COSTO DE MATERIALES:

NOTAS:

CEMENTO

ARENA

GRAVA

AGUA

PRECIO x TON:

PRECIO x CAMIN

PRECIO x CAMIN

PRECIO x PIPA

20 Bultos de 50 Kg.

DE 7M3

DE 7M3

DE 4000 LTS

$0.00

$0.00

$0.00

$0.00

DE 50 KG

PRECIO x M3:

PRECIO x M3:

PRECIO x M3:

$0.00

$0.00

$0.00

$0.00

DESPERDICIO:

DESPERDICIO:

DESPERDICIO:

DESPERDICIO:

3%
1.03

8%
1.08

8%
1.08

30%
1.30

COSTO CON DESP.

COSTO CON DESP.

COSTO CON DESP.

COSTO CON DESP.

$0.00

$0.00

$0.00

$0.00

AGREGADO
MXIMO

CEMENTO
TONELADA

DE 50 KG

ARENA
M3

GRAVA
M3

AGUA
M3

3/4"
1 1/2"
3/4"
1 1/2"

0.260
0.254
0.286
0.280

5.20
5.08
5.72
5.60

0.500
0.470
0.500
0.470

0.680
0.700
0.680
0.700

0.195
0.190
0.215
0.210

3/4"
1 1/2"
3/4"

0.323
0.308
0.354

6.46
6.16
7.08

0.480
0.450
0.480

0.670
0.700
0.670

0.210
0.200
0.230

1 1/2"

0.338

6.76

0.450

0.700

0.220

3/4"
1 1/2"
3/4"
1 1/2"

0.355
0.337
0.391
0.373

7.10
6.74
7.82
7.46

0.470
0.440
0.470
0.440

0.650
0.680
0.650
0.680

0.195
0.185
0.215
0.205

3/4"
1 1/2"
3/4"
1 1/2"

0.423
0.400
0.467
0.445

8.46
8.00
9.34
8.90

0.465
0.435
0.465
0.435

0.640
0.670
0.640
0.670

0.190
0.180
0.210
0.200

1 ESTA TABLA ES TIL PARA OBRAS PEQUEAS DONDE HAY QUE ELA
2 LLENAR SLO LOS CAMPOS EN COLOR AMARILLO
3 LOS COSTOS OBTENIDOS SON SLO DE MATERIALES

4 CADA QUIEN DEBER AGREGAR SUS COSTOS DE OPERACIN E IN

PRECIO x BULTO:

FC=

5 ESTA TABLA DE COSTOS PUEDE USARSE PARA FINES DE PLANEAC

CLASIFICACIN
REVENIMIENTO

100 kg/cm2

8 A 10 CM

FIRMES Y
PLANTILLAS

12 A 15 CM

150 kg/cm2

8 A 10 CM

FIRMES, DALAS

12 A 15 CM

Y CASTILLOS
200 kg/cm2

8 A 10 CM

LOSAS DE
ENTREPISO

12 A 15 CM

250 kg/cm2

8 A 10 CM

PISOS ESTRUCTURALES,
COLUMNAS, DADOS,
ZAPATAS Y TRABES

12 A 15 CM

6 LAS PROPORCIONES DE LA TABLA FUERON TOMADAS DE:


"COSTO Y TIEMPO EN EDIFICACIN"
CARLOS SUREZ SALAZAR
LIMUSA - NORIEGA EDITORES MXICO 1997
TERCERA EDICIN
ELABOR: Arq. Alfonso Placeres Y Aguirre alfonso_p@arquired.net
BULTOS

S PEQUEAS DONDE HAY QUE ELABORAR EL CONCRETO EN OBRA

COLOR AMARILLO

SLO DE MATERIALES
SUS COSTOS DE OPERACIN E INDIRECTOS
USARSE PARA FINES DE PLANEACIN DE COMPRA DE MATERIALES Y ANLISIS

LA FUERON TOMADAS DE:

O EN EDIFICACIN"

GA EDITORES MXICO 1997

Y Aguirre alfonso_p@arquired.net
$$$ x M3 CON

M3 CONCRETO

COSTO AL

CANTIDAD DE

CANTIDAD DE CEM

CANTIDAD DE

CANTIDAD DE

CANTIDAD DE

DESPERDICIO

REQUERIDOS:

CONSTRUCTOR

CEMENTO TON.

BULTOS DE 50 KG

ARENA EN M3

GRAVA EN M3

AGUA EN M3

$0.00
$0.00
$0.00
$0.00

0.00
0.00
0.96
0.00

0.00
0.00
19.22
0.00

0.00
0.00
1.68
0.00

0.00
0.00
2.28
0.00

0.00
0.00
0.72
0.00

$0.00
$0.00
$0.00
$0.00

0.00
0.00
1.18
0.00

0.00
0.00
23.65
0.00

0.00
0.00
1.60
0.00

0.00
0.00
2.24
0.00

0.00
0.00
0.77
0.00

$0.00
$0.00
$0.00
$0.00

$0.00
$0.00
$0.00
$0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

$0.00
$0.00
$0.00
$0.00

$0.00
$0.00
$0.00
$0.00

0.00
0.00
1.25
0.00

0.00
0.00
24.94
0.00

0.00
0.00
1.24
0.00

0.00
0.00
1.71
0.00

0.00
0.00
0.56
0.00

$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00

3.36

3.34

2.67