Está en la página 1de 22

PARAMETROS PARA EL DISEO HIDRAULICO(RED DE AGUA)

NOMBRE DEL PROYECTO: HABILITACION URBANA "LOS HURANGOS" - ICA

UBICACIN:

DPTO. ICA
PROV. ICA
DIST. ICA

N HABITANTES POR LOTE


N LOTES
POBLACION ACTUAL
TASA DE CRECIMIENTO
PERIODO DE DISEO
POBLACION FUTURA
Pf = Po * ( 1+ r*t/100 )
DOTACION
CAUDAL TOTAL
Qt = Pob.* Dot.
CAUDAL PROMEDIO(LTS/Sg)
Qp =

6
169
1014 hab
1.012 %
20 aos
1219 hab
150 LT/HAB/DIA
182,885 lts/dia
2.1167 lts/seg

CAUDAL MAXIMO DIARIO (LTS/Sg)


Qmx. diario = 1.3 x Qprom.

2.7517 lts/seg

CAUDAL MAXIMO HORARIO (LTS/Sg)


Qmx. horario = 2.5 x Qprom.

5.2918 lts/seg

CAUDAL UNITARIO (lts/seg)

0.03131 lts/seg

PARAMETROS PARA EL DISEO HIDRAULICO(RED DE DESAGUE)


NOMBRE DEL PROYECTO: HABILITACION URBANA "LOS HURANGOS" - ICA

UBICACIN:

DPTO. ICA
PROV. ICA
DIST. ICA

N HABITANTES POR LOTE


N LOTES
POBLACION ACTUAL
TASA DE CRECIMIENTO
PERIODO DE DISEO
POBLACION FUTURA
Pf = Po * ( 1+ r*t/100 )
DOTACION
CAUDAL DE AGUAS RESIDUALES
Qprom. = 0.80 * Pob.* Dot.
CAUDAL MAXIMO HORARIO (LTS/Sg)
Qmx. horario = 2.5 x Qprom.

CAUDAL UNITARIO (lts/seg)

6
166
996 hab
1.012 %
20 aos
1198 hab
150 LT/HAB/DIA
143,711 lts/dia
4.1583 lts/seg

0.02505 lts/seg

CALCULO HIDRAULICO
PARAMETROS BASICOS DE DISEO
COEFICIENTE DE RUGOSIDAD (n)

UNIDAD
---

VELOCIDAD MINIMA
VELOCIDAD MAXIMA
RELACION h/D MAXIMA
Caudal Unit./LOTE

VALOR
0.01

VALOR
0.010

SUGERIDO (*)
----

m/s
m/s

0.60
5.0

0.60
3.00

0.45
4.00

---

0.8

0.75

0.80

Col.H

Col.I

Vllena

Qlleno

Qu

Col.J
Caudal
Pico

# LOTES

SUGERIDO (**)
0.009

#NAME?
0.0047755336

0.000093
0.000932 max

0.02505

0.000251 min
Col.B

Col.C

Col.D

Col.E

omparar

V=0.60
Q m3/s

TRAMOS
BUZON

COTA TAPA

COTA FONDO

Col.G

V=0.45
Q m3/s

ALTURA

V>

Rug.

mm

MAX

MIN

0.6

m/seg

lt/seg

0.600

44.76

160

11.17

1088.86

292.60

0.60

3299.400

O.K.

0.010

2.47

49.75

1.200

52.02

160

40.37

685.94

184.32

0.60

3297.300

O.K.

0.010

2.67

53.63

3296.762

1.738

8.00

200

67.29

297.56

79.96

1.20

3296.762

O.K.

0.010

1.21

3300.400

3300.320

1.180

9.43

160

8.48

1088.86

292.60

0.60

3300.320

O.K.

0.010

3298.500

3300.320

3296.762

1.738

84.35

160

42.18

685.94

184.32

1.18

3296.762

O.K.

DEL

AL

DEL

AL

DEL

AL

BN-1

BN-2

3300.500

3300.000

3299.900

3299.400

BN-2

3300.000

3298.500

3299.400

3297.300

3298.500

3298.500

3297.300

BN-3

BN-4

3301.000

3301.500

BN-4

3301.500

H BUZON

Col.F

Col.L
J/H

Col.M
Relacin

a/A

y/D

Col.P
O*D

Vparcial

Tensin
Tractiva
Media

()

mm

Kg/m

O.K.

8.07

16.71

O.K.

10.28

19.16

0.073

O.K.

14.59

3.77

0.015

0.050

O.K.

8.07

3.52

0.13

0.019

0.057

O.K.

9.07

31.49

Sumat.

Qp

Vp

# LOTES

lt/seg

m/seg

1.0

0.03

0.09

0.015

0.050

2.0

0.05

0.10

0.025

0.064

14.77

7.0

0.18

0.18

0.031

1.14

5.76

1.0

0.03

0.09

0.010

3.40

8.08

2.0

0.05

3298.500

3299.000

3296.762

3296.137

2.863

8.00

200

78.11

220.14

59.16

1.74

3296.137

O.K.

0.010

1.21

17.78

11.0

0.28

0.23

0.038

0.082

O.K.

16.40

3.77

BN-5

BN-6

3301.000

3300.830

3300.400

3300.230

0.600

14.73

160

11.54

1088.86

292.60

0.60

3300.230

O.K.

0.010

1.42

5.76

1.0

0.03

0.09

0.015

0.050

O.K.

8.07

5.50

BN-6

BN-7

3300.830

3300.750

3300.230

3300.090

0.660

14.78

160

9.47

685.94

184.32

0.60

3300.090

O.K.

0.010

1.42

5.76

2.0

0.05

0.10

0.025

0.064

O.K.

10.28

5.52

BN-7

3300.750

3300.500

3300.090

3299.900

0.600

14.68

160

12.94

523.47

140.67

0.66

3299.900

O.K.

0.010

1.42

6.04

3.0

0.08

0.12

0.032

0.074

O.K.

11.91

5.48

BN-8

3302.000

3300.500

3301.400

3299.900

0.600

64.18

160

23.37

1088.86

292.60

0.60

3299.900

O.K.

0.010

2.96

5.76

1.0

0.03

0.09

0.015

0.050

O.K.

8.07

23.96

3300.500

3299.000

3299.900

3296.137

2.863

84.28

160

44.65

372.38

100.07

0.60

3296.137

O.K.

0.010

3.40

5.76

5.0

0.13

0.13

0.049

0.096

O.K.

15.37

31.46

BN-9

BN-10

3299.500

3299.500

3298.900

3298.830

0.670

10.40

160

6.73

1088.86

292.60

0.60

3298.830

O.K.

0.010

1.19

5.76

1.0

0.03

0.09

0.015

0.050

O.K.

8.07

3.88

BN-10

BN-11

3299.500

3299.500

3298.830

3298.770

0.730

9.98

160

6.01

685.94

184.32

0.67

3298.770

O.K.

0.010

1.17

6.09

2.0

0.05

0.11

0.024

0.063

O.K.

10.06

3.73

BN-11

BN-12

3299.500

3299.500

3298.770

3298.680

0.820

9.81

160

9.17

523.47

140.67

0.73

3298.680

O.K.

0.010

1.16

6.35

3.0

0.08

0.12

0.031

0.073

O.K.

11.65

3.66

BN-12

BN-13

3299.500

3299.500

3298.680

3298.590

0.910

9.67

160

9.31

432.11

116.12

0.82

3298.590

O.K.

0.010

1.15

6.73

4.0

0.10

0.14

0.037

0.081

O.K.

12.88

3.61

BN-13

BN-14

3299.500

3299.500

3298.590

3298.500

1.000

10.77

160

8.36

372.38

100.07

0.91

3298.500

O.K.

0.010

1.21

7.09

5.0

0.13

0.15

0.042

0.087

O.K.

13.93

4.02

BN-14

3299.500

3299.000

3298.500

3297.137

1.863

105.41

160

12.93

329.76

88.61

1.00

3297.137

O.K.

0.010

3.80

7.44

6.0

0.15

0.16

0.046

0.093

O.K.

14.84

39.35

3299.000

3298.296

3296.137

3295.629

2.667

9.99

200

50.85

138.68

37.27

2.86

3295.629

O.K.

0.010

1.36

22.81

22.0

0.55

0.33

0.053

0.101

O.K.

20.21

4.71

3298.296

3296.150

3295.629

3294.950

1.200

11.96

200

56.77

138.68

37.27

2.67

3294.950

O.K.

0.010

1.48

22.02

22.0

0.55

0.32

0.054

0.103

O.K.

20.57

5.64

3296.150

3294.543

3294.950

3293.343

1.200

28.31

200

56.77

138.68

37.27

1.20

3293.343

O.K.

0.010

2.28

14.77

22.0

0.55

0.24

0.073

0.126

O.K.

25.14

13.34

3294.543

3292.500

3293.343

3291.300

1.200

36.82

200

55.48

138.68

37.27

1.20

3291.300

O.K.

0.010

2.60

14.77

22.0

0.55

0.24

0.073

0.126

O.K.

25.14

17.36

10

3292.500

3292.000

3291.300

3290.800

1.200

7.53

200

66.40

138.68

37.27

1.20

3290.800

O.K.

0.010

1.18

14.77

22.0

0.55

0.24

0.073

0.126

O.K.

25.14

3.55

BN-15

BN-16

3295.000

3294.500

3294.400

3293.900

0.600

44.84

160

11.15

1088.86

292.60

0.60

3293.900

O.K.

0.010

2.48

5.76

1.0

0.03

0.09

0.015

0.050

O.K.

8.07

16.74

BN-16

BN-17

3294.500

3294.500

3293.900

3293.800

0.700

9.43

160

10.61

685.94

184.32

0.60

3293.800

O.K.

0.010

1.14

5.76

2.0

0.05

0.10

0.025

0.064

O.K.

10.28

3.52

BN-17

3294.500

3293.250

3293.800

3292.050

1.200

54.18

160

32.30

523.47

140.67

0.70

3292.050

O.K.

0.010

2.72

6.22

3.0

0.08

0.12

0.031

0.073

O.K.

11.76

20.22

10

3293.250

3292.000

3292.050

3290.800

1.200

16.89

200

74.00

523.47

140.67

1.20

3290.800

O.K.

0.010

1.76

14.77

3.0

0.08

0.15

0.016

0.053

O.K.

10.60

7.96

10

44

3292.000

3292.000

3290.800

3289.800

2.200

18.13

200

55.15

127.35

34.22

1.20

3289.800

O.K.

0.010

1.83

14.77

25.0

0.63

0.25

0.081

0.134

O.K.

26.85

8.55

11

12

3304.064

3303.858

3302.864

3302.658

1.200

6.97

200

29.57

685.94

184.32

1.20

3302.658

O.K.

0.010

1.13

14.77

2.0

0.05

0.13

0.012

0.047

O.K.

9.39

3.28

12

13

3303.858

3302.329

3302.658

3301.129

1.200

44.56

200

34.31

297.56

79.96

1.20

3301.129

O.K.

0.010

2.86

14.77

7.0

0.18

0.18

0.031

0.073

O.K.

14.59

21.01

CALCULO HIDRAULICO
PARAMETROS BASICOS DE DISEO
COEFICIENTE DE RUGOSIDAD (n)

UNIDAD
---

VELOCIDAD MINIMA
VELOCIDAD MAXIMA
RELACION h/D MAXIMA
Caudal Unit./LOTE

VALOR
0.01

VALOR
0.010

SUGERIDO (*)
----

m/s
m/s

0.60
5.0

0.60
3.00

0.45
4.00

---

0.8

0.75

0.80

Col.H

Col.I

Vllena

Qlleno

Qu

Col.J
Caudal
Pico

# LOTES

SUGERIDO (**)
0.009

#NAME?
0.0047755336

0.000093
0.000932 max

0.02505

0.000251 min
Col.B

Col.C

Col.D

Col.E

omparar

Col.F
V=0.60
Q m3/s

TRAMOS

Col.G

V=0.45
Q m3/s

Col.L
J/H

Col.M
Relacin

a/A

y/D

Col.P
O*D

Vparcial

Tensin
Tractiva
Media

()

mm

Kg/m

O.K.

20.73

32.92

O.K.

9.39

9.44

0.104

O.K.

20.88

9.39

0.020

0.059

O.K.

11.70

29.03

0.13

0.012

0.047

O.K.

9.39

8.14

0.20

0.044

0.089

O.K.

17.86

26.11

0.48

0.23

0.066

0.117

O.K.

23.33

28.27

1.23

0.38

0.104

0.160

O.K.

32.09

18.90

2.0

0.05

0.10

0.025

0.064

O.K.

10.28

13.59

3.0

0.08

0.12

0.031

0.074

O.K.

11.76

13.56

6.15

4.0

0.10

0.13

0.039

0.084

O.K.

13.42

13.59

2.23

7.18

5.0

0.13

0.15

0.041

0.087

O.K.

13.85

13.60

0.010

2.23

7.90

6.0

0.15

0.17

0.044

0.090

O.K.

14.42

13.60

O.K.

0.010

2.22

8.54

7.0

0.18

0.19

0.047

0.093

O.K.

14.95

13.48

3292.800

O.K.

0.010

2.22

14.77

64.0

1.60

0.31

0.163

0.220

O.K.

44.07

12.65

1.20

3291.200

O.K.

0.010

2.30

14.77

66.0

1.65

0.32

0.167

0.224

O.K.

44.79

13.49

17.92

1.20

3289.800

O.K.

0.010

2.15

14.77

66.0

1.65

0.32

0.167

0.224

O.K.

44.79

11.81

523.47

140.67

1.20

3301.435

O.K.

0.010

1.72

14.77

3.0

0.08

0.15

0.016

0.053

O.K.

10.60

7.51

33.94

372.38

100.07

1.20

3299.233

O.K.

0.010

3.46

14.77

5.0

0.13

0.17

0.024

0.064

O.K.

12.72

30.49

160

10.75

1088.86

292.60

0.60

3301.880

O.K.

0.010

3.60

5.76

1.0

0.03

0.09

0.015

0.050

O.K.

8.07

35.28

160

7.71

685.94

184.32

0.62

3301.147

O.K.

0.010

3.61

5.86

2.0

0.05

0.10

0.024

0.064

O.K.

10.21

35.35

95.03

160

13.47

523.47

140.67

0.85

3299.867

O.K.

0.010

3.61

6.87

3.0

0.08

0.13

0.029

0.070

O.K.

11.28

35.33

1.200

96.35

160

6.58

432.11

116.12

1.13

3299.233

O.K.

0.010

3.63

7.92

4.0

0.10

0.15

0.033

0.075

O.K.

12.00

35.82

3296.075

2.200

89.79

200

35.17

251.66

67.63

1.20

3296.075

O.K.

0.010

4.07

14.77

9.0

0.23

0.19

0.037

0.081

O.K.

16.29

42.19

3299.750

3297.075

1.200

79.68

200

33.57

1088.86

292.60

1.20

3297.075

O.K.

