HOJA DE METRADOS

04.00.00 OBRAS DE ARTE Y DRENAJE


04.07.00 BADENES
04.07.06 CONCRETO f'c = 245 Kg / cm2

PAOS DE 5.00x6.00
LOSA (M3/PAO)
ALTO ANCHO LONGITUD VOLUMEN No. VECES VOLUMEN (m3)
0.25 5.00 6.00 7.50 1.00 7.50
Total 7.50

PAOS DE 5.25x6.00
LOSA (M3/PAO)
ALTO ANCHO LONGITUD VOLUMEN No. VECES VOLUMEN (m3)
0.25 5.25 6.00 7.88 1.00 7.88
Total 7.88

PAOS DE 5.5x6.00
LOSA (M3/PAO)
ALTO ANCHO LONGITUD VOLUMEN No. VECES VOLUMEN (m3)
0.25 5.50 6.00 8.25 1.00 8.25
Total 8.25

UA EN LOSA DE APROXIMACION (M3/ML)


ESPESOR ANCHO1 ANCHO2 PROMEDIO LONGITUD VOLUMEN (m3)
0.750 0.50 0.25 0.38 1.00 0.28
Total 0.28

AFIRMADO (M3/PAO)
ESPESOR ANCHO LONGITUD VOLUMEN No. VECES VOLUMEN (m3)
0.150 4.53 6.00 4.07 1.00 4.07
Total 4.07

ALIVIADERO DE PIEDRA EMBOQUILLADA


ESPESOR ANCHO LONGITUD AREA No. VECES AREA (m2)
0.300 6.00 6.00 10.80 1.00 10.80
Total 10.80

ADECUACIN Y ACTUALIZACIN DE LOS ESTUDIOS DEFINITIVOS DE INGENIERIA PARA LA REHABILITACIN Y


MEJORAMIENTO DE LA CARRETERA: PUENTE PAUCARTAMBO OXAPAMPA.
HOJA DE METRADOS
04.00.00 OBRAS DE ARTE Y DRENAJE
04.07.00 BADENES
04.07.05 ACERO DE REFUERZO f'y = 4200 Kg / cm 2

REFUERZO EN LA LOSA
TIPO DESCRIPCION LONG/PIEZA BARRA/PIEZA CANTIDAD BARRAS LONGITUD @ N de veces

B1 .15 1/2 5.00 5/9 42 23.33 6 0.30 2


4.85

B2 0.20 1/2 6.40 3/4 36 27 5 0.30 2

B6 5/8 6.00 2/3 4 2.67

B7 0.15 3/8 0.80 1/9 36 4 5 0.30 2

0.15

5.00
B8 5/8 5.00 5/9 8 4.44 2

61.44
REFUERZO EN UA
TIPO DESCRIPCION LONG/PIEZA BARRA/PIEZA CANTIDAD BARRAS LONGITUD @ N de veces

6.00
B3 1/2" 6.00 2/3 2 1.33

6.00

B4 3/8" 6.00 2/3 2 1.33

0.30 0.30

B5 .90 .95 3/8" 2.61 3/9 31 10.33 6 0.2 1

0.16

ADECUACIN Y ACTUALIZACIN DE LOS ESTUDIOS DEFINITIVOS DE INGENIERIA PARA LA REHABILITACIN Y MEJORAMIENTO DE LA CARRETERA: PUENTE
PAUCARTAMBO OXAPAMPA.
HOJA DE METRADOS
04.00.00 OBRAS DE ARTE Y DRENAJE
04.07.00 BADENES
04.07.05 ACERO DE REFUERZO f'y = 4200 Kg / cm 2

BARRA LISA EN JUNTAS


TIPO DESCRIPCION LONG/PIEZA BARRA/PIEZA CANTIDAD BARRAS LONGITUD @ N de veces

1.20
LONG. 3/4" 1.20 1/6 21 3.5 6 0.3 1

1.40

TRANSV 3/4" 1.40 1/6 17 2.83 5 0.3 1

ARMADURA x PAO de 5m. x 6m.


DESCRIPCION 3/8" 1/2" 5/8" 3/4" 1"
Peso (Kg/m) 0.56 1 1.55 2.24 3.97

LOSA 4 50 1/3 4 4/9

TOTAL VARILLAS 4.0 50.3 4.4 0.0 0.0


KG 20.2 453.0 62.0 0.0 0.0
TOTAL 535.16 KG.

