OBRA: CIVIL CONSTRUCTION SERVICES

NUTRIAS AND JOBO RIVER FOR THE PROJE


Fecha:
PLANT FOR RBS

SEMANA N
RESUMEN % ACTIVIDADES CON DESVIACION

RESUMEN % COMPARATIVO

PLAN

REAL

DESVIACION

%PESO

%DP

% PERDIDO
(FUERZA MAYOR)
ACUMULADO

ENGINEERING
Bathymetric Study

22
28

Navigation Study for River


Transportation Purposes

Err:504

Err:504

Err:504

Err:504

Err:504

Err:504

Err:504

Err:504

Err:504

Err:504

Err:504

Err:504

100.00%

100.00%

0.00%

Err:504

Err:504

Err:504

Err:504

Err:504

Err:504

PERMITS
34

Navigation Permits
CONSTRUCTION

52
56

Slab concrete construction


Dredging Works

Actividades Preliminares JOBO River By


61
Pass

Err:504
15.82%

ON SERVICES AGREEMENT OF PUERTO


OR THE PROJECT NAMED 100 MW POWER
20 de junio de 2015
ANT FOR RBSI

#REF!
% RECUPERADO HE Y FINES DE
SEMANA

av FII
###

###
###

###
###
###
###
###
###
###
###
###
###
###
###
###
###

###
###
###

TAREAS SEGN EL PROJECT DE ALE


Nombre de tarea
Transporte Fluvial: Cabruta - Pto Nutrias
PREPARACION
Depto de Ingeniera
Planos
Planos de Fabricacin - Rampas
Planos de Montaje - Seafasting
Planos de Operacin - Load in / Load out
Procedimiento
Preparacin Procedimiento de Ejecucin
Entrega de Procedimiento de Ejecucin para Revisin
Emisin Procedimiento de Ejecucin Final
Packing list
Emisin Packing List Preliminar
Revisiones Packing List
Emisin Final Packing List
Depto de HSQE
Programa de Seguridad e Higiene
Preparacin Programa de Seguridad e Higiene
Revisin Cliente Programa de Seguridad e Higiene
Aprobacion del Programa de Seguridad e Higiene Final
Depto de Operaciones
Verificacion de Equipos Existentes
Nuevas compras (Local)
Presupuesto de Nuevas Compras
Emisin OC
Fabricaciones Menores / Compras
Compras Menores
Envos a Obra
Movilizacion de Equipos
Preparacion de Modulos
Carga de Equipos / Envio a Obra (Cabruta)
Preparacion de Barcazas
Movilizar soporte
Colocacion de Soporte sobre Barcazas
Trabajos de Defensas en el Maria Nieves
Desarrollo de la ingenieria Preliminar
Desarrollo de Planos de Fabricacion
Fabricacion de Estructura
Instalacion de Estructura sobre el Maria Nieves
EJECUCION
Acopio de Equipos
Configuracion de Modulos
Navegacion de Alianza a Cabruta
Trabajos de Adecuacion de Rampas en Cabruta
Trabajos de Adecuacion en Puerto Nutria

Preparacion para Carga


1er Ciclo de Navegacion Motor #1-#2-#3 Cabruta - P. Nutria
Atraque // Mooring // Pre lastrado - CPM 45
Preparacion de Rampas
Load Out motor # 1
Sea Fastning
Stand by
Atraque // Mooring // Pre lastrado - CPM 46
Preparacion de Rampas
Load Out motor # 2
Sea Fastning
Stand by
Atraque // Mooring // Pre lastrado - JACK
Preparacion de Rampas
Load Out motor # 3
Sea Fastning
Navegacion Cabruta - San Fernando - Motor #1 - #2 - #3
Paso del Maria Nieves
Navegacion San Fernando - P. Nutria
Atraque // Mooring // Pre lastrado - CPM 45
Preparacion de Rampas
Retiro de Sea Fastning
Load In Motor # 1
Atraque // Mooring // Pre lastrado - CPM 45
Preparacion de Rampas
Retiro de Sea Fastning
Load In Motor # 2
Atraque // Mooring // Pre lastrado - CPM 45
Preparacion de Rampas
Retiro de Sea Fastning
Load In Motor # 3
Retorno: Pto Nutrias - San Fernando - CPM 45- CPM 46 - JACK
Paso del Maria Nieves
Retorno: San Fernando - Cabruta - CPM 45- CPM 46 - JACK
2do Ciclo de Navegacion Motor #4-#5-#6 Cabruta - P. Nutria
Atraque // Mooring // Pre lastrado - CPM 45
Preparacion de Rampas
Load Out motor # 4
Sea Fastning
Stand by
Atraque // Mooring // Pre lastrado - CPM 46
Preparacion de Rampas
Load Out motor # 5
Sea Fastning
Stand by
Atraque // Mooring // Pre lastrado - JACK
Preparacion de Rampas
Load Out motor # 6

Sea Fastning
Navegacion Cabruta - San Fernando - Motor #4 - #5 - #6
Paso del Maria Nieves
Navegacion San Fernando - P. Nutria
Atraque // Mooring // Pre lastrado - CPM 45
Preparacion de Rampas
Retiro de Sea Fastning
Load In Motor # 4
Atraque // Mooring // Pre lastrado - CPM 45
Preparacion de Rampas
Retiro de Sea Fastning
Load In Motor # 5
Atraque // Mooring // Pre lastrado - CPM 45
Preparacion de Rampas
Retiro de Sea Fastning
Load In Motor # 6
Retorno: Pto Nutrias - Cabruta - CPM 45- CPM 46 - JACK
Paso del Maria Nieves
Retorno: San Fernando - Cabruta - CPM 45- CPM 46 - JACK
Retorno: Cabruta - P. Ordaz - CPM 45- CPM 46 - JACK