0.010

3.83

14.77

1.0

0.03

0.11

0.007

0.040

O.K.

7.98

37.44

3296.732

3296.075

3295.532

1.200

12.28

200

44.22

207.74

55.82

2.20

3295.532

O.K.

0.010

1.50

20.00

12.0

0.30

0.26

0.037

0.081

O.K.

16.17

5.77

3302.635

3300.950

3301.435

3299.750

1.200

49.53

200

34.02

1088.86

292.60

1.20

3299.750

O.K.

0.010

3.02

14.77

1.0

0.03

0.11

0.007

0.040

O.K.

7.98

23.27

26

3301.405

3300.950

3300.205

3299.750

1.200

13.02

200

34.95

1088.86

292.60

1.20

3299.750

O.K.

0.010

1.55

14.77

1.0

0.03

0.11

0.007

0.040

O.K.

7.98

6.12

27

3300.950

3297.661

3299.750

3296.461

1.200

71.41

200

46.06

297.56

79.96

1.20

3296.461

O.K.

0.010

3.63

14.77

7.0

0.18

0.18

0.031

0.073

O.K.

14.59

33.55

BUZON

COTA TAPA

COTA FONDO

ALTURA

V>

Rug.

mm

MAX

MIN

0.6

m/seg

lt/seg

Sumat.

Qp

Vp

# LOTES

lt/seg

m/seg

2.285

69.83

200

43.62

179.02

48.11

1.20

3298.083

O.K.

0.010

3.59

14.77

2.285

20.03

200

31.31

685.94

184.32

1.20

3298.083

O.K.

0.010

1.92

14.77

15.0

0.38

0.22

0.055

0.104

2.0

0.05

0.13

0.012

0.047

3297.342

2.332

19.93

200

37.18

143.05

38.44

2.28

3297.342

O.K.

0.010

1.92

20.38

21.0

0.53

0.30

0.056

3303.850

3302.033

1.200

61.59

200

29.50

432.11

116.12

1.20

3302.033

O.K.

0.010

3.37

14.77

4.0

0.10

0.16

3303.233

3302.658

3302.033

1.200

17.27

200

36.19

685.94

184.32

1.20

3302.033

O.K.

3301.405

3302.033

3300.205

1.200

55.39

200

33.00

220.14

59.16

1.20

3300.205

O.K.

0.010

1.78

14.77

2.0

0.05

0.010

3.19

14.77

11.0

0.28

3301.405

3299.674

3300.205

3297.342

2.332

59.98

200

47.73

152.92

41.09

1.20

3297.342

3299.674

3295.500

3297.342

3294.300

1.200

40.11

200

75.85

81.32

21.85

2.33

3294.300

O.K.

0.010

3.32

14.77

19.0

O.K.

0.010

2.72

20.59

49.0

BN-19

3297.000

3296.750

3296.400

3296.052

0.698

36.40

160

9.56

685.94

184.32

0.60

3296.052

O.K.

0.010

2.23

5.76

BN-19

BN-20

3296.750

3296.500

3296.052

3295.817

0.683

36.32

160

6.47

523.47

140.67

0.70

3295.817

O.K.

0.010

2.23

6.21

BN-20

BN-21

3296.500

3296.500

3295.817

3295.569

0.931

36.42

160

6.81

432.11

116.12

0.68

3295.569

O.K.

0.010

2.23

BN-21

BN-22

3296.500

3296.250

3295.569

3295.121

1.129

36.42

160

12.30

372.38

100.07

0.93

3295.121

O.K.

0.010

BN-22

BN-23

3296.250

3296.000

3295.121

3294.681

1.319

36.42

160

12.08

329.76

88.61

1.13

3294.681

O.K.

BN-23

20

3296.000

3295.500

3294.681

3294.300

1.200

36.11

160

10.55

297.56

79.96

1.32

3294.300

20

21

3295.500

3294.000

3294.300

3292.800

1.200

26.83

200

55.90

68.05

18.29

1.20

21

22

3294.000

3292.400

3292.800

3291.200

1.200

28.62

200

55.90

66.67

17.92

22

44

3292.400

3292.000

3291.200

3289.800

2.200

25.04

200

55.90

66.67

17

23

3303.233

3302.635

3302.033

3301.435

1.200

15.99

200

37.40

23

24

3302.635

3300.433

3301.435

3299.233

1.200

64.88

200

BN-24

BN-25

BN-25

BN-26

3303.500

3302.500

3302.900

3301.880

0.620

94.88

3302.500

3302.000

3301.880

3301.147

0.853

95.07

BN-26

BN-27

3302.000

3301.000

3301.147

3299.867

1.133

BN-27

24

3301.000

3300.433

3299.867

3299.233

24

25

3300.433

3298.275

3299.233

26

25

3300.950

3298.275

25

28

3298.275

23

26

18
26

DEL

AL

DEL

AL

DEL

AL

13

15

3302.329

3300.368

3301.129

3298.083

14

15

3299.910

3300.368

3298.710

3298.083

15

19

3300.368

3299.674

3298.083

16

17

3305.050

3303.233

12

17

3303.858

17

18

3303.233

18

19

19

20

BN-18

H BUZON

CALCULO HIDRAULICO
PARAMETROS BASICOS DE DISEO
COEFICIENTE DE RUGOSIDAD (n)

UNIDAD
---

VELOCIDAD MINIMA
VELOCIDAD MAXIMA
RELACION h/D MAXIMA
Caudal Unit./LOTE

VALOR
0.01

VALOR
0.010

SUGERIDO (*)
----

m/s
m/s

0.60
5.0

0.60
3.00

0.45
4.00

---

0.8

0.75

0.80

Col.H

Col.I

Vllena

Qlleno

Qu

Col.J
Caudal
Pico

# LOTES

SUGERIDO (**)
0.009

#NAME?
0.0047755336

0.000093
0.000932 max

0.02505

0.000251 min
Col.B

Col.C

Col.D

Col.E

omparar

Col.F
V=0.60
Q m3/s

TRAMOS

Col.G

V=0.45
Q m3/s

Col.L
J/H

Col.M
Relacin

a/A

y/D

Col.P
O*D

Vparcial

Tensin
Tractiva
Media

()

mm

Kg/m

O.K.

12.47

22.63

O.K.

19.34

14.50

0.142

O.K.

28.48

13.34

0.088

0.142

O.K.

28.48

7.70

0.25

0.088

0.142

O.K.

28.48

5.77

0.70

0.25

0.088

0.142

O.K.

28.48

5.85

1.0

0.03

0.11

0.007

0.040

O.K.

7.98

4.70

5.0

0.13

0.18

0.022

0.061

O.K.

12.24

0.00

17.58

8.0

0.20

0.21

0.030

0.072

O.K.

14.34

4.70

1.65

5.76

1.0

0.03

0.09

0.015

0.050

O.K.

8.07

7.44

0.010

1.66

6.23

2.0

0.05

0.11

0.023

0.062

O.K.

9.97

7.46

O.K.

0.010

1.65

7.21

4.0

0.10

0.14

0.035

0.078

O.K.

12.49

7.41

3299.645

O.K.

0.010

1.46

5.76

1.0

0.03

0.09

0.015

0.050

O.K.

8.07

5.76

0.61

3299.422

O.K.

0.010

1.43

5.78

2.0

0.05

0.10

0.024

0.064

O.K.

10.26

5.56

140.67

0.60

3299.182

O.K.

0.010

1.46

5.77

3.0

0.08

0.11

0.033

0.076

O.K.

12.14

5.76

432.11

116.12

0.82

3298.984

O.K.

0.010

1.46

6.73

4.0

0.10

0.14

0.037

0.081

O.K.

12.89

5.76

11.39

372.38

100.07

1.02

3298.800

O.K.

0.010

1.49

7.50

5.0

0.13

0.16

0.040

0.085

O.K.

13.58

6.01

200

10.81

251.66

67.63

1.20

3298.260

O.K.

0.010

3.03

14.77

9.0

0.23

0.19

0.037

0.081

O.K.

16.29

23.47

10.10

160

13.37

1088.86

292.60

0.60

3299.265

O.K.

0.010

1.18

5.76

1.0

0.03

0.09

0.015

0.050

O.K.

8.07

3.75

10.13

160

12.24

685.94

184.32

0.74

3299.141

O.K.

0.010

1.18

6.38

2.0

0.05

0.11

0.023

0.062

O.K.

9.88

3.77

1.300

10.16

160

13.88

523.47

140.67

0.86

3299.000

O.K.

0.010

1.18

6.89

3.0

0.08

0.13

0.029

0.070

O.K.

11.26

3.78

3298.480

1.637

45.61

160

11.40

432.11

116.12

1.30

3298.480

O.K.

0.010

2.50

8.48

4.0

0.10

0.16

0.031

0.073

O.K.

11.65

16.96

3298.325

3297.480

2.637

15.00

200

56.32

297.56

79.96

1.20

3297.480

O.K.

0.010

1.66

14.77

7.0

0.18

0.18

0.031

0.073

O.K.

14.59

7.05

3297.480

3296.519

3.836

17.06

200

56.32

220.14

59.16

2.64

3296.519

O.K.

0.010

1.77

21.89

11.0

0.28

0.27

0.032

0.075

O.K.

14.96

0.00

3300.355

3298.318

3297.519

2.836

10.74

200

74.39

187.45

50.37

1.20

3297.519

O.K.

0.010

1.41

14.77

14.0

0.35

0.21

0.052

0.100

O.K.

20.04

0.00

3300.355

3298.000

3296.519

3295.719

2.281

10.00

200

80.00

120.98

32.51

3.84

3295.719

O.K.

0.010

1.36

26.41

27.0

0.68

0.39

0.055

0.104

O.K.

20.80

0.00

BN-41

3297.750

3297.655

3297.150

3297.055

0.600

8.90

160

10.67

1088.86

292.60

0.60

3297.055

O.K.

0.010

1.10

5.76

1.0

0.03

0.09

0.015

0.050

O.K.

8.07

0.00

BN-41

BN-42

3297.655

3297.600

3297.055

3296.969

0.631

8.57

160

10.03

685.94

184.32

0.60

3296.969

O.K.

0.010

1.08

5.76

2.0

0.05

0.10

0.025

0.064

O.K.

10.28

0.00

BN-42

40

3297.600

3298.000

3296.969

3296.719

1.281

22.62

160

11.05

685.94

184.32

0.63

3296.719

O.K.

0.010

1.76

5.91

2.0

0.05

0.10

0.024

0.064

O.K.

10.18

0.00

BUZON

COTA TAPA

COTA FONDO

ALTURA

V>

Rug.

mm

MAX

MIN

0.6

m/seg

lt/seg

Sumat.

Qp

Vp

# LOTES

lt/seg

m/seg

1.200

48.16

200

39.06

372.38

100.07

1.33

3296.461

O.K.

0.010

2.98

15.56

1.200

30.86

200

30.10

196.94

52.92

1.20

3295.532

O.K.

0.010

2.38

14.77

5.0

0.13

0.17

0.023

0.062

13.0

0.33

0.21

0.049

0.097

3293.800

1.200

28.39

200

61.00

118.09

31.73

1.20

3293.800

O.K.

0.010

2.29

14.77

28.0

0.70

0.25

0.088

3293.800

3292.800

1.200

16.39

200

61.00

118.09

31.73

1.20

3292.800

O.K.

0.010

1.74

14.77

28.0

0.70

0.25

3293.251

3292.800

3292.051

1.200

12.28

200

61.00

118.09

31.73

1.20

3292.051

O.K.

0.010

1.50

14.77

28.0

0.70

3293.251

3292.444

3292.051

3291.244

1.200

12.45

200

64.84

118.09

31.73

1.20

3291.244

O.K.

0.010

1.51

14.77

28.0

33

3297.500

3296.968

3296.300

3295.500

1.468

10.00

200

80.00

1088.86

292.60

1.20

3295.500

O.K.

0.010

1.36

14.77

33

34

3296.968

3296.503

3295.500

3294.802

1.701

10.00

200

69.78

372.38

100.07

1.47

3294.802

O.K.

0.010

1.36

16.34

34

41

3296.503

3295.597

3294.802

3294.104

1.493

10.00

200

69.78

272.21

73.15

1.70

3294.104

O.K.

0.010

1.36

BN-32

BN-33

3300.400

3300.000

3299.800

3299.299

0.701

20.02

160

25.03

1088.86

292.60

0.60

3299.299

O.K.

0.010

BN-33

BN-34

3300.000

3300.000

3299.299

3299.059

0.941

20.07

160

11.96

685.94

184.32

0.70

3299.059

O.K.

BN-34

35

3300.000

3300.000

3299.059

3298.800

1.200

19.92

160

13.00

432.11

116.12

0.94

3298.800

BN-35

BN-36

3300.500

3300.250

3299.900

3299.645

0.605

15.48

160

16.47

1088.86

292.60

0.60

BN-36

BN-37

3300.250

3300.025

3299.645

3299.422

0.603

14.96

160

14.91

685.94

184.32

BN-37

BN-38

3300.025

3300.000

3299.422

3299.182

0.818

15.48

160

15.50

523.47

BN-38

BN-39

3300.000

3300.000

3299.182

3298.984

1.016

15.49

160

12.78

BN-39

35

3300.000

3300.000

3298.984

3298.800

1.200

16.15

160

35

39

3300.000

3300.355

3298.800

3298.260

2.095

49.95

BN-28
BN-29

BN-29

3300.000

3300.000

3299.400

3299.265

0.735

BN-30

3300.000

3300.000

3299.265

3299.141

0.859

BN-30

BN-31

3300.000

3300.300

3299.141

3299.000

BN-31

37

3300.300

3300.117

3299.000

36

37

3299.525

3300.117

37

39

3300.117

3300.355

38

39

3299.518

39

40

BN-40

DEL

AL

DEL

AL

DEL

AL

19

27

3299.674

3297.661

3298.342

3296.461

27

28

3297.661

3296.732

3296.461

3295.532

28

29

3296.732

3295.000

3295.532

29

30

3295.000

3294.000

30

31

3294.000

31

43

32

H BUZON

CALCULO HIDRAULICO
PARAMETROS BASICOS DE DISEO
COEFICIENTE DE RUGOSIDAD (n)

UNIDAD
---

VELOCIDAD MINIMA
VELOCIDAD MAXIMA
RELACION h/D MAXIMA
Caudal Unit./LOTE

VALOR
0.01

VALOR
0.010

SUGERIDO (*)
----

m/s
m/s

0.60
5.0

0.60
3.00

0.45
4.00

---

0.8

0.75

0.80

Col.H

Col.I

Vllena

Qlleno

Qu

Col.J
Caudal
Pico

# LOTES

SUGERIDO (**)
0.009

#NAME?
0.0047755336

0.000093
0.000932 max

0.02505

0.000251 min
Col.B

Col.C

Col.D

Col.E

omparar

V=0.60
Q m3/s

TRAMOS
BUZON

COTA TAPA

COTA FONDO

Col.G

V=0.45
Q m3/s

ALTURA

V>

Rug.

mm

MAX

MIN

0.6

m/seg

lt/seg

1.493

20.19

200

80.00

115.36

31.00

2.28

3294.104

O.K.

