Está en la página 1de 16

FORMATO DE METRADOS

(BUZONES)
HOJA N
OBRA :
Colector :
Fecha : A-4

PROFUNDIDAD DEL MOVIMIENTO DE TIERRA : LONGITUD EN METROS (m)


BUZON
TRAMO CLASIFICACION POR RANGO DE PROFUNDIDAD Y TIPO DE SUELO TIPO DE PAVIMENTO SARD INEL / JARDIN / VEREDA
Tipo
TERRENO NORMAL TERRENO NORMAL SATURADO
Suelo
DEL DEL 0.80 1.01 1.26 1.51 1.76 2.01 2.51 3.01 3.51 4.01 5.01 6.01 1.01 1.26 1.51 1.76 2.01 2.51 3.01 3.51 4.01 5.01 6.01 TIPO AREA
1.00 1.25 1.50 1.75 2.00 2.50 3.00 3.50 4.00 5.00 6.00 7.00 1.25 1.50 1.75 2.00 2.50 3.00 3.50 4.00 5.00 6.00 7.00 M2

BZ-1 1.15 TN 1 SP
BZ-11 2.57 TN 1 SP
BZ-14 1.20 TN 1 SP
BZ-147 1.15 TN 1
BZ-148 1.87 TN 1
BZ-149 1.15 TN 1
BZ-150 1.15 TN 1
BZ-151 2.64 TN 1
BZ-153 1.58 TN 1
BZ-154 2.06 TN 1
BZ-155 2.02 TN 1
BZ-16 1.27 TN 1
BZ-162 1.15 TN 1
BZ-163 1.15 TN 1
BZ-164 1.15 TN 1
BZ-165 1.15 TN 1
BZ-19 2.36 TN 1
BZ-2 1.19 TN 1
BZ-20 2.79 TN 1
BZ-24 1.15 TN 1
BZ-28 2.23 TN 1
BZ-29 1.15 TN 1
BZ-30 1.15 TN 1
BZ-31 1.15 TN 1
BZ-32 1.15 TN 1
BZ-33 1.15 TN 1
BZ-34 1.15 TN 1
BZ-35 1.15 TN 1
BZ-36 1.15 TN 1
BZ-37 2.63 TN 1
BZ-38 1.15 TN 1
BZ-39 1.15 TN 1
BZ-40 1.15 TN 1
BZ-41 1.15 TN 1
BZ-42 1.15 TN 1
BZ-43 1.15 TN 1
BZ-44 1.34 TN 1
BZ-45 1.15 TN 1
BZ-46 1.15 TN 1
BZ-47 1.15 TN 1
BZ-48 1.15 TN 1
BZ-5 1.15 TN 1
BZ-6 1.45 TN 1
BZ-7 2.11 TN 1
BZ-8 2.48 TN 1
BZ-81 1.15 TN 1
BZ-82 1.15 TN 1
BZ-9 2.91 TN 1
BZ-178 2.08 TN 1
BZ-179 1.80 TN 1
BZ-181 1.46 TN 1
TN

TOTAL 0.00 32.00 4.00 1.00 2.00 7.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 51.00

RESUMEN DE METRADOS DE BUZONES Y BUZONETES

Vol de elimin Bz
Bz 40.21 1.25 Buzon en T. Normal de 1.01 a 1.25m 32.00
Bz 6.03 1.50 Buzon en T. Normal de 1.26 a 1.50m 4.00
Bz 1.76 1.75 Buzon en T. Normal de 1.51 a 1.75m 1.00
Bz 4.02 2.00 Buzon en T. Normal de 1.76 a 2.00m 2.00
Bz 17.59 2.50 Buzon en T. Normal de 2.01 a 2.50m 7.00
Bz 15.08 3.00 Buzon en T. Normal de 2.51 a 3.00m 5.00
Bz 0.00 3.50 Buzon en T. Normal de 3.01 a 3.50m 0.00
Bz 0.00 4.00 Buzon en T. Normal de 3.51 a 4.00m 0.00
Bz 0.00 5.00 Buzon en T. Normal de 4.01 a 5.00m 0.00
Bz 0.00 6.00 Buzon en T. Normal de 5.01 a 6.00m 0.00
Bzn 44.64 Buzon en T. Normal de 6.01 a 7.00m 0.00
Total (m3) 129.33 51.00