UA x 6 ml
DESCRIPCION 3/8" 1/2" 5/8" 3/4" 1"
Peso (Kg/m) 0.56 1 1.55 2.24 3.97

UA 11 2/3 1 1/3

TOTAL VARILLAS 11.7 1.3


KG 58.8 12.0
TOTAL 70.80 KG.

ADECUACIN Y ACTUALIZACIN DE LOS ESTUDIOS DEFINITIVOS DE INGENIERIA PARA LA REHABILITACIN Y MEJORAMIENTO DE LA CARRETERA: PUENTE
PAUCARTAMBO OXAPAMPA.
HOJA DE METRADOS
04.00.00 OBRAS DE ARTE Y DRENAJE
04.07.00 BADENES
04.07.05 ACERO DE REFUERZO f'y = 4200 Kg / cm 2

REFUERZO EN LA LOSA
TIPO DESCRIPCION LONG/PIEZA BARRA/PIEZA CANTIDAD BARRAS LONGITUD @ N de veces

B1 .15 1/2 5.25 5/9 42 23.33 6 0.30 2


5.10

B2 0.20 1/2 6.40 3/4 38 28.5 5.25 0.30 2

B6 5/8 6.00 2/3 4 2.67

B7 0.15 3/8 0.80 1/9 38 4.2222222222 5.25 0.30 2

0.15

5.25
B8 5/8 5.25 5/9 8 4.44 2

63.17
REFUERZO EN UA
TIPO DESCRIPCION LONG/PIEZA BARRA/PIEZA CANTIDAD BARRAS LONGITUD @ N de veces

6.00
B3 1/2" 6.00 2/3 2 1.33

6.00

B4 3/8" 6.00 2/3 2 1.33

0.30 0.30

B5 .90 .95 3/8" 2.61 3/9 31 10.33 6 0.2 1

0.16

ADECUACIN Y ACTUALIZACIN DE LOS ESTUDIOS DEFINITIVOS DE INGENIERIA PARA LA REHABILITACIN Y MEJORAMIENTO DE LA CARRETERA: PUENTE
PAUCARTAMBO OXAPAMPA.
HOJA DE METRADOS
04.00.00 OBRAS DE ARTE Y DRENAJE
04.07.00 BADENES
04.07.05 ACERO DE REFUERZO f'y = 4200 Kg / cm 2

BARRA LISA EN JUNTAS


TIPO DESCRIPCION LONG/PIEZA BARRA/PIEZA CANTIDAD BARRAS LONGITUD @ N de veces

1.20
LONG. 3/4" 1.20 1/6 21 3.5 6 0.3 1

1.40

TRANSV 3/4" 1.40 1/6 18 3.00 5.25 0.3 1

ARMADURA x PAO de 5.25m. x 6m.


DESCRIPCION 3/8" 1/2" 5/8" 3/4" 1"
Peso (Kg/m) 0.56 1 1.55 2.24 3.97

LOSA 4 2/9 51 5/6 4 4/9

TOTAL VARILLAS 4.2 51.8 4.4 0.0 0.0


KG 21.3 466.5 62.0 0.0 0.0
TOTAL 549.78 KG.

UA x 6 ml
DESCRIPCION 3/8" 1/2" 5/8" 3/4" 1"
Peso (Kg/m) 0.56 1 1.55 2.24 3.97

UA 11 2/3 1 1/3

TOTAL VARILLAS 11.7 1.3


KG 58.8 12.0
TOTAL 70.80 KG.