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44

TAREAS RESUMIDAS PARA LA BASE DE DATOS


Planos (fabricacin-montaje-operacin)
Procedimiento (Preparacin-Entrega-Emisin)
Packing list (Emisin-Revisiones-Emisin Final)
Programa de SHA (Preparacin-Revisin Cliente-Aprobacin)
Operaciones (Verificacin de Equip. Existentes)
Nuevas compras (Presupuesto-Emisin OC-Fabricacin y compras menores-envos a obra)
Movilizacin de Equip. (Preparacin Mdulos-Carga de Equip./envo a Obra Cabruta)
Preparacin de Barcazas (Movilizar y Colocar Soporte s/Barcazas)
Trabajos de Defensas Puente Ma. Nieves (Ingenier{ia-Planos-Fabric. Estruct.-Instalacin)
Acopio de Equipos
Configuracin de Mdulos
Navegacin Alianza a Cabruta
Trabajo de Adecuacin de Rampas en Cabruta
Trabajos de Adecuacin en Puerto Nutrias
Preparacin para carga
Atraque // Mooring // Pre lastrado - CPM 45 (Load Out Motor # 1)
Atraque // Mooring // Pre lastrado - CPM 46 (Load Out Motor # 2)
Atraque // Mooring // Pre lastrado - RO MANAMO (Load Out Motor # 3)
Navegacion Cabruta - San Fernando - Motor #1 - #2 - #3
Paso del Puente Mara Nieves
Navegacion San Fernando - Puerto Nutria
Atraque // Mooring // Pre lastrado - CPM 46 (Load In Motor # 1)
Atraque // Mooring // Pre lastrado - CPM 46 (Load In Motor # 2)
Atraque // Mooring // Pre lastrado - RO MANAMO (Load In Motor # 3)
Retorno: Pto Nutrias - San Fernando - CPM 45 - CPM 46 - RO MANAMO
Paso del Puente Maria Nieves
Paso del 1er. Grupo de Cables
Paso del 2do. Grupo de Cables
Retorno: San Fernando - Cabruta - CPM 45- CPM 46 - RO MANAMO
Atraque // Mooring // Pre lastrado - CPM 45 (Load Out Motor # 4)
Atraque // Mooring // Pre lastrado - CPM 46 (Load Out Motor # 5)
Atraque // Mooring // Pre lastrado - RO MANAMO (Load Out Motor # 6)
Navegacion Cabruta - San Fernando - Motor #4 - #5 - #6
Paso del Puente Mara Nieves
Paso del 1er. Grupo de Cables
Paso del 2do. Grupo de Cables
Navegacion San Fernando - Puerto Nutria
Atraque // Mooring // Pre lastrado - CPM 46 (Load In Motor # 4)
Atraque // Mooring // Pre lastrado - CPM 46 (Load In Motor # 5)
Atraque // Mooring // Pre lastrado - RO MANAMO (Load In Motor # 6)
Retorno: Pto Nutrias - San Fernando - CPM 45 - CPM 46 - RO MANAMO
Paso del Puente Maria Nieves
Retorno: San Fernando - Cabruta - CPM 45- CPM 46 - RO MANAMO
Retorno: Cabruta - P. Ordaz - CPM 45- CPM 46 - JACK

Pesos

% de avance/activ.

42 dias

100%

42 dias

100%

49 dias

100%

42 dias

100%

35 dias

73%

56 dias

85%

14 das

45%

14 dias

30%

46 dias

53%

4 dias

0%

3 dias

0%

7 dias

21

dias

21 dias

0%

35%

0%

1 dias

0%

9 das

0%

6 dias

0%

3 dias

0%

3 dias

0%

1 dias

1 dias

0%

1 dias

0%

2 dias

0%

3 dias

0%

3 dias

0%

3 dias

0%

2 dias

0%

1 dias

0%

2 dias

0%

9 dias

0%

6 dias

0%

3 dias

0%

3 dias

0%

1 dias

0%

1 dias

0%

1 dias

0%

2 dias

0%

3 dias
0%

3 dias
0%

3 dias

0%

2 dias

0%

1 dias

0%

2 dias

0%

3 dias

480

0%

total proyecto
Total avance
TRANSPORTE FLUVIAL: CABRUTA - PUERTO NUTRIAS
PREPARACIN DPTO. DE INGENIERA
Planos (fabricacin-montaje-operacin)
AVANCE
PERIODO
ACUMULADO
ACUMULADO VALOR ABSOLUTO
PERIODO VALOR ABSOLUTO
Procedimiento (Preparacin-Entrega-Emisin)
PERIODO
ACUMULADO
ACUMULADO VALOR ABSOLUTO
PERIODO VALOR ABSOLUTO
Packing list (Emisin-Revisiones-Emisin Final)
PERIODO
ACUMULADO
ACUMULADO VALOR ABSOLUTO
PERIODO VALOR ABSOLUTO

Programa de SHA (Preparacin-Revisin Cliente-Aprobacin)


PERIODO
ACUMULADO
ACUMULADO VALOR ABSOLUTO
PERIODO VALOR ABSOLUTO
Operaciones (Verificacin de Equip. Existentes)
PERIODO
ACUMULADO
ACUMULADO VALOR ABSOLUTO
PERIODO VALOR ABSOLUTO
Nuevas compras (Presupuesto-Emisin OC-Fabricacin y compras menores-envos a obra)
PERIODO
ACUMULADO
ACUMULADO VALOR ABSOLUTO
PERIODO VALOR ABSOLUTO
Movilizacin de Equip. (Preparacin Mdulos-Carga de Equip./envo a Obra Cabruta)
PERIODO
ACUMULADO

ACUMULADO VALOR ABSOLUTO


PERIODO VALOR ABSOLUTO
Preparacin de Barcazas (Movilizar y Colocar Soporte s/Barcazas)
PERIODO
ACUMULADO
ACUMULADO VALOR ABSOLUTO
PERIODO VALOR ABSOLUTO
Trabajos de Defensas Puente Ma. Nieves (Ingeniera-Planos-Fabric. Estruct.-Instalacin)
PERIODO
ACUMULADO
ACUMULADO VALOR ABSOLUTO
PERIODO VALOR ABSOLUTO
EJECUCIN
Acopio de Equipos
PERIODO
ACUMULADO
ACUMULADO VALOR ABSOLUTO
PERIODO VALOR ABSOLUTO
Configuracin de Mdulos