0.010

1.93

20.36

1.200

10.05

200

48.26

90.12

24.22

1.49

3293.619

O.K.

0.010

1.36

16.47

3292.300

1.200

31.63

200

41.70

86.07

23.13

1.20

3292.300

O.K.

0.010

2.41

3294.000

3293.900

0.600

10.56

160

9.47

1088.86

292.60

0.60

3293.900

O.K.

0.010

3294.400

3293.900

3293.800

0.600

15.38

160

6.50

685.94

184.32

0.60

3293.800

O.K.

3294.400

3294.000

3293.800

3293.400

0.600

22.64

160

17.67

523.47

140.67

0.60

3293.400

43

3294.000

3293.500

3293.400

3292.300

1.200

63.00

160

17.46

432.11

116.12

0.60

43

44

3293.500

3292.444

3292.300

3291.244

1.200

16.66

200

63.37

81.32

21.85

44

45

3292.444

3292.000

3291.244

3290.800

1.200

9.84

200

45.10

36.05

9.69

45

46

46

47

47

48

48

49

DEL

AL

DEL

AL

DEL

AL

40

41

3298.000

3295.597

3295.719

3294.104

41

42

3295.597

3294.819

3294.104

3293.619

42

43

3294.819

3293.500

3293.619

BN-43

BN-44

3294.600

3294.500

BN-44

BN-45

3294.500

BN-45

BN-46

BN-46

H BUZON

Col.F

Col.L
J/H

Col.M
Relacin

a/A

y/D

Col.P
O*D

Vparcial

Tensin
Tractiva
Media

()

mm

Kg/m

O.K.

24.57

0.00

O.K.

33.28

0.00

0.183

O.K.

36.56

0.00

0.015

0.050

O.K.

8.07

0.00

0.10

0.025

0.064

O.K.

10.28

0.00

0.08

0.11

0.033

0.076

O.K.

12.15

0.00

4.0

0.10

0.12

0.041

0.086

O.K.

13.83

0.00

49.0

1.23

0.29

0.133

0.191

O.K.

38.25

0.00

166.0

4.16

0.40

0.333

0.367

O.K.

73.43

0.00

Sumat.

Qp

Vp

# LOTES

lt/seg

m/seg

29.0

0.73

0.33

0.071

0.123

42.0

1.05

0.31

0.110

0.166

14.77

45.0

1.13

0.29

0.125

1.20

5.76

1.0

0.03

0.09

0.010

1.45

5.76

2.0

0.05

O.K.

0.010

1.76

5.76

3.0

3292.300

O.K.

0.010

2.94

5.76

1.20

3291.244

O.K.

0.010

1.75

14.77

1.20

3290.800

O.K.

0.010

1.35

14.77

ALCANTARILLADO
METRADO DE TUBERIAS PVC-UF
DEPARTAMENTO: ICA
PROVINCIA : ICA
DISTRITO: ICA
CALLE
PASAJE

TIPO
TERRENO

BUZON
INICIO FINAL

COTAS DE BUZON INICIO


TAPA
FONDO Hprom.

COTAS DE BUZON FINAL


TAPA
FONDO Hprom.

LONGITUD
TUBERIA

DIAMETRO ALTURA
( m.m.)
PROM.

1.00-1.50

PROFUNDIDAD (MTS)
2.00-2.50
2.50-3.00

1.50-2.00

TN

BN-1

BN-2

3300.500

3299.900

0.60

3300.000

3299.400

0.60

11.17

160

0.80

11.17

TN

3298.500

3297.300

1.20

3298.500

3296.762

1.74

67.29

200

1.67

TN

BN-3

BN-4

3301.000

3300.400

0.60

3301.500

3300.320

1.18

8.48

160

1.09

8.48

TN

BN-4

3301.500

3300.320

1.18

3298.500

3296.762

1.74

42.18

160

1.66

TN

3298.500

3296.762

1.74

3299.000

3296.137

2.86

78.11

200

2.50

TN

BN-5

BN-6

3301.000

3300.400

0.60

3300.830

3300.230

0.60

11.54

160

0.80

TN

BN-6

BN-7

3300.830

3300.230

0.60

3300.750

3300.090

0.66

9.47

160

TN

BN-7

3300.750

3300.090

0.66

3300.500

3299.900

0.60

12.94

TN

BN-8

3302.000

3301.400

0.60

3300.500

3299.900

0.60

TN

3300.500

3299.900

0.60

3299.000

3296.137

TN

BN-9

BN-10

3299.500

3298.900

0.60

3299.500

TN

BN-10

BN-11

3299.500

3298.830

0.67

TN

BN-11

BN-12

3299.500

3298.770

TN

BN-12

BN-13

3299.500

TN

BN-13

BN-14

TN

BN-14

TN

TN

67.29
42.18

3.00-3.50

3.50-4.00

11.54

0.83

9.47

160

0.83

12.94

23.37

160

0.80

23.37

2.86

44.65

160

1.93

3298.830

0.67

6.73

160

0.83

6.73

3299.500

3298.770

0.73

6.01

160

0.90

6.01

0.73

3299.500

3298.680

0.82

9.17

160

0.98

9.17

3298.680

0.82

3299.500

3298.590

0.91

9.31

160

1.07

9.31

3299.500

3298.590

0.91

3299.500

3298.500

1.00

8.36

160

1.15

8.36

3299.500

3298.500

1.00

3299.000

3297.137

1.86

12.93

160

1.63

3299.000

3296.137

2.86

3298.296

3295.629

2.67

50.85

200

2.96

3298.296

3295.629

2.67

3296.150

3294.950

1.20

56.77

200

2.13

TN

3296.150

3294.950

1.20

3294.543

3293.343

1.20

56.77

200

1.40

56.77

TN

3294.543

3293.343

1.20

3292.500

3291.300

1.20

55.48

200

1.40

55.48

TN

10

3292.500

3291.300

1.20

3292.000

3290.800

1.20

66.40

200

1.40

66.40

TN

BN-15

BN-16

3295.000

3294.400

0.60

3294.500

3293.900

0.60

11.15

160

0.80

11.15

TN

BN-16

BN-17

3294.500

3293.900

0.60

3294.500

3293.800

0.70

10.61

160

0.85

10.61

TN

BN-17

3294.500

3293.800

0.70

3293.250

3292.050

1.20

32.30

160

1.15

32.30

TN

10

3293.250

3292.050

1.20

3292.000

3290.800

1.20

74.00

200

1.40

74.00

TN

10

44

3292.000

3290.800

1.20

3292.000

3289.800

2.20

55.15

200

1.90

TN

11

12

3304.064

3302.864

1.20

3303.858

3302.658

1.20

29.57

200

1.40

29.57

TN

12

13

3303.858

3302.658

1.20

3302.329

3301.129

1.20

34.31

200

1.40

34.31

TN

13

15

3302.329

3301.129

1.20

3300.368

3298.083

2.28

43.62

200

1.94

43.62

TN

14

15

3299.910

3298.710

1.20

3300.368

3298.083

2.28

31.31

200

1.94

31.31

TN

15

19

3300.368

3298.083

2.28

3299.674

3297.342

2.33

37.18

200

2.51

TN

16

17

3305.050

3303.850

1.20

3303.233

3302.033

1.20

29.50

200

1.40

TN

12

17

3303.858

3302.658

1.20

3303.233

3302.033

1.20

36.19

200

TN

17

18

3303.233

3302.033

1.20

3301.405

3300.205

1.20

33.00

TN

18

19

3301.405

3300.205

1.20

3299.674

3297.342

2.33

TN

19

20

3299.674

3297.342

2.33

3295.500

3294.300

TN

BN-18

BN-19

3297.000

3296.400

0.60

3296.750

3296.052

44.65

12.93

55.15

56.77

78.11

50.85

29.50

1.40

36.19

200

1.40

33.00

47.73

200

1.97

47.73

1.20

75.85

200

1.97

75.85

0.70

9.56

160

0.85

9.56

37.18

ALCANTARILLADO
METRADO DE TUBERIAS PVC-UF
DEPARTAMENTO: ICA
PROVINCIA : ICA
DISTRITO: ICA
CALLE
PASAJE

TIPO
TERRENO

BUZON
INICIO FINAL

COTAS DE BUZON INICIO


TAPA
FONDO Hprom.

COTAS DE BUZON FINAL


TAPA
FONDO Hprom.

LONGITUD
TUBERIA

DIAMETRO ALTURA
( m.m.)
PROM.

1.00-1.50

PROFUNDIDAD (MTS)
2.00-2.50
2.50-3.00

1.50-2.00

3.00-3.50

3.50-4.00

TN

BN-19

BN-20

3296.750

3296.052

0.70

3296.500

3295.817

0.68

6.47

160

0.89

6.47

TN

BN-20

BN-21

3296.500

3295.817

0.68

3296.500

3295.569

0.93

6.81

160

1.01

6.81

TN

BN-21

BN-22

3296.500

3295.569

0.93

3296.250

3295.121

1.13

12.30

160

1.23

12.30

TN

BN-22

BN-23

3296.250

3295.121

1.13

3296.000

3294.681

1.32

12.08

160

1.42

12.08

TN

BN-23

20

3296.000

3294.681

1.32

3295.500

3294.300

1.20

10.55

160

1.46

10.55

TN

20

21

3295.500

3294.300

1.20

3294.000

3292.800

1.20

55.90

200

1.40

55.90

TN

21

22

3294.000

3292.800

1.20

3292.400

3291.200

1.20

55.90

200

1.40

55.90

TN

22

44

3292.400

3291.200

1.20

3292.000

3289.800

2.20

55.90

200

1.90

TN

17

23

3303.233

3302.033

1.20

3302.635

3301.435

1.20

37.40

200

1.40

37.40

TN

23

24

3302.635

3301.435

1.20

3300.433

3299.233

1.20

33.94

200

1.40

33.94

TN

BN-24

BN-25

3303.500

3302.900

0.60

3302.500

3301.880

0.62

10.75

160

0.81

10.75

TN

BN-25

BN-26

3302.500

3301.880

0.62

3302.000

3301.147

0.85

7.71

160

0.94

7.71

TN

BN-26

BN-27

3302.000

3301.147

0.85

3301.000

3299.867

1.13

13.47

160

1.19

13.47

TN

BN-27

24

3301.000

3299.867

1.13

3300.433

3299.233

1.20

6.58

160

1.37

6.58

TN

24

25

3300.433

3299.233

1.20

3298.275

3296.075

2.20

35.17

200

1.90

TN

26

25

3300.950

3299.750

1.20

3298.275

3297.075

1.20

33.57

200

1.40

TN

25

28

3298.275

3296.075

2.20

3296.732

3295.532

1.20

44.22

200

1.90

TN

23

26

3302.635

3301.435

1.20

3300.950

3299.750

1.20

34.02

200

1.40

34.02

TN

18

26

3301.405

3300.205

1.20

3300.950

3299.750

1.20

34.95

200

1.40

34.95

TN

26

27

3300.950

3299.750

1.20

3297.661

3296.461

1.20

46.06

200

1.40

46.06

TN

19

27

3299.674

3298.342

1.33

3297.661

3296.461

1.20

39.06

200

1.47

39.06

TN

27

28

3297.661

3296.461

1.20

3296.732

3295.532

1.20

30.10

200

1.40

30.10

TN

28

29

3296.732

3295.532

1.20

3295.000

3293.800

1.20

61.00

200

1.40

61.00

TN

29

30

3295.000

3293.800

1.20

3294.000

3292.800

1.20

61.00

200

1.40

61.00

TN

30

31

3294.000

3292.800

1.20

3293.251

3292.051

1.20

61.00

200

1.40

61.00

TN

31

43

3293.251

3292.051

1.20

3292.444

3291.244

1.20

64.84

200

1.40

64.84

TN

32

33

3297.500

3296.300

1.20

3296.968

3295.500

1.47

80.00

200

1.53

80.00

TN

34

41

3296.503

3294.802

1.70

3295.597

3294.104

1.49

69.78

200

1.80

69.78

TN

BN-32

BN-33

3300.400

3299.800

0.60

3300.000

3299.299

0.70

25.03

160

0.85

25.03

TN

BN-33

BN-34

3300.000

3299.299

0.70

3300.000

3299.059

0.94

11.96

160

1.02

11.96

TN

BN-34

35

3300.000

3299.059

0.94

3300.000

3298.800

1.20

13.00

160

1.27

13.00

TN

BN-35

BN-36

3300.500

3299.900

0.60

3300.250

3299.645

0.61

16.47

160

0.80

16.47

TN

BN-36

BN-37

3300.250

3299.645

0.61

3300.025

3299.422

0.60

14.91

160

0.80

14.91

TN

BN-37

BN-38

3300.025

3299.422

0.60

3300.000

3299.182

0.82

15.50

160

0.91

15.50

TN

BN-38

BN-39

3300.000

3299.182

0.82

3300.000

3298.984

1.02

12.78

160

1.12

12.78

TN

BN-39

35

3300.000

3298.984

1.02

3300.000

3298.800

1.20

11.39

160

1.31

11.39

TN

35

39

3300.000

3298.800

1.20

3300.355

3298.260

2.09

10.81

200

1.85

33.57
-

55.90

35.17
44.22

10.81

ALCANTARILLADO
METRADO DE TUBERIAS PVC-UF
DEPARTAMENTO: ICA
PROVINCIA : ICA
DISTRITO: ICA
CALLE
PASAJE

TIPO
TERRENO

BUZON
INICIO FINAL

COTAS DE BUZON INICIO


TAPA
FONDO Hprom.

COTAS DE BUZON FINAL


TAPA
FONDO Hprom.

LONGITUD
TUBERIA

DIAMETRO ALTURA
( m.m.)
PROM.