88.00
Buzonete en T. Normal de 0.80 a 1.00m 0.00
Buzonete en T. Normal de 1.01 a 1.25m 32.00
Buzonetes en T. Normal de 1.26 a 1.50m 4.00
Buzonetes en T. Normal de 1.51 a 1.75m 1.00
37.00
DEL AL
CALLE NUEVA 11 BZ-83 BZ-85 1.15 1.15
CALLE NUEVA 11 BZ-85 BZ-91 1.15 2.33
CALLE NUEVA 13 BZ-134 BZ-110 2.39 2.24
CALLE NUEVA 13 BZ-110 BZ-116 2.24 1.87
CALLE NUEVA 13 BZ-116 BZ-133 1.87 1.63
CALLE NUEVA 13 BZ-133 BZ-145 1.63 1.62
CALLE NUEVA 6 BZ-81 BZ-80 1.15 1.94
CALLE NUEVA 6 BZ-80 BZ-83 1.94 1.15
COLECTOR 21 DE JUNIO BZ-95 BZ-91 1.44 2.33
COLECTOR 21 DE JUNIO BZ-135 BZ-95 1.15 1.44
COLECTOR CENTRAL BZ-161 BZ-166 1.53 1.15
COLECTOR CENTRAL BZ-166 BZ-143 1.15 1.31
COLECTOR CENTRAL BZ-160 BZ-161 1.15 1.53
COLECTOR CENTRAL - PTAR2 BZ-143 BZ-167 1.31 1.49
COLECTOR CENTRAL - PTAR2 BZ-167 BZ-168 1.49 1.69
COLECTOR CENTRAL - PTAR2 BZ-168 BZ-169 1.69 1.89
COLECTOR CENTRAL - PTAR2 BZ-169 BZ-170 1.89 1.91
COLECTOR CENTRAL - PTAR2 BZ-170 BZ-180 1.91 1.79
COLECTOR INDEPENDENCIA BZ-90 BZ-92 1.15 1.15
COLECTOR INDEPENDENCIA BZ-92 BZ-93 1.15 1.15
COLECTOR INDEPENDENCIA BZ-93 BZ-94 1.15 1.15
COLECTOR INDEPENDENCIA BZ-94 BZ-95 1.15 1.44
COLECTOR PUENTE BZ-91 BZ-136 2.33 2.04
COLECTOR PUENTE BZ-136 BZ-137 2.04 1.18
COLECTOR PUENTE BZ-137 BZ-138 1.18 1.15
COLECTOR PUENTE BZ-138 BZ-141 1.15 1.15
COLECTOR PUENTE BZ-141 BZ-142 1.15 1.19
COLECTOR PUENTE BZ-142 BZ-143 1.19 1.31
COLECTOR PUENTE BZ-101 BZ-139 1.15 1.15
COLECTOR PUENTE BZ-139 BZ-140 1.15 1.15
COLECTOR PUENTE BZ-140 BZ-141 1.15 1.15
COLECTOR SALIDA PUTINA BZ-145 BZ-146 1.62 1.77
COLECTOR SALIDA PUTINA BZ-146 BZ-171 1.77 1.79
COLECTOR SALIDA PUTINA BZ-171 BZ-172 1.79 1.7
COLECTOR SALIDA PUTINA BZ-172 BZ-173 1.7 1.68
COLECTOR SALIDA PUTINA BZ-173 BZ-174 1.68 1.58
COLECTOR SALIDA PUTINA BZ-174 BZ-169 1.58 1.89
JR LORETO BZ-102 BZ-103 1.15 1.15
JR LORETO BZ-103 BZ-104 1.15 2.09
JR LORETO BZ-104 BZ-96 2.09 1.15
JR. 21 DE JUNIO BZ-104 BZ-135 2.09 1.15
JR. 21 DE JUNIO BZ-104 BZ-120 2.09 1.15
JR. 21 DE JUNIO BZ-120 BZ-121 1.15 2.3
JR. 21 DE JUNIO BZ-121 BZ-122 2.3 2.73
JR. 21 DE JUNIO BZ-122 BZ-123 2.73 2.02
JR. 21 DE JUNIO BZ-123 BZ-124 2.02 1.52
JR. 21 DE JUNIO BZ-124 BZ-134 1.52 2.39
JR. BOLOGNESI BZ-119 BZ-103 1.15 1.15
JR. BOLOGNESI BZ-119 BZ-125 1.15 2.46
JR. CALLE NUEVA 10 BZ-66 BZ-63 1.15 1.15
JR. CALLE NUEVA 8 BZ-52 BZ-57 1.15 1.15
JR. CALLE NUEVA 8 BZ-57 BZ-58 1.15 1.15
JR. CALLE NUEVA 8 BZ-58 BZ-59 1.15 1.15
JR. CALLE NUEVA 9 BZ-51 BZ-49 1.15 1.15
JR. CALLE NUEVA 9 BZ-49 BZ-56 1.15 1.15
JR. CALLE NUEVA 9 BZ-56 BZ-65 1.15 1.15
JR. CALLE NUEVA 9 BZ-65 BZ-66 1.15 1.15
JR. CALLE NUEVA 9 BZ-66 BZ-67 1.15 2.25
JR. INDEPENDENCIA BZ-86 BZ-71 1.15 1.15
JR. INDEPENDENCIA BZ-83 BZ-84 1.15 1.15
JR. INDEPENDENCIA BZ-87 BZ-84 1.15 1.15
JR. INDEPENDENCIA BZ-87 BZ-88 1.15 1.15
JR. INDEPENDENCIA BZ-88 BZ-89 1.15 1.53
JR. INDEPENDENCIA BZ-89 BZ-90 1.53 1.15
JR. JOSE ANTONIO ENCINAS BZ-109 BZ-124 1.32 1.52
JR. JOSE ANTONIO ENCINAS BZ-115 BZ-132 1.15 1.52
JR. JOSE ANTONIO ENCINAS BZ-159 BZ-144 1.15 1.56
JR. JOSE ANTONIO ENCINAS BZ-144 BZ-146 1.56 1.77
JR. LEONCIO PRADO BZ-47 BZ-54 1.15 1.15
JR. LEONCIO PRADO BZ-54 BZ-60 1.15 1.15
JR. LEONCIO PRADO BZ-60 BZ-61 1.15 1.15
JR. LEONCIO PRADO BZ-61 BZ-160 1.15 1.15
JR. LIMA BZ-12 BZ-54 1.15 1.15
JR. LIMA BZ-54 BZ-55 1.15 2.15
JR. LIMA BZ-57 BZ-56 1.15 1.15
JR. LIMA BZ-56 BZ-55 1.15 2.15
JR. LORETO BZ-127 BZ-99 2.19 1.15
JR. MANCO CAPAC BZ-68 BZ-60 1.15 1.15
JR. MANCO CAPAC BZ-58 BZ-65 1.15 1.15
JR. MANCO CAPAC BZ-62 BZ-65 1.2 1.15
JR. MANCO CAPAC BZ-60 BZ-62 1.15 1.2
JR. MICAELA BASTIDAS BZ-126 BZ-127 1.15 2.19
JR. MICAELA BASTIDAS BZ-127 BZ-128 2.19 2.91
JR. MICAELA BASTIDAS BZ-128 BZ-129 2.91 3.16
JR. MICAELA BASTIDAS BZ-129 BZ-130 3.16 2.96
