-B

07.06.00 Eliminacin de Material Excedente a una Distancia = 5 Km + 25% esponjamiento c/ volquete m3


Acarreo de material excedente

08.00.00 VARIOS

08.01.00 Limpieza final de obra m2


ETRADOS

CUBAMBA - AMAZONAS

MEDIDAS
CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO

1.00 1.00 1.00 1.00

1.00 1.00 1.00 4.00

1.00 1.00 6007.37


1.00 Area = 494.92 494.92
1.00 Area = 459.13 459.13

1.00 Area = 482.96 482.96


1.00

1.00 Area = 492.09 492.09


1.00

1.00 Area = 727.07 727.07


1.00 Area = 754.20 754.20
Area = 784.23 784.23

1.00 Area = 488.53 488.53


1.00 Area = 650.80 650.80
Area = 673.44 673.44

1.00 1.00 6007.37


1.00 Area = 494.92 494.92
1.00 Area = 459.13 459.13

1.00 Area = 482.96 482.96


1.00

1.00 Area = 492.09 492.09


1.00

1.00 Area = 727.07 727.07


1.00 Area = 754.20 754.20
Area = 784.23 784.23

1.00 Area = 488.53 488.53


1.00 Area = 650.80 650.80
Area = 673.44 673.44
ETRADOS

CUBAMBA - AMAZONAS

MEDIDAS
CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO

1.00 1.00 7282.14

1.00 1.00 7282.14 7282.14

1.00 1.00 6007.37


1.00 Area = 494.92 494.92
1.00 Area = 459.13 459.13

1.00 Area = 482.96 482.96


1.00

1.00 Area = 492.09 492.09


1.00

1.00 Area = 727.07 727.07


1.00 Area = 754.20 754.20
Area = 784.23 784.23

1.00 Area = 488.53 488.53


1.00 Area = 650.80 650.80
Area = 673.44 673.44

1.00 6007.37
1.00 Area = 494.92 494.92
1.00 Area = 459.13 459.13

1.00 Area = 482.96 482.96


1.00

1.00 Area = 492.09 492.09


1.00

1.00 Area = 727.07 727.07


1.00 Area = 754.20 754.20
Area = 784.23 784.23

1.00 Area = 488.53 488.53


1.00 Area = 650.80 650.80
Area = 673.44 673.44

1.00 6007.37
1.00 Area = 494.92 494.92
1.00 Area = 459.13 459.13
ETRADOS

CUBAMBA - AMAZONAS

MEDIDAS
CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO

1.00 Area = 482.96 482.96


1.00

1.00 Area = 492.09 492.09


1.00

1.00 Area = 727.07 727.07


1.00 Area = 754.20 754.20
Area = 784.23 784.23

1.00 Area = 488.53 488.53


1.00 Area = 650.80 650.80
Area = 673.44 673.44

1.00 6007.37
1.00 Area = 494.92 494.92
1.00 Area = 459.13 459.13

1.00 Area = 482.96 482.96


1.00

1.00 Area = 492.09 492.09


1.00

1.00 Area = 727.07 727.07


1.00 Area = 754.20 754.20
Area = 784.23 784.23

1.00 Area = 488.53 488.53


1.00 Area = 650.80 650.80
Area = 673.44 673.44

1.00 263.26
0.38 0.40 0.15 1755.06 263.26
1.00 7.68
1.00 76.32
1.00 8.10
1.00 7.68
1.00 76.60
1.00 8.10

1.00 8.09
1.00 77.59
ETRADOS

CUBAMBA - AMAZONAS

MEDIDAS
CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
1.00 8.03
77.91

1.00 7.85
1.00 74.30
1.00 7.85
1.00 8.02
1.00 7.74
1.00 74.79
1.00 8.14
1.00 7.69
1.00 1.27
1.00 0.86

1.00 7.86
1.00 75.72
1.00 7.85
1.00 8.31
1.00 75.39
1.00 7.84

1.00 7.85
1.00 72.67
1.00 7.75
1.00 72.73
1.00 7.86

1.00 7.64
1.00 75.89
1.00 7.87
1.00 75.72
1.00 7.93

1.00 7.80
1.00 71.29
1.00 7.78
1.00 7.78
1.00 7.88
1.00 71.57
1.00 7.92
1.00 7.74
1.00 1.58
1.00 2.36
ETRADOS

CUBAMBA - AMAZONAS

MEDIDAS
CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO

1.00 7.83
1.00 75.56
1.00 7.85
1.00 75.14
1.00 76.50
1.00 76.75
1.00 79.40
1.00 80.84

1.00 3504.61

1.00 76.32 76.32


1.00 76.60 76.60

1.00 77.59 77.59


1.00 77.91 77.91

1.00 177.93 177.93


30.00 2.00 6.00 360.00

1.00 74.30 74.30


1.00 74.79 74.79

30.00 1.00 6.00 180.00

1.00 75.72 75.72


1.00 75.39 75.39

30.00 1.00 6.00 180.00

1.00 72.67 72.67


1.00 72.73 72.73
ETRADOS

CUBAMBA - AMAZONAS

MEDIDAS
CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO

1.00 75.89 75.89


1.00 75.72 75.72

1.00 71.29 71.29


1.00 71.57 71.57

30.00 3.00 6.00 540.00

1.00 75.56 75.56

1.00 75.14 75.14


1.00 76.50 76.50
1.00 76.75 76.75
1.00 79.40 79.40
1.00 80.84 80.84

30.00 3.00 6.00 540.00

14.00

3.00 3.00
4.00 4.00
2.00 2.00
1.00 1.00

2.00 2.00
1.00 1.00
1.00 1.00

1.00 6007.37
1.00 6007.37 6007.37

1.00 1.00 2292.49

1.00 1372.80 1372.80

1.00 919.69 919.69


ETRADOS

CUBAMBA - AMAZONAS

MEDIDAS
CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
1.00 1.00 254.40

12.00 7.20 86.40

4.00 6.00 24.00

14.00 6.00 84.00

3.00 6.00 18.00

7.00 6.00 42.00

1.00 1.00 418.62

2.00 13.27 26.54

4.00 12.33 49.32


2.00 6.00 12.00

4.00 12.08 48.32


2.00 6.00 12.00

4.00 13.23 52.92


2.00 7.20 14.40

4.00 12.82 51.28


2.00 6.00 12.00

4.00 13.00 52.00


2.00 6.00 12.00

2.00 12.39 24.78

2.00 11.69 23.38

2.00 13.84 27.68

1.00 1.00 1902.45

Repeciticiones N de veces
1.00 217.77 217.77
1.00 200.42 200.42
1.00 209.11 209.11
1.00 182.16 182.16
1.00 192.80 192.80
1.00 170.16 170.16
ETRADOS

CUBAMBA - AMAZONAS

MEDIDAS
CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
1.00 200.27 200.27
1.00 188.57 188.57
1.00 182.13 182.13
1.00 159.06 159.06

1.00 1.00 1372.80


Repeciticiones N de veces
11.00 5.00 7.20 396.00
8.00 7.20 57.60
1.00 7.20 7.20

21.00 6.00 126.00

2.00 6.00 12.00

13.00 5.00 6.00 390.00


3.00 6.00 18.00

4.00 5.00 6.00 120.00


1.00 6.00 6.00
8.00 5.00 6.00 240.00

1.00 1.00 919.69

Repeciticiones N de veces

1.00 85.77 85.77


1.00 91.73 91.73
1.00 85.08 85.08
1.00 7.05 7.05

1.00 85.79 85.79


1.00 5.60 5.60

1.00 6.13 6.13


1.00 5.50 5.50
0.00
1.00 104.11 104.11
1.00 182.90 182.90

1.00 84.60 84.60


1.00 5.96 5.96

1.00 86.60 86.60


1.00 82.87 82.87
ETRADOS

CUBAMBA - AMAZONAS

MEDIDAS
CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
441.20

9.00 3.00 0.10 2.70 29.7


10.00 3.00 0.10 3.00
9.00 3.00 0.10 2.70
10.00 3.00 0.10 3.00
11.00 3.00 0.10 3.30
10.00 3.00 0.10 3.00
10.00 3.00 0.10 3.00
10.00 3.00 0.10 3.00
10.00 3.00 0.10 3.00
10.00 3.00 0.10 3.00