PROFUNDIDAD (MTS)
2.00-2.50
2.50-3.00

3.00-3.50

3.50-4.00

TN

BN-28

BN-29

3300.000

3299.400

0.60

3300.000

3299.265

0.74

13.37

160

0.87

13.37

TN

BN-29

BN-30

3300.000

3299.265

0.74

3300.000

3299.141

0.86

12.24

160

1.00

12.24

TN

BN-30

BN-31

3300.000

3299.141

0.86

3300.300

3299.000

1.30

13.88

160

1.28

13.88

TN

BN-31

37

3300.300

3299.000

1.30

3300.117

3298.480

1.64

11.40

160

1.67

TN

36

37

3299.525

3298.325

1.20

3300.117

3297.480

2.64

56.32

200

2.12

TN

48

49

0.000

0.000

0.000

0.000

0.00

0.20

TOTALES

2,498.60

1.00-1.50

1.50-2.00

1,491.38

11.40

727.99

56.32
-

113.09

166.14

SUSTENTO DE METRADOS
-

ALCANTARILLADO
METRADO DE BUZONES
DEPARTAMENTO: ICA
PROVINCIA : ICA
DISTRITO: ICA
UBICACIN

TIPO
TERRENO
TN
1
TN
1
TN
1
TN
1
TN
1
TN
1
TN
1
TN
1
TN
1
TN
1
TN
1
TN
1
TN
TN
1
TN
1
TN
1
TN
TN
1
TN
1
TN
1
TN
1
TN
1
TN
1
TN
1
TN
TN
1
TN
1
TN
1
TN
1
TN
1
TN
1
TN
TN
TN
TN
1

BUZON
N
1
2
3
BN-4
2
BN-5
BN-6
BN-7
BN-8
3
BN-9
BN-10
BN-12
BN-13
BN-14
5
6
7
8
BN-15
BN-16
BN-17

COTA
COTA BUZON
BZS.
DADO TIPO
TAPA
FONDO Hprom. 1.20 m.
8" SUPERF
400.500 399.300
1.20
1.00
2
394.350 393.150
1.20
1.00
2
393.200 392.000
1.20
1.00
2
393.200 391.671
1.53
1.00
2
396.160 394.960
1.20
1.00
2
393.296 392.096
1.20
1.00
2
393.200 391.612
1.59
1.00
3
395.940 394.440
1.50
1.00
3
393.200 391.430
1.77
1.00
3
393.200 392.000
1.20
1.00
2
393.200 391.248
1.95
1.00
3
393.200 391.184
2.02
1.00
2
395.500 394.300
1.20
2
396.000 393.705
2.30
1.00
3
393.200 391.068
2.13
1.00
2
393.200 390.883
2.32
1.00
2
396.160 394.960
396.160 394.781
1.38
1.00
3
397.200 394.387
2.81
1.00
3
394.000 392.800
1.20
1.00
1
395.800 392.475
3.32
1.00
3
393.200 392.000
1.20
1.00
1
393.200 391.660
1.54
1.00
3
393.200 391.530
1.67
1.00
2

ALTURA
PROMEDIO
1.20
1.20
1.20
1.53
1.20
1.20
1.59
1.50
1.77
1.20
1.95
2.02
1.20
2.30
2.13
2.32

ALTURA
PROFUNDIDAD (MTS)
WinuE:
WinuE:
WinuE:
WinuE:
WinuE:
WinuE:
EXCAV.
1.00-1.50
1.51-2.00
2.01-2.50 2.51-3.00
3.01-3.50
3.51-4.0
BZ. TIPO A
BZ. TIPO A
BZ. TIPO
BZ. TIPO
BZ. TIPO
A
A
BZ.ATIPO A
1.40
1.00
1.40
1.00
1.40
1.00
1.73
1.00
1.40
1.00
1.40
1.00
1.79
1.00
1.70
1.00
1.97
1.00
1.40
1.00
2.15
1.00
2.22
1.00
1.40
2.50
1.00
2.33
1.00
2.52
1.00
-

1.38
2.81
1.20
3.32
1.20
1.54
1.67

1.58
3.01
1.40
3.52
1.40
1.74
1.87

1.00
1.00
1.00
-

1.00
1.00

1.00
-

1.00
-

10
11
12
13
14
15

397.010
397.000
393.200
393.200
393.200
393.200

395.510
394.646
392.000
391.619
391.186
390.892

1.50
2.35
1.20
1.58
2.01
2.31

1.00
1.00
1.00
1.00
1.00
1.00

1
3
2
2
2
3

1.50
2.35
1.20
1.58
2.01
2.31

1.70
2.55
1.40
1.78
2.21
2.51

1.00
1.00
-

1.00
-

1.00
1.00
1.00

18

393.200

391.543

1.66

1.00

1.66

1.86

1.00

SUSTENTO DE METRADOS
-

ALCANTARILLADO
METRADO DE BUZONES
DEPARTAMENTO: ICA
PROVINCIA : ICA
DISTRITO: ICA
UBICACIN

TIPO
TERRENO
TN
1
TN
1
TN
1
TN
1
TN
1

BUZON
N
19
BN-18
BN-19
BN-20
BN-21

COTA
COTA BUZON
BZS.
DADO TIPO
TAPA
FONDO Hprom. 1.20 m.
8" SUPERF
393.200 392.000
1.20
1.00
1
393.200 391.233
1.97
1.00
4
393.200 392.000
1.20
1.00
1
393.200 391.035
2.16
1.00
4
393.200 392.000
1.20
1.00
2

ALTURA
PROMEDIO
1.20
1.97
1.20
2.16
1.20

ALTURA
PROFUNDIDAD (MTS)
WinuE:
WinuE:
WinuE:
WinuE:
WinuE:
WinuE:
EXCAV.
1.00-1.50
1.51-2.00
2.01-2.50 2.51-3.00
3.01-3.50
3.51-4.0
BZ. TIPO A
BZ. TIPO A
BZ. TIPO
BZ. TIPO
BZ. TIPO
A
A
BZ.ATIPO A
1.40
1.00
2.17
1.00
1.40
1.00
2.36
1.00
1.40
1.00
-

TN
TN
TN
TN
TN
TN
TN
TN
TN
TN
TN
TN
TN
TN
TN
TN

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

BN-23
20
21
22
17
23
BN-24
BN-25
BN-26
BN-27
24
26
25
23
18
26

393.200
393.200
393.200
393.200
393.200
393.200
393.800
393.682
393.800
393.551
393.682
393.800
393.800
393.200
393.200
393.200

390.800
391.200
390.640
391.200
390.607
390.501
390.349
392.482
390.283
391.504
391.051
390.127
390.083
392.000
391.780
391.170

2.40
2.00
2.56
2.00
2.59
2.70
3.45
1.20
3.52
2.05
2.63
3.67
3.72
1.20
1.42
2.03

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

2
3
3
2
1
2
2
2
3
3
2
3
2
1
3
3

2.40
2.00
2.56
2.00
2.59
2.70
3.45
1.20
3.52
2.05
2.63
3.67
3.72
1.20
1.42
2.03

2.60
2.20
2.76
2.20
2.79
2.90
3.65
1.40
3.72
2.25
2.83
3.87
3.92
1.40
1.62
2.23

1.00
1.00
1.00
-

1.00
1.00
-

1.00
1.00
1.00

1.00
1.00
1.00
1.00
-

1.00
-

1.00
1.00
1.00
-

TN
TN
TN

1
1
1

27
28
29

393.433
393.316
393.316

392.233
391.598
390.850

1.20
1.72
2.47

1.00
1.00
1.00

3
3
4

1.20
1.72
2.47

1.40
1.92
2.67

1.00
-

1.00
-

1.00

TN

31

393.433

390.525

2.91

1.00

2.91

3.11

1.00

TN

BN-32

393.551

391.823

1.73

1.00

1.73

1.93

1.00

TN
TN
TN

1
1
1

BN-34
BN-35
BN-36

393.551
393.749
393.200

390.197
389.932
392.000

3.35
3.82
1.20

1.00
1.00
1.00

4
3
1

3.35
3.82
1.20

3.55
4.02
1.40

1.00

1.00
-

1.00
-

SUSTENTO DE METRADOS
-

ALCANTARILLADO
METRADO DE BUZONES
DEPARTAMENTO: ICA
PROVINCIA : ICA
DISTRITO: ICA
UBICACIN

TIPO
TERRENO

BUZON
N

COTA
TAPA

COTA BUZON
BZS.
DADO TIPO
FONDO Hprom. 1.20 m.
8" SUPERF

ALTURA
PROMEDIO

ALTURA
EXCAV.

WinuE:
WinuE:

1.00-1.50
1.51-2.00
BZ. TIPO
BZ. TIPO
A
A

PROFUNDIDAD (MTS)
WinuE:
WinuE:
WinuE:
WinuE:
2.01-2.50 2.51-3.00
3.01-3.50
3.51-4.0
BZ. TIPO A
BZ. TIPO A
BZ. TIPO
BZ.ATIPO A

TN

BN-38

393.200

391.416

1.78

1.00

1.78

1.98

1.00

TN

35

393.316

391.066

2.25

1.00

2.25

2.45

1.00

TN
TN
TN
TN

1
1
1
1

BN-29
BN-30
BN-31
36

393.433
393.551
393.551
393.645

390.740
390.801
390.413
390.151

2.69
2.75
3.14
3.49

1.00
1.00
1.00
1.00

3
3
3
2

2.69
2.75
3.14
3.49

2.89
2.95
3.34
3.69

1.00
1.00
-

1.00
1.00

TN
TN
TN

1
1
1

0
0
0

393.675
393.711
393.711

390.078
389.860
389.795

3.60
3.85
3.92

1.00
1.00
1.00

3
3
2

3.60
3.85
3.92

3.80
4.05
4.12

1.00
1.00
1.00

134

167

TOTALES

20.00

14.00

13.00

8.00

5.00

7.00

ALCANTARILLADO
METRADO DE CONEXIONES DOMICILIARIAS
DEPARTAMENTO: ICA
PROVINCIA : ICA
DISTRITO: ICA
CALLE
PASAJE

TIPO
TERRENO

BUZON
INICIO
FINAL

COTAS DE BUZON INICIO


TAPA
FONDO Hprom.

COTAS DE BUZON FINAL


TAPA
FONDO Hprom.

LONGITUD
TUBERIA

DIAMETRO ALTURA
( m.m.)
PROM.

# LOTES

PROFUNDIDAD (MTS)
N conex. 2.50-3.00

1.00-1.50

N conex.

1.50-2.00

N conex.

2.00-2.50

N conex.

3.00-3.50

N conex.

3.50-4.00

85.00

17.00

TN

BN-1

BN-2

3300.500

3299.900

0.60

3300.000

3299.400

0.60

5.00

160

0.80

17

TN

BN-2

3300.000

3299.400

0.60

3298.500

3297.300

1.20

6.00

160

1.10

18

TN

3298.500

3297.300

1.20

3298.500

3296.762

1.74

5.00

200

1.47

17

85.00

17.00

TN

BN-3

BN-4

3301.000

3300.400

0.60

3301.500

3300.320

1.18

5.00

160

0.89

25.00

5.00

TN

BN-4

3301.500

3300.320

1.18

3298.500

3296.762

1.74

5.00

160

1.46

TN

3298.500

3296.762

1.74

3299.000

3296.137

2.86

5.00

200

2.30

15

TN

BN-5

BN-6

3301.000

3300.400

0.60

3300.830

3300.230

0.60

5.00

160

0.60

10

50.00

10.00

TN

BN-6

BN-7

3300.830

3300.230

0.60

3300.750

3300.090

0.66

5.30

160

0.63

37.10

7.00

TN

BN-7

3300.750

3300.090

0.66

3300.500

3299.900

0.60

5.00

160

0.63

15

75.00

15.00

TN

BN-8

3302.000

3301.400

0.60

3300.500

3299.900

0.60

5.30

160

0.60

37.10

7.00

TN

3300.500

3299.900

0.60

3299.000

3296.137

2.86

5.00

160

1.73

6.00

TN

BN-9

BN-10

3299.500

3298.900

0.60

3299.500

3298.830

0.67

5.30

160

0.63

10.60

2.00

TN

BN-10

BN-11

3299.500

3298.830

0.67

3299.500

3298.770

0.73

5.30

160

0.70

21.20

4.00

TN

BN-11

BN-12

3299.500

3298.770

0.73

3299.500

3298.680

0.82

5.00

160

0.78

17

85.00

17.00

TN

BN-12

BN-13

3299.500

3298.680

0.82

3299.500

3298.590

0.91

5.00

160

0.87

10.00

2.00

TN

BN-13

BN-14

3299.500

3298.590

0.91

3299.500

3298.500

1.00

5.30

160

0.95

10.60

2.00

TN

BN-14

3299.500

3298.500

1.00

3299.000

3297.137

1.86

5.30

160

1.43

26.50

5.00

TN

3299.000

3296.137

2.86

3298.296

3295.629

2.67

5.00

200

2.76

4.00

TN

3298.296

3295.629

2.67

3296.150

3294.950

1.20

5.00

200

1.93

7.00

TN

3296.150

3294.950

1.20

3294.543

3293.343

1.20

5.00

200

1.20

30.00

6.00

TN

3294.543

3293.343

1.20

3292.500

3291.300

1.20

5.00

200

1.20

35.00

7.00

TN

10

3292.500

3291.300

1.20

3292.000

3290.800

1.20

5.00

200

1.20

40.00

8.00

TN

BN-15

BN-16

3295.000

3294.400

0.60

3294.500

3293.900

0.60

5.00

160

0.60

12

60.00

12.00

TN

BN-16

BN-17

3294.500

3293.900

0.60

3294.500

3293.800

0.70

5.00

160

0.65

20.00

4.00

TN

BN-17

3294.500

3293.800

0.70

3293.250

3292.050

1.20

5.00

160

0.95

15.00

3.00

TN

10

3293.250

3292.050

1.20

3292.000

3290.800

1.20

5.00

200

1.20

5.00

1.00

TN

10

44

3292.000

3290.800

1.20

3292.000

3289.800

2.20

5.00

200

1.70

4.00

TN

11

12

3304.064

3302.864

1.20

3303.858

3302.658

1.20

5.00

200

1.20

20.00

4.00

TN

12

13

3303.858

3302.658

1.20

3302.329

3301.129

1.20

5.00

200

1.20

35.00

7.00

TN

13

15

3302.329

3301.129

1.20

3300.368

3298.083

2.28

5.00

200

1.74

5.00

1.00

TN

14

15

3299.910

3298.710

1.20

3300.368

3298.083

2.28

5.00

200

1.74

17

85.00

17.00

TN

15

19

3300.368

3298.083

2.28

3299.674

3297.342

2.33

5.00

200

2.31

9.00

TN

16

17

3305.050

3303.850

1.20

3303.233

3302.033

1.20

5.00

200

1.20

25.00

5.00

TN

12

17

3303.858

3302.658

1.20

3303.233

3302.033

1.20

5.00

200

1.20

10.00

2.00

TN

17

18

3303.233

3302.033

1.20

3301.405

3300.205

1.20

5.00

200

1.20

40.00

8.00

TN

18

19

3301.405

3300.205

1.20

3299.674

3297.342

2.33

5.00

200

1.77

5.00

TN

19

20

3299.674

3297.342

2.33

3295.500

3294.300

1.20

5.00

200

1.77

8.00

TN

BN-18

BN-19

3297.000

3296.400

0.60

3296.750

3296.052

0.70

5.00

160

0.65

5.00

1.00

TN

BN-19

BN-20

3296.750

3296.052

0.70

3296.500

3295.817

0.68

5.00

160

0.69

35.00

7.00

TN

BN-20

BN-21

3296.500

3295.817

0.68

3296.500

3295.569

0.93

5.00

160

0.81

10

50.00

10.00

TN

BN-21

BN-22

3296.500

3295.569

0.93

3296.250

3295.121

1.13

5.30

160

1.03

15.90

3.00

TN

BN-22

BN-23

3296.250

3295.121

1.13

3296.000

3294.681

1.32

5.30

160

1.22

10.60

2.00

TN

BN-23

20

3296.000

3294.681

1.32

3295.500

3294.300

1.20

5.30

160

1.26

21.20

4.00

TN

20

21

3295.500

3294.300

1.20

3294.000

3292.800

1.20

5.30

200

1.20

10.60

2.00

TN

21

22

3294.000

3292.800

1.20

3292.400

3291.200

1.20

5.00

200

1.20

TN

22

44

3292.400

3291.200

1.20

3292.000

3289.800

2.20

5.30

200

1.70

2.00

TN

17

23

3303.233

3302.033

1.20

3302.635

3301.435

1.20

5.00

200

1.20

30.00

35.00

20.00

Usuario:
25.00
una conexin
al parque

40.00

10.60
-

75.00

45.00

15.00

20.00

ALCANTARILLADO
METRADO DE CONEXIONES DOMICILIARIAS
DEPARTAMENTO: ICA
PROVINCIA : ICA
DISTRITO: ICA
CALLE
PASAJE

TIPO
TERRENO

BUZON
INICIO
FINAL

COTAS DE BUZON INICIO


TAPA
FONDO Hprom.

