V= 5.544+05535
V= 6.0975 m3
Fc= 210 Kg/cm2
AGREGADO-DESCRIPCIN M3 Baldes
ARENA=6.0975X0.52 3.1707=3.2 179.2
GRAVA=6.0975X0.53 3.231675=3.2 179.2
CEMENTO=6.0975X9.73 1.6828=59.33 Bolsas 94.08
AGUA=6.0975X0.186 1.134135 63.28
Arena= 3.5 m3
Grava= 3.5 m3
Cemento= 60 Bolsas
Agua=1130 Litros
1
CONSTRUCCIN DE EDIFICACIONES
2. VIGA DE CIMENTACIN
EJE 1
Datos
A= 0.20x0.25=0.05 m2
L=8.875 m
V= 0.20x0.25x8.875
V= 0.444 m3
Fc= 210 Kg/cm2
AGREGADO-DESCRIPCIN M3 Baldes
ARENA=0.444X0.52 0.23 12.88
PIEDRA=0.444X0.53 0.24 13.44
CEMENTO=0.444X9.73 0.12=4.32 Bolsas 6.832
AGUA=0.444X0.186 0.08 4.48
EJE 2
Datos
A= 0.20x0.25=0.05 m2
L=8.875 m
V= 0.20x0.25x8.875
V= 0.444 m3
Fc= 210 Kg/cm2
AGREGADO-DESCRIPCIN M3 Baldes
ARENA=0.444X0.52 0.23 12.88
PIEDRA=0.444X0.53 0.24 13.44
CEMENTO=0.444X9.73 0.12=4.32 Bolsas 6.832
AGUA=0.444X0.186 0.08 4.48
EJE 3
A= 0.20X0.25= 0.05 M2
L= 6.125 M
V= 0.20X0.25X6.125
V=0.306 M3
AGREGADO-DESCRIPCIN M3 Baldes
ARENA=0.336X0.52 0.159 8.904
PIEDRA=0.306X0.53 0.162 9.072
CEMENTO=0.306X9.73 0.08=2.98 Bolsas 4.48
AGUA=0.306X0.186 0.057 3.192