OFICINA DE INGENIERA JUAN JOS IBEZ

R1 R2 ZUNCHO 30x30, CON 412 Av. Torreblanca 2-8, 2C, Sant Cugat del Valls
E=16/20 o 15 (Segn A1) Tf. 93 590 70 76, Fax 93 590 73 32 (Socio N 25)
www.jji-ingenieria.com / jji@arrakis.es
HORMIGONADO CONTRA TIERRA
(SIN JUNTAS)
FORJADO ASOCIACIN DE
RECUBRIMIENTO 1: 70 mm CONSULTORES DE ESTRUCTURAS
RECUBRIMIENTO 2: 35 mm

H(m) B(m) A1 A2 A3 A4 LA1 LA2 ACERO HORMIGN H. POBRE


A1 A3 MALLA
ESPECIFICACIONES CIMENTACIN:
H<=3.00 1.20 112/20 110/20 110/20 112/20 60 cm 40 cm 80 Kp/m 1.86 m/m 0.12 m/m
PAV. GARAJE
70 cm 40 cm 104 Kp/m 2.09 m/m 0.13 m/m
- Resistencia terreno ........: 3.00 Kp/cm
H<=3.50 1.30 116/20 110/20 110/20 112/20 - Peso especfico terreno ....: 2.06 Tn/m
A2 7 - ngulo rozamiento ..........: 27 Grados
H<=4.00 1.60 120/15 110/20 110/15 112/20 80 cm 50 cm 193 Kp/m 2.48 m/m 0.16 m/m - ngulo de talud ............: 0 Grados
A4

0.80
- Cohesin terreno ...........: ---- Kp/cm
H<=4.50 2.00 125/15 112/20 112/15 112/20 100 cm 50 cm 299 Kp/m 2.95 m/m 0.20 m/m - Nivel fretico .............: ---- m

0.35
H
- MATERIALES:

3.5
HORMIGN DE LIMPIEZA 10 cm
- Acero B-500S ............fyk= 500 N/mm2
LADO x LADO - Hormign ...................= HA-25/B/20/IIa
DETALLE MUROS A
- TIPO DE CONTROL:
- Ejecucin ..................: Normal
DETALLE ZAPATA - Hormign ...................:
- Acero ......................:
Estadstico
Normal
Anclaje 1 (LA1)

- Tolerancias ................: Anejo 10, EHE


Anclaje 2

- SEGURIDAD:
(LA2)

PAV. GARAJE - Cf. mayoracin cargas libres: 1.60


ESTUDIAR NECESIDADES - Cf. mayoracin cargas fijas.: 1.50
0.20

DE DRENAJE - Cf. minoracin hormign ....: 1.50


- Cf. minoracin acero .......: 1.15
- PATILLAS: ...................................: 0.35 m
110/20 RECUBRIMIENTOS AMBIENTE IIa
0.80

Recubrimiento lado exento ....: 35 mm


A1 Recubrimiento lado tierras ...: 70 mm
CANTO ZAPATAS (No indicadas) .: 0.80 m
CANTO LOSA ...............................: ----- m

LAD O -B-
HORMIGN LIMPIEZA 10 cm

0.30 RECUBRIMIENTO 1: 70 mm
RECUBRIMIENTO 2: 35 mm

R1

R1

R1
LAD O -A-
BASE (B)

SUP. 629 m2
PILARES 1 2 3 4 R1
1.401.40
#16/20 1.201.20 1.101.10 1.101.10
#16/20 #16/20 #16/20
1.202.30 5
#16/20

MURETE
LOSA RE
LL

R3
EN
O

6 7 8 9 10
1.302.60
#16/15
11 R1
2.402.40 2.402.40 2.502.50 2.502.50 2.302.30 RECUBRIMIENTO 1: 35 mm
#16/20
28 #16/15 #16/15 #16/15 #16/15 RECUBRIMIENTO 2: 70 mm
0.801.60
1.5