COTAS DE BUZON FINAL


TAPA
FONDO Hprom.

LONGITUD
TUBERIA

DIAMETRO ALTURA
( m.m.)
PROM.

# LOTES

PROFUNDIDAD (MTS)
N conex. 2.50-3.00

1.00-1.50

N conex.

1.50-2.00

N conex.

2.00-2.50

N conex.

3.00-3.50

N conex.

3.50-4.00

TN

23

24

3302.635

3301.435

1.20

3300.433

3299.233

1.20

5.00

200

1.20

TN

BN-24

BN-25

3303.500

3302.900

0.60

3302.500

3301.880

0.62

5.00

160

0.61

15.00

3.00

TN

BN-25

BN-26

3302.500

3301.880

0.62

3302.000

3301.147

0.85

5.00

160

0.74

11

55.00

11.00

TN

BN-26

BN-27

3302.000

3301.147

0.85

3301.000

3299.867

1.13

5.00

160

0.99

20.00

4.00

TN

BN-27

24

3301.000

3299.867

1.13

3300.433

3299.233

1.20

5.30

160

1.17

31.80

6.00

TN

24

25

3300.433

3299.233

1.20

3298.275

3296.075

2.20

5.30

200

1.70

5.00

TN

26

25

3300.950

3299.750

1.20

3298.275

3297.075

1.20

5.00

200

1.20

TN

25

28

3298.275

3296.075

2.20

3296.732

3295.532

1.20

5.00

200

1.70

5.00

TN

23

26

3302.635

3301.435

1.20

3300.950

3299.750

1.20

5.00

200

1.20

15.00

3.00

TN

18

26

3301.405

3300.205

1.20

3300.950

3299.750

1.20

5.00

200

1.20

20

100.00

20.00

TN

26

27

3300.950

3299.750

1.20

3297.661

3296.461

1.20

5.00

200

1.20

20.00

4.00

TN

19

27

3299.674

3298.342

1.33

3297.661

3296.461

1.20

5.00

200

1.27

30.00

6.00

TN

27

28

3297.661

3296.461

1.20

3296.732

3295.532

1.20

5.00

200

1.20

30.00

6.00

TN

28

29

3296.732

3295.532

1.20

3295.000

3293.800

1.20

5.00

200

1.20

16

80.00

16.00

TN

29

30

3295.000

3293.800

1.20

3294.000

3292.800

1.20

5.00

200

1.20

30.00

6.00

TN

30

31

3294.000

3292.800

1.20

3293.251

3292.051

1.20

5.00

200

1.20

16

80.00

16.00

TN

31

43

3293.251

3292.051

1.20

3292.444

3291.244

1.20

5.00

200

1.20

10.00

2.00

TN

32

33

3297.500

3296.300

1.20

3296.968

3295.500

1.47

5.00

200

1.33

13

65.00

13.00

TN

34

41

3296.503

3294.802

1.70

3295.597

3294.104

1.49

5.00

200

1.60

6.00

TN

BN-32

BN-33

3300.400

3299.800

0.60

3300.000

3299.299

0.70

5.00

160

0.65

25.00

5.00

TN

BN-33

BN-34

3300.000

3299.299

0.70

3300.000

3299.059

0.94

5.00

160

0.82

25.00

5.00

TN

BN-34

35

3300.000

3299.059

0.94

3300.000

3298.800

1.20

5.00

160

1.07

30.00

6.00

TN

BN-35

BN-36

3300.500

3299.900

0.60

3300.250

3299.645

0.61

5.00

160

0.60

15.00

3.00

TN

BN-36

BN-37

3300.250

3299.645

0.61

3300.025

3299.422

0.60

5.00

160

0.60

15.00

3.00

TN

BN-37

BN-38

3300.025

3299.422

0.60

3300.000

3299.182

0.82

5.00

160

0.71

40.00

8.00

TN

BN-38

BN-39

3300.000

3299.182

0.82

3300.000

3298.984

1.02

5.00

160

0.92

25.00

5.00

TN

BN-39

35

3300.000

3298.984

1.02

3300.000

3298.800

1.20

5.00

160

1.11

35.00

7.00

TN

35

39

3300.000

3298.800

1.20

3300.355

3298.260

2.09

5.00

200

1.65

6.00

TN

BN-28

BN-29

3300.000

3299.400

0.60

3300.000

3299.265

0.74

5.00

160

0.67

12

60.00

12.00

TN

BN-29

BN-30

3300.000

3299.265

0.74

3300.000

3299.141

0.86

5.00

160

0.80

35.00

7.00

TN

BN-30

BN-31

3300.000

3299.141

0.86

3300.300

3299.000

1.30

5.00

160

1.08

10.00

2.00

TN

BN-31

37

3300.300

3299.000

1.30

3300.117

3298.480

1.64

5.00

160

1.47

20.00

4.00

TN

36

37

3299.525

3298.325

1.20

3300.117

3297.480

2.64

5.00

200

1.92

TN

48

49

0.000

0.000

0.000

0.000

5.00

TN

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

5.00

#REF!

TN

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

5.00

TN

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

5.00

TN

0.000

0.000

0.000

0.000

TOTALES

0.00

26.50
25.00

30.00

30.00

25.00

5.00

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

HOJA DE METRADOS
OBRA

:ELABORACION DEL EXPEDIENTE TECNICO DEL PROYECTO: REDES DE AGUA POTABLE Y ALCANTARILLADO DE LA URBANIZACION LOS HUARANGOS

ENTIDAD
UBICACIN

D&D CONSTRUCTORES S.A.C.


: ICA-ICA-ICA

PROYECTISTA

: DENNIS RENALT GARCIA ARTEAGA

METRADO

: REDES DE AGUA POTABLE Y ALCANTARILLADO

FECHA

:AGOSTO DEL 2014

REVISADO POR:
ITEM
01
1.01
1.02
2
2.01
02.01.01
02.01.02

DESCRIPCION
OBRAS PROVISIONALES
CASETA DE GUARDIANIA Y ALMACEN DE A=10m x L=20m
MOVILIZACION Y DESMOVILIZACION DE EQUIPO
REDES Y CONEXIONES DOMICILIARIAS DE AGUA POTABLE
TRABAJOS PRELIMINARES
TRAZO, NIVELES Y REPLANTEO DE OBRA
SEALIZACION EN OBRA (CINTA DE SEGURIDAD)
1RA. ETAPA
TRAMO 01 (160MM)
TRAMO 02 (110MM)
TRAMO 03 (110MM)
TRAMO 04 (90MM)
TRAMO 05 (90MM)
2DA ETAPA
TRAMO 01 (110MM)
TRAMO 02 (110MM)
TRAMO 03 (90MM)

TIPO

CANT.

MES
GLB

ML
ML

PARCIAL SUB-TOTAL

TOTAL

3.00
2.00

3.00
2.00

3.00
2.00

3.00
2.00

3426.34

3426.34

3426.34

3426.34
3426.34

1.00
1.00
1.00
1.00
1.00

227.50
667.50
242.96
310.45
653.73

227.50
667.50
242.96
310.45
653.73

2102.14

1.00
1.00
1.00

538.90
197.90
587.40

538.90
197.90
587.40

1324.20

4.00

4.00

02.01.03
TRANQUERAS DE MADERA 1.20X1.10M P/DESVIO TRANSITO VEHICULAR
2.02 MOVIMIENTO DE TIERRAS
02.02.01
EXCAVACION DE ZANJA C/MAQ. H=1.20 M ANCHO 0.60M EN T.N. (PROMEDIO)
1RA. ETAPA
TRAMO 01 (160MM)
TRAMO 02 (110MM)
TRAMO 03 (110MM)
TRAMO 04 (90MM)
TRAMO 05 (90MM)
2DA ETAPA
TRAMO 01 (110MM)
TRAMO 02 (110MM)
TRAMO 03 (90MM)

und

02.02.02

REFINE Y NIVELACION DE FONDO DE ZANJA P/TUB 90mm ISO 4435

ML

3426.34

02.02.03

CAMA DE APOYO E=0.10m, MATERIAL SELECTO COMPACTADO

ML

3426.34

02.02.04

RELLENO SELECTO COMPACTADO C/PLANCHA VIBRATORIA H=0.30 T.N. (PROMEDIO)

ML

3426.34

02.02.05

ELIMINACION DE MATERIAL EXCEDENTE T.N. (R=5KM)


1RA. ETAPA
TRAMO 01 (160MM)
TRAMO 02 (110MM)
TRAMO 03 (110MM)
TRAMO 04 (90MM)
CAMA Y PROTECCCION DE TUBERIAS
2DA ETAPA
TRAMO 01 (110MM)
TRAMO 02 (110MM)
TRAMO 03 (90MM)
CAMA Y PROTECCCION DE TUBERIAS
RIEGO DE MATERIAL EXTRAIDO DE EXCAVACION P/EVITAR POLVO
MATERIAL PARA LA ELIMINACION
MATERIAL PROVENIENTE DE LA EXCAVACION

m3

02.02.06

2.03 RED DE TUBERIAS


02.03.01
SUMINISTRO E INSTALACION DE TUBERIA PVC-UF 160 mm ISO C-7.5
1RA. ETAPA
TRAMO 01 (160MM)
02.03.02
SUMINISTRO E INSTALACION DE TUBERIA PVC-UF 110 mm ISO C-7.5
1RA. ETAPA
TRAMO 02 (110MM)
TRAMO 03 (110MM)
2DA ETAPA
TRAMO 01 (110MM)
TRAMO 02 (110MM)
02.03.03
SUMINISTRO E INSTALACION DE TUBERIA PVC-UF 90 mm ISO C-7.5
1RA. ETAPA
TRAMO 04 (90MM)
TRAMO 05 (90MM)
2DA ETAPA
TRAMO 03 (90MM)
02.03.04
02.03.05
02.03.06
02.03.07
02.03.08
02.03.09

PRUEBA HIDRAULICA A ZANJA ABIERTA D=160mm


PRUEBA HIDRAULICA A ZANJA ABIERTA D=110mm
PRUEBA HIDRAULICA A ZANJA ABIERTA D=90mm
PRUEBA HIDRAULICA+DESINFECCION DE TUBERIA PVC D=160mm A ZANJA TAPADA
PRUEBA HIDRAULICA+DESINFECCION DE TUBERIA PVC D=110mm A ZANJA TAPADA
PRUEBA HIDRAULICA+DESINFECCION DE TUBERIA PVC D=90mm A ZANJA TAPADA

2.04
02.05.01
02.05.02
02.05.02

VALVULAS
SUMINISTRO DE VALVULA COMPUERTA HD D=200mm
SUMINISTRO DE VALVULA COMPUERTA HD D=160mm
SUMINISTRO DE VALVULA COMPUERTA HD D=110mm
1ERA ETAPA
2DA ETAPA
SUMINISTRO DE VALVULA COMPUERTA HD D=90mm.
1ERA ETAPA
2DA ETAPA
SUMINISTRO DE GRIFO CONTRA INCENDIO-POSTE DE 2 BOCAS
1ERA ETAPA

02.05.03

02.05.04

4.00

ML
1.00
1.00
1.00
1.00
1.00

227.50
667.50
242.96
310.45
653.73

227.50
667.50
242.96
310.45
653.73

2102.14

1.00
1.00
1.00

538.90
197.90
587.40

538.90
197.90
587.40

1324.20

314.33
1.00 227.50
1.00 667.50
1.00 242.96
1.00 310.45
0.70 2102.14

0.01
0.01
0.01
0.01
0.40

1.25
1.25
1.25
1.25
0.30

2.70
7.93
2.89
2.47
176.58

192.57

1.00 538.90
1.00 197.90
1.00 587.40
0.70 1324.20

0.01
0.01
0.01
0.40

1.25
1.25
1.25
0.30

4.29
1.57
4.67
111.23

121.76

m3

468.93
0.30
0.30
-0.30

314.33
3426.34
121.76

0.40

1.00

94.30
411.16
-36.53

468.93

ML

227.50
1.00

227.50

227.50

227.50

1.00
1.00

667.50
242.96

667.50
242.96

910.46

1.00
1.00

538.90
197.90

538.90
197.90

736.80

ML

1647.26

ML

ml
ml
ml
m
m
m

und
und
und

4.00
3426.34

2531.34
1.00
1.00

310.45
653.73

1.00

587.40

227.50
1647.26
2531.34
227.50
1647.26
2531.34

1.00
2.00

310.45
653.73

1943.94

587.40

587.40

227.50
1647.26
2531.34
227.50
1647.26
2531.34

227.50
1647.26
2531.34
227.50
1647.26
2531.34

227.50
1647.26
2531.34
227.50
1647.26
2531.34

1.00
2.00
10.00

4.00
6.00

und

10.00
6.00
4.00

und

10.00
4.00

HOJA DE METRADOS
OBRA

:ELABORACION DEL EXPEDIENTE TECNICO DEL PROYECTO: REDES DE AGUA POTABLE Y ALCANTARILLADO DE LA URBANIZACION LOS HUARANGOS

ENTIDAD
UBICACIN

D&D CONSTRUCTORES S.A.C.