18.00 4.00 0.50 36.00 332


18.00 4.00 0.50 36.00
18.00 4.00 0.50 36.00
16.00 4.00 0.50 32.00
16.00 4.00 0.50 32.00
16.00 4.00 0.50 32.00
16.00 4.00 0.50 32.00
16.00 4.00 0.50 32.00
16.00 4.00 0.50 32.00
16.00 4.00 0.50 32.00

2.00 0.50 3.75 3.75 43.9


4.00 0.10 4.20 1.68
2.00 0.50 3.75 3.75
2.00 0.10 3.50 0.70
2.00 0.50 3.75 3.75
2.00 0.10 5.10 1.02
2.00 0.50 3.00 3.00
2.00 0.10 6.70 1.34
2.00 0.50 3.15 3.15
2.00 0.10 4.95 0.99
2.00 0.50 3.15 3.15
2.00 0.10 5.00 1.00
2.00 0.50 3.15 3.15
2.00 0.10 3.90 0.78
2.00 0.50 3.15 3.15
2.00 0.10 5.60 1.12
2.00 0.50 3.15 3.15
2.00 0.10 5.60 1.12
2.00 0.50 3.15 3.15
2.00 0.10 5.00 1.00

2.00 1.78 3.56 35.60


2.00 1.78 3.56
ETRADOS

CUBAMBA - AMAZONAS

MEDIDAS
CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
2.00 1.78 3.56
2.00 1.78 3.56
2.00 1.78 3.56
2.00 1.78 3.56
2.00 1.78 3.56
2.00 1.78 3.56
2.00 1.78 3.56
2.00 1.78 3.56

16.00

3.00 3.00
2.00 2.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
2.00 2.00
2.00 2.00
2.00 2.00
1.00 1.00

1.00 1.00 9102.68

factor de esponjamiento 1.25 7282.14 9102.68

1.00 1.00 2741.67


2741.67
133.99
131.10
140.83
119.30
120.14
124.02
109.34
132.63
118.70
170.15
152.76
149.56
138.50
151.49
117.03
122.51
110.56
ETRADOS

CUBAMBA - AMAZONAS

MEDIDAS
CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
117.60
93.74
97.87

1.00 2.36 1.20 2.83 2.83


1.00 1.90 1.20 2.28 2.28
1.00 2.02 1.20 2.42 2.42
1.00 2.55 1.20 3.06 3.06
1.00 2.26 1.20 2.71 2.71
1.00 2.13 1.20 2.56 2.56
1.00 2.24 1.20 2.69 2.69
1.00 2.21 1.20 2.65 2.65
1.00 2.76 1.20 3.31 3.31
1.00 2.09 1.20 2.51 2.51
1.00 1.80 1.20 2.16 2.16
1.00 1.54 1.20 1.85 1.85
1.00 1.70 1.20 2.04 2.04
1.00 1.47 1.20 1.76 1.76
1.00 2.48 1.20 2.98 2.98
1.00 2.20 1.20 2.64 2.64
1.00 1.10 1.20 1.32 1.32
1.00 1.80 1.20 2.16 2.16
1.00 1.50 1.20 1.80 1.80
1.00 2.00 1.20 2.40 2.40
1.00 1.85 1.20 2.22 2.22
1.00 1.81 1.20 2.17 2.17
1.00 1.73 1.20 2.08 2.08
1.00 2.93 1.20 3.52 3.52
1.00 2.56 1.20 3.07 3.07
1.00 2.66 1.20 3.19 3.19
1.00 4.13 1.20 4.96 4.96
1.00 3.53 1.20 4.24 4.24
1.00 2.84 1.20 3.41 3.41
1.00 2.68 1.20 3.22 3.22
1.00 2.58 1.20 3.10 3.10
1.00 2.46 1.20 2.95 2.95
1.00 2.64 1.20 3.17 3.17
1.00 2.83 1.20 3.40 3.40
1.00 3.02 1.20 3.62 3.62
1.00 2.55 1.20 3.06 3.06
1.00 2.64 1.20 3.17 3.17
1.00 2.84 1.20 3.41 3.41
1.00 2.92 1.20 3.50 3.50
1.00 2.31 1.20 2.77 2.77
1.00 AREA 20.76 20.76 20.76
1.00 2.61 1.20 3.13 3.13
1.00 2.52 1.20 3.02 3.02
1.00 2.42 1.20 2.90 2.90
1.00 2.61 1.20 3.13 3.13
1.00 2.51 1.20 3.01 3.01
1.00 2.41 1.20 2.89 2.89
1.00 2.38 1.20 2.86 2.86
ETRADOS

CUBAMBA - AMAZONAS

MEDIDAS
CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
1.00 2.59 1.20 3.11 3.11
1.00 2.76 1.20 3.31 3.31
1.00 2.80 1.20 3.36 3.36
1.00 2.79 1.20 3.35 3.35
1.00 2.77 1.20 3.32 3.32
1.00 2.63 1.20 3.16 3.16
1.00 2.68 1.20 3.22 3.22
1.00 2.71 1.20 3.25 3.25
1.00 2.66 1.20 3.19 3.19
1.00 2.45 1.20 2.94 2.94
1.00 2.99 1.20 3.59 3.59

1.00 1.00 2741.67


2551.82
133.99
131.10
140.83
119.30
120.14
124.02
109.34
132.63
118.70
170.15
152.76
149.56
138.50
151.49
117.03
122.51
110.56
117.60
93.74
97.87

189.85
1.00 2.36 1.20 2.83
1.00 1.90 1.20 2.28
1.00 2.02 1.20 2.42
1.00 2.55 1.20 3.06
1.00 2.26 1.20 2.71
1.00 2.13 1.20 2.56
1.00 2.24 1.20 2.69
1.00 2.21 1.20 2.65
1.00 2.76 1.20 3.31
1.00 2.09 1.20 2.51
1.00 1.80 1.20 2.16
1.00 1.54 1.20 1.85
1.00 1.70 1.20 2.04
1.00 1.47 1.20 1.76
1.00 2.48 1.20 2.98
1.00 2.20 1.20 2.64
ETRADOS

CUBAMBA - AMAZONAS

MEDIDAS
CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
1.00 1.10 1.20 1.32
1.00 1.80 1.20 2.16
1.00 1.50 1.20 1.80
1.00 2.00 1.20 2.40
1.00 1.85 1.20 2.22
1.00 1.81 1.20 2.17
1.00 1.73 1.20 2.08
1.00 2.93 1.20 3.52
1.00 2.56 1.20 3.07
1.00 2.66 1.20 3.19
1.00 4.13 1.20 4.96
1.00 3.53 1.20 4.24
1.00 2.84 1.20 3.41
1.00 2.68 1.20 3.22
1.00 2.58 1.20 3.10
1.00 2.46 1.20 2.95
1.00 2.64 1.20 3.17
1.00 2.83 1.20 3.40
1.00 3.02 1.20 3.62
1.00 2.55 1.20 3.06
1.00 2.64 1.20 3.17
1.00 2.84 1.20 3.41
1.00 2.92 1.20 3.50
1.00 2.31 1.20 2.77
1.00 AREA 20.76 20.76
1.00 2.61 1.20 3.13
1.00 2.52 1.20 3.02
1.00 2.42 1.20 2.90
1.00 2.61 1.20 3.13
1.00 2.51 1.20 3.01
1.00 2.41 1.20 2.89
1.00 2.38 1.20 2.86
1.00 2.59 1.20 3.11
1.00 2.76 1.20 3.31
1.00 2.80 1.20 3.36
1.00 2.79 1.20 3.35
1.00 2.77 1.20 3.32
1.00 2.63 1.20 3.16
1.00 2.68 1.20 3.22
1.00 2.71 1.20 3.25
1.00 2.66 1.20 3.19
1.00 2.45 1.20 2.94
1.00 2.99 1.20 3.59