PERIODO
ACUMULADO
ACUMULADO VALOR ABSOLUTO
PERIODO VALOR ABSOLUTO
Navegacin Alianza a Cabruta
PERIODO
ACUMULADO
ACUMULADO VALOR ABSOLUTO
PERIODO VALOR ABSOLUTO
Trabajo de Adecuacin de Rampas en Cabruta
PERIODO
ACUMULADO
ACUMULADO VALOR ABSOLUTO
PERIODO VALOR ABSOLUTO
Trabajos de Adecuacin en Puerto Nutrias
PERIODO
ACUMULADO
ACUMULADO VALOR ABSOLUTO
PERIODO VALOR ABSOLUTO

Preparacin Para Carga


PERIODO
ACUMULADO
ACUMULADO VALOR ABSOLUTO
PERIODO VALOR ABSOLUTO
EMBARQUE 1er Ciclo de Navegacion Motor #1-#2-#3 Cabruta - P. Nutria
Atraque // Mooring // Pre lastrado - CPM 45 (Load Out Motor # 1)
PERIODO
ACUMULADO
ACUMULADO VALOR ABSOLUTO
PERIODO VALOR ABSOLUTO
Atraque // Mooring // Pre lastrado - RO MANAMO (Load Out Motor # 2)
PERIODO
ACUMULADO
ACUMULADO VALOR ABSOLUTO
PERIODO VALOR ABSOLUTO
Atraque // Mooring // Pre lastrado - CPM 46 (Load Out Motor # 3)
PERIODO

ACUMULADO
ACUMULADO VALOR ABSOLUTO
PERIODO VALOR ABSOLUTO
Navegacion Cabruta - San Fernando - Motor #1 - #2 - #3
PERIODO
ACUMULADO
ACUMULADO VALOR ABSOLUTO
PERIODO VALOR ABSOLUTO
Paso del Puente Mara Nieves
PERIODO
ACUMULADO
ACUMULADO VALOR ABSOLUTO
PERIODO VALOR ABSOLUTO
Paso del 1er. Grupo de Cables
PERIODO
ACUMULADO
ACUMULADO VALOR ABSOLUTO
PERIODO VALOR ABSOLUTO
Paso del 2do. Grupo de Cables

PERIODO
ACUMULADO
ACUMULADO VALOR ABSOLUTO
PERIODO VALOR ABSOLUTO
Navegacion San Fernando - Puerto Nutria
PERIODO
ACUMULADO
ACUMULADO VALOR ABSOLUTO
PERIODO VALOR ABSOLUTO
DESEMBARQUE 1er Ciclo de Navegacion Motor #1-#2-#3 Cabruta - P. Nutria
Atraque // Mooring // Pre lastrado - CPM 45 (Load In Motor # 1)
PERIODO
ACUMULADO
ACUMULADO VALOR ABSOLUTO
PERIODO VALOR ABSOLUTO
Atraque // Mooring // Pre lastrado - RO MANAMO (Load In Motor # 2)
PERIODO
ACUMULADO
ACUMULADO VALOR ABSOLUTO

PERIODO VALOR ABSOLUTO


Atraque // Mooring // Pre lastrado - CPM 46 (Load In Motor # 3)
PERIODO
ACUMULADO
ACUMULADO VALOR ABSOLUTO
PERIODO VALOR ABSOLUTO
Retorno: Pto Nutrias - San Fernando - CPM 45 - RO MANAMO - CPM 46
PERIODO
ACUMULADO
ACUMULADO VALOR ABSOLUTO
PERIODO VALOR ABSOLUTO
Paso del Puente Maria Nieves
PERIODO
ACUMULADO
ACUMULADO VALOR ABSOLUTO
PERIODO VALOR ABSOLUTO
Retorno: San Fernando - Cabruta - CPM 45- RO MANAMO - CPM 46
PERIODO

ACUMULADO
ACUMULADO VALOR ABSOLUTO
PERIODO VALOR ABSOLUTO
EMBARQUE 2do. Ciclo de Navegacion Motor #4-#5-#6 Cabruta - P. Nutria
Atraque // Mooring // Pre lastrado - CPM 45 (Load Out Motor # 4)
PERIODO
ACUMULADO
ACUMULADO VALOR ABSOLUTO
PERIODO VALOR ABSOLUTO
Atraque // Mooring // Pre lastrado - RO MANAMO (Load Out Motor # 5)
PERIODO
ACUMULADO
ACUMULADO VALOR ABSOLUTO
PERIODO VALOR ABSOLUTO
Atraque // Mooring // Pre lastrado - CPM 46 (Load Out Motor # 6)
PERIODO
ACUMULADO
ACUMULADO VALOR ABSOLUTO
PERIODO VALOR ABSOLUTO

Navegacion Cabruta - San Fernando - Motor #4 - #5 - #6


PERIODO
ACUMULADO
ACUMULADO VALOR ABSOLUTO
PERIODO VALOR ABSOLUTO
Paso del Puente Mara Nieves
PERIODO
ACUMULADO
ACUMULADO VALOR ABSOLUTO
PERIODO VALOR ABSOLUTO
Paso del 1er. Grupo de Cables
PERIODO
ACUMULADO
ACUMULADO VALOR ABSOLUTO
PERIODO VALOR ABSOLUTO
Paso del 2do. Grupo de Cables
PERIODO
ACUMULADO
ACUMULADO VALOR ABSOLUTO

PERIODO VALOR ABSOLUTO


Navegacion San Fernando - Puerto Nutria
PERIODO
ACUMULADO
ACUMULADO VALOR ABSOLUTO
PERIODO VALOR ABSOLUTO
DESEMBARQUE 2do Ciclo de Navegacion Motor #4-#5-#6 Cabruta - P. Nutria
Atraque // Mooring // Pre lastrado - CPM 45 (Load In Motor # 4)
PERIODO
ACUMULADO
ACUMULADO VALOR ABSOLUTO
PERIODO VALOR ABSOLUTO
Atraque // Mooring // Pre lastrado - RO MANAMO (Load In Motor # 5)
PERIODO
ACUMULADO
ACUMULADO VALOR ABSOLUTO
PERIODO VALOR ABSOLUTO
Atraque // Mooring // Pre lastrado - CPM 46 (Load In Motor # 6)