JR. MICAELA BASTIDAS BZ-130 BZ-131 2.96 2.71
JR. MICAELA BASTIDAS BZ-131 BZ-132 2.71 1.52
JR. MICAELA BASTIDAS BZ-132 BZ-133 1.52 1.63
JR. MICAELA BASTIDAS BZ-182 BZ-133 1.15 1.63
JR. MIGUEL GRAU BZ-122 BZ-107 2.73 1.78
JR. MIGUEL GRAU BZ-157 BZ-130 1.15 2.96
JR. MIGUEL GRAU BZ-113 BZ-130 1.61 2.96
JR. PEDRO VILCAPAZA BZ-125 BZ-121 2.46 2.3
JR. PEDRO VILCAPAZA BZ-121 BZ-106 2.3 2.17
JR. PEDRO VILCAPAZA BZ-156 BZ-129 1.15 3.16
JR. PEDRO VILCAPAZA BZ-112 BZ-129 1.9 3.16
JR. PROLONGACION MANCO CAPAC BZ-81 BZ-70 1.15 1.15
JR. RAMON CASTILLA BZ-69 BZ-61 1.15 1.15
JR. RAMON CASTILLA BZ-59 BZ-67 1.15 2.25
JR. RAMON CASTILLA BZ-67 BZ-64 2.25 3.32
JR. RAMON CASTILLA BZ-61 BZ-64 1.15 3.32
JR. SAN MARTIN BZ-53 BZ-50 1.15 2.61
JR. SAN MARTIN BZ-50 BZ-55 2.61 2.15
JR. SAN MARTIN BZ-55 BZ-62 2.15 1.2
JR. SAN MARTIN BZ-62 BZ-63 1.2 1.15
JR. SAN MARTIN BZ-63 BZ-64 1.15 3.32
JR. SAN MARTIN BZ-64 BZ-161 3.32 1.53
JR. TUPAC AMARU BZ-52 BZ-49 1.15 1.15
JR. TUPAC AMARU BZ-49 BZ-50 1.15 2.61
JR. TUPAC AMARU BZ-47 BZ-50 1.15 2.61
JR. UNION BZ-108 BZ-123 1.15 2.02
JR. UNION BZ-158 BZ-131 1.15 2.71
JR. UNION BZ-114 BZ-131 1.15 2.71
PASAJE BZ-84 BZ-85 1.15 1.15
PASAJE BZ-85 BZ-72 1.15 1.15
distancia pendiente
32.9 9.968 BZ-101 1.15
113.7 5.81 BZ-102 1.15
68.7 0.57 BZ-103 1.15
15.1 0.517 BZ-104 2.09
66.3 2.827 BZ-106 2.17
75.7 0.515 BZ-107 1.78
48 5.308 BZ-108 1.15
67.2 10 BZ-109 1.32
43.4 0.581 BZ-110 2.24
30.6 2.368 BZ-112 1.9
39.4 2.137 BZ-113 1.61
90.1 0.5 BZ-114 1.15
70.2 0.615 BZ-115 1.15
90.5 0.5 BZ-116 1.87
98.5 0.5 BZ-119 1.15
86.6 0.5 BZ-12 1.15
114.7 0.257 BZ-120 1.15
66.8 0.257 BZ-121 2.3
58.9 4.671 BZ-122 2.73
74.4 1.17 BZ-123 2.02
90.5 2.166 BZ-124 1.52
92.3 0.643 BZ-125 2.46
67.7 0.529 BZ-126 1.15
54.8 0.526 BZ-127 2.19
32.8 1.821 BZ-128 2.91
32.6 2.736 BZ-129 3.16
53 3.45 BZ-130 2.96
69.2 0.699 BZ-131 2.71
52.1 2.494 BZ-132 1.52
37.1 3.805 BZ-133 1.63
27.8 1.19 BZ-134 2.39
94.9 0.367 BZ-135 1.15
111 0.5 BZ-136 2.04
126.9 0.356 BZ-137 1.18
145.5 0.355 BZ-138 1.15
125.3 0.353 BZ-139 1.15
107.3 0.792 BZ-140 1.15
74.1 1.161 BZ-141 1.15
83 0.717 BZ-142 1.19
69.1 -2.99 BZ-143 1.31
70.4 1.4 BZ-144 1.56
68.9 -1.792 BZ-145 1.62
103.2 1.103 BZ-146 1.77
77.9 0.615 BZ-156 1.15
62.4 0.602 BZ-157 1.15
94 0.588 BZ-158 1.15
99.5 0.583 BZ-159 1.15
70 1.142 BZ-160 1.15
102.7 0.717 BZ-161 1.53
77.6 -0.168 BZ-166 1.15
92.4 5.961 BZ-167 1.49
51.2 5.1 BZ-168 1.69
101.4 5.493 BZ-169 1.89
71.3 1.402 BZ-170 1.91
93.8 3.101 BZ-171 1.79
50.3 2.94 BZ-172 1.7
41.7 4.863 BZ-173 1.68
67.6 6.909 BZ-174 1.58
64.6 6.708 BZ-47 1.15
56.5 2.018 BZ-49 1.15
31.5 0.476 BZ-50 2.61
60.2 1.778 BZ-51 1.15
49.1 0.713 BZ-52 1.15
57.4 1.828 BZ-53 1.15
70.9 -0.222 BZ-54 1.15
63.7 3.132 BZ-55 2.15
63.3 1.277 BZ-56 1.15
38.7 2.095 BZ-57 1.15
93.3 1.479 BZ-58 1.15
83.5 1.796 BZ-59 1.15
107.9 3.271 BZ-60 1.15
82.5 4.218 BZ-61 1.15
62.9 5.039 BZ-62 1.2
99 0.041 BZ-63 1.15
63.6 0.613 BZ-64 3.32
69.3 2.526 BZ-65 1.15
67.2 -4.386 BZ-66 1.15
101.9 2.973 BZ-67 2.25
58.3 -1.269 BZ-68 1.15
72.8 -0.937 BZ-69 1.15
88.9 -1.179 BZ-70 1.15
91.2 0.755 BZ-71 1.15
62.4 0.733 BZ-72 1.15
111.2 0.698 BZ-80 1.94
76 0.66 BZ-81 1.15
63 0.639 BZ-83 1.15
99.2 0.604 BZ-84 1.15
87.5 0.587 BZ-85 1.15
62.1 2.158 BZ-86 1.15
70 -0.7 BZ-87 1.15
38.9 4.537 BZ-88 1.15
66.3 4.303 BZ-89 1.53
84.4 0.665 BZ-90 1.15
67.5 -0.839 BZ-91 2.33
37.3 5.044 BZ-92 1.15
66.2 4.408 BZ-93 1.15
119 9.717 BZ-94 1.15
134.9 3.106 BZ-95 1.44
55 0.716 BZ-96 1.15
85.4 0.604 BZ-99 1.15
79.5 2.466 BZ-180 1.79
61.3 3.347 BZ-182 1.15
95.2 0.692
61.9 0.664
39.9 3.051
71.8 7.408
99.6 1.96
63.1 4.739
78.5 5.101
101.9 0.748
71.3 -0.067
45.5 3.466
63.9 3.626
50.2 4.265
88.2 2.496
FORMATO DE METRADOS
(MOVIMIENTO DE TIERRA, SUMINISTRO E INSTALACION DE TUBERIA)