: ICA-ICA-ICA

PROYECTISTA

: DENNIS RENALT GARCIA ARTEAGA

METRADO

: REDES DE AGUA POTABLE Y ALCANTARILLADO

FECHA

:AGOSTO DEL 2014

REVISADO POR:
ITEM
02.05.05
02.05.06
02.05.07
02.05.08
02.05.09
02.05.10
02.05.11
2.05
02.06.06
02.06.06
02.06.07
02.06.08
02.06.09
02.06.10
02.06.10
02.06.10
02.06.12
02.06.12
02.06.13
02.06.13
02.06.15
02.06.16
02.06.16
02.06.17
02.06.19
02.06.20
02.06.22
02.06.23
02.06.23
02.06.25
02.06.26
02.06.27
02.06.28
02.06.30
2.06
02.06.01
02.06.01.01

DESCRIPCION
2DA ETAPA
INSTALACION DE VALVULA HD D=200mm
INSTALACION DE VALVULA HD D=160mm
INSTALACION DE VALVULA HD D=110mm
INSTALACION DE VALVULA HD D=90mm.
INSTALACION DE VALVULA D=110mm Y GRIFO CONTRA INCENDIO
DADOS DE CONCRETO F'C=140 KG/CM2 P/ANCLAJE DE VALVULAS Y GRIFOS
CAJA DE CONCRETO P/PROTEC. VALVULA INC. MARCO Y TAPA DE FF
SUMINISTRO, INSTALACION Y ANCLAJES DE ACCESORIOS
CRUZ PVC UF 110mm x 110mm
TEE PVC UF 160mm x 160mm
TEE PVC UF 160mm x 110mm
TEE PVC UF 160mm x 90mm
TEE PVC UF 110mm x 110mm
TEE PVC UF 110mm x 90mm
TEE PVC UF 90mm x 90mm
TAPON 160mm
TAPON 90mm
CODO PVC UF 200mm x 22.5
CODO PVC UF 160mm x 90
CODO PVC UF 160mm x 45
CODO PVC UF 110mm x 22.5
CODO PVC UF 90mm x 90
CODO PVC UF 90mm x 45
CODO PVC UF 90mm x 22.5
TRANSICION PVC - AC 200mm
TRANSICION PVC - AC 160mm
REDUCCION PVC UF 200mm A 160mm
REDUCCION PVC UF 160mm A 110mm
REDUCCION PVC UF 110mm A 90mm
INSTALAC. DE ACCESORIOS PARA AGUA PVC 200 mm
INSTALAC. DE ACCESORIOS PARA AGUA PVC 160 mm
INSTALAC. DE ACCESORIOS PARA AGUA PVC 110 mm
INSTALAC. DE ACCESORIOS PARA AGUA PVC 90 mm
DADOS DE CONCRETO F'C=140 KG/CM2 P/ANCLAJE DE VALVULAS Y GRIFOS
CONEXIONES DOMICILIARIAS DE AGUA POTABLE
TRABAJOS PRELIMINARES
TRAZO, Y REPLANTEO DE CONEXIONES DOMICILIARIAS
CALLE LOS NOGALES

A TUB. PVC 110mm

CALLE LOS EUCALIPTOS

A TUB. PVC 110mm

TIPO

CANT.

und
und
und
und
und
und
und

6.00
1.00
2.00
10.00
10.00
2.00
25.00
25.00

und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und

3.00
3.00
1.00
2.00
10.00
5.00
5.00
1.00
3.00
1.00
2.00
3.00
10.00
3.00
4.00
5.00
1.00
1.00
1.00
2.00
8.00
3.00
14.00
36.00
21.00
74.00

02.06.01.02
02.06.02
02.06.02.01
02.06.02.02
02.06.02.03
02.06.02.04
02.06.02.05

A TUB. PVC 90mm


A TUB. PVC 110mm

CALLE LOS LOS ALAMOS


CALLE LOS CEDROS

A TUB. PVC 90mm


A TUB. PVC 110mm
A TUB. PVC 110mm

CALLE LOS CAOBAS

A TUB. PVC 90mm


AL PARQUE
A TUB. PVC 90mm

CALLE LOS JAZMINES

A TUB. PVC 90mm

CALLE LOS HUARANGOS


CALLE LOS HUARANGOS
CALLE LOS LAS CASUARINAS

A TUB. PVC 90mm


A TUB. PVC 110mm
A TUB. PVC 90mm

CALLE LOS ALMENDROS

A TUB. PVC 160mm


A TUB. PVC 110mm

CALLE LAS ACACIAS

A TUB. PVC 110mm

CALLE LOS ABETOS

A TUB. PVC 90mm


A TUB. PVC 110mm

CALLE LOS FICUS

A TUB. PVC 90mm


A TUB. PVC 110mm

CALLE LAS MIMOSAS


CALLE LOS MANZANOS
CALLE LOS PECANOS

A TUB. PVC 90mm


A TUB. PVC 90mm
A TUB. PVC 90mm

CALLE LOS CASTAOS

A TUB. PVC 90mm

CINTA PLASTICA SEALIZADORA P/LIMITE SEGURIDAD DE OBRA


MOVIMIENTO DE TIERRAS
EXCAVACION ZANJA TN A PULSO A=0.45 MENOR= 1M
REFINE Y NIVELACION DE FONDO DE ZANJA A=0.60 TN
CAMA DE ARENA MANUAL APOYO E=0.10m Y PROTEC E=0.20m P/TUB DN
RELLENO APISONADO CON MATERIAL PROPIO C/COMPACTADOR H=1.20
ELIMINACION DE MATERIAL C/CARG+VOLQUETE R=3KM
TRAMOS DEL 1 AL 9 AV. ARENALES

02.06.03
CONEXIONES DOMICILIARIAS DE AGUA POTABLE
02.06.03.01 CONEX.DOMICILIARIAS DE AGUA 1/2" A TUB. PVC-UF 160mm

PARCIAL SUB-TOTAL

ML

TOTAL
1.00
2.00
10.00
10.00
2.00
25.00
25.00

2.00

5.00
3.00
1.00
2.00
16.00
11.00
7.00
1.00
6.00
1.00
2.00
3.00
12.00
3.00
5.00
5.00
1.00
1.00
1.00
4.00
10.00
3.00
16.00
54.00
27.00
100.00

6.00
6.00
2.00
0.00
3.00

2.00
0.00
1.00

2.00
2.00
2.00
18.00
6.00
26.00

ML

A TUB. PVC 90mm


CALLE LOS ROBLES
CALLE LOS LOS PINOS

1550.00
26.00
29.00
25.00
15.00
4.00
1.00
14.00
4.00
6.00
7.00
9.00
6.00
7.00
11.00
2.00
7.00
7.00
6.00
2.00
12.00
28.00
34.00
24.00
14.00
23.00

7.50
1.50
1.50
7.50
1.50
7.50
1.50
7.50
1.50
1.50
1.50
1.50
7.50
1.50
10.00
1.50
7.50
1.50
7.50
1.50
1.50
1.50
7.50
1.50
1.50

195.00
43.50
37.50
112.50
6.00
7.50
21.00
30.00
9.00
10.50
13.50
9.00
52.50
16.50
20.00
10.50
52.50
9.00
15.00
18.00
42.00
51.00
180.00
21.00
34.50

22.00
8.00
5.00
32.00
11.00
2.00
16.00
4.00
11.00
17.00
15.00
13.00
15.00
8.00

1.50
7.50
1.50
1.50
7.50
1.50
1.50
7.50
1.50
1.50
1.50
7.50
1.50
7.50

33.00
60.00
7.50
48.00
82.50
3.00
24.00
30.00
16.50
25.50
22.50
97.50
22.50
60.00

1.00

962.00

588.00
1550.00

1550.00

ML
ML
ML
ML
m3

1550.00
1550.00
1550.00
1550.00
1550.00
18.41

1.00 1550.00

0.01

1.25

18.41

18.41

21.00

21.00

und

14.00
14.00

1.50

HOJA DE METRADOS
OBRA

:ELABORACION DEL EXPEDIENTE TECNICO DEL PROYECTO: REDES DE AGUA POTABLE Y ALCANTARILLADO DE LA URBANIZACION LOS HUARANGOS

ENTIDAD
UBICACIN

D&D CONSTRUCTORES S.A.C.


: ICA-ICA-ICA

PROYECTISTA

: DENNIS RENALT GARCIA ARTEAGA

METRADO

: REDES DE AGUA POTABLE Y ALCANTARILLADO

FECHA

:AGOSTO DEL 2014

REVISADO POR:
ITEM

DESCRIPCION

TIPO

LONG. PROMEDIO
02.06.03.02 CONEX.DOMICILIARIAS DE AGUA 1/2" A TUB. PVC-UF 110mm
CALLE LOS NOGALES

A TUB. PVC 110mm

CALLE LOS EUCALIPTOS

A TUB. PVC 110mm

CALLE LOS LOS PINOS

A TUB. PVC 110mm

CALLE LOS LOS ALAMOS


CALLE LOS CEDROS

A TUB. PVC 110mm


A TUB. PVC 110mm

CALLE LOS HUARANGOS


CALLE LOS LAS CASUARINAS
CALLE LOS ALMENDROS

A TUB. PVC 110mm


A TUB. PVC 90mm
A TUB. PVC 110mm

CALLE LAS ACACIAS

A TUB. PVC 110mm

CALLE LOS ABETOS

A TUB. PVC 110mm

CALLE LOS FICUS

A TUB. PVC 110mm

LONG. PROMEDIO
02.06.03.03 CONEX.DOMICILIARIAS DE AGUA 1/2" A TUB. PVC-UF 900mm
CALLE LOS EUCALIPTOS
A TUB. PVC 90mm
CALLE LOS ROBLES
CALLE LOS LOS PINOS
CALLE LOS CEDROS
CALLE LOS CAOBAS

A TUB. PVC 90mm


A TUB. PVC 90mm
A TUB. PVC 90mm
AL PARQUE
A TUB. PVC 90mm

CALLE LOS JAZMINES

A TUB. PVC 90mm

CALLE LOS HUARANGOS


CALLE LOS LAS CASUARINAS

A TUB. PVC 90mm


A TUB. PVC 90mm

CALLE LAS ACACIAS


CALLE LOS ABETOS
CALLE LAS MIMOSAS
CALLE LOS MANZANOS
CALLE LOS PECANOS

A
A
A
A
A

CALLE LOS CASTAOS

A TUB. PVC 90mm

CANT.

14.00
1.50

ML

26.00
29.00
25.00
15.00
4.00
6.00
9.00
6.00
7.00
28.00
23.00
22.00
8.00
32.00
11.00
16.00
4.00
271.00
3.03

7.50
1.50
1.50
7.50
7.50
1.50
1.50
1.50
7.50
1.50
1.50
1.50

195.00
43.50
37.50
112.50
30.00
9.00
13.50
9.00
52.50
42.00
0.00
34.50

1.50
7.50
1.50
7.50
1.50
7.50

33.00
60.00
48.00
82.50
24.00
30.00

ML
1.50
7.50
1.50
1.50
1.50
10.00
1.50
7.50
1.50
7.50
1.50
1.50
7.50
1.50
1.50
1.50
1.50
1.50
7.50
1.50
7.50

m3

03
3.01
03.01.01
03.01.02

ML
ML

2.00 2498.60

und

8.00

03.03.20

277.50

217.00
4.00
1.00
14.00
7.00
11.00
2.00
7.00
7.00
6.00
2.00
12.00
34.00
24.00
5.00
2.00
11.00
17.00
15.00
13.00
15.00
8.00
217.00
3.10
1550.00

02.07.04
COSTOS AMBIENTALES
02.07.04.01 RIEGO DE MATERIAL EXTRAIDO DE EXCAVACION P/EVITAR POLVO

MOVIMIENTO DE TIERRAS Y REPOSICION DE PAVIMENTOS


EXCAV. C/EQ, P/ALCAN.T.NORMAL H<1.500M DN 200 MM
EXCAV. C/EQ, P/ALCAN.T.NORMAL H=1.51-2.00M DN 200 MM
EXCAV. C/EQ, P/ALCAN.T.NORMAL H=2.01-2.50M DN 200 MM
EXCAV. C/EQ, P/ALCAN.T.NORMAL H=2.51-3.00M DN 200 MM
EXCAV. C/EQ, P/ALCAN.T.NORMAL H=3.01-3.50M DN 200 MM
EXCAV. C/EQ, P/ALCAN.T.NORMAL H=3.51-4.00M DN 200 MM
REFINE Y NIVELACION DE FONDO DE ZANJA P/TUB 200mm
CAMA DE ARENA MANUAL APOYO E=0.10m Y PROTEC.E=0.20m P/TUB DN 200MM
ENTIBADO CORRIDO DE ZANJAS H=2.01-2.50m DE PROF.
ENTIBADO CORRIDO DE ZANJAS H=2.51-3.00m DE PROF.
ENTIBADO CORRIDO DE ZANJAS H=3.01-3.50m DE PROF.
ENTIBADO CORRIDO DE ZANJAS H=3.51-4.00m DE PROF.
RELLENO COMPACTADO ZANJAS P/TUBERIA ALCANTARILLADO H<1.50M
RELLENO COMPACTADO ZANJAS P/TUBERIA ALCANTARILLADO H=1.50-2.00M
RELLENO COMPACTADO ZANJAS P/TUBERIA ALCANTARILLADO H=2.01-2.50M
RELLENO COMPACTADO ZANJAS P/TUBERIA ALCANTARILLADO H=2.51-3.00M
RELLENO COMPACTADO ZANJAS P/TUBERIA ALCANTARILLADO H=3.01-3.50M
RELLENO COMPACTADO ZANJAS P/TUBERIA ALCANTARILLADO H=3.51-4.00M
ELIMINACION DE MATERIAL C/CARG+VOLQUETE R=3KM
TUBERIAS DE PVC-UF 200mm S-20
CAMA DE ARENA MANUAL APOYO E=0.10m Y PROTEC.E=0.20m P/TUB DN 355MM
INCLUIDA LA ELIMINACION DE LAS TUBERIAS A CAMBIAR
RIEGO DE MATERIAL EXTRAIDO DE EXCAVACION P/EVITAR POLVO
MATERIAL EXCAVADO
EXCAV. C/EQ, P/ALCAN.T.NORMAL H<1.500M DN 200 MM
EXCAV. C/EQ, P/ALCAN.T.NORMAL H=1.51-2.00M DN 200 MM
EXCAV. C/EQ, P/ALCAN.T.NORMAL H=2.01-2.50M DN 200 MM
EXCAV. C/EQ, P/ALCAN.T.NORMAL H=2.51-3.00M DN 200 MM

0.30

6.00
7.50
21.00
10.50
16.50
20.00
10.50
52.50
9.00
15.00
18.00
51.00
180.00
7.50
3.00
16.50
25.50
22.50
97.50
22.50
60.00

ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
m3

1550.00

0.45

1.20

1550.00

1550.00

251.10

251.10

251.10

4997.20

4997.20
2498.60

0.00
2498.60
8.00

1491.38
727.99
113.09
166.14
0.00
0.00
2498.60
2498.60
113.09
166.14
0.00
0.00
1491.38
727.99
113.09
166.14
0.00
0.00

2498.60 0.03
0.70 2498.60 0.80

0.25

98.12
349.80

m3
ML
ML
ML
ML

255.00

1550.00

1491.38
727.99
113.09
166.14
0.00
0.00
2498.60
2498.60
113.09
166.14
0.00
0.00
1491.38
727.99
113.09
166.14
0.00
0.00
1.25

417.50

ML

0.00
2498.60

ML

TOTAL

544.50

und

ML

03.03
03.03.01
03.03.02
03.03.03
03.03.04
03.03.05
03.03.06
03.03.07
03.03.08
03.03.09
03.03.10
03.03.11
03.03.12
03.03.13
03.03.14
03.03.15
03.03.16
03.03.17
03.03.18
03.03.19

PARCIAL SUB-TOTAL

271.00

LONG. PROMEDIO
02.07.03.05 DOBLE PRUEBA HIDRAULICA EN TUBERIA DE CONEX. DOM. DE AGUA TUB. 110, 160, 90mm.