PERIODO
ACUMULADO
ACUMULADO VALOR ABSOLUTO
PERIODO VALOR ABSOLUTO
Retorno: Pto Nutrias - San Fernando - CPM 45 - RO MANAMO - CPM 46
PERIODO
ACUMULADO
ACUMULADO VALOR ABSOLUTO
PERIODO VALOR ABSOLUTO
Paso del Puente Maria Nieves
PERIODO
ACUMULADO
ACUMULADO VALOR ABSOLUTO
PERIODO VALOR ABSOLUTO
Retorno: San Fernando - Cabruta - CPM 45- RO MANAMO -CPM 46
PERIODO
ACUMULADO
ACUMULADO VALOR ABSOLUTO
PERIODO VALOR ABSOLUTO

Retorno: Cabruta - P. Ordaz - CPM 45- RO MANAMO - CPM 46


PERIODO
ACUMULADO
ACUMULADO VALOR ABSOLUTO
PERIODO VALOR ABSOLUTO

Das

Pesos

42

2.00%

49

49

0.50%

0.50%

3/1/2016

4/11/2016

3/1/2016

4/11/2016

100.00%

3/1/2016

4/11/2016

100.00%

4/12/2016

5/30/2016

4/12/2016

5/30/2016

100.00%

4/12/2016

5/30/2016

100.00%

3/1/2016

4/18/2016

3/1/2016

4/18/2016

100.00%

3/1/2016

4/18/2016

100.00%

49

35

56

14

1.00%

2.00%

0.50%

1.50%

4/12/2016

5/30/2016

4/12/2016

5/30/2016

100.00%

4/12/2016

5/30/2016

100.00%

3/1/2016

4/4/2016

3/1/2016

4/4/2016

100.00%

3/1/2016

4/4/2016

100.00%

4/5/2016

5/30/2016

4/5/2016

5/30/2016

100.00%

4/5/2016

5/30/2016

100.00%

5/17/2016

5/30/2016

5/17/2016

5/30/2016

100.00%

5/17/2016

5/30/2016

100.00%

14

53

2.50%

6.00%

3.00%

2.00%

5/17/2016

5/30/2016

5/17/2016

5/30/2016

100.00%

5/17/2016

5/30/2016

100.00%

4/25/2016

6/16/2016

4/25/2016

6/16/2016

100.00%

4/25/2016

6/16/2016

100.00%

5/31/2016

6/3/2016

5/31/2016

6/3/2016

100.00%

5/31/2016

6/3/2016

100.00%

6/4/2016

6/6/2016

21

21

3.00%

2.50%

2.50%

6/4/2016

6/6/2016

100.00%

6/4/2016

6/6/2016

100.00%

5/31/2016

6/6/2016

5/31/2016

6/6/2016

100.00%

5/31/2016

6/6/2016

100.00%

5/17/2016

6/6/2016

5/17/2016

6/6/2016

100.00%

5/17/2016

6/6/2016

100.00%

5/17/2016

6/6/2016

5/17/2016

6/6/2016

100.00%

5/17/2016

6/6/2016

100.00%

2.00%

3.00%

3.00%

3.00%

6/6/2016

6/6/2016

6/6/2016

6/6/2016

100.00%

6/6/2016

6/6/2016

100.00%

6/7/2016

6/15/2016

6/7/2016

6/15/2016

100.00%

6/7/2016

6/15/2016

100.00%

6/10/2016

6/15/2016

6/10/2016

6/15/2016

100.00%

6/10/2016

6/15/2016

100.00%

6/13/2016

6/15/2016

6/13/2016

6/15/2016

100.00%

3.00%

3.00%

1.00%

1.00%

6/13/2016

6/15/2016

100.00%

6/16/2016

6/18/2016

6/16/2016

6/18/2016

100.00%

6/16/2016

6/18/2016

100.00%

6/19/2016

6/19/2016

6/19/2016

6/19/2016

100.00%

6/19/2016

6/19/2016

100.00%

6/20/2016

6/20/2016

6/20/2016

6/20/2016

100.00%

6/20/2016

6/20/2016

100.00%

6/21/2016

6/21/2016

3.00%

3.00%

3.00%

6/21/2016

6/21/2016

100.00%

6/21/2016

6/21/2016

100.00%

6/22/2016

6/23/2016

6/22/2016

6/23/2016

100.00%

6/22/2016

6/23/2016

100.00%

6/24/2016

6/26/2016

6/24/2016

6/26/2016

100.00%

6/24/2016

6/26/2016

100.00%

6/27/2016

6/29/2016

6/27/2016

6/29/2016

100.00%

6/27/2016

6/29/2016

100.00%

3.00%

1.50%

1.50%

1.50%

6/30/2016

7/2/2016

6/30/2016

7/2/2016

100.00%

6/30/2016

7/2/2016

100.00%

7/3/2016

7/4/2016

7/3/2016

7/4/2016

100.00%

7/3/2016

7/4/2016

100.00%

7/5/2016

7/5/2016

7/5/2016

7/5/2016

100.00%

7/5/2016

7/5/2016

100.00%

7/6/2016

7/7/2016

7/6/2016

7/7/2016

100.00%

3.00%

3.00%

3.00%

7/6/2016

7/7/2016

100.00%

7/8/2016

7/16/2016

7/8/2016

7/16/2016

100.00%

7/8/2016

7/16/2016

100.00%

7/11/2016

7/16/2016

7/11/2016

7/16/2016

100.00%

7/11/2016

7/16/2016

100.00%

7/14/2016

7/16/2016

7/14/2016

7/16/2016

100.00%

7/14/2016

7/16/2016

100.00%

3.00%

3.00%

1.00%

1.00%

7/17/2016

7/19/2016

7/17/2016

7/19/2016

100.00%

7/17/2016

7/19/2016

100.00%

7/20/2016

7/20/2016

7/20/2016

7/20/2016

100.00%

7/20/2016

7/20/2016

100.00%

7/21/2016

7/21/2016

7/21/2016

7/21/2016

100.00%

7/21/2016

7/21/2016

100.00%

7/22/2016

7/22/2016

7/22/2016

7/22/2016

100.00%

7/22/2016

7/22/2016

100.00%

3.00%

3.00%

3.00%

3.00%

7/23/2016

7/24/2016

7/23/2016

7/24/2016

100.00%

7/23/2016

7/24/2016

100.00%

7/25/2016

7/27/2016

7/25/2016

7/27/2016

100.00%

7/25/2016

7/27/2016

100.00%

7/28/2016

7/30/2016

7/28/2016

7/30/2016

100.00%

7/28/2016

7/30/2016

100.00%

7/31/2016

8/2/2016

1.50%

1.50%

1.50%

7/31/2016

8/2/2016

100.00%

7/31/2016

8/2/2016

100.00%

8/3/2016

8/4/2016

8/3/2016

8/4/2016

100.00%

8/3/2016

8/4/2016

100.00%

8/5/2016

8/5/2016

8/5/2016

8/5/2016

100.00%

8/5/2016

8/5/2016

100.00%

8/6/2016

8/7/2016

8/6/2016

8/7/2016

100.00%

8/6/2016

8/7/2016

100.00%

501

1.50%

100.00%

8/8/2016

