PROYECTO:
ADICIONAL DE OBRA N 01
MURO TIPO:
MC - 07
DATOS :
FSD=
FSV=
ANGULO FRIC. INTERNO =
COEF. EMP. ACTIVO Ka=
COEF. FRICCION DESL. f=
PESO RELLENO
PESO MURO CONCRETO=
SOBRECARGA
Ws/c=
ALTURA EQUIV. S/C Ho=
ALTURA PANTALLA Hp=
ALTURA DE RELLENO Hr=
CAPACID. PORTANTE Gt=
(Suelo mejorado)
CONCRETO
f'c=
ACERO
fy=
1.50
2.00
37.00 grados
0.249
0.50
1.80 ton/m3
2.40 ton/m3
1.50 ton/m2
0.83 m.
7.00 m.
6.90 m.
0.86 kg/cm2
Hp
t2
210.00 kg/cm2
4,200.00 kg/cm2
Hz
B2
0.25 m.
Hp
M=
Mu=1.8*M=
cuanta
d=
t2=
d=
0.70 m.
0.80 m. Usar:
7.70 m.
0.80 m
8.53 m.
2.00 ton/m3 (del concreto y suelo)
2.86 m. USAR :
3.00 m
0.40 m. USAR :
B1
Pi
BRAZO
m
P1
P2
P3
P4
P5
Ps/c1
Ps/c2
TOTAL
6.91
4.14
3.73
28.57
2.79
3.45
0.68
50.26
FUERZAS ACTUANTES
Ha=
Ma=
FSD=
FSV=
MOMENTO
ton-m
12.44
3.00
3.73
69.99
3.21
8.45
0.78
101.60
1.80
0.73
1.00
2.45
1.15
2.45
1.15
Ps/c1
Ps/c1
P5
P2
P4
P3
P1
B2
16.14 ton.
45.10 ton-m.
1.558
2.253
>
>
B1
1.50 BIEN
2.00 BIEN
1.12 m.
0.68 m.
0.60 m.
MAL ! AUMENTAR EL VALOR DE B1
q1=
q2=
q1<Gt
q2<Gt
1.57 kg/cm2
-0.177 kg/cm2
MAL NO PASA
BIEN
q2
q1
S = 4.9
cm
@ 10
cm
1/2''
12.84 cm2/m.
3.64 cm2/m.
en la base
en la corona
Hc
4.60
2.70 m.
1.35 m. usar
Usar acero :
12.84 cm2/m.
1/2''
en la base
S = 9.9
cm
@ 18
cm
Ast arriba:
5.00 cm2/m.
1/2Ast=
1/2Ast=
Ast intermedio:
2.50
2.50
3/8''
3/8''
@ 28.5
@ 28.5
4.75
4.75
3/8''
3/8''
@ 15.0
@ 15.0
7.00
7.00
3/8''
3/8''
@ 10.1
@ 10.1
9.50 cm2/m
1/2Ast=
1/2Ast=
Ast abajo:
14.00 cm2/m
1/2Ast=
1/2Ast=
@ 18
@ 18
cm
cm
Usar acero :
1.92 ton/m
25.01 ton/m
4.50 ton-m
71.70 cm. (recubrimento 7.5 cm. y 1/2 acero 5/8")
100 cm.
210.00 kg/cm2
4,200.00 kg/cm2
0.005
1.67 cm2/m
15.77 cm2/m
S = 8.0
cm
@ 13
cm
1/2''
Usar acero :
9.41 ton/m
(1.77) ton/m
15.84 ton/m
22.63 ton/m
36.72 ton-m
52.59 ton-m
74.20 cm.
100 cm.
210.00 kg/cm2
4,200.00 kg/cm2
0.052
19.35 cm2
2.30
9.41
16.32 cm2
1/2''
@ 6.5
cm
@ 13
cm
(1.77) Ton/m
6.65 ton/m
35.37 ton
48.44 ton
BIEN
REFUERZO TRANSVERSAL
Ast=0.0020bh/2
8.00 cm2
Usar acero :
@ 15.8
cm
1/2''
@ 25
cm
3/8"
@ 35
cm
T1 = 0.25 m
3/8'' @ 18 cm
1/2'' @ 18 cm
1/2'' @ 20 cm
1/2'' @ 13 cm
1/2'' @ 25 cm
1/2'' @ 13 cm
Hz = 0.80 m
1/2'' @ 25 cm
3/8" @ 35 cm
P = 0.60 m
T2 = 0.70 m
T = 2.30 m
B = 3.60 m
MURO DE CONTENCION MC - 07
HT = 7.80 m
Hp = 7.00 m
1/2'' @ 20 cm