1.00 1.00 945.16

945.16

10.13 10.13

4.13
18.23 34.99
ETRADOS

CUBAMBA - AMAZONAS

MEDIDAS
CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
12.63

46.71 67.68
20.97

27.99 38.87
10.88

11.92 35.32
23.40

7.25
10.21 28.34
10.88

33.19
6.00 50.30
5.07
6.04

50.12 89.19
39.07

54.17 54.17

67.79 67.79

44.70 53.65
8.95

7.97 30.71
5.26
17.48
3.90 3.90
ETRADOS

CUBAMBA - AMAZONAS

MEDIDAS
CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO

47.45 51.45
4.00
75.84 75.84

85.82 85.82

66.75 71.71
4.96

33.99 33.99

36.60 61.31
24.71

1.00 1.00 62.90

62.90
10.02 10.02

26.44 52.88
13.50
12.94

1.00 1.00 1100.78


0.40 2751.95 1100.78
133.99
131.10
140.83
119.30
120.14
124.02
109.34
132.63
118.70
180.43
152.76
149.56
138.50
151.49
117.03
122.51
ETRADOS

CUBAMBA - AMAZONAS

MEDIDAS
CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
110.56
117.60
93.74
97.87

rampas 189.85

2751.95
2751.95 2751.95
133.99
131.10
140.83
119.30
120.14
124.02
109.34
132.63
118.70
180.43
152.76
149.56
138.50
151.49
117.03
122.51
110.56
117.60
93.74
97.87

rampas 189.85

2751.95
2751.95
133.99
131.1
140.83
119.3
120.14
124.02
109.34
132.63
118.7
180.43
152.76
149.56
138.5
151.49
117.03
122.51
110.56
ETRADOS

CUBAMBA - AMAZONAS

MEDIDAS
CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
117.6
93.74
97.87

rampas 189.85

2562.10

133.99 2562.10
131.1
140.83
119.3
120.14
124.02
109.34
132.63
118.7
180.43
152.76
149.56
138.5
151.49
117.03
122.51
110.56
117.6
93.74
97.87

189.85

189.85
1.00 2.36 1.20 2.83
1.00 1.90 1.20 2.28
1.00 2.02 1.20 2.42
1.00 2.55 1.20 3.06
1.00 2.26 1.20 2.71
1.00 2.13 1.20 2.56
1.00 2.24 1.20 2.69
1.00 2.21 1.20 2.65
1.00 2.76 1.20 3.31
1.00 2.09 1.20 2.51
1.00 1.80 1.20 2.16
1.00 1.54 1.20 1.85
1.00 1.70 1.20 2.04
1.00 1.47 1.20 1.76
1.00 2.48 1.20 2.98
1.00 2.20 1.20 2.64
1.00 1.10 1.20 1.32
1.00 1.80 1.20 2.16
ETRADOS

CUBAMBA - AMAZONAS

MEDIDAS
CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
1.00 1.50 1.20 1.80
1.00 2.00 1.20 2.40
1.00 1.85 1.20 2.22
1.00 1.81 1.20 2.17
1.00 1.73 1.20 2.08
1.00 2.93 1.20 3.52
1.00 2.56 1.20 3.07
1.00 2.66 1.20 3.19
1.00 4.13 1.20 4.96
1.00 3.53 1.20 4.24
1.00 2.84 1.20 3.41
1.00 2.68 1.20 3.22
1.00 2.58 1.20 3.10
1.00 2.46 1.20 2.95
1.00 2.64 1.20 3.17
1.00 2.83 1.20 3.40
1.00 3.02 1.20 3.62
1.00 2.55 1.20 3.06
1.00 2.64 1.20 3.17
1.00 2.84 1.20 3.41
1.00 2.92 1.20 3.50
1.00 2.31 1.20 2.77
1.00 AREA 20.76 20.76
1.00 2.61 1.20 3.13
1.00 2.52 1.20 3.02
1.00 2.42 1.20 2.90
1.00 2.61 1.20 3.13
1.00 2.51 1.20 3.01
1.00 2.41 1.20 2.89
1.00 2.38 1.20 2.86
1.00 2.59 1.20 3.11
1.00 2.76 1.20 3.31
1.00 2.80 1.20 3.36
1.00 2.79 1.20 3.35
1.00 2.77 1.20 3.32
1.00 2.63 1.20 3.16
1.00 2.68 1.20 3.22
1.00 2.71 1.20 3.25
1.00 2.66 1.20 3.19
1.00 2.45 1.20 2.94
1.00 2.99 1.20 3.59

1970.10

lado n01
72.27 0.30 21.681
71.72 0.30 21.516
75.23 0.30 22.569
74.05 0.30 22.215
73.7 0.30 22.11
71.48 0.30 21.444
75.24 0.30 22.572
ETRADOS

CUBAMBA - AMAZONAS

MEDIDAS
CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
75.28 0.30 22.584
78.55 0.30 23.565
78.23 0.30 23.469
74.54 0.30 22.362
75.39 0.30 22.617
74.82 0.30 22.446
75.36 0.30 22.608
72.94 0.30 21.882
73.59 0.30 22.077
76.07 0.30 22.821
76.12 0.30 22.836
77.02 0.30 23.106
76.66 0.30 22.998
1498.26 0.30 449.478

71.41 0.30 21.423


73.01 0.30 21.903
74.43 0.30 22.329
74.84 0.30 22.452
75.78 0.30 22.734
72.68 0.30 21.804
74.31 0.30 22.293
73.23 0.30 21.969
79.09 0.30 23.727
79.73 0.30 23.919
74.24 0.30 22.272
75.71 0.30 22.713
76.24 0.30 22.872
74.02 0.30 22.206
72.87 0.30 21.861
72.79 0.30 21.837
74.99 0.30 22.497
76.42 0.30 22.926
76.35 0.30 22.905
79.32 0.30 23.796
1501.46 0.30 450.438

perimetro 19.34 0.30 5.802


19.19 0.30 5.757
19.24 0.30 5.772
18.39 0.30 5.517
17.86 0.30 5.358
22.23 0.30 6.669
18.45 0.30 5.535
19.94 0.30 5.982
20.38 0.30 6.114
19.35 0.30 5.805
16.13 0.30 4.839
20.04 0.30 6.012
29.67 0.30 8.901
21.74 0.30 6.522
ETRADOS

CUBAMBA - AMAZONAS

MEDIDAS
CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
20.31 0.30 6.093
21.85 0.30 6.555
20.04 0.30 6.012
20.04 0.30 6.012
19.38 0.30 5.814
19.57 0.30 5.871
20.79 0.30 6.237
23.81 0.30 7.143
17.74 0.30 5.322
21.05 0.30 6.315
21.14 0.30 6.342
20.45 0.30 6.135
16.9 0.30 5.07
22.54 0.30 6.762

625.20

25.00 1.20 30.00


25.00 1.20 30.00
26.00 1.20 31.20
26.00 1.20 31.20
27.00 1.20 32.40
25.00 1.20 30.00
26.00 1.20 31.20
25.00 1.20 30.00
27.00 1.20 32.40
27.00 1.20 32.40
26.00 1.20 31.20
26.00 1.20 31.20
27.00 1.20 32.40
26.00 1.20 31.20
26.00 1.20 31.20
26.00 1.20 31.20
26.00 1.20 31.20
26.00 1.20 31.20
27.00 1.20 32.40
26.00 1.20 31.20