8/10/2016

8/8/2016

8/10/2016

100.00%

8/8/2016

8/10/2016

100.00%

42471
42471
42471
42471
42471
42471
42471
42471
42471
42471
42471

3/1/2016

3/8/2016

3/15/2016

3/22/2016

3/29/2016

4/5/2016

Sem 1

Sem 2

Sem 3

Sem 4

Sem 5

Sem 6

0.80%

1.61%

2.41%

3.22%

4.02%

4.49%

0.71%

0.99%

1.41%

1.80%

2.43%

4.10%

10

10

10

10

10

10

0.26%

0.50%

1.00%

1.30%

1.90%

2.00%

16.67%

16.67%

16.67%

16.67%

16.67%

16.67%

16.67%

33.33%

50.00%

66.67%

83.33%

100.00%

0.33%

0.67%

1.00%

1.33%

1.67%

2.00%

0.33%

0.33%

0.33%

0.33%

0.33%

0.33%

10

10

10

10

10

10

0.05%

0.05%

0.11%

0.08%

0.09%

0.06%

14.29%

14.29%

14.29%

14.29%

14.29%

14.29%

14.29%

28.57%

42.86%

57.14%

71.43%

85.71%

0.07%

0.14%

0.21%

0.29%

0.36%

0.43%

0.07%

0.07%

0.07%

0.07%

0.07%

0.07%

10

10

10

10

10

0.40%

0.44%

0.30%

0.42%

0.44%

2.00%

20.00%

20.00%

20.00%

20.00%

20.00%

0.00%

20.00%

40.00%

60.00%

80.00%

100.00%

100.00%

0.40%

0.80%

1.20%

1.60%

2.00%

2.00%

0.40%

0.40%

0.40%

0.40%

0.40%

0.00%
10
0.04%
12.50%
12.50%
0.06%
0.06%

4/12/2016

4/19/2016

4/26/2016

5/3/2016

5/10/2016

5/17/2016

Sem 7

Sem 8

Sem 9

Sem 10

Sem 11

Sem 12

4.84%

5.78%

6.73%

7.67%

8.61%

13.22%

2.35%

2.87%

3.33%

3.35%

3.66%

5.11%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

2.00%

2.00%

2.00%

2.00%

2.00%

2.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

10

10

10

10

10

10

0.06%

0.06%

0.08%

0.08%

0.10%

0.07%

14.29%

14.29%

14.29%

14.29%

14.29%

14.29%

14.29%

28.57%

42.86%

57.14%

71.43%

85.71%

0.07%

0.14%

0.21%

0.29%

0.36%

0.43%

0.07%

0.07%

0.07%

0.07%

0.07%

0.07%

0.08%

0.50%

0.50%

0.50%

0.50%

0.50%

14.29%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

0.50%

0.50%

0.50%

0.50%

0.50%

0.50%

0.07%

0.00%

0.00%

0.00%

0.00%

0.00%

10

10

10

10

10

10

10

0.15%

0.14%

0.16%

0.12%

0.10%

0.20%

14.29%

14.29%

14.29%

14.29%

14.29%

14.29%

14.29%

28.57%

42.86%

57.14%

71.43%

85.71%

0.14%

0.29%

0.43%

0.57%

0.71%

0.86%

0.14%

0.14%

0.14%

0.14%

0.14%

0.14%

2.00%

2.00%

2.00%

2.00%

2.00%

2.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

2.00%

2.00%

2.00%

2.00%

2.00%

2.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

10

10

10

10

10

10

0.06%

0.05%

0.11%

0.05%

0.06%

0.06%

12.50%

12.50%

12.50%

12.50%

12.50%

12.50%

25.00%

37.50%

50.00%

62.50%

75.00%

87.50%

0.13%

0.19%

0.25%

0.31%

0.38%

0.44%

0.06%

0.06%

0.06%

0.06%

0.06%

0.06%
10
0.68%
50.00%
50.00%

0.75%
0.75%
10
0.75%
50.00%
50.00%
1.25%
1.25%
10

10

10

10

10

0.12%

0.48%

0.60%

0.90%

0.48%

11.11%

11.11%

11.11%

11.11%

11.11%

11.11%

22.22%

33.33%

44.44%

55.56%

0.67%

1.33%

2.00%

2.67%

3.33%

0.67%

0.67%

0.67%

0.67%

0.67%

10
0.38%
33.33%
33.33%
0.83%
0.83%
10
0.00%
33.33%
33.33%
0.83%
0.83%

5/24/2016

5/31/2016

6/7/2016

6/14/2016

6/21/2016

6/28/2016

Sem 13

Sem 14

Sem 15

Sem 16

Sem 17

Sem 18

17.83%

30.17%

35.33%

47.50%

56.00%

62.00%

3.87%

5.43%

6.30%

6.30%

9.48%

9.48%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

2.00%

2.00%

2.00%

2.00%

2.00%

2.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

14.29%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

0.50%

0.50%

0.50%

0.50%

0.50%

0.50%

0.07%

0.00%

0.00%

0.00%

0.00%

0.00%

0.50%

0.50%

0.50%

0.50%

0.50%

0.50%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

0.50%

0.50%

0.50%

0.50%

0.50%

0.50%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

10
0.06%

10
0.13%

1.00%

1.00%

1.00%

1.00%

1.00%

14.29%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

1.00%

1.00%

1.00%

1.00%

1.00%

1.00%

0.14%

0.00%

0.00%

0.00%

0.00%

0.00%

2.00%

2.00%

2.00%

2.00%

2.00%

2.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

2.00%

2.00%

2.00%

2.00%

2.00%

2.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.08%

0.50%

0.50%

0.50%

0.50%

0.50%

12.50%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

0.50%

0.50%

0.50%

0.50%

0.50%

0.50%

0.06%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.68%

0.68%

0.68%

0.68%

0.68%

50.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

10

10

1.50%

1.50%

1.50%

1.50%

1.50%

1.50%

0.75%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.75%

0.75%

0.75%

0.75%

0.75%

50.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