ADECUACIN Y ACTUALIZACIN DE LOS ESTUDIOS DEFINITIVOS DE INGENIERIA PARA LA REHABILITACIN Y MEJORAMIENTO DE LA CARRETERA: PUENTE
PAUCARTAMBO OXAPAMPA.
HOJA DE METRADOS
04.00.00 OBRAS DE ARTE Y DRENAJE
04.07.00 BADENES
04.07.05 ACERO DE REFUERZO f'y = 4200 Kg / cm 2

REFUERZO EN LA LOSA
TIPO DESCRIPCION LONG/PIEZA BARRA/PIEZA CANTIDAD BARRAS LONGITUD @ N de veces

B1 .15 1/2 5.50 6/9 42 23.33 6 0.30 2


5.35

B2 0.20 1/2 6.40 3/4 38 28.5 5.5 0.30 2

B6 5/8 6.00 2/3 4 2.67

B7 0.15 3/8 0.80 1/9 38 4.2222222222 5.5 0.30 2

0.15

5.50
B8 5/8 5.50 6/9 8 4.44 2

63.17
REFUERZO EN UA
TIPO DESCRIPCION LONG/PIEZA BARRA/PIEZA CANTIDAD BARRAS LONGITUD @ N de veces

6.00
B3 1/2" 6.00 2/3 2 1.33

6.00

B4 3/8" 6.00 2/3 2 1.33

0.30 0.30

B5 .90 .95 3/8" 2.61 3/9 31 10.33 6 0.2 1

0.16

ADECUACIN Y ACTUALIZACIN DE LOS ESTUDIOS DEFINITIVOS DE INGENIERIA PARA LA REHABILITACIN Y MEJORAMIENTO DE LA CARRETERA: PUENTE
PAUCARTAMBO OXAPAMPA.
HOJA DE METRADOS
04.00.00 OBRAS DE ARTE Y DRENAJE
04.07.00 BADENES
04.07.05 ACERO DE REFUERZO f'y = 4200 Kg / cm 2

BARRA LISA EN JUNTAS


TIPO DESCRIPCION LONG/PIEZA BARRA/PIEZA CANTIDAD BARRAS LONGITUD @ N de veces

1.20
LONG. 3/4" 1.20 1/6 21 3.5 6 0.3 1

1.40

TRANSV 3/4" 1.40 1/6 18 3.00 5.5 0.3 1

ARMADURA x PAO de 5.50m. x 6m.


DESCRIPCION 3/8" 1/2" 5/8" 3/4" 1"
Peso (Kg/m) 0.56 1 1.55 2.24 3.97

LOSA 4 2/9 51 5/6 4 4/9

TOTAL VARILLAS 4.2 51.8 4.4 0.0 0.0


KG 21.3 466.5 62.0 0.0 0.0
TOTAL 549.78 KG.

UA x 6 ml
DESCRIPCION 3/8" 1/2" 5/8" 3/4" 1"
Peso (Kg/m) 0.56 1 1.55 2.24 3.97

UA 11 2/3 1 1/3

TOTAL VARILLAS 11.7 1.3


KG 58.8 12.0
TOTAL 70.80 KG.

ADECUACIN Y ACTUALIZACIN DE LOS ESTUDIOS DEFINITIVOS DE INGENIERIA PARA LA REHABILITACIN Y MEJORAMIENTO DE LA CARRETERA: PUENTE
PAUCARTAMBO OXAPAMPA.
HOJA DE METRADOS
04.00.00 OBRAS DE ARTE
04.07.00 BADENES
04.07.04 ENCOFRADO Y DESENCOFRADO

ENCOFRADO DE BADENES
DESCRIPCION LARGO ALTURA No. VECES AREA ANCHO ALTURA No. VECES AREA TOTAL
LOSA
4x5x6 20.00 0.25 3.00 15.00 10.00 0.25 5.00 12.50 27.50
4x5x4 27.50
LOSA
4x5x6 15.00 0.25 3.00 11.25 10.00 0.25 5.00 12.50 23.75
4x5x1.5 23.75
LOSA
4x5x6 25.00 0.25 3.00 18.75 10.00 0.25 5.00 12.50 31.25
4x5x6.5 31.25
LOSA
8x5x6 30.00 0.25 3.00 22.50 10.00 0.25 7.00 17.50 40.00
4x5x3 40.00
LOSA
12x5x6 40.00 0.25 3.00 30.00 11.00 0.25 9.00 24.75 54.75
4x5x2 54.75
LOSA
4x5.25x6 20.00 0.25 3.00 15.00 10.50 0.25 5.00 13.13 28.13
4x5.25x4 28.13
LOSA
8x5.5x6 30.00 0.25 3.00 22.50 11.00 0.25 7.00 19.25 41.75
4x5.5x3 41.75
LOSA
4x5.5x6 20.00 0.25 3.00 15.00 11.00 0.25 5.00 13.75 28.75
4x5.5x4 28.75
LOSA
4x5.5x6 15.00 0.25 3.00 11.25 11.00 0.25 5.00 13.75 25.00
4x5.5x1.5 25.00

