01
PLAZO DE EJECUCION
PRESUPUESTO TOTAL
Dias
S/.
120
1,068,412.08
% VAL. 02
% VAL. 03
% VAL. 04
26.88%
25.15%
22.63%
25.34%
TOTAL % VAL.
Meses
Adel. Directo
20.00%
Adel. Mat.
0.00%
213,682.42
0.00
1
2
3
4
TOTAL
213,682.42
0.00
Valorizacin
AMORTIZACIONES
Adel. Directo
Adel. Materiales
287,232.16
268,686.60
241,810.51
270,682.81
57,446.43
53,737.32
48,362.10
54,136.56
0.00
0.00
0.00
0.00
1,068,412.08
213,682.42
0.00
100%
Pago Neto
213,682.42
229,785.73
214,949.28
193,448.41
216,546.25
1,068,412.08
Presupuesto
Cliente
Lugar
Contratista
ITEM
DESCRIPCION
UNIDAD
METRADO
P.U.
PARCIAL
8,969.48
310,015.88
2.01
OBRAS PRELIMINARES
20,527.11
2.02
82,521.80
02.02.01
MOVIMIENTO DE TIERRAS
02.02.02
2.03
69,872.51
12,649.29
78,938.28
02.03.01
MOVIMIENTO DE TIERRAS
43,658.19
02.03.02
PISOS Y PAVIMENTOS
29,330.26
02.03.03
2.04
5,949.83
13,113.04
02.04.01
MOVIMIENTO DE TIERRAS
1,382.55
02.04.02
CONCRETO SIMPLE
1,455.77
02.04.03
CONCRETO ARMADO
4,961.38
02.04.04
REVESTIMIENTOS
1,380.09
02.04.05
2,459.67
02.04.06
581.80
02.04.07
CARPINTERIA METALICA
651.60
02.04.08
PINTURAS
2.05
240.18
8,695.31
02.05.01
MOVIMIENTO DE TIERRAS
02.05.02
CONCRETO SIMPLE
1,637.57
02.05.03
CONCRETO ARMADO
4,289.54
02.05.04
REVESTIMIENTOS
867.92
02.05.05
182.77
02.05.06
486.03
02.05.07
CARPINTERIA METALICA
325.80
02.05.08
PINTURAS
02.05.09
VARIOS
2.06
DESARENADOR
552.98
85.65
267.05
9,037.74
02.06.01
MOVIMIENTO DE TIERRAS
02.06.02
CONCRETO SIMPLE
02.06.03
CONCRETO ARMADO
02.06.04
REVESTIMIENTOS
835.73
02.06.05
CARPINTERIA METALICA
572.52
02.06.06
797.54
02.06.07
PINTURAS
2.07
02.07.01
MOVIMIENTO DE TIERRAS
02.07.02
CONCRETO SIMPLE
02.07.03
CARPINTERIA METALICA
02.07.04
REVOQUES Y ENLUCIDOS
02.07.05
PINTURAS
2.08
02.08.01
MOVIMIENTO DE TIERRAS
02.08.02
CONCRETO SIMPLE
247.21
261.79
6,148.62
174.33
16,650.08
392.52
899.35
14,027.93
189.62
1,140.66
3,119.05
214.08
1,697.43
SEM. 01
SEM. 02
MES 02
SEM. 03
SEM. 04
SEM. 05
SEM. 06
MES 03
SEM. 07
SEM. 08
SEM. 09
SEM. 10
MES 04
SEM. 11
SEM. 12
SEM. 13
SEM. 14
SEM. 15
SEM. 16
Presupuesto
Cliente
Lugar
Contratista
ITEM
DESCRIPCION
02.08.03
02.08.04
PINTURAS
2.09
UNIDAD
METRADO
P.U.
