Está en la página 1de 6

1 2 3 4

ID Q Vs A
- (m3/s) (m/s) (m2) (m)
1] a 0.79 9.0 0.088 0.33
2] b 1.2 9.0 0.136 0.42
a-b 0.79 9.0 0.088 0.33
b-B 2.0 9.0 0.224 0.53

B-C

C-D 2.0 9.0 0.222 0.53


D-E 2.0 9.0 0.222 0.53
E-F 2.0 9.0 0.222 0.53

Tramos Tramos
Dimensiones 1] a 2] b 1] a
N (h) 30 40 2 ]b
Altura (m) 3.5 4
Ancho (m) 6 5.5
Profundidad (m) 4.5 5

Nota: El caudal del tramo (1] a) = (a-b)


y el caudal del tramo (b-B) = (C-D) (D
5 6 7 8
D A real V real LTR
(in) (in) (m) (m2) (m/s) (m)
13.14 10.00 0.25 0.05 15.54 1.45
16.37 10.00 0.25 0.05 24.12 2.20
13.16 10.00 0.25 0.05 15.59 3.20
21.01 19.00 0.48 0.18 11.00 2.5

20.94 19.00 0.48 0.18 10.93 4.40


20.94 19.00 0.48 0.18 10.93 5.30
20.94 19.00 0.48 0.18 10.93 5.90

Q(m3/h)
2835
4400

mo (b-B) = (C-D) (D-E) (E-F)


METODO - LONGITUD EQUIVALENTE
9 10 11 12 13 14
C R E O LE LT
90 - - - (m) (m)
90 0.51 - - 6.5 7.95
90 0.51 - - 6.5 8.70
120 0.51 - - 8.67 11.87
- 0.97 - - 9.67 12.17

EQUIPO DE CONTROL
- 0.97 - - - 4.40
- 0.97 - - - 5.30
90 0.97 - 45 10.25 16.15
NTE
15 16 17 18 19 20
hf100 hf P F F+1 Pec
(mmH2O) (mmH2O) (mmH2O) - - (mmH2O)
1.1 0.09 14.78 13.74 14.74 217.84
2.4 0.21 35.59 33.10 34.10 1213.8
1.1 0.13 14.87 13.83 14.83 220.53
0.3 0.03 7.403 6.88 7.885 58.373

ONTROL
0.3 0.01 7.313 6.802 7.802 57.056
0.3 0.01 7.313 6.802 7.802 57.056
0.3 0.04 7.313 6.802 7.802 57.056

1
a

2
21 22 23 24 25 26
Pr Fr Per Pecr Pe Pe gobierna
(mmH2O) - (mmH2O) (mmH2O) (mmH2O) (mmH2O)
9.0 13.742 123.7 341.53 341.6 356.4
9.0 33.103 297.9 1511.8 1512 1547.6
9.0 13.830 124.5 345.00 345.1 360.0
9.0 6.885 61.96 120.34 120.37 127.8

9.0 6.8015 61.21 118.270 118.28 125.595


9.0 6.8015 61.21 118.270 118.28 125.598
9.0 6.8015 61.21 118.270 118.31 125.627

Equipo de
control

b B C
27
%Dif
-
0.02
0.01
0.04
0.03

0.01
0.01
0.03

D
E

También podría gustarte