UAx ML
TAPAS 0.50 0.25 0.38 0.75 1.00 0.28
LATERAL 1 1.00 0.75 1.00 0.75

ADECUACIN Y ACTUALIZACIN DE LOS ESTUDIOS DEFINITIVOS DE INGENIERIA PARA LA REHABILITACIN Y MEJORAMIENTO DE LA


CARRETERA: PUENTE PAUCARTAMBO OXAPAMPA.
HOJA DE METRADOS
04.00.00 OBRAS DE ARTE Y DRENAJE
04.07.00 BADENES
04.07.01 EXCAVACION PARA ESTRUCTURAS
04.07.02 BASE
04.07.06 JUNTA ASFALTICA LONGITUDINAL

EXCAVACION RELLENO PAOS ACERO (kg) ENCOFRADO (m2) CONCRETO f'c=245 (m3) JUNTAS AFIRMADO (M3)
PROGRESIVA DESCRIPCION LARGO ANCHO ALTO
m3 m3 5x6 5 x Var. LOSA UA Barra Lisa LOSA UA LOSA UA (ml) e=0.15
2+518.00 BADENES 20 10 0.25 16.31 0.00 4x5x6 4x5x4 3,665.20 696.20 496.38 27.50 45.75 50.00 16.24 50.00 27.00
5+589.00 BADENES 15 10 0.25 13.5 0.00 4x5x6 4 x 5 x 1.5 2,748.90 578.20 450.69 23.75 38.25 37.50 13.44 45.00 20.25
5+715.00 BADENES 20 10 0.25 16.31 0.00 4x5x6 4x5x4 3,665.20 696.20 496.38 27.50 45.75 50.00 16.24 50.00 27.00
6+184.00 BADENES 30 10 0.25 21.94 0.00 8x5x6 4x5x3 5,497.80 932.20 794.15 40.00 61.88 75.00 21.84 80.00 40.50
7+675.00 BADENES 25 10 0.25 19.13 0.00 4x5x6 4 x 5 x 6.5 4,581.50 814.20 414.40 31.25 53.25 62.50 19.04 55.00 33.75
8+386.00 BADENES 15 10 0.25 13.5 0.00 4x5x6 4 x 5 x 1.5 2,748.90 578.20 450.69 23.75 38.25 50.00 13.44 45.00 20.25
10+277.00 BADENES 25 10 0.25 19.13 0.00 4x5x6 4 x 5 x 6.5 4,581.50 814.20 539.39 31.25 53.25 62.50 19.04 55.00 33.75
12+232.00 BADENES 30 10 0.25 21.94 0.00 8x5x6 4x5x3 5,497.80 932.20 794.15 40.00 61.88 75.00 21.84 80.00 40.50
13+726.00 BADENES 30 10 0.25 21.94 0.00 8x5x6 4x5x3 5,497.80 932.20 794.15 40.00 61.88 75.00 21.84 80.00 40.50
15+710.00 BADENES 20 10 0.25 16.31 0.00 4x5x6 4x5x4 3,665.20 696.20 496.38 27.50 45.75 50.00 16.24 50.00 27.00
20+785.00 BADENES 20 10 0.25 16.31 0.00 4x5x6 4x5x4 3,665.20 696.20 496.38 27.50 45.75 50.00 16.24 50.00 27.00
21+050.00 BADENES 40 10 0.25 27.56 0.00 12 x 5 x 6 4x5x2 7,330.40 1,168.20 1,091.93 54.75 78.00 100.00 27.44 110.00 54.00
22+860.00 BADENES 20 10 0.25 16.31 0.00 4x5x6 4x5x4 3,665.20 696.20 496.38 27.50 45.75 50.00 16.24 50.00 27.00
23+304.00 BADENES 20 10 0.25 16.31 0.00 4x5x6 4x5x4 3,665.20 696.20 496.38 27.50 45.75 50.00 16.24 50.00 27.00
23+507.00 BADENES 25 10 0.25 19.13 0.00 4x5x6 4 x 5 x 6.5 4,581.50 814.20 539.39 31.25 53.25 62.50 19.04 55.00 33.75
23+738.00 BADENES 25 10 0.25 19.13 0.00 4x5x6 4 x 5 x 6.5 4,581.50 814.20 539.39 31.25 53.25 62.50 19.04 55.00 33.75
26+355.00 BADENES 30 10 0.25 21.94 0.00 8x5x6 4x5x3 5,497.80 932.20 794.15 40.00 61.88 80.00 21.84 80.00 40.50
30+845.00 BADENES 20 10 0.25 16.31 0.00 4x5x6 4x5x4 3,665.20 696.20 496.38 27.50 45.75 50.00 16.24 50.00 27.00
38+821.00 BADENES 20 10 0.25 16.31 0.00 4x5x6 4x5x4 3,665.20 696.20 496.38 27.50 45.75 50.00 16.24 50.00 27.00
39+388.00 BADENES 15 10 0.25 13.5 0.00 4x5x6 4 x 5 x 1.5 2,748.90 578.20 450.69 23.75 38.25 37.50 13.44 45.00 20.25
39+840.00 BADENES 20 10 0.25 16.31 0.00 4x5x6 4x5x4 3,665.20 696.20 496.38 27.50 45.75 50.00 16.24 50.00 27.00
40+965.00 BADENES 15 10 0.25 13.5 0.00 4x5x6 4 x 5 x 1.5 2,748.90 578.20 450.69 23.75 38.25 37.50 13.44 45.00 20.25
TOTAL 500 392.63 0.00 91,630.00 16,732.40 12,571.28 682.25 1,103.27 1,267.50 390.88 1,280.00 675.00