PARCIAL
1,034.15
173.39
3,693.52
02.09.01
MOVIMIENTO DE TIERRAS
02.09.02
CONCRETO SIMPLE
02.09.03
CONCRETO ARMADO
02.09.04
REVESTIMIENTOS
415.11
02.09.05
CARPINTERIA METALICA
325.80
02.09.06
503.72
02.09.07
PINTURAS
2.10
RESERVORIO (V=15M3)
177.25
328.84
1,848.08
94.72
26,302.88
02.10.01
MOVIMIENTO DE TIERRAS
02.10.02
CONCRETO SIMPLE
02.10.03
CONCRETO ARMADO
02.10.04
REVESTIMIENTOS
2,526.56
02.10.05
1,876.34
02.10.06
PINTURAS
2.11
02.11.01
MOVIMIENTO DE TIERRAS
02.11.02
CONCRETO ARMADO
02.11.03
REVESTIMIENTOS
02.11.04
VALVULAS Y ACCESORIOS
02.11.05
VARIOS
2.12
02.12.01
MOVIMIENTO DE TIERRAS
02.12.02
CONCRETO SIMPLE
02.12.03
CARPINTERIA METALICA
02.12.04
02.12.05
PINTURAS
2.13
02.13.01
MOVIMIENTO DE TIERRAS
02.13.02
CONCRETO SIMPLE
02.13.03
CONCRETO ARMADO
02.13.04
REVESTIMIENTOS
02.13.05
CARPINTERIA METALICA
02.13.06
02.13.07
2.14
PINTURAS
VALVULA DE CONTROL (06 UND)
1,993.36
3,746.88
15,705.01
454.73
2517.16
67.62
848
127.89
1239.67
233.98
7694.02
187.31
449.67
6448.76
94.81
513.47
2678.61
84.94
83.73
1239.11
407.49
326.1
443.46
93.78
4956.64
02.14.01
MOVIMIENTO DE TIERRAS
02.14.02
CONCRETO SIMPLE
175.98
02.14.03
CONCRETO ARMADO
02.14.04
REVESTIMIENTOS
02.14.05
CARPINTERIA METALICA
02.14.06
709.43
02.14.07
PINTURAS
145.05
218.73
2486.74
568.51
652.2
SEM. 01
SEM. 02
MES 02
SEM. 03
SEM. 04
SEM. 05
SEM. 06
MES 03
SEM. 07
SEM. 08
SEM. 09
SEM. 10
MES 04
SEM. 11
SEM. 12
SEM. 13
SEM. 14
SEM. 15
SEM. 16
Presupuesto
Cliente
Lugar
Contratista
ITEM
2.15
DESCRIPCION
UNIDAD
METRADO
P.U.
PARCIAL
MOVIMIENTO DE TIERRAS
4211.97
02.15.02
9543.15
02.15.03
PISOS Y PAVIMENTOS
02.16.02
VARIOS
SEGURIDAD, HIGIENE Y SALUD OCUPACIONAL
MITIGACION DE IMPACTO AMBIENTAL
3.03
OTROS
3.04
CAPACITACIN
OBRAS PRELIMINARES
1.02
01.02.01
MOVIMIENTO DE TIERRAS
01.02.02
1.03
m3
153.29
39.13
152.55
24.83
MOVIMIENTO DE TIERRAS
01.03.02
CONCRETO ARMADO
5,998.24
3,787.82
42,891.86
15967
2574.86
20350
4000
344,007.17
10895.39
132532.26
102656.83
29875.43
01.03.01
1.04
m3
1.01
121029.49
5703.51
115325.98
41904.24
01.04.01
MOVIMIENTO DE TIERRAS
10367.85
01.04.02
18607.95
01.04.03
PISOS Y PAVIMENTOS
1.05
1.06
01.06.01
OBRAS PRELIMINARES
01.06.02
MOVIMIENTO DE TIERRAS
01.06.03
01.06.04
01.06.05
CONCRETO ARMADO
12928.44
13721.89
23923.9
87.71
950.76
304.91
4029.02
5628.52
01.06.05.01
ZAPATAS
2,153.07
01.06.05.02
COLUMNAS
2,537.50
01.06.05.03
VIGAS
01.06.06
01.06.07
937.95
5755.12
COLOCACIN DE ARMADURA
7167.86
01.06.07.01
glb
5,132.56
01.06.07.02
m2
28.8
70.67
5,132.56
2,035.30
17,379.08
2.01
2.02
SEM. 04
9786.06
02.16.01
3.02
MES 02
SEM. 03
6029.46
3.01
SEM. 02
19784.58
02.15.01
2.16
SEM. 01
3034.54
14344.54
FLETE
31,264.84
LEYENDA:
PARTIDAS CRITICAS
PARTIDAS SECUNDARIAS
SEM. 05
SEM. 06
MES 03
SEM. 07
SEM. 08
SEM. 09
SEM. 10
MES 04
SEM. 11
SEM. 12
SEM. 13
SEM. 14
SEM. 15
SEM. 16