HOJA N
OBRA :
Colector :
Fecha

BUZON PROFUNDIDAD DEL TRAMO LONG DEL TRAMO TIPO DE PAVIMENTO

PROFUND HORIZONT PENDIENT LONGITUD ZANJA EXC LONGITUD TUBERIA TUBERIA Tipo Tipo Tipo ASFALTO
TERRENO NORMAL
Suelo Excav inter.
DEL AL DEL AL PROMEDIO ENTRE EJE % OBLICUA (no incl Diam. TUBERIA (SERIE) (DN) 0.80 1.01 1.26 1.51 1.76 2.01 2.51 3.01 3.50 4.01 5.01 6.01
nombre de CALLE DE BUZON (m) Buzon) PVC - U UF 1.00 1.25 1.50 1.75 2.00 2.50 3.00 3.50 4.00 5.00 6.00 7.00 (m)

CALLE NUEVA 11 BZ-83 BZ-85 1.15 1.15 1.15 32.9 9.968 33.06 31.86 32.26 SN2 160 TN Maq. P 31.86
CALLE NUEVA 11 BZ-85 BZ-185 1.15 1.15 1.15 59.7 4.775 59.77 58.57 58.97 SN2 160 TN Maq. P 58.57
CALLE NUEVA 11 BZ-185 BZ-91 1.15 2.33 1.74 54.1 6.951 54.23 53.03 53.43 SN2 160 TN Maq. P 53.03

CALLE NUEVA 13 BZ-134 BZ-110 2.39 2.24 2.32 68.70 0.57 68.70 67.50 67.90 SN2 160 TN Maq. P 67.50
CALLE NUEVA 13 BZ-110 BZ-116 2.24 1.87 2.06 15.10 0.52 15.10 13.90 14.30 SN2 160 TN Maq. M 13.90
CALLE NUEVA 13 BZ-116 BZ-133 1.87 1.63 1.75 66.30 2.83 66.33 65.13 65.53 SN2 160 TN Maq. M 65.13
CALLE NUEVA 13 BZ-133 BZ-145 1.63 1.62 1.63 75.70 0.52 75.70 74.50 74.90 SN2 160 TN Maq. M 74.50

CALLE NUEVA 6 BZ-81 BZ-80 1.15 1.94 1.55 48.00 5.31 48.07 46.87 47.27 SN2 160 TN Maq. P 46.87
CALLE NUEVA 6 BZ-80 BZ-83 1.94 1.15 1.55 67.20 10.00 67.54 66.34 66.74 SN2 160 TN Maq. P 66.34

COLECTOR 21 DE JUNIO BZ-95 BZ-91 1.44 2.33 1.89 128.90 0.12 128.90 127.70 128.10 SN2 160 TN Maq. P 127.70
COLECTOR 21 DE JUNIO BZ-135 BZ-95 1.15 1.44 1.30 83.90 7.14 84.11 82.91 83.31 SN2 160 TN Maq. P 82.91

COLECTOR CENTRAL BZ-161 BZ-166 1.53 1.15 1.34 39.40 2.14 39.41 38.21 38.61 SN2 160 TN Maq. P 38.21
COLECTOR CENTRAL BZ-166 BZ-143 1.15 1.31 1.23 90.10 0.50 90.10 88.90 89.30 SN2 160 TN Maq. P 88.90
COLECTOR CENTRAL BZ-160 BZ-161 1.15 1.53 1.34 70.20 0.62 70.20 69.00 69.40 SN2 160 TN Maq. P 69.00

COLECTOR CENTRAL - PTAR2 BZ-143 BZ-167 1.31 1.49 1.40 90.50 0.50 90.50 89.30 89.70 SN2 160 TN Maq. M 89.30
COLECTOR CENTRAL - PTAR2 BZ-167 BZ-168 1.49 1.69 1.59 98.50 0.50 98.50 97.30 97.70 SN2 160 TN Maq. M 97.30
COLECTOR CENTRAL - PTAR2 BZ-168 BZ-169 1.69 1.89 1.79 86.60 0.50 86.60 85.40 85.80 SN2 160 TN Maq. M 85.40
COLECTOR CENTRAL - PTAR2 BZ-169 BZ-170 1.89 1.91 1.90 114.70 0.26 114.70 113.50 113.90 SN2 160 TN Maq. M 113.50
COLECTOR CENTRAL - PTAR2 BZ-170 BZ-180 1.91 1.79 1.85 66.80 0.26 66.80 65.60 66.00 SN2 160 TN Maq. P 65.60

COLECTOR INDEPENDENCIA BZ-90 BZ-92 1.15 1.15 1.15 58.90 4.67 58.96 57.76 58.16 SN2 160 TN Maq. P 57.76
COLECTOR INDEPENDENCIA BZ-92 BZ-93 1.15 1.15 1.15 74.40 1.17 74.41 73.21 73.61 SN2 160 TN Maq. P 73.21
COLECTOR INDEPENDENCIA BZ-93 BZ-94 1.15 1.15 1.15 90.50 2.17 90.52 89.32 89.72 SN2 160 TN Maq. P 89.32
COLECTOR INDEPENDENCIA BZ-94 BZ-95 1.15 1.44 1.30 92.30 0.64 92.30 91.10 91.50 SN2 160 TN Maq. P 91.10

COLECTOR PUENTE BZ-91 BZ-136 2.33 2.04 2.19 67.70 0.53 67.70 66.50 66.90 SN2 160 TN Maq. M 66.50
COLECTOR PUENTE BZ-136 BZ-137 2.04 1.18 1.61 54.80 0.53 54.80 53.60 54.00 SN2 160 TN Maq. M 53.60
COLECTOR PUENTE BZ-137 BZ-138 1.18 1.15 1.17 32.80 1.82 32.81 31.61 32.01 SN2 160 TN Maq. P 31.61
COLECTOR PUENTE BZ-138 BZ-141 1.15 1.15 1.15 32.60 2.74 32.61 31.41 31.81 SN2 160 TN Maq. M 31.41
COLECTOR PUENTE BZ-141 BZ-142 1.15 1.19 1.17 53.00 3.45 53.03 51.83 52.23 SN2 160 TN Maq. M 51.83
COLECTOR PUENTE BZ-142 BZ-143 1.19 1.31 1.25 69.20 0.70 69.20 68.00 68.40 SN2 160 TN Maq. P 68.00
COLECTOR PUENTE BZ-101 BZ-139 1.15 1.15 1.15 52.10 2.49 52.12 50.92 51.32 SN2 160 TN Maq. M 50.92
COLECTOR PUENTE BZ-139 BZ-140 1.15 1.15 1.15 37.10 3.81 37.13 35.93 36.33 SN2 160 TN Maq. M 35.93
COLECTOR PUENTE BZ-140 BZ-141 1.15 1.15 1.15 27.80 1.19 27.80 26.60 27.00 SN2 160 TN Maq. P 26.60