ADECUACIN Y ACTUALIZACIN DE LOS ESTUDIOS DEFINITIVOS DE INGENIERIA PARA LA REHABILITACIN Y MEJORAMIENTO DE LA CARRETERA: PUENTE PAUCARTAMBO OXAPAMPA.
HOJA DE METRADOS
04.00.00 OBRAS DE ARTE Y DRENAJE
04.07.00 BADENES
04.07.01 EXCAVACION PARA ESTRUCTURAS 04.07.03 BASE (e=0.15 m.) minimo 04.07.04 ENCOFRADO Y DESENCOFRADO
04.07.05 ACERO DE REFUERZO
04.07.06 CONCRETO f`y= 245 kg / cm2

EXCAVACION EXCAVACION RELLENO PAOS ACERO (kg) ENCOFRADO (m2) CONCRETO f'c=245 (m3) JUNTAS AFIRMADO (M3) Aliv. Piedra Piedra Grande
PROGRESIVA DESCRIPCION LARGO ANCHO ALTO
(manual ua) m3 (con equipo) m3 5x6 5 x Var. LOSA UA Barra Lisa LOSA UA LOSA UA (ml) e=0.15 (min) Emboquillada m2 con Mortero m2
2+518.00 BADENES 20 10.5 0.25 16.59 22.2 0.00 4 x 5.25 x 6 4 x 5 .25x 4 3,665.20 708.00 512.06 28.13 46.50 52.53 16.52 51.50 112.30 70 120
5+589.00 BADENES 15 10 0.25 13.5 249 0.00 4x5x6 4 x 5 x 1.5 2,675.80 578.20 450.69 23.75 38.25 37.50 13.44 45.00 34.11 157.5 0
5+715.00 BADENES 20 10 0.25 16.31 32.6 0.00 4x5x6 4x5x4 3,567.73 696.20 496.38 27.50 45.75 50.00 16.24 50.00 113.00 70 120
6+184.00 BADENES 30 10 0.25 21.94 705.3 0.00 8x5x6 4x5x3 5,351.60 932.20 794.15 40.00 61.88 75.00 21.84 80.00 85.50 315 0
7+675.00 BADENES 25 11 0.25 19.69 139.5 0.00 4x5x6 4 x 5 x 6.5 4,459.67 837.80 414.40 31.25 54.75 62.50 19.60 58.00 74.75 175 150
8+386.00 BADENES 15 10 0.25 13.5 238.95 0.00 4x5x6 4 x 5 x 1.5 2,675.80 578.20 450.69 23.75 38.25 50.00 13.44 45.00 47.85 105 120
10+277.00 BADENES 25 10 0.25 19.13 282.5 0.00 4x5x6 4 x 5 x 6.5 4,459.67 814.20 539.39 31.25 53.25 62.50 19.04 55.00 59.85 262.5 0
12+232.00 BADENES 30 10 0.25 21.94 200.4 0.00 8x5x6 4x5x3 5,351.60 932.20 794.15 40.00 61.88 75.00 21.84 80.00 61.20 210 180
13+726.00 BADENES 30 11 0.25 22.5 178.5 0.00 8 x 5.5 x 6 4 x 5.5 x 3 5,497.80 955.80 846.42 41.75 63.38 82.50 22.40 85.00 67.50 210 180