2.50%

2.50%

2.50%

2.50%

2.50%

2.50%

1.25%

0.00%

0.00%

0.00%

0.00%

0.00%

10

10

10

10

0.60%

0.00%

0.00%

0.00%

3.18%

3.18%

11.11%

11.11%

11.11%

11.11%

0.00%

0.00%

66.67%

77.78%

88.89%

100.00%

100.00%

100.00%

4.00%

4.67%

5.33%

6.00%

6.00%

6.00%

0.67%

0.67%

0.67%

0.67%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

0.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

100.00%

3.00%

3.00%

3.00%

3.00%

3.00%

3.00%

0.00%

0.00%

0.00%

0.00%

10

10

10

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

0.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

100.00%

2.00%

2.00%

2.00%

2.00%

2.00%

2.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

0.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

100.00%

3.00%

3.00%

3.00%

3.00%

3.00%

3.00%

0.00%

0.00%

0.00%

0.00%

10

10

10

0.50%

0.00%

0.88%

0.88%

0.88%

0.88%

33.33%

33.33%

0.00%

0.00%

0.00%

0.00%

66.67%

100.00%

100.00%

100.00%

100.00%

100.00%

1.67%

2.50%

2.50%

2.50%

2.50%

2.50%

0.83%

0.83%

0.00%

0.00%

0.00%

0.00%

10

10

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

33.33%

33.33%

0.00%

0.00%

0.00%

0.00%

66.67%

100.00%

100.00%

100.00%

100.00%

100.00%

1.67%

2.50%

2.50%

2.50%

2.50%

2.50%

0.83%

0.83%

0.00%

0.00%

0.00%

0.00%

10
0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

0.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

100.00%

2.00%

2.00%

2.00%

2.00%

2.00%

2.00%

0.00%

0.00%

0.00%

0.00%

10

10

0.00%

0.00%

0.00%

0.00%

50.00%

50.00%

0.00%

0.00%

50.00%

100.00%

100.00%

100.00%

1.50%

3.00%

3.00%

3.00%

1.50%

1.50%

0.00%

0.00%

10

10

0.00%

0.00%

0.00%

0.00%

50.00%

50.00%

0.00%

0.00%

50.00%

100.00%

100.00%

100.00%

1.50%

3.00%

3.00%

3.00%

1.50%

1.50%

0.00%

0.00%

10

10

0.00%

0.00%

0.00%

0.00%

50.00%

50.00%

0.00%

0.00%

50.00%

100.00%

100.00%

100.00%

1.50%

3.00%

3.00%

3.00%

1.50%

1.50%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

0.00%

0.00%

100.00%

100.00%

100.00%

3.00%

3.00%

3.00%

3.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

0.00%

0.00%

100.00%

100.00%

100.00%

3.00%

3.00%

3.00%

3.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

0.00%

0.00%

100.00%

100.00%

100.00%

1.00%

1.00%

1.00%

1.00%

0.00%

0.00%

10

10

10

10

0.00%

0.00%

100.00%

0.00%

100.00%

100.00%

1.00%

1.00%

1.00%

0.00%

10
0.00%

0.00%

100.00%

0.00%

100.00%

100.00%

3.00%

3.00%

3.00%

0.00%

10
0.00%

0.00%

100.00%

0.00%

100.00%

100.00%

3.00%

3.00%

3.00%

0.00%

10

10

0.00%

0.00%

50.00%

50.00%

50.00%

100.00%

1.50%

3.00%

1.50%

1.50%
10
0.00%
100.00%
100.00%
3.00%
3.00%
10
0.00%
100.00%
100.00%
1.50%
1.50%

7/5/2016

7/12/2016

7/19/2016

7/26/2016

8/2/2016

8/9/2016

Sem 19

Sem 20

Sem 21

Sem 22

Sem 23

Sem 24

69.50%

74.00%

83.50%

91.00%

94.75%

100.00%

9.48%

9.48%

9.48%

9.48%

9.48%

9.48%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

2.00%

2.00%

2.00%

2.00%

2.00%

2.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

0.50%

0.50%

0.50%

0.50%

0.50%

0.50%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.50%

0.50%

0.50%

0.50%

0.50%

0.50%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

0.50%

0.50%

0.50%

0.50%

0.50%

0.50%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

1.00%

1.00%

1.00%

1.00%

1.00%

1.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

1.00%

1.00%

1.00%

1.00%

1.00%

1.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

2.00%

2.00%

2.00%

2.00%

2.00%

2.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

2.00%

2.00%

2.00%

2.00%

2.00%

2.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.50%

0.50%

0.50%

0.50%

0.50%

0.50%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

0.50%

0.50%

0.50%

0.50%

0.50%

0.50%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.68%

0.68%

0.68%

0.68%

0.68%

0.68%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

1.50%

1.50%

1.50%

1.50%

1.50%

1.50%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.75%

0.75%

0.75%

0.75%

0.75%

0.75%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

2.50%

2.50%

2.50%

2.50%

2.50%

2.50%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

3.18%

3.18%

3.18%

3.18%

3.18%

3.18%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

6.00%

6.00%

6.00%

6.00%

6.00%