COLECTOR SALIDA PUTINA BZ-145 BZ-146 1.62 1.77 1.70 94.90 0.37 94.90 93.70 94.10 SN2 160 TN Maq. P 93.70
COLECTOR SALIDA PUTINA BZ-146 BZ-171 1.77 1.79 1.78 111.00 0.50 111.00 109.80 110.20 SN2 160 TN Maq. P 109.80
COLECTOR SALIDA PUTINA BZ-171 BZ-172 1.79 1.70 1.75 126.90 0.36 126.90 125.70 126.10 SN2 160 TN Maq. P 125.70
COLECTOR SALIDA PUTINA BZ-172 BZ-173 1.70 1.68 1.69 145.50 0.36 145.50 144.30 144.70 SN2 160 TN Maq. P 144.30
COLECTOR SALIDA PUTINA BZ-173 BZ-174 1.68 1.58 1.63 125.30 0.35 125.30 124.10 124.50 SN2 160 TN Maq. P 124.10
COLECTOR SALIDA PUTINA BZ-174 BZ-169 1.58 1.89 1.74 107.30 0.79 107.30 106.10 106.50 SN2 160 TN Maq. P 106.10

JR LORETO BZ-102 BZ-103 1.15 1.15 1.15 74.10 1.16 74.10 72.90 73.30 SN2 160 TN Maq. P 72.90
JR LORETO BZ-103 BZ-104 1.15 2.09 1.62 83.00 0.72 83.00 81.80 82.20 SN2 160 TN Maq. P 81.80
JR LORETO BZ-104 BZ-96 2.09 1.15 1.62 69.10 2.99 69.13 67.93 68.33 SN2 160 TN Maq. P 67.93
P
JR. 21 DE JUNIO BZ-104 BZ-135 2.09 1.15 1.62 70.40 1.40 70.41 69.21 69.61 SN4 160 TN Maq. P 69.21
JR. 21 DE JUNIO BZ-104 BZ-120 2.09 1.15 1.62 68.90 -1.79 68.91 67.71 68.11 SN4 160 TN Maq. P 67.71
JR. 21 DE JUNIO BZ-120 BZ-121 1.15 2.30 1.73 103.20 1.10 103.21 102.01 102.41 SN4 160 TN Maq. P 102.01
JR. 21 DE JUNIO BZ-121 BZ-122 2.30 2.73 2.52 77.90 0.62 77.90 76.70 77.10 SN4 160 TN Maq. P 76.70
JR. 21 DE JUNIO BZ-122 BZ-123 2.73 2.02 2.38 62.40 0.60 62.40 61.20 61.60 SN4 160 TN Maq. P 61.20
JR. 21 DE JUNIO BZ-123 BZ-124 2.02 1.52 1.77 94.00 0.59 94.00 92.80 93.20 SN4 160 TN Maq. P 92.80
JR. 21 DE JUNIO BZ-124 BZ-134 1.52 2.39 1.96 99.50 0.58 99.50 98.30 98.70 SN4 160 TN Maq. P 98.30

JR. BOLOGNESI BZ-119 BZ-103 1.15 1.15 1.15 70.00 1.14 70.00 68.80 69.20 SN4 160 TN Maq. P 68.80
JR. BOLOGNESI BZ-119 BZ-125 1.15 2.46 1.81 102.70 0.72 102.70 101.50 101.90 SN4 160 TN Maq. P 101.50
160
JR. CALLE NUEVA 10 BZ-66 BZ-63 1.15 1.15 1.15 77.60 0.17 77.60 76.40 76.80 SN2 160 TN Maq. P 76.40
160
JR. CALLE NUEVA 8 BZ-52 BZ-57 1.15 1.15 1.15 92.40 5.96 92.56 91.36 91.76 SN2 160 TN Maq. P 91.36
JR. CALLE NUEVA 8 BZ-57 BZ-58 1.15 1.15 1.15 51.20 5.10 51.27 50.07 50.47 SN2 160 TN Maq. P 50.07
JR. CALLE NUEVA 8 BZ-58 BZ-59 1.15 1.15 1.15 101.40 5.49 101.55 100.35 100.75 SN2 200 TN Maq. P 100.35

JR. CALLE NUEVA 9 BZ-51 BZ-49 1.15 1.15 1.15 71.30 1.40 71.31 70.11 70.51 SN2 200 TN Maq. P 70.11
JR. CALLE NUEVA 9 BZ-49 BZ-56 1.15 1.15 1.15 93.80 3.10 93.85 92.65 93.05 SN2 200 TN Maq. P 92.65
JR. CALLE NUEVA 9 BZ-56 BZ-65 1.15 1.15 1.15 50.30 2.94 50.32 49.12 49.52 SN2 200 TN Maq. P 49.12
JR. CALLE NUEVA 9 BZ-65 BZ-66 1.15 1.15 1.15 41.70 4.86 41.75 40.55 40.95 SN2 200 TN Maq. P 40.55
JR. CALLE NUEVA 9 BZ-66 BZ-67 1.15 2.25 1.70 67.60 6.91 67.76 66.56 66.96 SN2 160 TN Maq. P 66.56
160
JR. INDEPENDENCIA BZ-86 BZ-71 1.15 1.15 1.15 64.60 6.71 64.75 63.55 63.95 SN2 160 TN Maq. P 63.55
JR. INDEPENDENCIA BZ-83 BZ-84 1.15 1.15 1.15 56.50 2.02 56.51 55.31 55.71 SN2 160 TN Maq. P 55.31
JR. INDEPENDENCIA BZ-87 BZ-84 1.15 1.15 1.15 31.50 0.48 31.50 30.30 30.70 SN2 160 TN Maq. P 30.30
JR. INDEPENDENCIA BZ-87 BZ-88 1.15 1.15 1.15 60.20 1.78 60.21 59.01 59.41 SN2 160 TN Maq. P 59.01
JR. INDEPENDENCIA BZ-88 BZ-89 1.15 1.53 1.34 49.10 0.71 49.10 47.90 48.30 SN2 160 TN Maq. P 47.90
JR. INDEPENDENCIA BZ-89 BZ-90 1.53 1.15 1.34 57.40 1.83 57.41 56.21 56.61 SN2 160 TN Maq. P 56.21