15+710.00 BADENES 20 11 0.25 16.88 725.2 0.00 4 x 5.5 x 6 4 x 5.5 x 4 3,665.20 719.80 527.74 28.75 47.25 55.00 16.80 53.00 41.20 140 140
20+785.00 BADENES 20 10 0.25 16.31 131.4 0.00 4x5x6 4x5x4 3,567.73 696.20 496.38 27.50 45.75 50.00 16.24 50.00 40.20 175 120
21+050.00 BADENES 40 11 0.25 28.13 294.8 0.00 12 x 5.5 x 6 4 x 5.5 x 2 7,330.40 1,191.80 1,165.10 54.75 79.50 110.00 28.00 117.00 109.60 420 240
22+860.00 BADENES 20 10 0.25 16.31 303.6 0.00 4x5x6 4x5x4 3,567.73 696.20 496.38 27.50 45.75 50.00 16.24 50.00 62.60 140 120
23+304.00 BADENES 20 10 0.25 16.31 144.8 0.00 4x5x6 4x5x4 3,567.73 696.20 496.38 27.50 45.75 50.00 16.24 50.00 87.80 140 120
23+507.00 BADENES 20 11 0.25 16.88 180.2 0.00 4 x 5.5 x 6 4 x 5.5 x 6.5 4,581.50 719.80 527.74 28.75 47.25 68.75 16.80 53.00 54.00 140 120
23+738.00 BADENES 25 10 0.25 19.13 168.25 0.00 4x5x6 4 x 5 x 6.5 4,459.67 814.20 539.39 31.25 53.25 62.50 19.04 55.00 129.00 175 150
26+355.00 BADENES 30 11 0.25 22.5 86.7 0.00 8 x 5.5 x 6 4 x 5.5 x 3 5,497.80 955.80 846.42 41.75 63.38 88.00 22.40 85.00 60.39 420 0
30+845.00 BADENES 20 11 0.25 16.88 648.8 0.00 4 x 5.5 x 6 4 x 5.5 x 4 3,665.20 719.80 527.74 28.75 47.25 55.00 16.80 53.00 52.16 140 120
38+821.00 BADENES 20 11 0.25 16.88 156.4 0.00 4 x 5.5 x 6 4 x 5.5 x 4 3,665.20 719.80 527.74 28.75 47.25 55.00 16.80 53.00 40.20 210 0
39+388.00 BADENES 15 11 0.25 14.06 114.45 0.00 4 x 5.5 x 6 4 x 5.5 x 1.5 2,748.90 601.80 482.05 25.00 39.75 41.25 14.00 48.00 29.90 210 0
39+840.00 BADENES 20 10 0.25 16.31 48 0.00 4x5x6 4x5x4 3,567.73 696.20 496.38 27.50 45.75 50.00 16.24 50.00 34.64 350 0
40+965.00 BADENES 15 10 0.25 13.5 33.75 0.00 4x5x6 4 x 5 x 1.5 2,675.80 578.20 450.69 23.75 38.25 37.50 13.44 45.00 27.20 105 0
TOTAL 495 395.18 5,085.30 0.00 90,265.47 16,838.60 12,878.46 688.88 1,110.02 1,320.53 393.40 1,311.50 1424.94 4340.00 2000.00

