Está en la página 1de 22

LOSA ALIGERADA 1D

Datos:

Enlucido = 70 Kg/m2 f'c = 210 Kg/cm2


Contrapiso = 80 Kg/m2
Tab. Rep. = 100.00 Kg/m2 f'y = 4200 Kg/cm2
Peso de Losa = 350 Kg/m2
S/C = 200 Kg/m2 h= 25 cm

Pm = 240.00 Kg/m2/vig rec = 2 cm


Pv = 80.00 Kg/m2/vig
d= 21.415 cm
W= 0.472 Tn/m/vig
Cuadro de Momentos segn Varillas de Acero:

As 10 cm 40 cm

a Mu a
3/8" 0.713 cm2 1.677 cm 0.554 Tn.m 0.419 cm

2 - 3/8" 1.425 cm2 3.353 cm 1.063 Tn.m 0.838 cm

1/2" 1.267 cm2 2.981 cm 0.954 Tn.m 0.745 cm

1/2" + 3/8" 1.979 cm2 4.657 cm 1.428 Tn.m 1.164 cm

2 - 1/2" 2.534 cm2 5.961 cm 1.765 Tn.m 1.490 cm

Planilla para Jugar con Momentos ltimos - Acero Necesario:

*Para b= 40 cm *Para b= 10 cm

Mu = 0.2630 Tn.m Mu = 0.700 Tn.m

26300 = 3467032.821 cm *w*(1-0.59w) 70000 = 866758.20525 cm

0.59 w2 -1 w + 0.00759 = 0 0.59 w2 -1 w +

w1 = 1.6873 = 0.0004 w1 = 1.6099 =

w2 = 0.0076 As = 0.326 cm2 w2 = 0.0850 As =


Planilla para Jugar con Cortantes y Verificar que Cumpla:

0.672

Vc (10)
= 1.645 Tn

f * Vc (10)
= 1.398 Tn

Vc (12.5)
= 2.056 Tn x

f * Vc (12.5)
= 1.748 Tn 2.475

x= 1.324 m Vud =

Tramo 5 :

0.425 Tn.m As (necesaria) = 0.529 cm2

3.55

0.838

Vud = 0.7369
0.838

Tramo 7 :

0.793 Tn.m As (necesaria) = 0.993 cm2

4.85

1.145

Vud = 1.0439

1.145
Tramo 1 :

1.331 Tn.m As (necesaria) = 1.828 cm2

0.793 Tn.m 0.920 Tn.m

4.850 5.225

0.993 cm2 1.155 cm2 As (necesaria)

2 3/8" 2 3/8"

1.145 1.418

1.316 1.233
Vud = 1.0363 1.3093

CUMPLE CUMPLE

Tramo 9 y Tramo 2:

0.931 Tn.m As (necesaria) = 1.234 cm2

0.425 Tn.m 0.801 Tn.m

3.550 4.875

0.529 cm2 1.003 cm2 As (necesaria)

1 3/8" 2 3/8"

0.838 1.323

0.963 1.151
Vud = 0.7290 1.2143

CUMPLE CUMPLE

Tramo 3:
1 1/2" 1 1/2" 1
1 3/8" 1 3/8"

As (necesaria) 1.626 cm2 1.555 cm2 1.039 cm2

1.198 Tn.m 1.151 Tn.m 0.793 Tn.m

0.793 Tn.m 0.805 Tn.m 0.638 Tn.m

4.850 5.225 4.650

As (necesaria) 0.993 cm2 1.008 cm2 0.797 cm2

2 3/8" 2 3/8" 2 3/8"

1.145 1.233 1.097 0.963


1.316 1.233 1.097

Vud = 1.0363 1.1319 0.9960

CUMPLE CUMPLE CUMPLE

Tramo 6 :

0.500 Tn.m As (necesaria) = 0.640 cm2

0.587 Tn.m 0.263 Tn.m

3.70 2.475

0.733 cm2 0.326 cm2 As (necesaria)

2 3/8" 1 3/8"

0.873 0.672
1.004 0.584

Vud = 0.7644 0.5633

CUMPLE CUMPLE

Tramo 8 :

0.351 Tn.m As (necesaria) = 0.444 cm2

0.587 Tn.m 0.093 Tn.m

3.70 1.475

0.733 cm2 0.115 cm2 As (necesaria)

2 3/8" 1 3/8"

0.873 0.400
1.004 0.348

Vud = 0.7644 0.2914

CUMPLE CUMPLE

Tramo 4:
1 1/2" 1 1/2"
1 3/8"

As (necesaria) 1.626 cm2 0.910 cm2

1.198 Tn.m 0.700 Tn.m

0.793 Tn.m 0.805 Tn.m 0.263 Tn.m

4.85 5.225 2.475

As (necesaria) 0.993 cm2 1.008 cm2 0.326 cm2

2 3/8" 2 3/8" 1 3/8"

1.145 1.233 0.672


1.316 1.233 0.584

Vud = 1.0363 1.1319 0.5633

CUMPLE CUMPLE CUMPLE


40 cm

Mu
0.571 Tn.m

1.131 Tn.m

1.008 Tn.m

1.559 Tn.m

1.980 Tn.m

*w*(1-0.59w)

0.08076 = 0

= 0.0043

As = 0.910 cm2
0.584

Vud = 0.5633

1 3/8"

0.7369 CUMPLE
2 3/8"

1.0439 CUMPLE
1 1/2"
1 3/8"
1 1/2"
1/2"

1.039 cm2

0.793 Tn.m

0.425 Tn.m

3.550

0.529 cm2

1 3/8"

0.963
1.097 0.838

9960 0.8544

UMPLE CUMPLE

1 1/2"
1 1/2"
0.584

5633

UMPLE

También podría gustarte