JR. JOSE ANTONIO ENCINAS BZ-109 BZ-124 1.32 1.52 1.42 70.90 0.22 70.90 69.70 70.10 SN2 160 TN Maq. P 69.70
JR. JOSE ANTONIO ENCINAS BZ-115 BZ-132 1.15 1.52 1.34 63.70 3.13 63.73 62.53 62.93 SN2 160 TN Maq. P 62.53
JR. JOSE ANTONIO ENCINAS BZ-159 BZ-144 1.15 1.56 1.36 63.30 1.28 63.31 62.11 62.51 SN2 160 TN Maq. P 62.11
JR. JOSE ANTONIO ENCINAS BZ-144 BZ-146 1.56 1.77 1.67 38.70 2.10 38.71 37.51 37.91 SN2 160 TN Maq. P 37.51

JR. LEONCIO PRADO BZ-47 BZ-54 1.15 1.15 1.15 93.30 1.48 93.31 92.11 92.51 SN2 160 TN Maq. P 92.11
JR. LEONCIO PRADO BZ-54 BZ-60 1.15 1.15 1.15 83.50 1.80 83.51 82.31 82.71 SN2 160 TN Maq. P 82.31
JR. LEONCIO PRADO BZ-60 BZ-61 1.15 1.15 1.15 107.90 3.27 107.96 106.76 107.16 SN2 160 TN Maq. P 106.76
JR. LEONCIO PRADO BZ-61 BZ-160 1.15 1.15 1.15 82.50 4.22 82.57 81.37 81.77 SN2 160 TN Maq. P 81.37

JR. LIMA BZ-12 BZ-54 1.15 1.15 1.15 62.90 5.04 62.98 61.78 62.18 SN2 160 TN Maq. P 61.78
JR. LIMA BZ-54 BZ-55 1.15 2.15 1.65 99.00 0.04 99.00 97.80 98.20 SN2 160 TN Maq. P 97.80
JR. LIMA BZ-57 BZ-56 1.15 1.15 1.15 63.60 0.61 63.60 62.40 62.80 SN2 160 TN Maq. P 62.40
JR. LIMA BZ-56 BZ-55 1.15 2.15 1.65 69.30 2.53 69.32 68.12 68.52 SN2 160 TN Maq. P 68.12

JR. LORETO BZ-127 BZ-99 2.19 1.15 1.67 67.2 4.386 67.26 66.06 66.46 SN2 160 TN Maq. P 66.06

JR. MANCO CAPAC BZ-68 BZ-60 1.15 1.15 1.15 101.90 2.97 101.95 100.75 101.15 SN2 160 TN Maq. P 100.75
JR. MANCO CAPAC BZ-58 BZ-65 1.15 1.15 1.15 58.30 1.27 58.30 57.10 57.50 SN2 160 TN Maq. P 57.10
JR. MANCO CAPAC BZ-62 BZ-65 1.20 1.15 1.18 72.80 0.94 72.80 71.60 72.00 SN2 160 TN Maq. P 71.60
JR. MANCO CAPAC BZ-60 BZ-62 1.15 1.20 1.18 88.90 1.18 88.91 87.71 88.11 SN2 160 TN Maq. P 87.71
0.00
JR. MICAELA BASTIDAS BZ-126 BZ-127 1.15 2.19 1.67 91.20 0.76 91.20 90.00 90.40 SN2 160 TN Maq. P 90.00
JR. MICAELA BASTIDAS BZ-127 BZ-128 2.19 2.91 2.55 62.40 0.73 62.40 61.20 61.60 SN2 160 TN Maq. P 61.20
JR. MICAELA BASTIDAS BZ-128 BZ-129 2.91 3.16 3.04 111.20 0.70 111.20 110.00 110.40 SN2 160 TN Maq. P 110.00
JR. MICAELA BASTIDAS BZ-129 BZ-130 3.16 2.96 3.06 76.00 0.66 76.00 74.80 75.20 SN2 160 TN Maq. P 74.80
JR. MICAELA BASTIDAS BZ-130 BZ-131 2.96 2.71 2.84 63.00 0.64 63.00 61.80 62.20 SN2 160 TN Maq. P 61.80
JR. MICAELA BASTIDAS BZ-131 BZ-132 2.71 1.52 2.12 99.20 0.60 99.20 98.00 98.40 SN2 160 TN Maq. P 98.00
JR. MICAELA BASTIDAS BZ-132 BZ-133 1.52 1.63 1.58 87.50 0.59 87.50 86.30 86.70 SN2 160 TN Maq. P 86.30
JR. MICAELA BASTIDAS BZ-182 BZ-133 1.15 1.63 1.39 62.10 2.16 62.11 60.91 61.31 SN2 160 TN Maq. P 60.91

JR. MIGUEL GRAU BZ-122 BZ-107 2.73 1.78 2.26 70.00 0.70 70.00 68.80 69.20 SN2 160 TN Maq. P 68.80
JR. MIGUEL GRAU BZ-157 BZ-130 1.15 2.96 2.06 38.90 4.54 38.94 37.74 38.14 SN2 160 TN Maq. P 37.74
JR. MIGUEL GRAU BZ-113 BZ-130 1.61 2.96 2.29 66.30 4.30 66.36 65.16 65.56 SN2 160 TN Maq. P 65.16

JR. PEDRO VILCAPAZA BZ-125 BZ-121 2.46 2.30 2.38 84.40 0.67 84.40 83.20 83.60 SN2 160 TN Maq. P 83.20
JR. PEDRO VILCAPAZA BZ-121 BZ-106 2.30 2.17 2.24 67.50 0.84 67.50 66.30 66.70 SN2 160 TN Maq. P 66.30
JR. PEDRO VILCAPAZA BZ-156 BZ-129 1.15 3.16 2.16 37.30 5.04 37.35 36.15 36.55 SN2 160 TN Maq. P 36.15
JR. PEDRO VILCAPAZA BZ-112 BZ-129 1.90 3.16 2.53 66.20 4.41 66.26 65.06 65.46 SN2 160 TN Maq. P 65.06