5503.00

23.00 9.60 220.80


1.00 7.42 7.42
24.00 9.60 230.40
25.00 9.60 240.00
25.00 9.60 240.00
23.00 9.60 220.80
23.00 9.60 220.80
24.00 9.60 230.40
2.00 3.95 7.90
21.00 9.50 199.50
ETRADOS

CUBAMBA - AMAZONAS

MEDIDAS
CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
2.00 9.70 19.40
1.00 14.00 14.00
1.00 8.40 8.40
25.00 9.60 240.00
1.00 10.72 10.72
1.00 5.90 5.90
26.00 9.60 249.60
24.00 9.60 230.40
1.00 7.00 7.00
25.00 9.60 240.00
24.00 9.60 230.40
1.00 4.76 4.76
24.00 9.60 230.40
1.00 6.72 6.72
23.00 9.60 220.80
1.00 12.16 12.16
19.00 9.60 182.40
1.00 12.35 12.35
2.00 11.10 22.20
2.00 12.05 24.10
25.00 9.60 240.00
1.00 4.32 4.32
25.00 9.60 240.00
25.00 9.60 240.00

25.00 9.60 240.00


1.00 4.32 4.32

2.00 26.94 53.88

4.00 29.70 118.80

4.00 30.95 123.80

1.00 20.00 20.00


1.00 27.35 27.35
2.00 6.80 13.60

4.00 28.56 114.24

4.00 28.90 115.60

2.00 26.50 53.00

2.00 23.63 47.26

2.00 28.55 57.10


ETRADOS

CUBAMBA - AMAZONAS

MEDIDAS
CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
890.40

11.00 1.20 13.20


9.00 1.20 10.80
9.00 1.20 10.80
12.00 1.20 14.40
11.00 1.20 13.20
10.00 1.20 12.00
10.00 1.20 12.00
11.00 1.20 13.20
13.00 1.20 15.60
10.00 1.20 12.00
9.00 1.20 10.80
7.00 1.20 8.40
8.00 1.20 9.60
7.00 1.20 8.40
12.00 1.20 14.40
11.00 1.20 13.20
5.00 1.20 6.00
8.00 1.20 9.60
7.00 1.20 8.40
9.00 1.20 10.80
8.00 1.20 9.60
9.00 1.20 10.80
8.00 1.20 9.60
14.00 1.20 16.80
12.00 1.20 14.40
12.00 1.20 14.40
20.00 1.20 24.00
18.00 1.20 21.60
13.00 1.20 15.60
13.00 1.20 15.60
13.00 1.20 15.60
11.00 1.20 13.20
12.00 1.20 14.40
14.00 1.20 16.80
12.00 1.20 14.40
12.00 1.20 14.40
13.00 1.20 15.60
13.00 1.20 15.60
14.00 1.20 16.80
11.00 1.20 13.20
12.00 7.20 86.40
12.00 1.20 14.40
13.00 1.20 15.60
11.00 1.20 13.20
12.00 1.20 14.40
12.00 1.20 14.40
11.00 1.20 13.20
11.00 1.20 13.20
13.00 1.20 15.60
13.00 1.20 15.60
14.00 1.20 16.80
ETRADOS

CUBAMBA - AMAZONAS

MEDIDAS
CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
14.00 1.20 16.80
14.00 1.20 16.80
12.00 1.20 14.40
12.00 1.20 14.40
13.00 1.20 15.60
14.00 1.20 16.80
14.00 1.20 16.80
14.00 1.20 16.80

2751.95

area 2562.10 2562.10


area 189.85 189.85

149.00
149.00 149.00

149.00
149.00 149.00

1031.98

1.25 2751.95 0.30 1031.98

389.50

75.39 0.25 18.85


76.73 0.25 19.18
79.63 0.25 19.91
77.08 0.25 19.27
44.51 0.25 11.13
74.19 0.25 18.55
76.92 0.25 19.23
76.25 0.25 19.06
85.6 0.25 21.40
87.93 0.25 21.98
80.29 0.25 20.07
82.53 0.25 20.63
81.29 0.25 20.32
ETRADOS

CUBAMBA - AMAZONAS

MEDIDAS
CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
72.47 0.25 18.12
78.76 0.25 19.69
78.63 0.25 19.66
81.12 0.25 20.28
83.08 0.25 20.77
82.71 0.25 20.68
82.87 0.25 20.72

389.50

75.39 0.25 18.85


76.73 0.25 19.18
79.63 0.25 19.91
77.08 0.25 19.27
44.51 0.25 11.13
74.19 0.25 18.55
76.92 0.25 19.23
76.25 0.25 19.06
85.6 0.25 21.40
87.93 0.25 21.98
80.29 0.25 20.07
82.53 0.25 20.63
81.29 0.25 20.32
72.47 0.25 18.12
78.76 0.25 19.69
78.63 0.25 19.66
81.12 0.25 20.28
83.08 0.25 20.77
82.71 0.25 20.68
82.87 0.25 20.72

233.70

75.39 0.25 0.60 11.31


76.73 0.25 0.60 11.51
79.63 0.25 0.60 11.94
77.08 0.25 0.60 11.56
44.51 0.25 0.60 6.68
74.19 0.25 0.60 11.13
76.92 0.25 0.60 11.54
76.25 0.25 0.60 11.44
85.6 0.25 0.60 12.84
87.93 0.25 0.60 13.19
80.29 0.25 0.60 12.04
82.53 0.25 0.60 12.38
81.29 0.25 0.60 12.19
72.47 0.25 0.60 10.87
78.76 0.25 0.60 11.81
78.63 0.25 0.60 11.79
81.12 0.25 0.60 12.17
ETRADOS

CUBAMBA - AMAZONAS

MEDIDAS
CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
83.08 0.25 0.60 12.46
82.71 0.25 0.60 12.41
82.87 0.25 0.60 12.43

194.75

75.39 0.125 9.42


76.73 0.125 9.59
79.63 0.125 9.95
77.08 0.125 9.64
44.51 0.125 5.56
74.19 0.125 9.27
76.92 0.125 9.62
76.25 0.125 9.53
85.6 0.125 10.70
87.93 0.125 10.99
80.29 0.125 10.04
82.53 0.125 10.32
81.29 0.125 10.16
72.47 0.125 9.06
78.76 0.125 9.85
78.63 0.125 9.83
81.12 0.125 10.14
83.08 0.125 10.39
82.71 0.125 10.34
82.87 0.125 10.36

2025.37

75.39 1.30 98.01


76.73 1.30 99.75
79.63 1.30 103.52
77.08 1.30 100.20
44.51 1.30 57.86
74.19 1.30 96.45
76.92 1.30 100.00
76.25 1.30 99.13
85.6 1.30 111.28
87.93 1.30 114.31
80.29 1.30 104.38
82.53 1.30 107.29
81.29 1.30 105.68
72.47 1.30 94.21
78.76 1.30 102.39
78.63 1.30 102.22
81.12 1.30 105.46
83.08 1.30 108.00
82.71 1.30 107.52
82.87 1.30 107.73
ETRADOS

CUBAMBA - AMAZONAS

MEDIDAS
CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO

6006.3872 6006.39

130.25

25.00 0.25 6.25


25.00 0.25 6.25
26.00 0.25 6.50
26.00 0.25 6.50
27.00 0.25 6.75
25.00 0.25 6.25
26.00 0.25 6.50
25.00 0.25 6.25
27.00 0.25 6.75
27.00 0.25 6.75
26.00 0.25 6.50
26.00 0.25 6.50
27.00 0.25 6.75
26.00 0.25 6.50
26.00 0.25 6.50
26.00 0.25 6.50
26.00 0.25 6.50
26.00 0.25 6.50
27.00 0.25 6.75
26.00 0.25 6.50