6.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

3.00%

3.00%

3.00%

3.00%

3.00%

3.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

2.00%

2.00%

2.00%

2.00%

2.00%

2.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

3.00%

3.00%

3.00%

3.00%

3.00%

3.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.88%

0.88%

0.88%

0.88%

0.88%

0.88%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

2.50%

2.50%

2.50%

2.50%

2.50%

2.50%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

2.50%

2.50%

2.50%

2.50%

2.50%

2.50%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

2.00%

2.00%

2.00%

2.00%

2.00%

2.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

3.00%

3.00%

3.00%

3.00%

3.00%

3.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

3.00%

3.00%

3.00%

3.00%

3.00%

3.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

3.00%

3.00%

3.00%

3.00%

3.00%

3.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

3.00%

3.00%

3.00%

3.00%

3.00%

3.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

3.00%

3.00%

3.00%

3.00%

3.00%

3.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

1.00%

1.00%

1.00%

1.00%

1.00%

1.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

1.00%

1.00%

1.00%

1.00%

1.00%

1.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

3.00%

3.00%

3.00%

3.00%

3.00%

3.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

3.00%

3.00%

3.00%

3.00%

3.00%

3.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

3.00%

3.00%

3.00%

3.00%

3.00%

3.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

3.00%

3.00%

3.00%

3.00%

3.00%

3.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

1.50%

1.50%

1.50%

1.50%

1.50%

1.50%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

1.50%

1.50%

1.50%

1.50%

1.50%

1.50%

1.50%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

0.00%

0.00%

0.00%

0.00%

0.00%

10

10

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

1.50%

1.50%

1.50%

1.50%

1.50%

1.50%

1.50%

0.00%

0.00%

0.00%

0.00%

0.00%

10

10

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

50.00%

50.00%

0.00%

0.00%

0.00%

0.00%

50.00%

100.00%

100.00%

100.00%

100.00%

100.00%

1.50%

3.00%

3.00%

3.00%

3.00%

3.00%

1.50%

1.50%

0.00%

0.00%

0.00%

0.00%

10

10

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

50.00%

50.00%

0.00%

0.00%

0.00%

0.00%

100.00%

50.00%

0.00%

0.00%

0.00%

100.00%

3.00%

1.50%

0.00%

0.00%

0.00%

3.00%

1.50%

1.50%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

0.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

100.00%

3.00%

3.00%

3.00%

3.00%

3.00%

3.00%

0.00%

0.00%

0.00%

0.00%

10

10

10

0.00%

0.00%

0.00%

0.00%

0.00%

50.00%

50.00%

0.00%

0.00%

0.00%

50.00%

100.00%

100.00%

100.00%

100.00%

1.50%

3.00%

3.00%

3.00%

3.00%

1.50%

1.50%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

3.00%

3.00%

3.00%

3.00%

3.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

1.00%

1.00%

1.00%

1.00%

1.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

1.00%

1.00%

1.00%

1.00%

10

10

10

1.00%

0.00%

0.00%

0.00%

100.00%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

3.00%

3.00%

3.00%

3.00%

3.00%

0.00%

0.00%

0.00%

10

10

0.00%

0.00%

0.00%

0.00%

50.00%

50.00%

0.00%

0.00%

50.00%

100.00%

100.00%

100.00%

1.50%

3.00%

3.00%

3.00%

1.50%

1.50%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

0.00%

0.00%

100.00%

100.00%

100.00%

3.00%

3.00%

3.00%

3.00%

0.00%

0.00%

10

10

0.00%

0.00%

10

10

0.00%

50.00%

50.00%

0.00%

100.00%

50.00%

100.00%

3.00%

1.50%

3.00%

1.50%

1.50%

0.00%

10
0.00%

0.00%

100.00%

0.00%

100.00%

100.00%

1.50%

1.50%

1.50%

0.00%

10
0.00%

0.00%

100.00%

0.00%

100.00%

100.00%

1.50%

1.50%

1.50%

0.00%

10
0.00%

0%

100%

0%

100%

100%

1.50%

1.50%

1.50%

0.00%

10

10

0.00%

0.00%

50.00%

50.00%

50.00%

100.00%

0.75%

1.50%

0.75%

0.75%

60
2.00%
100.00%
100.00%
2.00%
0.00%
70
100%

70

70

0
50
1
22
0
0
80
1
16
0
0
20
1
13

0
0
20
1
13
0
0
90
1
13
1
0
0
10
1
11
0
0
10

1
11
0
0
10
1
11
0
0
30
1
12
0
0
30
1
12
0
0

10
1
11
0
0
0
20
1
10
0
0
20
1
10
0
0
20
1

10
0
0
10
1
9
0
0
10
1
9
0
0
10
1
9
0
0
10

1
8
0
0
10
1
8
0
0
0
10
1
8
0
0
20
1
8
0

0
10
1
7
0
0
10
1
7
0
0
10
1
6
0
0
10
1

6
0
0
0
20
1
6
0
0
20
1
3
0
0
10
1
5
0
0

20
1
5
0
0
10
1
4
0
0
10