JR. PROLONGACION MANCO CAPAC BZ-81 BZ-184 1.15 1.15 1.15 62.00 9.72 62.29 61.09 61.49 SN2 160 TN Maq. P 61.09
JR. PROLONGACION MANCO CAPAC BZ-184 BZ-70 1.15 1.15 1.15 57.00 9.72 57.27 56.07 56.47 SN2 160 TN Maq. P 56.07

JR. RAMON CASTILLA BZ-69 BZ-183 1.15 1.15 1.15 67.40 3.11 67.43 66.23 66.63 SN2 160 TN Maq. P 66.23
JR. RAMON CASTILLA BZ-59 BZ-67 1.15 2.25 1.70 55.00 0.72 55.00 53.80 54.20 SN2 160 TN Maq. P 53.80
JR. RAMON CASTILLA BZ-67 BZ-64 2.25 3.32 2.79 85.40 0.60 85.40 84.20 84.60 SN2 160 TN Maq. P 84.20
JR. RAMON CASTILLA BZ-61 BZ-64 1.15 3.32 2.24 79.50 2.47 79.52 78.32 78.72 SN2 160 TN Maq. P 78.32
JR. RAMON CASTILLA BZ-183 BZ-61 1.15 1.15 1.15 67.30 3.11 67.33 66.13 66.53 SN2 160 TN Maq. P 66.13

JR. SAN MARTIN BZ-53 BZ-50 1.15 2.61 1.88 61.30 3.35 61.33 60.13 60.53 SN2 160 TN Maq. P 60.13
JR. SAN MARTIN BZ-50 BZ-55 2.61 2.15 2.38 95.20 0.69 95.20 94.00 94.40 SN2 160 TN Maq. P 94.00
JR. SAN MARTIN BZ-55 BZ-62 2.15 1.20 1.68 61.90 0.66 61.90 60.70 61.10 SN2 160 TN Maq. P 60.70
JR. SAN MARTIN BZ-62 BZ-63 1.20 1.15 1.18 39.90 3.05 39.92 38.72 39.12 SN2 160 TN Maq. P 38.72
JR. SAN MARTIN BZ-63 BZ-64 1.15 3.32 2.24 71.80 7.41 72.00 70.80 71.20 SN2 160 TN Maq. P 70.80
JR. SAN MARTIN BZ-64 BZ-161 3.32 1.53 2.43 99.60 1.96 99.62 98.42 98.82 SN2 160 TN Maq. P 98.42

JR. TUPAC AMARU BZ-52 BZ-49 1.15 1.15 1.15 63.10 4.74 63.17 61.97 62.37 SN2 160 TN Maq. P 61.97
JR. TUPAC AMARU BZ-49 BZ-50 1.15 2.61 1.88 78.50 5.10 78.60 77.40 77.80 SN2 160 TN Maq. P 77.40
JR. TUPAC AMARU BZ-47 BZ-50 1.15 2.61 1.88 101.90 0.75 101.90 100.70 101.10 SN2 160 TN Maq. P 100.70

JR. UNION BZ-108 BZ-123 1.15 2.02 1.59 71.30 0.07 71.30 70.10 70.50 SN2 160 TN Maq. P 70.10
JR. UNION BZ-158 BZ-131 1.15 2.71 1.93 45.50 3.47 45.53 44.33 44.73 SN2 160 TN Maq. P 44.33
JR. UNION BZ-114 BZ-131 1.15 2.71 1.93 63.90 3.63 63.94 62.74 63.14 SN2 160 TN Maq. P 62.74
PASAJE BZ-84 BZ-85 1.15 1.15 1.15 50.20 4.27 50.25 49.05 49.45 SN2 160 TN Maq. P 49.05
PASAJE BZ-85 BZ-72 1.15 1.15 1.15 88.20 2.50 88.23 87.03 87.43 SN2 160 TN Maq. P 87.03
TOTAL 8,594.06 8,452.46 8,499.66 0.00 2,906.6 729.89 2,136.29 1,139.92 1,006.00 348.97 184.80 0.00 0.00 0.00 0.00
RESUMEN DE METRADOS DE REDES DE ALCANTARILLADO

Tuberia SN2 DN 160mm 8,144.88


Tuberia SN4 DN 160mm P PROYECTADO
Tuberia SN8 DN 160mm M MEJORAMIENTO
Total (m) 8,144.88
RESUMEN COLECTOR A MEJORAR RESUMEN COLECTOR PROYECTADA
Tuberia SN2 DN 200mm 354.78 MAQUINARIA MAQUINARIA
Tuberia SN4 DN 200mm 200.60 DN Tipo de Terreno Longitud DN Tipo de Terreno Longitud
Tuberia SN8 DN 200mm TN TRE (m) TN TRE (m)
Total (m) 555.38 160 834.42 834.42 DN 160 7,310.46 7,310.46
200 0.00 0.00 DN 200 354.78 354.78
Tuberia SN2 DN 250mm #REF! 250 0.00 0.00 DN 250 0.00 0.00
Tuberia SN4 DN 250mm #REF! 300 0.00 0.00 DN 300 0.00 0.00
Tuberia SN8 DN 250mm #REF! 0.00
Total (m) #REF! 834.42 7,665.24

PULSO PULSO
DN Tipo de Terreno Longitud DN Tipo de Terreno Longitud
Desmontaje y retiro de tuberia PVC DN 160- 200 - 250 mm 834.42 ml TN TRE (m) TN TRE (m)
160 0.00 0.00 160 0.00 0.00
area seccion lon tub volumen 200 0.00 0.00 200 0.00 0.00
Eliminacion y deposito de tuberia de PVC retirada en centro de 0.02 8,499.66 217.0376035 m3 250 0.00 0.00 250 0.00 0.00
300 0.00 0.00 300 0.00 0.00
Prueba de compactacin de suelos (procto modif densidad campo) 14.00 und
0.00 0.00
3.84459