467.39

75.39 0.30 22.62


76.73 0.30 23.02
79.63 0.30 23.89
77.08 0.30 23.12
44.51 0.30 13.35
74.19 0.30 22.26
76.92 0.30 23.08
76.25 0.30 22.88
85.6 0.30 25.68
87.93 0.30 26.38
80.29 0.30 24.09
82.53 0.30 24.76
81.29 0.30 24.39
72.47 0.30 21.74
78.76 0.30 23.63
78.63 0.30 23.59
81.12 0.30 24.34
83.08 0.30 24.92
82.71 0.30 24.81
82.87 0.30 24.86
ETRADOS

CUBAMBA - AMAZONAS

MEDIDAS
CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
623.19

75.39 0.40 30.16


76.73 0.40 30.69
79.63 0.40 31.85
77.08 0.40 30.83
44.51 0.40 17.80
74.19 0.40 29.68
76.92 0.40 30.77
76.25 0.40 30.50
85.6 0.40 34.24
87.93 0.40 35.17
80.29 0.40 32.12
82.53 0.40 33.01
81.29 0.40 32.52
72.47 0.40 28.99
78.76 0.40 31.50
78.63 0.40 31.45
81.12 0.40 32.45
83.08 0.40 33.23
82.71 0.40 33.08
82.87 0.40 33.15

292.12

esponjamiento 1.25 233.70 292.12

1019.15

70.06 0.60 42.04


71.72 0.60 43.03
21.22 0.60 12.73
71.88 0.60 43.13
72.7 0.60 43.62
22.93 0.60 13.76
69.2 0.60 41.52
70.15 0.60 42.09
22.96 0.60 13.78
72.96 0.60 43.78
71.88 0.60 43.13
19.92 0.60 11.95
77.74 0.60 46.64
76.73 0.60 46.04
17.43 0.60 10.46
18.24 0.60 10.94
74.24 0.60 44.54
74.04 0.60 44.42
ETRADOS

CUBAMBA - AMAZONAS

MEDIDAS
CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
79.54 0.60 47.72
78.46 0.60 47.08
18.31 0.60 10.99
18.69 0.60 11.21
71.52 0.60 42.91
71.44 0.60 42.86
22.03 0.60 13.22
84.09 0.60 50.45
86.72 0.60 52.03
75.01 0.60 45.01
75.31 0.60 45.19
21.46 0.60 12.88

1019.15

70.06 0.60 42.04


71.72 0.60 43.03
21.22 0.60 12.73
71.88 0.60 43.13
72.7 0.60 43.62
22.93 0.60 13.76
69.2 0.60 41.52
70.15 0.60 42.09
22.96 0.60 13.78
72.96 0.60 43.78
71.88 0.60 43.13
19.92 0.60 11.95
77.74 0.60 46.64
76.73 0.60 46.04
17.43 0.60 10.46
18.24 0.60 10.94
74.24 0.60 44.54
74.04 0.60 44.42
79.54 0.60 47.72
78.46 0.60 47.08
18.31 0.60 10.99
18.69 0.60 11.21
71.52 0.60 42.91
71.44 0.60 42.86
22.03 0.60 13.22
84.09 0.60 50.45
86.72 0.60 52.03
75.01 0.60 45.01
75.31 0.60 45.19
21.46 0.60 12.88

509.57

70.06 0.60 0.50 21.02


71.72 0.60 0.50 21.52
ETRADOS

CUBAMBA - AMAZONAS

MEDIDAS
CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
21.22 0.60 0.50 6.37
71.88 0.60 0.50 21.56
72.7 0.60 0.50 21.81
22.93 0.60 0.50 6.88
69.2 0.60 0.50 20.76
70.15 0.60 0.50 21.05
22.96 0.60 0.50 6.89
72.96 0.60 0.50 21.89
71.88 0.60 0.50 21.56
19.92 0.60 0.50 5.98
77.74 0.60 0.50 23.32
76.73 0.60 0.50 23.02
17.43 0.60 0.50 5.23
18.24 0.60 0.50 5.47
74.24 0.60 0.50 22.27
74.04 0.60 0.50 22.21
79.54 0.60 0.50 23.86
78.46 0.60 0.50 23.54
18.31 0.60 0.50 5.49
18.69 0.60 0.50 5.61
71.52 0.60 0.50 21.46
71.44 0.60 0.50 21.43
22.03 0.60 0.50 6.61
84.09 0.60 0.50 25.23
86.72 0.60 0.50 26.02
75.01 0.60 0.50 22.50
75.31 0.60 0.50 22.59
21.46 0.60 0.50 6.44

212.32

70.06 0.125 8.76


71.72 0.125 8.97
21.22 0.125 2.65
71.88 0.125 8.99
72.7 0.125 9.09
22.93 0.125 2.87
69.2 0.125 8.65
70.15 0.125 8.77
22.96 0.125 2.87
72.96 0.125 9.12
71.88 0.125 8.99
19.92 0.125 2.49
77.74 0.125 9.72
76.73 0.125 9.59
17.43 0.125 2.18
18.24 0.125 2.28
74.24 0.125 9.28
74.04 0.125 9.26
79.54 0.125 9.94
78.46 0.125 9.81
ETRADOS

CUBAMBA - AMAZONAS

MEDIDAS
CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
18.31 0.125 2.29
18.69 0.125 2.34
71.52 0.125 8.94
71.44 0.125 8.93
22.03 0.125 2.75
84.09 0.125 10.51
86.72 0.125 10.84
75.01 0.125 9.38
75.31 0.125 9.41
21.46 0.125 2.68

4871.438 4871.44

2038.30 2038.30

70.06 PERIMETRO= 1.2 84.07


71.72 PERIMETRO= 1.2 86.06
21.22 PERIMETRO= 1.2 25.46
71.88 PERIMETRO= 1.2 86.26
72.7 PERIMETRO= 1.2 87.24
22.93 PERIMETRO= 1.2 27.52
69.2 PERIMETRO= 1.2 83.04
70.15 PERIMETRO= 1.2 84.18
22.96 PERIMETRO= 1.2 27.55
72.96 PERIMETRO= 1.2 87.55
71.88 PERIMETRO= 1.2 86.26
19.92 PERIMETRO= 1.2 23.90
77.74 PERIMETRO= 1.2 93.29
76.73 PERIMETRO= 1.2 92.08
17.43 PERIMETRO= 1.2 20.92
18.24 PERIMETRO= 1.2 21.89
74.24 PERIMETRO= 1.2 89.09
74.04 PERIMETRO= 1.2 88.85
79.54 PERIMETRO= 1.2 95.45
78.46 PERIMETRO= 1.2 94.15
18.31 PERIMETRO= 1.2 21.97
18.69 PERIMETRO= 1.2 22.43
71.52 PERIMETRO= 1.2 85.82
71.44 PERIMETRO= 1.2 85.73
22.03 PERIMETRO= 1.2 26.44
84.09 PERIMETRO= 1.2 100.91
86.72 PERIMETRO= 1.2 104.06
75.01 PERIMETRO= 1.2 90.01
75.31 PERIMETRO= 1.2 90.37
21.46 PERIMETRO= 1.2 25.75

