Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Fecha: 30-11-2016
ESTIMADO PROPIO
PROVEEDOR 1
PROVEEDOR 2
PROVEEDOR 3
PROVEEDOR 5
PROVEEDOR 6
P.U
15,000.00
6,300.00
120,000.00
5,000.00
7,500.00
5,000.00
P.U
21,260.97
7,581.00
90,263.45
5,539.78
7,500.00
5,000.00
P.U
18,640.00
6,119.40
203,593.93
14,279.88
7,500.00
5,000.00
P.U
22,472.00
3,500.00
163,333.00
4,404.74
1,084.62
5,000.00
P.U
P.U
Obras preliminares
Demoliciones
Estructuras metalicas
Concreto armado
Resanes y eliminacin de desmonte
Otros
COSTO DIRECTO
S/.
158,800.00
G.G. 8.00%
12,704.00
UTI. 7.00%
11,116.00
SUB TOTAL
S/.
TOTAL
S/.
IGV. 18.00%
182,620.00
32,871.60
215,491.60
S/.
137,145.20
G.G. 15.00%
20,571.78
UTI. 10.00%
13,714.52
S/.
171,431.50
IGV. 18.00%
S/.
30,857.67
202,289.17
Plazo de Entrega
S/.
S/.
255,133.21
G.G. 8.00%
20,410.66
UTI. 7.00%
17,859.32
S/.
293,403.19
S/.
346,215.77
Plazo de Entrega
G.G. 5.00%
G.G. 0.00%
UTI. 5.00%
9,989.72
UTI. 0.00%
0.00
219,773.80
IGV. 18.00%
S/.
39,559.28
259,333.08
Plazo de Entrega
40 das
60 das
ADELANTO 20.00%
ADELANTO 30.00%
69,243.15
S/.
77,799.92
Observaciones:
LOS TRABAJOS SE REALIZARAN PARA EL INGRESO DEL OPERADOR PARIS, QUIEN SEGN CONTRATO SE LE DEBE ENTREGAR EL MONTACARGAS HABILITADO
AF-P-02-F1
S/.
IGV. 18.00%
S/.
S/.
IGV. 18.00%
Plazo de Entrega
ADELANTO 20.00%
S/.
ADELANTO 20.00%
S/.
PROVEEDORES
1 CONSTRUMAQ PERU S.A.
2 CEMBF S.A.C.
3 ZURPROIN EIRL
4
5
ELABORADO POR:
ENRIQUE CALDERON
FECHA:
11/30/2016
REVISADO POR:
FECHA:
VERIFICADO POR :
ENRIQUE CALDERON
FECHA:
11/30/2016
FECHA:
Ver. 02
UTI. 0.00%
0.00
S/.
S/.
G.G. 0.00%
Plazo de Entrega
35 das
S/.
0.00
ADELANTO 50.00%
101,144.59
S/.
9,989.72
S/.
52,812.57
IGV. 18.00%
S/.
199,794.36
05-06-12
PROVEEDOR 6
P.U
S/.
0.00
0.00
S/.
0.00
S/.
Plazo de Entrega
ADELANTO 20.00%
S/.
AF-P-02-F1
Ver. 02
05-06-12
FORMULARIO
Codigo: AF-P-02-F1
Revision: 00
Aprobacion: CSGI
Fecha: 30-05-12
10.00
15.00
20.00
20.00
20.00
10.00
5.00
6.00
8.00
PROVEEDOR 1
P.U
15.00
16.00
12.00
13.00
20.00
15.00
P.T
150.00
160.00
120.00
130.00
200.00
150.00
0.00
0.00
0.00
200.00
0.00
20.00
TOTAL
PROVEEDOR 2
P.U
15.00
20.00
15.00
10.00
18.00
1,110.00
P.T
0.00
150.00
200.00
150.00
0.00
100.00
0.00
0.00
0.00
180.00
0.00
PROVEEDOR 3
P.U
20.00
15.00
20.00
25.00
780.00
P.T
200.00
150.00
200.00
0.00
250.00
0.00
0.00
0.00
0.00
0.00
0.00
Plazo de Entrega
Plazo de Entrega
En Stock
Item 9: 15 dias
Item 5: 10 dias
Contado
Credito (dias)
Contado
Credito (dias)
PROVEEDOR 5
P.U
P.U
800.00
Plazo de Entrega
Credito (dias)
PROVEEDOR 4
Contado
30
P.T
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
P.T
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Plazo de Entrega
Plazo de Entrega
Credito (dias)
Credito (dias)
Contado
Contado
ELABORADO POR:
FECHA:
REVISADO POR:
FECHA:
VERIFICADO POR :
FECHA:
FECHA:
Codigo: AF-P-02-F1
Revision: 00
Aprobacion: CSGI
Fecha: 30-05-12
.................."
PROVEEDOR 6
P.U
P.T
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Plazo de Entrega
Credito (dias)
Contado