ADECUACIN Y ACTUALIZACIN DE LOS ESTUDIOS DEFINITIVOS DE INGENIERIA PARA LA REHABILITACIN Y MEJORAMIENTO DE LA CARRETERA: PUENTE PAUCARTAMBO OXAPAMPA.
RESUMEN DE METRADOS - BADENES
04.07.00 BADENES

ITEM DESCRIPCION UNID CANTIDAD

MOVIMIENTO DE TIERRAS
04.07.01 Excavacin Para estructuras (equipo) m3 5,085.30
04.07.02 Excavacin Para estructuras (manual) m3 395.18
04.07.03 Base (e = 0.15 m) (minimo) m3 1424.94
04.07.04 Encofrado y Desencofrado m2 1,798.9

04.07.05 ACERO DE REFUERZO 119982.53


04.07.05.1 Acero Corrugado kg 107,104.07
04.07.05.2 Acero Liso kg 12878.46

04.07.06 Concreto f'c=245 kg/cm2 m3 1713.93

04.07.07 Juntas Asfaltica Longitudinal ml 1311.5

04.07.08 Aliviadero de Piedra Emboquillada m2 4340.00


04.07.09 Piedra Grande con Mortero m2 2000.00

ADECUACIN Y ACTUALIZACIN DE LOS ESTUDIOS DEFINITIVOS DE INGENIERIA PARA LA REHABILITACIN Y


MEJORAMIENTO DE LA CARRETERA: PUENTE PAUCARTAMBO OXAPAMPA.
351370439.xls
MUROS
PROGRESIVA AREA ENCOFRADO (m2) Piedra Acomdada JUNTAS
DESCRIPCION TIPO LARGO ANCHO ALTO LADO 1 LADO 2
INICIO FIN UA MURO MURO TAPAS TOTAL m3 (ml)
2+505.00 2+528.00 BADENES 6 23.00 3.60 6 0.7 12.37 7.03 6.12 302.45 65.35 367.80 0.00 45.45
5+705.00 5+718.00 BADENES 4 13.00 2.4 4 0.7 5.28 5.02 4.02 117.52 17.94 135.46 0.00 10.64
8+375.00 8+388.00 BADENES 2 13.00 1.3 2 1.55 2.01 2.07 53.04 4.65 57.69 0.00 4.78
15+700.00 15+710.00 BADENES 2 10.00 1.3 2 1.55 2.01 2.07 40.80 4.65 45.45 0.00 4.78
22+844.00 22+865.00 BADENES 3 21.00 2 3 3.45 3.01 3.06 127.47 17.25 144.72 0.00 21.81
23+294.00 23+307.00 BADENES 4 13.00 2.4 4 0.7 5.28 5.02 4.02 117.52 17.94 135.46 0.00 10.64
23+725.00 23+745.00 BADENES 3 20.00 2 3 3.45 3.01 3.06 121.40 13.80 135.20 0.00 14.54
30+830.00 30+853.00 BADENES 6 23.00 3.6 6 0.7 12.37 7.03 6.12 302.45 65.35 367.80 0.00 45.45

TOTAL 136.00 1,389.58 0.00 158.09


(*) Los Muros Badenes no cuentan con Aliviaderos de piedra emboquillada se les colocar piedra acomodada
100000

90000

80000

70000 LARGO
ANCHO
60000 ALTO
EXCAVACION (manual ua) m3
50000 RELLENO m3
PAOS 5 x 6
40000 5 x Var.
ACERO (kg) LOSA
30000 UA
Barra Lisa
20000 ENCOFRADO (m2) LOSA
UA
10000 CONCRETO f'c=245 (m3) LOSA
UA
JUNTAS (ml)
0
AFIRMADO (M3) e=0.15 (min)

TOTAL
BADENES

BADENES

BADENES

BADENES
BADENES

BADENES
BADENES
BADENES

BADENES
BADENES
BADENES

BADENES
BADENES
BADENES
BADENES
BADENES
BADENES
BADENES
BADENES

BADENES
BADENES
BADENES
2+518.00
5+589.00
5+715.00
6+184.00
7+675.00
8+386.00
10+277.00
12+232.00
13+726.00
15+710.00
20+785.00
21+050.00
22+860.00
23+304.00
23+507.00
23+738.00
26+355.00
30+845.00
38+821.00
39+388.00
39+840.00
40+965.00