ZUNCHO 30x30, CON


#16/20 5
2

R1 R2
1.4
R4

412, E=16/20
FORJA
DO RA
1.1

5 MP A
CUANTAS ZAPATAS + RIOSTRAS: 1.4 12
5 2

19 SOLER
R1

A EN R
- ACERO ......: 5571 Kp A MP A
1.2

30
R4

- HORMIGN ...: 121.50 m


55

- H. POBRE ...: 24.66 m 1.501.50 29 CUANTAS / M:


#16/15 1.001.00 3.802.90 POZO H.POBRE - ACERO ......: 50 Kp/m
#16/20 #20/15 14 15 HASTA N. FOSO
16 17 - HORMIGN: 1.08 m/m
110/20
R1
1.0

- H. POBRE ..: 0.10 m/m


R6
4

4
0.9 2.302.30
0.5

3.003.000.90 2.902.900.90 2.902.900.90 #16/20

H <= 1.6 m
2

25 #20/15 #16/15 110/20


1.3 #16/15
0.8

0.4
3 5 31
4

112/20

20 18 ZAPATA A
112/20
2.402.70 2.602.60
#16/15 #16/20 NIVEL FOSO SOLERA
3.301.70 110/20
#20/15
R2

R5
2.102.10 2.202.20 2.402.40 2.302.30
1.901.90 1.901.90

0.35
#16/20 #16/20 #16/15 #16/20 112/20
#16/20 #16/20 110/20

0.60
R1 112/20
DETALLE RIOSTRAS
21 22 23 24 25 26 27
SOLAPE BARRAS 40

2.701.40
R1

R1

R1

R1

R1
#16/15 HORMIGN DE LIMPIEZA 10 cm

1 2 3 4 1 DETALLE MURETE 0.30

3.5 4 1.00
0.35

7
H

7 7 3
0.35

3.5

HORMIGON LIMPIEZA 10 cm 2
B

ARMADURAS
RIOSTRA BxH
1 2 3 4

R1 40x40 316 316 212 E:18/20

SECCIN FOSO ASCENSOR


R2 40x80 325 312 410 E:18/30

20
R3 40x80 325 316 412 E:18/30

25
20 4
R4 60x80 425 612 410 E:18/30
PATILLAS 9 CM
PROYECTO:
EJECUCIN DE EDIFICIO PLURIFAMILIAR
R5 60x80 525 612 410 E:18/20 SEPARADORES 6 3 DE 15 VIVIENDAS
EN OBRA (H)

(/40 CM HORIZON.)
112/20 cms. (/15 CM VERTICAL)
112/20 3 SITUACIN: CALLE TRAMUNTANA N 8
R6 80x80 DC1025 716 412 E:28/15
RIPOLLET (BARCELONA)
30 24
24

7 3 18/15 cms.
7
(Zona foso)
NOTA: DC ( DOBLE CAPA), DISPONER LAS BARRAS EN CONTACTO, UNA BAJO
#12/20 7
OFICINA INGENIERA DESIGNACIN:

CIMENTACIN
LA OTRA, ATADAS CADA METRO DE LARGO, LA 1 CON PATILLAS. 112/20 18/15 JUAN JOS IBEZ
0.60

# INDICADA TORREBLANCA 2-8, 2C


0.35

SANT CUGAT DEL VALLS


ARRANQUE CAJA ASCENSOR DE HORMIGN DETALLE SOLAPES EN ESQUINA TLF. 93 590 7076
0.35

<=1 m. <=1 m. <=1 m. <=1 m. <=1 m. <=1 m.


3.5 FAX 93 590 7332
HORMIGON LIMPIEZA 10 cm www.jji-ingenieria.com ESCALA: FECHA: FEBRERO 2003 PLANO Nro.
jji@arrakis.es 1 : 100
COTAS EN PLANTA
CUADRO DE RIOSTRAS
E1/18
INGENIERO: PROMOTOR:

REF.
SORIANO CATALANA DE PROMOCIONES S.L. 0098