1
4
0
0
10
1
4
0

0
10
1
4
0
0
0
20
1
4
0
0
10
1
3
0
0
20

1
3
0
0
10
1
2
0
0
10
1
2
0
0
10
1
2
0
0

20
0%
0.00%

100.00%

1.50%

0.00%

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

6
3/1
01/
0
N SEMANAS

PLANIFICADO

PERIODO
PLANIFICADO ORIGINAL

REAL

PERIODO
EJECUTADO REAL

0.9

0.8

0.9

0.8

PORCENTAJES

0.7

0.6

0.5

0.4

0.3

0.2

0.1

Numero
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43

44

Actividad
Planos (fabricacin-montaje-operacin)
Procedimiento (Preparacin-Entrega-Emisin)
Packing list (Emisin-Revisiones-Emisin Final)
Programa de SHA (Preparacin-Revisin Cliente-Aprobacin)
Operaciones (Verificacin de Equip. Existentes)
Nuevas compras (Presupuesto-Emisin OC-Fabricacin y compras menores-envos a obra)
Movilizacin de Equip. (Preparacin Mdulos-Carga de Equip./envo a Obra Cabruta)
Preparacin de Barcazas (Movilizar y Colocar Soporte s/Barcazas)
Trabajos de Defensas Puente Ma. Nieves (Ingenier{ia-Planos-Fabric. Estruct.-Instalacin)
Acopio de Equipos
Configuracin de Mdulos
Navegacin Alianza a Cabruta
Trabajo de Adecuacin de Rampas en Cabruta
Trabajos de Adecuacin en Puerto Nutrias
Preparacin para carga
Atraque // Mooring // Pre lastrado - CPM 45 (Load Out Motor # 1)
Atraque // Mooring // Pre lastrado - CPM 46 (Load Out Motor # 2)
Atraque // Mooring // Pre lastrado - RO MANAMO (Load Out Motor # 3)
Navegacion Cabruta - San Fernando - Motor #1 - #2 - #3
Paso del Puente Mara Nieves
Paso del 1er. Grupo de Cables
Paso del 2do. Grupo de Cables
Navegacion San Fernando - Puerto Nutria
Atraque // Mooring // Pre lastrado - CPM 46 (Load In Motor # 1)
Atraque // Mooring // Pre lastrado - CPM 46 (Load In Motor # 2)
Atraque // Mooring // Pre lastrado - RO MANAMO (Load In Motor # 3)
Retorno: Pto Nutrias - San Fernando - CPM 45 - CPM 46 - RO MANAMO
Paso del Puente Maria Nieves
Retorno: San Fernando - Cabruta - CPM 45- CPM 46 - RO MANAMO
Atraque // Mooring // Pre lastrado - CPM 45 (Load Out Motor # 4)
Atraque // Mooring // Pre lastrado - CPM 46 (Load Out Motor # 5)
Atraque // Mooring // Pre lastrado - RO MANAMO (Load Out Motor # 6)
Navegacion Cabruta - San Fernando - Motor #4 - #5 - #6
Paso del Puente Mara Nieves
Paso del 1er. Grupo de Cables
Paso del 2do. Grupo de Cables
Navegacion San Fernando - Puerto Nutria
Atraque // Mooring // Pre lastrado - CPM 46 (Load In Motor # 4)
Atraque // Mooring // Pre lastrado - CPM 46 (Load In Motor # 5)
Atraque // Mooring // Pre lastrado - RO MANAMO (Load In Motor # 6)
Retorno: Pto Nutrias - San Fernando - CPM 45 - CPM 46 - RO MANAMO
Paso del Puente Maria Nieves
Retorno: San Fernando - Cabruta - CPM 45- CPM 46 - RO MANAMO

Retorno: Cabruta - P. Ordaz - CPM 45- CPM 46 - RO MANAMO

Inicio

Fin
3/1/2016

4/11/2016

4/12/2016

5/30/2016

3/1/2016

4/18/2016

4/12/2016

5/30/2016

3/1/2016

4/4/2016

4/5/2016

5/30/2016

5/17/2016

5/30/2016

5/17/2016

5/30/2016

4/25/2016

6/16/2016

5/31/2016

6/3/2016

6/4/2016

6/6/2016

5/31/2016

6/6/2016

5/17/2016

6/6/2016

5/17/2016

6/6/2016

6/6/2016

6/6/2016

6/7/2016

6/15/2016

6/10/2016

6/15/2016

6/13/2016

6/15/2016

6/16/2016

6/18/2016

6/19/2016

6/19/2016

6/20/2016

6/20/2016

6/21/2016

6/21/2016

6/22/2016

6/23/2016

6/24/2016

6/26/2016

6/27/2016

6/29/2016

6/30/2016

7/2/2016

7/3/2016

7/4/2016

7/5/2016

7/5/2016

7/6/2016

7/7/2016

7/8/2016

7/16/2016

7/11/2016

7/16/2016

7/14/2016

7/16/2016

7/17/2016

7/19/2016

7/20/2016

7/20/2016

7/21/2016

7/21/2016

7/22/2016

7/22/2016

7/23/2016

7/24/2016

7/25/2016

7/27/2016

7/28/2016

7/30/2016

7/31/2016

8/2/2016

8/3/2016

8/4/2016

8/5/2016

8/5/2016

8/6/2016

8/7/2016

% avance
al 30/05/2016
100%
100%
100%
100%
100%
100%
45%
30%
53%
0%
0%
0%
35%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

3/1/2016

3/8/2016

13%

15%

9%

10%

20%

22%

8/8/2016

8/10/2016

0%

3/15/2016

3/22/2016

3/29/2016

4/5/2016

15%

20%

17%

20%

22%
15%

15%
21%

18%

11%

4/12/2016

4/19/2016

12%
15%
15%

12%

12%

9%

14%

22%
8%

2%

4/26/2016

5/3/2016

5/10/2016

5/17/2016

5/24/2016

15%

15%

20%

14%

12%

16%

12%

10%

20%

13%

22%

10%

11%

8%

10%

15%

12%
45%
30%
8%

16%
0%
0%
10%

15%
0%

20%
0%

5/31/2016

0%
0%
0%
0%
0%
0%
0%

6/7/2016

6/14/2016

0%

0%

0%
0%
0%

0%
0%
0%
0%
0%
0%

6/21/2016

0%
0%
0%
0%

6/28/2016

7/5/2016

7/12/2016

0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%

7/19/2016

0%
0%
0%
0%
0%
0%

7/26/2016

0%
0%
0%

8/2/2016

0%
0%
0%
0%

8/9/2016

0%

0%

También podría gustarte