03.01.03

und

TUB. PVC 90mm


TUB. PVC 90mm
TUB. PVC 90mm
TUB. PVC 90mm
TUB. PVC 90mm

RED PRINCIPAL DE ALCANTARILLADO


TRABAJOS PRELIMINARES
SEALIZACION EN OBRA (CINTA DE SEGURIDAD)
TRAZO, NIVELES Y REPLANTEO DE OBRA
TUBERIAS DE PVC-UF 200mm S-20
TUBERIAS DE PVC-UF 200mm S-25
TRANQUERAS DE MADERA 1.20X1.10M P/DESVIO TRANSITO VEHICULAR Y PEATONAL

1491.38
727.99
113.09
166.14
0.00
0.00
2498.60
2498.60
113.09
166.14
0.00
0.00
1491.38
727.99
113.09
166.14
0.00
0.00
447.92

447.92
349.23

0.30 1491.38
0.30 727.99
0.30 113.09
0.30 166.14

0.80
0.80
0.80
0.80

1.75
1.75
2.25
2.75

357.93
174.72
27.14
39.87

HOJA DE METRADOS
OBRA

:ELABORACION DEL EXPEDIENTE TECNICO DEL PROYECTO: REDES DE AGUA POTABLE Y ALCANTARILLADO DE LA URBANIZACION LOS HUARANGOS

ENTIDAD
UBICACIN

D&D CONSTRUCTORES S.A.C.


: ICA-ICA-ICA

PROYECTISTA

: DENNIS RENALT GARCIA ARTEAGA

METRADO

: REDES DE AGUA POTABLE Y ALCANTARILLADO

FECHA

:AGOSTO DEL 2014

REVISADO POR:
ITEM

DESCRIPCION

EXCAV. C/EQ, P/ALCAN.T.NORMAL H=3.01-3.50M DN 200 MM


EXCAV. C/EQ, P/ALCAN.T.NORMAL H=3.51-4.00M DN 200 MM
MATERIAL A ELIMINAR
03.04
SUMINISTRO E INSTALACION DE TUBERIAS
03.04.01
TUBERIA P.V.C. DESG. U.F. ISO 4435 SERIE-20 200MM ADQUISICION E INST.
03.04.02
TUBERIA P.V.C. DESG. U.F. ISO 4435 SERIE-25 200MM ADQUISICION E INST.
03.04.04
PRUEBA HIDRAULICA
03.04.04.01 DOBLE PRUEBA HIDR.+ ESCORRENT. TUBERIA 2000mm
03.04.04.02 DOBLE PRUEBA HIDR.+ ESCORRENT. TUBERIA 200mm
03.05
BUZONES
03.05.01
BUZON DE INSPECCION TIPO I DE 1.00M TN HASTA 1.50M. PROF.
03.05.01
BUZON DE INSPECCION TIPO I DE 1.51M TN HASTA 2.00M. PROF.
03.05.02
BUZON DE INSPECCION TIPO I DE 2.01M TN HASTA 2.51M. PROF.
03.05.03
BUZON DE INSPECCION TIPO I DE 2.51M TN HASTA 3.00M. PROF.
03.05.04
BUZON DE INSPECCION TIPO I DE 3.01M TN HASTA 3.50M. PROF.
03.05.05
BUZON DE INSPECCION TIPO I DE 3.51M TN HASTA 4.00M. PROF.
04
4.01
04.01.01
04.01.02

CONEXIONES DOMICILIARIAS DE ALCANTARILLADO


TRABAJOS PRELIMINARES
CINTA PLASTICA SEALIZADORA P/LIMITE SEGURIDAD DE OBRA
TRAZO Y REPLANTEO DE CONEXIONES DOMICILIARIAS
1RA ETAPA
CALLE LOS NOGALES
A TUB. PVC 200mm

TIPO

CANT.

ML
ML

0.30
0.30
447.92

H
2.75
2.75
2.00

PARCIAL SUB-TOTAL
0.00
0.00
107.50

0.00
2498.60

0.00
2498.60

ML
ML

0.00
2498.60

0.00
2498.60

0.00
2498.60

und
und
und
und
und
und

20.00
14.00
13.00
8.00
5.00
7.00

ML
ML

1.00

20.00
14.00
13.00
8.00
5.00
7.00

2521.65

2521.65

130.00
145.00
125.00
75.00
20.00
5.00
70.00
20.00
30.00
35.00
46.35
30.00
35.00
55.00
5.00
35.00
35.00
30.00
10.00
63.60
148.40
170.00
120.00

A TUB. PVC 200mm


A TUB. PVC 200mm

14.00
23.00

5.00
5.00

70.00
115.00

CALLE LAS ACACIAS

A TUB. PVC 200mm

CALLE LOS ABETOS

A TUB. PVC 200mm


A TUB. PVC 200mm

CALLE LOS FICUS

A TUB. PVC 200mm


A TUB. PVC 200mm

CALLE LAS MIMOSAS


CALLE LOS MANZANOS
CALLE LOS PECANOS

A TUB. PVC 200mm


A TUB. PVC 200mm
A TUB. PVC 200mm

CALLE LOS CASTAOS

A TUB. PVC 200mm

22.00
8.00
5.00
32.00
11.00
2.00
16.00
4.00
11.00
17.00
15.00
13.00
15.00
8.00

5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.30
5.00
5.00
5.00
5.00
5.00

110.00
40.00
25.00
160.00
55.00
10.00
80.00
20.00
58.30
85.00
75.00
65.00
75.00
40.00

A TUB. PVC 200mm

A TUB. PVC 200mm


A TUB. PVC 200mm

CALLE LOS LOS ALAMOS


CALLE LOS CEDROS

A TUB. PVC 200mm


A TUB. PVC 200mm
A TUB. PVC 200mm

CALLE LOS CAOBAS

A TUB. PVC 200mm


AL PARQUE
A TUB. PVC 200mm

CALLE LOS JAZMINES

A TUB. PVC 200mm

CALLE LOS HUARANGOS


CALLE LOS HUARANGOS
CALLE LOS LAS CASUARINAS

A TUB. PVC 200mm


A TUB. PVC 200mm
A TUB. PVC 200mm

2da. ETAPA
CALLE LOS ALMENDROS

MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJA P/CONEX. DOMICILIARIAS Hprom=1.50m
EXCAVACION MANUAL DE ZANJA P/CONEX. DOMICILIARIAS Hprom=2.00m
EXCAVACION MANUAL DE ZANJA P/CONEX. DOMICILIARIAS Hprom=2.50m
EXCAVACION MANUAL DE ZANJA P/CONEX. DOMICILIARIAS Hprom=3.00m
EXCAVACION MANUAL DE ZANJA P/CONEX. DOMICILIARIAS Hprom=3.50m
EXCAVACION MANUAL DE ZANJA P/CONEX. DOMICILIARIAS Hprom=4.00m
REFINE Y NIVELACION DE FONDO DE ZANJA A=0.60 TN
CAMA DE ARENA MANUAL APOYO E=0.10m Y PROTEC. E=0.20m P/TUB DN 160MM
RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CONEX. Hprom=1.50M
RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CONEX. Hprom=2.00M
RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CONEX. Hprom=2.50M
RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CONEX. Hprom=3.00M
RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CONEX. Hprom=3.50M
RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CONEX. Hprom=4.00M
ELIMINACION DE MATERIAL EXCEDENTE
EXCAVACION DE CAJAS DOMICILIARIAS
CAMA DE ARENA MANUAL APOYO E=0.10m Y PROTEC. E=0.20m P/TUB DN 160MM
CONEXIONES DOMICILIARIAS
CONEXION DOMICIL. DESAGUE
CONEXION DOMICIL. DESAGUE
CONEXION DOMICIL. DESAGUE
CONEXION DOMICIL. DESAGUE
CONEXION DOMICIL. DESAGUE
CONEXION DOMICIL. DESAGUE
CONEXION DOMICIL. DESAGUE

TUBO PVC-UF250mm a 160 mm


TUBO PVC-UF200mm a 160 mm Hp=1.50m
TUBO PVC-UF200mm a 160 mm Hp=2.00m
TUBO PVC-UF200mm a 160 mm Hp=2.50m
TUBO PVC-UF200mm a 160 mm Hp=3.00m
TUBO PVC-UF200mm a 160 mm Hp=3.50m
TUBO PVC-UF200mm a 160 mm Hp=4.00m

349.23

0.00
2498.60

5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.15
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.30
5.30
5.00
5.00

CALLE LOS ROBLES


CALLE LOS LOS PINOS

TOTAL

ML
ML

A TUB. PVC 200mm

04.03
04.03.01
04.03.02
04.03.03
04.03.04
04.03.05
04.03.06
04.03.07

0.00 0.80
0.00 0.80
0.30
0.80

26.00
29.00
25.00
15.00
4.00
1.00
14.00
4.00
6.00
7.00
9.00
6.00
7.00
11.00
1.00
7.00
7.00
6.00
2.00
12.00
28.00
34.00
24.00

CALLE LOS EUCALIPTOS

04.02
04.02.01
04.02.02
04.02.03
04.02.04
04.02.05
04.02.06
04.02.03
04.02.04
04.02.05
04.02.06
04.02.07
04.02.08
04.02.09
04.02.10
04.02.07

ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
m3

1438.35

1083.30

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
2521.65
2521.65
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
esponj. 25%

und
und
und
und
und
und
und

2521.65
2521.65

16.00
149.00
140.00
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
2521.65
2521.65
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.80
0.45

0.40
0.60

0.80
1.00

#REF!
#REF!

#REF!
#REF!
16.00
149.00
140.00
#REF!
#REF!
#REF!
#REF!

HOJA DE METRADOS
OBRA

:ELABORACION DEL EXPEDIENTE TECNICO DEL PROYECTO: REDES DE AGUA POTABLE Y ALCANTARILLADO DE LA URBANIZACION LOS HUARANGOS

ENTIDAD
UBICACIN

D&D CONSTRUCTORES S.A.C.


: ICA-ICA-ICA

PROYECTISTA

: DENNIS RENALT GARCIA ARTEAGA

METRADO

: REDES DE AGUA POTABLE Y ALCANTARILLADO

FECHA

:AGOSTO DEL 2014

REVISADO POR:
ITEM
04.03.04
04.04.
04.04.01

5
5.01

DESCRIPCION
DOBLE PRUEBA HIDRAULICA+ESCORRENTIA TUBERIA 250, 200 y 160 mm
COSTOS AMBIENTALES
RIEGO DE MATERIAL EXTRAIDO DE EXCAVACION P/EVITAR POLVO
EXCAVACIONES DE ZANJAS CONEXIONES DOMICILIARIAS
SEGURIDAD EN OBRA
EQUIPOS DE PROTECCION PERSONAL (EPPS)

TIPO

ML

CANT.

PARCIAL SUB-TOTAL

m3

#REF!
#REF!
#REF!

mes

TOTAL
2521.65

2521.65

3.00

0.30
0.30

#REF!
#REF!

#REF!
3.00

RESUMEN GENERAL DE METRADOS


OBRA

:SISTEMA DE REDES DE AGUA POTABLE Y ALCANTARILLADO DE LA HABILITACION URBANA LOS


HUARANGOS

PROPIETARIO:

D&D CONSTRUCTORES S.A.C.

UBICACIN

: ICA-ICA-ICA

FECHA

:AGOSTO DEL 2014

Und.

Metrado

PROYECTISTA : DENNIS RENALT GARCIA ARTEAGA


METRADO

: REDES DE AGUA POTABLE Y ALCANTARILLADO

Lugar

ICA - ICA - ICA

Item

Descripcin

01

RED DE DISTRIBUCION DE AGUA POTABLE

01

OBRAS PROVISIONALES

1.01

CASETA DE GUARDIANIA Y ALMACEN DE A=10m x L=20m

MES

3.00

1.02

MOVILIZACION Y DESMOVILIZACION DE EQUIPO

GLB

2.00

REDES Y CONEXIONES DOMICILIARIAS DE AGUA POTABLE

2.01

TRABAJOS PRELIMINARES

02.01.01

TRAZO, NIVELES Y REPLANTEO DE OBRA

ML

3426.34

02.01.02

SEALIZACION EN OBRA (CINTA DE SEGURIDAD)

ML

3426.34

02.01.03

TRANQUERAS DE MADERA 1.20X1.10M P/DESVIO TRANSITO VEHICULAR

und

4.00

2.02

MOVIMIENTO DE TIERRAS

02.02.01

EXCAVACION DE ZANJA C/MAQ. H=1.20 M ANCHO 0.60M EN T.N. (PROMEDIO)

ML

3426.34

02.02.02

REFINE Y NIVELACION DE FONDO DE ZANJA P/TUB 90mm ISO 4435

ML

3426.34

02.02.03

CAMA DE APOYO E=0.10m, MATERIAL SELECTO COMPACTADO

ML

3426.34

02.02.04

RELLENO SELECTO COMPACTADO C/PLANCHA VIBRATORIA H=0.30 T.N. (PROMEDIO)

ML

3426.34

02.02.05

ELIMINACION DE MATERIAL EXCEDENTE T.N. (R=5KM)

m3

314.33

02.02.06

RIEGO DE MATERIAL EXTRAIDO DE EXCAVACION P/EVITAR POLVO

m3

468.93

2.03

RED DE TUBERIAS

02.03.01

SUMINISTRO E INSTALACION DE TUBERIA PVC-UF 160 mm ISO C-7.5

ML

227.50

02.03.02

SUMINISTRO E INSTALACION DE TUBERIA PVC-UF 110 mm ISO C-7.5

ML

1647.26

02.03.03

SUMINISTRO E INSTALACION DE TUBERIA PVC-UF 90 mm ISO C-7.5

ML

2531.34

02.03.04

PRUEBA HIDRAULICA A ZANJA ABIERTA D=160mm

ml

227.50

02.03.05

PRUEBA HIDRAULICA A ZANJA ABIERTA D=110mm

ml

1647.26

02.03.06

PRUEBA HIDRAULICA A ZANJA ABIERTA D=90mm

ml

2531.34

02.03.07

PRUEBA HIDRAULICA+DESINFECCION DE TUBERIA PVC D=160mm A ZANJA TAPADA

227.50

02.03.08

PRUEBA HIDRAULICA+DESINFECCION DE TUBERIA PVC D=110mm A ZANJA TAPADA

1647.26

02.03.09

PRUEBA HIDRAULICA+DESINFECCION DE TUBERIA PVC D=90mm A ZANJA TAPADA

2531.34

2.04

VALVULAS

02.05.01

SUMINISTRO DE VALVULA COMPUERTA HD D=200mm

und

02.05.02

SUMINISTRO DE VALVULA COMPUERTA HD D=160mm

und

2.00

02.05.02

SUMINISTRO DE VALVULA COMPUERTA HD D=110mm

und

10.00

02.05.03

SUMINISTRO DE VALVULA COMPUERTA HD D=90mm.

und

10.00

02.05.04

SUMINISTRO DE GRIFO CONTRA INCENDIO-POSTE DE 2 BOCAS

und

10.00

02.05.05

INSTALACION DE VALVULA HD D=200mm

und

1.00

02.05.06
02.05.07

INSTALACION DE VALVULA HD D=160mm


INSTALACION DE VALVULA HD D=110mm

und
und

2.00
10.00

02.05.08
02.05.09
02.05.10
02.05.11
2.05

INSTALACION DE VALVULA HD D=90mm.