2123.23

70.06 1.25 87.58


71.72 1.25 89.65
ETRADOS

CUBAMBA - AMAZONAS

MEDIDAS
CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
21.22 1.25 26.53
71.88 1.25 89.85
72.7 1.25 90.88
22.93 1.25 28.66
69.2 1.25 86.50
70.15 1.25 87.69
22.96 1.25 28.70
72.96 1.25 91.20
71.88 1.25 89.85
19.92 1.25 24.90
77.74 1.25 97.18
76.73 1.25 95.91
17.43 1.25 21.79
18.24 1.25 22.80
74.24 1.25 92.80
74.04 1.25 92.55
79.54 1.25 99.43
78.46 1.25 98.08
18.31 1.25 22.89
18.69 1.25 23.36
71.52 1.25 89.40
71.44 1.25 89.30
22.03 1.25 27.54
84.09 1.25 105.11
86.72 1.25 108.40
75.01 1.25 93.76
75.31 1.25 94.14
21.46 1.25 26.83

2972.52

70.06 1.75 122.61


71.72 1.75 125.51
21.22 1.75 37.14
71.88 1.75 125.79
72.7 1.75 127.23
22.93 1.75 40.13
69.2 1.75 121.10
70.15 1.75 122.76
22.96 1.75 40.18
72.96 1.75 127.68
71.88 1.75 125.79
19.92 1.75 34.86
77.74 1.75 136.05
76.73 1.75 134.28
17.43 1.75 30.50
18.24 1.75 31.92
74.24 1.75 129.92
74.04 1.75 129.57
79.54 1.75 139.20
78.46 1.75 137.31
18.31 1.75 32.04
ETRADOS

CUBAMBA - AMAZONAS

MEDIDAS
CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
18.69 1.75 32.71
71.52 1.75 125.16
71.44 1.75 125.02
22.03 1.75 38.55
84.09 1.75 147.16
86.72 1.75 151.76
75.01 1.75 131.27
75.31 1.75 131.79
21.46 1.75 37.56

41.62

70.06 0.35 0.07 1.72


71.72 0.35 0.07 1.76
21.22 0.35 0.07 0.52
71.88 0.35 0.07 1.76
72.7 0.35 0.07 1.78
22.93 0.35 0.07 0.56
69.2 0.35 0.07 1.70
70.15 0.35 0.07 1.72
22.96 0.35 0.07 0.56
72.96 0.35 0.07 1.79
71.88 0.35 0.07 1.76
19.92 0.35 0.07 0.49
77.74 0.35 0.07 1.90
76.73 0.35 0.07 1.88
17.43 0.35 0.07 0.43
18.24 0.35 0.07 0.45
74.24 0.35 0.07 1.82
74.04 0.35 0.07 1.81
79.54 0.35 0.07 1.95
78.46 0.35 0.07 1.92
18.31 0.35 0.07 0.45
18.69 0.35 0.07 0.46
71.52 0.35 0.07 1.75
71.44 0.35 0.07 1.75
22.03 0.35 0.07 0.54
84.09 0.35 0.07 2.06
86.72 0.35 0.07 2.12
75.01 0.35 0.07 1.84
75.31 0.35 0.07 1.85
21.46 0.35 0.07 0.53

636.97

esponjamiento 1.25 509.57 636.9675


ETRADOS

CUBAMBA - AMAZONAS

MEDIDAS
CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
90.48

35.24 2.00 70.48

10.00 2.00 20.00

90.48

35.24 2.00 70.48

10.00 2.00 20.00

25.44

1.00 35.24 0.58 20.44

1.00 10.00 0.50 5.00

9.05

1.00 35.24 0.20 7.05

1.00 10.00 0.20 2.00

45.24

1.00 35.24 1.00 35.24

1.00 10.00 1.00 10.00

56.55

1.00 35.24 1.25 44.05

1.00 10.00 1.25 12.50


ETRADOS

CUBAMBA - AMAZONAS

MEDIDAS
CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
1097.9136 1097.91

20.36

1.00 35.24 0.20 1.00 7.05


1.00 35.24 1.00 0.25 8.81

1.00 10.00 0.20 1.00 2.00


1.00 10.00 1.00 0.25 2.50

5 1 5 5.00

21.80 21.80

2504.15
AREA 2504.15

500.83
AREA 2504.15 0.20 500.83 500.83

2504.15
AREA 2504.15 2504.15

2504.15

AREA 54.31 54.31


AREA 40.81 40.81
AREA 63.85 63.85
AREA 50.87 50.87

AREA 63.59 63.59


AREA 53.57 53.57
AREA 51.03 51.03
AREA 34.42 34.42

AREA 27.56 27.56


AREA 39.87 39.87
AREA 40.8 40.8
AREA 38.3 38.3
ETRADOS

CUBAMBA - AMAZONAS

MEDIDAS
CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO

AREA 31.2 31.2


AREA 43.82 43.82
AREA 34.09 34.09
AREA 48.41 48.41

AREA 66.47 66.47


AREA 83.28 83.28
AREA 113.31 113.31
AREA 100.76 100.76

AREA 74.59 74.59


AREA 63.66 63.66
AREA 74.93 74.93
AREA 84.53 84.53

AREA 59.87 59.87


AREA 75.5 75.5
AREA 62.62 62.62
AREA 64.31 64.31

AREA 64.07 64.07


AREA 67.56 67.56
AREA 60.02 60.02
AREA 71.31 71.31

AREA 67.23 67.23


AREA 72.52 72.52
AREA 69.54 69.54
AREA 87.89 87.89

AREA 85.38 85.38


AREA 72.52 72.52
AREA 77.07 77.07
AREA 68.71 68.71

227.00

11.00 11.00
11.00 11.00
12.00 12.00
11.00 11.00
7.00 7.00
11.00 11.00
12.00 12.00
12.00 12.00
13.00 13.00
ETRADOS

CUBAMBA - AMAZONAS

MEDIDAS
CANT PIEZA AREA PESO PARCIAL TOTAL
LONG. ANCHO ALTO
12.00 12.00
11.00 11.00
12.00 12.00
12.00 12.00
11.00 11.00
12.00 12.00
11.00 11.00
11.00 11.00
12.00 12.00
12.00 12.00
11.00 11.00

626.04
500.83 1.25 626.04

12226.44
area 12,226.44 12,226.44
RESUMEN DE METRADOS
CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTI
OBRA
ALTO - PROVINCIA DE UTCUBAMBA - AMAZONAS

Item Descripcin Und.

01.00.00 OBRAS PROVISIONALES


01.01.00 Cartel de indentificacin de Obra de 3.60 x 8.50 m. und
01.02.00 Alquiler de Almacn y Oficina mes

02.00.00 PAVIMENTOS
02.01.00 TRABAJOS PRELIMINARES
02.01.01 Limpieza de Terreno Manual m2
02.01.02 Trazo, Nivel y Replanteo m2
02.02.00 MOVIMIENTO DE TIERRAS
02.02.01 Corte con Maquinaria en terreno natural hasta H=1.00 m m3
02.02.02 Perfilado, Nivelacin y compactacin de la subrasante en zonas de corte m2
02.02.03 Mejoramiento de subrasante con over menor a 6" e=20cm m2
02.02.04 Base Granular e=20cm m2
02.03.00 CONCRETO SIMPLE
02.03.01 Losa de Rodadura, Concreto f'c = 210 Kg/cm2, e=0.20 m. m2
02.03.02 Concreto en Uas para Pavimento Rgido, Concreto f'c = 210 Kg/cm2 m3
02.03.03 Encofrado y Desencofrado de Losa de Rodadura m2
02.03.04 Levantamiento de Buzones Existentes a nivel de rasante und
02.04.00 CURADO
02.04.01 Curado de Losa de Rodadura, durante 7 dias - 4 veces x dia m2
02.05.00 JUNTAS
02.05.01 Juntas de contraccin e=6mm m
02.05.02 Juntas de contruccin de 3/4" c/ pasajuntas m
02.05.03 Juntas de contruccin de 3/4" sin pasajuntas en la interseccin de calles m
02.05.04 Juntas asflticas en pavimentos h=20 cm, e=1" m
02.06.00 ACERO LISO
02.06.01 Dowels transversales con acero liso de 3/4" m
02.06.02 Barras de amarre longitudinal con acero corrugado de 3/4" m
02.07.00 SEALIZACION
02.07.01 SEALIZACION HORIZONTAL
02.07.01.01 Pintado de Franjas en Pavimento - Sealizacion m2
02.07.02 SEALIZACION VERTICAL
02.07.02.01 Sealizacin Preventiva de lado 0.60 x 0.60 und
02.08.00 ELIMINACION DE MATERIAL EXCEDENTE
Item Descripcin Und.