200-250 100-160
PULSO 200mm 200 250 200-250 PULSO - 160MM ancho zan altura vol elimin. ancho zan altura vol elimin.
Excavacion en T. Normal DN 200 -250 de 0.80 a 1.00m 0.00 0.00 0.00 0.00 Excavacion en T. Normal DN 100 -150 de 0.80 a 1.00m 0.00 0.00 0.80 1.00 0.00 0.75 1.00 0.00
Excavacion en T. Normal DN 200 -250 de 1.01 a 1.25m 0.00 0.00 0.00 352.78 Excavacion en T. Normal DN 100 -150 de 1.01 a 1.25m 0.00 2,553.81 0.80 1.25 183.44 0.75 1.25 1,244.98
Excavacion en T. Normal DN 200 -250 de 1.26 a 1.50m 0.00 0.00 0.00 0.00 Excavacion en T. Normal DN 100 -150 de 1.26 a 1.50m 0.00 729.89 0.80 1.50 0.00 0.75 1.50 492.67
Excavacion en T. Normal DN 200 -250 de 1.51 a 1.75m 0.00 0.00 0.00 0.00 Excavacion en T. Normal DN 100 -150 de 1.51 a 1.75m 0.00 2,136.29 0.80 1.75 0.00 0.75 1.75 1,842.55
Excavacion en T. Normal DN 200 -250 de 1.76 a 2.00m 0.00 0.00 0.00 0.00 Excavacion en T. Normal DN 100 -150 de 1.76 a 2.00m 0.00 1,139.92 0.80 2.00 0.00 0.75 2.00 1,196.91
Excavacion en T. Normal DN 200 -250 de 2.01 a 2.50m 0.00 0.00 0.00 0.00 Excavacion en T. Normal DN 100 -150 de 2.01 a 2.50m 0.00 1,006.00 0.90 2.50 0.00 0.85 2.50 1,624.69
Excavacion en T. Normal DN 200 -250 de 2.51 a 3.00m 0.00 0.00 0.00 0.00 Excavacion en T. Normal DN 100 -150 de 2.51 a 3.00m 0.00 348.97 0.90 3.00 0.00 0.85 3.00 711.90
Excavacion en T. Normal DN 200 -250 de 3.01 a 3.50m 0.00 0.00 0.00 0.00 Excavacion en T. Normal DN 100 -150 de 3.01 a 3.50m 0.00 184.80 0.90 3.50 0.00 0.85 3.50 455.54
Excavacion en T. Normal DN 200 -250 de 3.51 a 4.01m 0.00 0.00 0.00 0.00 0.00 1.00 4.00 0.00 0.95 4.00 0.00
Excavacion en T. Normal DN 200 -250 de 4.01 a 5.00m 0.00 0.00 0.00 0.00 0.00 1.00 5.00 0.00 0.95 5.00 0.00
Excavacion en T. Normal DN 200 -250 de 5.01 a 6.00m 0.00 0.00 0.00 0.00 0.00 1.00 6.00 0.00 0.95 6.00 0.00
0.00 0.00
0.00 0.00 0.00 0.00 183.44 7,569.3

7,752.70 volumen total eliminacion de material (m3)


MAQUINA 200mm 200 250 200-250 MAQUINA - 160MM
Excavacion en T. Normal DN 200 -250 de 0.80 a 1.00m 0.00 0.00 0.00 Excavacion en T. Normal DN 100 -150 de 0.80 a 1.00m 0.00
Excavacion en T. Normal DN 200 -250 de 1.01 a 1.25m 352.78 0.00 352.78 Excavacion en T. Normal DN 100 -150 de 1.01 a 1.25m 2,553.81
Excavacion en T. Normal DN 200 -250 de 1.26 a 1.50m 0.00 0.00 0.00 Excavacion en T. Normal DN 100 -150 de 1.26 a 1.50m 729.89
Excavacion en T. Normal DN 200 -250 de 1.51 a 1.75m 0.00 0.00 0.00 Excavacion en T. Normal DN 100 -150 de 1.51 a 1.75m 2,136.29
Excavacion en T. Normal DN 200 -250 de 1.76 a 2.00m 0.00 0.00 0.00 Excavacion en T. Normal DN 100 -150 de 1.76 a 2.00m 1,139.92
Excavacion en T. Normal DN 200 -250 de 2.01 a 2.50m 0.00 0.00 0.00 Excavacion en T. Normal DN 100 -150 de 2.01 a 2.50m 1,006.00
Excavacion en T. Normal DN 200 -250 de 2.51 a 3.00m 0.00 0.00 0.00 Excavacion en T. Normal DN 100 -150 de 2.51 a 3.00m 348.97
Excavacion en T. Normal DN 200 -250 de 3.01 a 3.50m 0.00 0.00 0.00 Excavacion en T. Normal DN 100 -150 de 3.01 a 3.50m 184.80
Excavacion en T. Normal DN 200 -250 de 3.51 a 4.01m 0.00 0.00 0.00
Excavacion en T. Normal DN 200 -250 de 4.01 a 5.00m 0.00 0.00 0.00
Excavacion en T. Normal DN 200 -250 de 5.01 a 6.00m 0.00 0.00 0.00

352.78 0.00 352.78 8,099.68

Entibado metlico tipo cajn (Box), de zanjas de 1.76 a 2.00 m de prof. (Incl. Instalacin, mantenimiento y retiro) ###
Entibado metlico tipo cajn (Box), de zanjas de 2.01 a 2.50 m de prof. (Incl. Instalacin, mantenimiento y retiro) ###
Entibado metlico tipo cajn (Box), de zanjas de 2.51 a 3.00 m de prof. (Incl. Instalacin, mantenimiento y retiro) 348.97
Entibado metlico tipo cajn (Box), de zanjas de 3.01 a 3.50 m de prof. (Incl. Instalacin, mantenimiento y retiro) 184.80
Entibado metlico tipo cajn (Box), de zanjas de 3.51 a 4.00 m de prof. (Incl. Instalacin, mantenimiento y retiro) 0.00
Entibado metlico tipo cajn (Box), de zanjas de 4.01 a 5.00 m de prof. (Incl. Instalacin, mantenimiento y retiro) 0.00
Entibado metlico tipo cajn (Box), de zanjas de 5.01 a 6.00 m de prof. (Incl. Instalacin, mantenimiento y retiro) 0.00
FORMATO DE METRADOS

HOJA N

TIPO DE PAVIMENTO

ASFALTO CONCRETO ADOQUIN


AREA AREA AREA
(m2) (m) (m2) (m) (m2)
6.05 4.54 92.11 451.34
5.5 4.13 82.31 559.73
2.65 1.99 108.0 421.04

7.05 5.29 94.00 601.61

2.60 1.95 39.92 155.68


72.00 388.78
0.00 17.89 2,578.19