INSTALACION DE VALVULA D=110mm Y GRIFO CONTRA INCENDIO
DADOS DE CONCRETO F'C=140 KG/CM2 P/ANCLAJE DE VALVULAS Y GRIFOS
CAJA DE CONCRETO P/PROTEC. VALVULA INC. MARCO Y TAPA DE FF
SUMINISTRO, INSTALACION Y ANCLAJES DE ACCESORIOS

und
und
und
und

10.00
2.00
25.00
25.00

02.06.06
02.06.06

CRUZ PVC UF 110mm x 110mm


TEE PVC UF 160mm x 160mm

und
und

5.00
3.00

02.06.07
02.06.08
02.06.09

TEE PVC UF 160mm x 110mm


TEE PVC UF 160mm x 90mm
TEE PVC UF 110mm x 110mm

und
und
und

1.00
2.00
16.00

02.06.10
02.06.10

TEE PVC UF 110mm x 90mm


TEE PVC UF 90mm x 90mm

und
und

11.00
7.00

02.06.10
02.06.12
02.06.12

TAPON 160mm
TAPON 90mm
CODO PVC UF 200mm x 22.5

und
und
und

1.00
6.00
1.00

02.06.13
02.06.13

CODO PVC UF 160mm x 90


CODO PVC UF 160mm x 45

und
und

2.00
3.00

02.06.15
02.06.16
02.06.16

CODO PVC UF 110mm x 22.5


CODO PVC UF 90mm x 90
CODO PVC UF 90mm x 45

und
und
und

12.00
3.00
5.00

1.00

RESUMEN GENERAL DE METRADOS


OBRA

:SISTEMA DE REDES DE AGUA POTABLE Y ALCANTARILLADO DE LA HABILITACION URBANA LOS


HUARANGOS

PROPIETARIO:

D&D CONSTRUCTORES S.A.C.

UBICACIN

: ICA-ICA-ICA

FECHA

:AGOSTO DEL 2014

Und.

Metrado

PROYECTISTA : DENNIS RENALT GARCIA ARTEAGA


METRADO

: REDES DE AGUA POTABLE Y ALCANTARILLADO

Lugar

ICA - ICA - ICA

Item

Descripcin

02.06.17

CODO PVC UF 90mm x 22.5

und

5.00

02.06.19
02.06.20
02.06.22

TRANSICION PVC - AC 200mm


TRANSICION PVC - AC 160mm
REDUCCION PVC UF 200mm A 160mm

und
und
und

1.00
1.00
1.00

02.06.23
02.06.23

REDUCCION PVC UF 160mm A 110mm


REDUCCION PVC UF 110mm A 90mm

und
und

4.00
10.00

02.06.25
02.06.26
02.06.27

INSTALAC. DE ACCESORIOS PARA AGUA PVC 200 mm


INSTALAC. DE ACCESORIOS PARA AGUA PVC 160 mm
INSTALAC. DE ACCESORIOS PARA AGUA PVC 110 mm

und
und
und

3.00
16.00
54.00

02.06.28
02.06.30

INSTALAC. DE ACCESORIOS PARA AGUA PVC 90 mm


DADOS DE CONCRETO F'C=140 KG/CM2 P/ANCLAJE DE VALVULAS Y GRIFOS

und
und

27.00
100.00

2.06
02.06.01

CONEXIONES DOMICILIARIAS DE AGUA POTABLE


TRABAJOS PRELIMINARES

02.06.01.01
02.06.01.02
02.06.02

TRAZO, Y REPLANTEO DE CONEXIONES DOMICILIARIAS


CINTA PLASTICA SEALIZADORA P/LIMITE SEGURIDAD DE OBRA
MOVIMIENTO DE TIERRAS

ML
ML

1550.00
1550.00

02.06.02.01
02.06.02.02
02.06.02.03
02.06.02.04
02.06.02.05
02.06.03
02.06.03.01
02.06.03.02
02.06.03.03
02.07.03.05

EXCAVACION ZANJA TN A PULSO A=0.45 MENOR= 1M


REFINE Y NIVELACION DE FONDO DE ZANJA A=0.60 TN
CAMA DE ARENA MANUAL APOYO E=0.10m Y PROTEC E=0.20m P/TUB DN
RELLENO APISONADO CON MATERIAL PROPIO C/COMPACTADOR H=1.20
ELIMINACION DE MATERIAL C/CARG+VOLQUETE R=3KM
CONEXIONES DOMICILIARIAS DE AGUA POTABLE
CONEX.DOMICILIARIAS DE AGUA 1/2" A TUB. PVC-UF 160mm
CONEX.DOMICILIARIAS DE AGUA 1/2" A TUB. PVC-UF 110mm
CONEX.DOMICILIARIAS DE AGUA 1/2" A TUB. PVC-UF 900mm
DOBLE PRUEBA HIDRAULICA EN TUBERIA DE CONEX. DOM. DE AGUA TUB. 110, 160, 90mm.

ML
ML
ML
ML
m3

1550.00
1550.00
1550.00
1550.00
18.41

und
und
und
ML

14.00
271.00
217.00
1550.00

02.07.04
02.07.04.01

COSTOS AMBIENTALES
RIEGO DE MATERIAL EXTRAIDO DE EXCAVACION P/EVITAR POLVO

m3

251.10

03
3.01
03.01.01

RED PRINCIPAL DE ALCANTARILLADO


TRABAJOS PRELIMINARES
SEALIZACION EN OBRA (CINTA DE SEGURIDAD)

ML

4997.20

03.01.02
03.01.03

TRAZO, NIVELES Y REPLANTEO DE OBRA


TRANQUERAS DE MADERA 1.20X1.10M P/DESVIO TRANSITO VEHICULAR Y PEATONAL

ML
und

2498.60
8.00

03.03
03.03.01

MOVIMIENTO DE TIERRAS Y REPOSICION DE PAVIMENTOS


EXCAV. C/EQ, P/ALCAN.T.NORMAL H<1.500M DN 200 MM

ML

1491.38

03.03.02
03.03.03

EXCAV. C/EQ, P/ALCAN.T.NORMAL H=1.51-2.00M DN 200 MM


EXCAV. C/EQ, P/ALCAN.T.NORMAL H=2.01-2.50M DN 200 MM

ML
ML

727.99
113.09

03.03.04
03.03.05
03.03.06

EXCAV. C/EQ, P/ALCAN.T.NORMAL H=2.51-3.00M DN 200 MM


EXCAV. C/EQ, P/ALCAN.T.NORMAL H=3.01-3.50M DN 200 MM
EXCAV. C/EQ, P/ALCAN.T.NORMAL H=3.51-4.00M DN 200 MM

ML
ML
ML

166.14
0.00
0.00

03.03.07
03.03.08
03.03.09
03.03.10

REFINE Y NIVELACION DE FONDO DE ZANJA P/TUB 200mm


CAMA DE ARENA MANUAL APOYO E=0.10m Y PROTEC.E=0.20m P/TUB DN 200MM
ENTIBADO CORRIDO DE ZANJAS H=2.01-2.50m DE PROF.
ENTIBADO CORRIDO DE ZANJAS H=2.51-3.00m DE PROF.

ML
ML
ML
ML

2498.60
2498.60
113.09
166.14

03.03.11
03.03.12
03.03.13

ENTIBADO CORRIDO DE ZANJAS H=3.01-3.50m DE PROF.


ENTIBADO CORRIDO DE ZANJAS H=3.51-4.00m DE PROF.
RELLENO COMPACTADO ZANJAS P/TUBERIA ALCANTARILLADO H<1.50M

ML
ML
ML

0.00
0.00
1491.38

03.03.14
03.03.15

RELLENO COMPACTADO ZANJAS P/TUBERIA ALCANTARILLADO H=1.50-2.00M


RELLENO COMPACTADO ZANJAS P/TUBERIA ALCANTARILLADO H=2.01-2.50M

ML
ML

727.99
113.09

03.03.16
03.03.17
03.03.18

RELLENO COMPACTADO ZANJAS P/TUBERIA ALCANTARILLADO H=2.51-3.00M


RELLENO COMPACTADO ZANJAS P/TUBERIA ALCANTARILLADO H=3.01-3.50M
RELLENO COMPACTADO ZANJAS P/TUBERIA ALCANTARILLADO H=3.51-4.00M

ML
ML
ML

166.14
0.00
0.00

03.03.19
03.03.20

ELIMINACION DE MATERIAL C/CARG+VOLQUETE R=3KM


RIEGO DE MATERIAL EXTRAIDO DE EXCAVACION P/EVITAR POLVO

m3
m3

447.92
349.23

03.04
03.04.01

SUMINISTRO E INSTALACION DE TUBERIAS


TUBERIA P.V.C. DESG. UF.ISO 4435 SERIE-20 250MM ADQUISICION E INST.

ML

195.05

RESUMEN GENERAL DE METRADOS


OBRA

:SISTEMA DE REDES DE AGUA POTABLE Y ALCANTARILLADO DE LA HABILITACION URBANA LOS


HUARANGOS

PROPIETARIO:

D&D CONSTRUCTORES S.A.C.

UBICACIN

: ICA-ICA-ICA

FECHA

:AGOSTO DEL 2014

Und.

Metrado

PROYECTISTA : DENNIS RENALT GARCIA ARTEAGA


METRADO

: REDES DE AGUA POTABLE Y ALCANTARILLADO

Lugar

ICA - ICA - ICA

Item

Descripcin

03.04.02

TUBERIA P.V.C. DESG. U.F. ISO 4435 SERIE-20 200MM ADQUISICION E INST.

ML

325.17

03.04.02
03.04.04
03.04.04.01

TUBERIA P.V.C. DESG. U.F. ISO 4435 SERIE-25 200MM ADQUISICION E INST.
PRUEBA HIDRAULICA
DOBLE PRUEBA HIDR.+ ESCORRENT. TUBERIA 2000mm

ML

2498.60

ML

0.00

03.04.04.02
03.05

DOBLE PRUEBA HIDR.+ ESCORRENT. TUBERIA 200mm


BUZONES

ML

2498.60

03.05.01
03.05.01
03.05.02

BUZON DE INSPECCION TIPO I DE 1.00M TN HASTA 1.50M. PROF.


BUZON DE INSPECCION TIPO I DE 1.51M TN HASTA 2.00M. PROF.
BUZON DE INSPECCION TIPO I DE 2.01M TN HASTA 2.51M. PROF.

und
und
und

20.00
14.00
13.00

03.05.03
03.05.04

BUZON DE INSPECCION TIPO I DE 2.51M TN HASTA 3.00M. PROF.


BUZON DE INSPECCION TIPO I DE 3.01M TN HASTA 3.50M. PROF.

und
und

8.00
5.00

03.05.05

BUZON DE INSPECCION TIPO I DE 3.51M TN HASTA 4.00M. PROF.

und

7.00

04
4.01
04.01.01

CONEXIONES DOMICILIARIAS DE ALCANTARILLADO


TRABAJOS PRELIMINARES
CINTA PLASTICA SEALIZADORA P/LIMITE SEGURIDAD DE OBRA

ML

2521.65

04.01.02
04.02
04.02.01
04.02.02
04.02.03
04.02.04
04.02.05
04.02.06
04.02.03
04.02.04
04.02.05
04.02.06
04.02.07
04.02.08
04.02.09
04.02.10
04.02.07

TRAZO Y REPLANTEO DE CONEXIONES DOMICILIARIAS


MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJA P/CONEX. DOMICILIARIAS Hprom=1.50m
EXCAVACION MANUAL DE ZANJA P/CONEX. DOMICILIARIAS Hprom=2.00m
EXCAVACION MANUAL DE ZANJA P/CONEX. DOMICILIARIAS Hprom=2.50m
EXCAVACION MANUAL DE ZANJA P/CONEX. DOMICILIARIAS Hprom=3.00m
EXCAVACION MANUAL DE ZANJA P/CONEX. DOMICILIARIAS Hprom=3.50m
EXCAVACION MANUAL DE ZANJA P/CONEX. DOMICILIARIAS Hprom=4.00m
REFINE Y NIVELACION DE FONDO DE ZANJA A=0.60 TN
CAMA DE ARENA MANUAL APOYO E=0.10m Y PROTEC. E=0.20m P/TUB DN 160MM
RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CONEX. Hprom=1.50M
RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CONEX. Hprom=2.00M
RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CONEX. Hprom=2.50M
RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CONEX. Hprom=3.00M
RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CONEX. Hprom=3.50M
RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CONEX. Hprom=4.00M
ELIMINACION DE MATERIAL EXCEDENTE

ML

2521.65

ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
m3

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
2521.65
2521.65
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

04.03
04.03.01

CONEXIONES DOMICILIARIAS
CONEXION DOMICIL. DESAGUE TUBO PVC-UF250mm a 160 mm

und

16.00

04.03.02
04.03.03
04.03.04

CONEXION DOMICIL. DESAGUE TUBO PVC-UF200mm a 160 mm Hp=1.50m


CONEXION DOMICIL. DESAGUE TUBO PVC-UF200mm a 160 mm Hp=2.00m
CONEXION DOMICIL. DESAGUE TUBO PVC-UF200mm a 160 mm Hp=2.50m

und
und
und

149.00
140.00
#REF!

04.03.05
04.03.06

CONEXION DOMICIL. DESAGUE TUBO PVC-UF200mm a 160 mm Hp=3.00m


CONEXION DOMICIL. DESAGUE TUBO PVC-UF200mm a 160 mm Hp=3.50m

und
und

#REF!
#REF!

04.03.07
04.03.04
04.04.

CONEXION DOMICIL. DESAGUE TUBO PVC-UF200mm a 160 mm Hp=4.00m


DOBLE PRUEBA HIDRAULICA+ESCORRENTIA TUBERIA 250, 200 y 160 mm
COSTOS AMBIENTALES

und
ML

#REF!
2521.65

04.04.01
5
5.01

RIEGO DE MATERIAL EXTRAIDO DE EXCAVACION P/EVITAR POLVO


SEGURIDAD EN OBRA
EQUIPOS DE PROTECCION PERSONAL (EPPS)

m3

#REF!

mes

3.00