02.08.01 Eliminacin de Material Excedente a una Distancia = 5 Km + 25% esponjamiento c/ volquete m3

03.00.00 VEREDAS
03.01.00 TRABAJOS PRELIMINARES
03.01.01 Limpieza de Terreno Manual m2
03.01.02 Trazo, Nivel y Replanteo m2
03.01.03 Demolicin de Vereda existente de concreto simple m2
03.01.04 Demolicin de Vereda existente de concreto simple con una H= 1.00 m m2
03.02.00 MOVIMIENTO DE TIERRAS
03.02.01 Corte manual de terreno m3
03.02.02 Nivelacion y Apisonado en Veredas m2
03.02.03 Relleno Compactado C/ Material de prestamo (Afirmado) para base de vereda m2
03.03.00 CONCRETO SIMPLE
03.03.01 Concreto f'c=175 Kg/cm2 en veredas, acabado frot., inc. brua. m2
03.03.02 Concreto f 'c=175 kg/cm2 en Rampas m2
03.03.03 Encofrado, descencofrado de Vereda. m2
03.04.00 JUNTAS Y BRUADO
03.04.01 Junta de dilatacin 1" x 4" de concreto asfltico a 3.0 m m
03.04.02 Bruado de veredas m
03.04.03 Bruado de rampas m
03.05.00 CURADO
03.05.01 Curado de vereda con arena fina , durante 7 dias - 4 veces x da m2
03.06.00 SUMINISTRO Y COLOCACION DE CAJAS PARA AGUA Y DESAGUE
03.06.01 Suministro y colocacin de encimado de cajas para agua und
03.06.02 Suministro y colocacin de encimado de cajas para desague und
03.07.00 ELIMINACION DE MATERIAL EXCEDENTE
03.07.01 Eliminacin de Material Excedente a una Distancia = 5 Km + 25% esponjamiento c/ volquete m3

04.00.00 SARDINEL
04.01.00 TRABAJOS PRELIMINARES
04.01.01 Limpieza de Terreno Manual m2
04.01.02 Trazo, Nivel y Replanteo m2
04.02.00 MOVIMIENTO DE TIERRAS
04.02.01 Excavacion de sardineles hasta h=60 cm m3
04.03.00 CONCRETO SIMPLE
04.03.01 Concreto f'c = 175 Kg/cm2 vaceado con mezcladora m3
04.03.02 Encofrado y Desencofrado m2
04.03.03 Acero Corrugado 3/8", fy=4200 kg/cm2 kg
04.03.04 Relleno de Juntas de Dilatacin con concreto asfaltico 1"x2" m en sardinel m
04.03.05 Tarrajeo pulido en sardineles m2
04.03.06 Curado de sardinel con arena fina, durante 7 dias - 4 veces x da m2
04.04.00 ELIMINACION DE MATERIAL EXCEDENTE

04.04.01 Eliminacin de Material Excedente a una Distancia = 5 Km + 25% esponjamiento c/ volquete m3


Item Descripcin Und.

05.00.00 CUNETAS RECTANGULARES


05.01.00 TRABAJOS PRELIMINARES
05.01.00 Limpieza de Terreno Manual m2
05.02.00 Trazo, Nivel y Replanteo m2
05.02.00 MOVIMIENTO DE TIERRAS
05.02.01 Excavacion de cunetas rectangulares hasta h=60 cm m3
05.03.00 CONCRETO SIMPLE
05.03.01 Concreto f'c = 175 Kg/cm2 vaceado con mezcladora m3
05.03.02 Acero Corrugado 3/8", fy=4200 kg/cm2 kg
05.03.03 Encofrado y Desencofrado M2
05.03.04 Tarrajeo pulido en Cunetas rectangulares m2
05.03.05 Curado de sardinel y canaletas, durante 7 dias - 4 veces x da m2
05.03.06 Tapas de concreto para Cunetas Rectangulares m3
05.04.00 ELIMINACION DE MATERIAL EXCEDENTE

05.04.01 Eliminacin de Material Excedente a una Distancia = 5 Km + 25% esponjamiento c/ volquete m3

06.00.00 MURO DE CONTENCION


06.01.00 TRABAJOS PRELIMINARES
06.01.01 Limpieza de Terreno Manual m2
06.01.02 Trazo, Nivel y Replanteo m2
06.02.00 MOVIMIENTO DE TIERRAS
06.02.01 Corte de Terreno Manual para Muro de Contencin m3
06.02.02 Relleno con material de prstamo en Muro de Contencin m3
06.03.00 CONCRETO SIMPLE
06.03.01 Solado 1:10; C:A e = 4" m2
06.04.00 CONCRETO ARMADO
06.04.01 Encofrado y Desencofrado de Muro de contencin m2
06.04.02 ACERO CORRUGADO, fy = 4200 Kg/cm2 -Muro de Contencion kg
06.04.03 Concreto f'c = 210 Kg/cm2 en muro de contencin m3
06.05.00 JUNTAS
06.05.01 Juntas de Dilatacin en Muro y Losa Inferior con water stop 6" cada 9.00 m. m
06.06.00 ELIMINACION DE MATERIAL EXCEDENTE

06.06.01 Eliminacin de Material Excedente a una Distancia = 5 Km + 25% esponjamiento c/ volquete m3

07.00.00 AREAS VERDES


07.01.00 Corte superficial para jardineras hasta 0.20 m m2
07.02.00 Acarreo de material excedente dp <=50 m m3
07.03.00 Suministro y colocacin de tierra agricola h=0.20 m m2
07.04.00 Sembrado de grass m2
07.05.00 Arborizacion con plantones und

07.06.00 Eliminacin de Material Excedente a una Distancia = 5 Km + 25% esponjamiento c/ volquete m3


Item Descripcin Und.

08.00.00 VARIOS
08.01.00 Limpieza final de obra m2
UMEN DE METRADOS
DE PISTAS Y VEREDAS EN EL BARRIO SAN MARTIN
ROVINCIA DE UTCUBAMBA - AMAZONAS

Metrado

1.00
4.00

6,007.37
6,007.37

7,282.14
6,007.37
6,007.37
6,007.37

6,007.37
263.26
3,504.61
14.00

6,007.37

2,292.49
254.40
418.62
1,902.45

1,372.80
919.69

441.20

16.00
Metrado

9,102.68

2,741.67
2,741.67
945.16
62.90

1,100.78
2,751.95
2,751.95

2,562.10
189.85
1,970.10

625.20
5503.00
890.40

2,751.95

149.00
149.00

1,031.98

389.50
389.50

233.70

194.75
2,025.37
6,006.39
130.25
467.39
623.19

292.12
Metrado

1,019.15
1,019.15

509.57

212.32
4871.44
2,038.30
2,123.23
2972.52
41.62

636.97

90.48
90.48

25.44
9.05

45.24

56.55
1,097.91
20.36

5.00

21.80

2504.15
500.83
2504.15
2504.15
227.00

626.04
Metrado

12226.44
METRADO DE ACERO
N de Descripcin del Diseo de Acero
Partida Elemento Estructural en el elemento estructural
MURO DE CONTENCION
ACERO FY=4200 KG/CM2
3/8" @ 0.3
L= 40.00 39.92

0.10 0.10

0.1

1.50

0.2

MURO DE CONTENCION
ACERO FY=4200 KG/CM2
3/8" @ 0.3 3/8" @ 0.25
L= 40.00 39.92

0.10 0.10

0.1

1.50

0.2

MURO DE CONTENCION
ACERO FY=4200 KG/CM2
3/8" @ 0.25
L= 40.00 39.92

0.10 0.10

0.2

1.00

0.2

MURO DE CONTENCION
ACERO FY=4200 KG/CM2
3/8" @ 0.2
L= 40.00 39.92
0.10 0.10

0.2

1.00

0.2
METRADO DE ACERO -MURO DE CONTENCION
Dimetro Longitud porRepeticioneCantidad de Elemento LONGITUD POR DIAMETRO DE VARILLA EN ML.
varilla diseo del diseo Estructurales 1/4 3/8 1/2 5/8

3/8 40.12 6.00 1.00 240.72

3/8 1.80 134.00 1.00 241.20

3/8 40.12 6.00 1.00 240.72

3/8 1.80 161.00 1.00 289.80

3/8 40.12 5.00 1.00 200.60

3/8 1.40 161.00 1.00 225.40

3/8 40.12 6.00 1.00 240.72


3/8 1.40 201.00 1.00 281.40

Peso en kilogramos por metro lineal 0.22 0.56 0.99 1.55


Longitud total por dimetro, en metros lineales - 1,960.56 - -
Total en kilogramos por dimetro - 1,097.91 - -
RO DE VARILLA EN ML.
3/4 1
2.24 3.97 Total en kg
- -
- - 1,097.91
METRADO DE ACE
N de Descripcin del Diseo de Acero
Partida Elemento Estructural en el elemento estructural
AV.MARIANO MELGAR
ACERO FY=4200 KG/CM2
1/4" @ 0.15
L= 426.13 426.05

0.10 0.10

0.50 0.5

0.45

JR.JOSE GALVEZ
1/4" @ 0.15
L= 145.00 144.92

0.10 0.10

0.50 0.5

0.45

JR.RICARDO PALMA
1/4" @ 0.15
L= 343.00 342.92

0.10 0.10

0.50 0.5

0.45

JR.PEDRO RUIZ
1/4" @ 0.15
L= 496.00 495.92

0.10 0.10
0.50 0.5

0.45

JR.ABRAHAM
1/4" @ 0.15
L= 142.94 142.86

0.10 0.10

0.50 0.5

0.45

OTROS AV
1/4" @ 0.15
L= 66.21 66.13

0.10 0.10

0.50 0.5

0.45
METRADO DE ACERO - CUNETAS RECTANGULARES
Dimetro Longitud porRepeticioneCantidad de Elemento LONGITUD POR DIAMETRO DE VARILLA EN M
varilla diseo del diseo Estructurales 1/4 3/8 1/2

1/4 426.25 4 1 1,705.00

1/4 1.45 2842 1 4,120.90

1/4 145.12 4 1 580.48

1/4 1.45 968 1 1,403.60

1/4 343.12 4 1 1,372.48

1/4 1.45 2288 1 3,317.60

1/4 496.12 4 1 1,984.48


1/4 1.45 3308 1 4,796.60

1/4 143.06 4 1 572.24

1/4 1.45 954 1 1,383.30

1/4 66.33 4 1 265.32

1/4 1.45 442 1 640.90

Peso en kilogramos por metro lineal 0.22 0.56 0.99


Longitud total por dimetro, en metros lineales 22,142.90 - -
Total en kilogramos por dimetro 4,871.44 - -
OR DIAMETRO DE VARILLA EN ML.
5/8 3/4 1
1.55 2.24 3.97 Total en kg
- - -
- - - 4,871.44
METRADO DE ACERO - SARDINELES

N de Descripcin del Diseo de Acero Dimetro Longitud porRepeticioneCantidad de Elemento


Partida Elemento Estructural en el elemento estructural varilla diseo del diseo Estructurales
SARDINEL
AV.MARIANO MELGAR
1/4" @ 0.15
L= 430.00 429.92 1/4 430.12 11.00 1.00

0.10 0.10

1/4 1.70 2,868.00 1.00

1.50

0.2

JR.JOSE GALVEZ
ACERO FY=4200 KG/CM2
1/4" @ 0.15
L= 154.00 153.92 1/4 154.12 11.00 1.00

0.10 0.10

1/4 1.70 1,028.00 1.00

1.50

0.2

JR.PEDRO RUIZ
ACERO FY=4200 KG/CM2
Pgina 93
METRADO DE ACERO - SARDINELES

N de Descripcin del Diseo de Acero Dimetro Longitud porRepeticioneCantidad de Elemento


Partida Elemento Estructural en el elemento estructural varilla diseo del diseo Estructurales
1/4" @ 0.15
L= 404.50 404.42 1/4 404.62 8.00 1.00

0.10 0.10

1/4 1.20 2,698.00 1.00

1.00

0.2

JR.ABRAHAM VALDELOMAR
ACERO FY=4200 KG/CM2
1/4" @ 0.15
L= 156.00 155.92 1/4 156.12 8.00 1.00

0.10 0.10

1/4 1.20 1,041.00 1.00

1.00

0.2

JR.RICARDO PALMA
ACERO FY=4200 KG/CM2
1/4" @ 0.15
L= 329.78 329.70 1/4 329.90 8.00 1.00
Pgina 94
METRADO DE ACERO - SARDINELES

N de Descripcin del Diseo de Acero Dimetro Longitud porRepeticioneCantidad de Elemento


Partida Elemento Estructural en el elemento estructural varilla diseo del diseo Estructurales

0.10 0.10

1/4 1.20 2,200.00 1.00

1.00

0.2

Peso en kilogramos por metro lineal


Longitud total por dimetro, en metros lineales
Total en kilogramos por dimetro

Pgina 95
DO DE ACERO - SARDINELES

LONGITUD POR DIAMETRO DE VARILLA EN ML.


1/4 3/8 1/2 5/8 3/4 1

4,731.32

4,875.60

1,695.32

1,747.60

Pgina 96
DO DE ACERO - SARDINELES

LONGITUD POR DIAMETRO DE VARILLA EN ML.


1/4 3/8 1/2 5/8 3/4 1

3,236.96

3,237.60

1,248.96

1,249.20

2,639.20
Pgina 97
DO DE ACERO - SARDINELES

LONGITUD POR DIAMETRO DE VARILLA EN ML.


1/4 3/8 1/2 5/8 3/4 1

2,640.00

0.22 0.56 0.99 1.55 2.24 3.97 Total en kg


27,301.76 - - - - -
6,006.39 - - - - - 6,006.39

Pgina 98
METRADO DE ACERO - TAPAS DE CANALETAS

N de Descripcin del Diseo de Acero Dimetro Longitud porRepeticioneCantidad de Elemento


Partida Elemento Estructural en el elemento estructural varilla diseo del diseo Estructurales
TAPAS DE CUNETAS
AV.MARIANO MELGAR
1/4" @ 0.15
L= 1698.58 1698.50 1/4 1,698.50 3.00 1.00

1/4 0.35 11325.00 1.00

0.35

Peso en kilogramos por metro lineal


Longitud total por dimetro, en metros lineales
Total en kilogramos por dimetro

Pgina 99
E ACERO - TAPAS DE CANALETAS

LONGITUD POR DIAMETRO DE VARILLA EN ML.


1/4 3/8 1/2 5/8 3/4 1

5,095.50

3,963.75

0.22 0.56 0.99 1.55 2.24 3.97 Total en kg


9,059.25 - - - - -
1,993.04 - - - - - 1,993.04