Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Memoria de Calculo Paredes
Memoria de Calculo Paredes
UBICACIN:
PARTIDA:
SUBPARTIDA:
ELEMENTO:
UNIDAD:
7.0 PAREDES
7.1 PAREDED TIPO I (15x20x40)
P-1
m
MEMORIA DE CALCULO
FECHA
OCT. 2015
1
0.60
2 = 1.67
CANTIDAD DE OBRA
CALCULANDO PARA 1 m
7.0 PAREDES
7.1 PAREDED TIPO I (15x20x40)
P-1
m
MEMORIA DE CALCULO
FECHA
OCT. 2015
CANTIDAD DE MATERIAL
ACERO TRANSVERSAL
LONGITUD DEL BASTON 1m
= (
= 1 (0.60) (
)(
1
1
)(
)
6
14
1 1
)(
)
6 14
3
= 0.020
8
ALAMBRE DE AMARRE
POR CADA QUINTAL DE ACERO SE NECESITAN 10lb DE ALAMBRE DE AMARRE
10
0.02 = 0.20 2
1
= ( )( )()( )
= 0.01125 3 /2
7.0 PAREDES
7.1 PAREDED TIPO I (15x20x40)
P-1
m
MEMORIA DE CALCULO
FECHA
OCT. 2015
= ( )( 2 )
= (0.1650.200.10 )(12.5 UNIDADES)
= 0.04125 3 / 2
7.0 PAREDES
7.1 PAREDED TIPO I (15x20x40)
P-1
m
MEMORIA DE CALCULO
FECHA
OCT. 2015
CANTIDAD POR m
AREA DE PARED
MATERIAL TOTAL
BLOQUES
12.5 UNIDADES/ m
384.56 m
4807 UNIDADES
0.020 qq/ m
384.56 m
7.69 qq
ALAMBRE DE AMARRE
0.20 lb/ m
384.56 m
76.9 lb
CEMENTO
0.40 bolsas/ m
384.56 m
153.82 bolsas
ARENA
0.034 m/ m
384.56 m
13.07 m
GRAVA
0.038 m/ m
384.56 m
14.61 m
AGUA
0.014 m/ m
384.56 m
5.38 m
7.0 PAREDES
7.1 PAREDED TIPO I (15x20x40)
P-1
m
MEMORIA DE CALCULO
FECHA
OCT. 2015
MANO DE OBRA
NIVELACION
PERSONAL: AUXILIAR
RENDIMIENTO: 34.9 ml/h-h
CONVIRTIENDO EL RENDIMIENTO A DIAS HOMBRE
= (34.9 / ) (7
)
= 244.3
CALCULANDO TIEMPO INVERTIDO
1
=
244.3/
= 0.00409
= (0.53/ ) (7
)
= 3.71
CALCULANDO TIEMPO INVERTIDO
0.02
=
3.71/
= 0.0054
7.0 PAREDES
7.1 PAREDED TIPO I (15x20x40)
P-1
m
MEMORIA DE CALCULO
FECHA
OCT. 2015
COLOCACION DE BASTONES
PERSONAL: ARMADOR
RENDIMIENTO: 0.7 qq/h-h
CONVIRTIENDO EL RENDIMIENTO A DIAS HOMBRE
= (0.7/ ) (7
)
= 4.9
CALCULANDO TIEMPO INVERTIDO
0.02
=
4.9/
= 0.0041
7.0 PAREDES
7.1 PAREDED TIPO I (15x20x40)
P-1
m
MEMORIA DE CALCULO
FECHA
OCT. 2015
= (1.98 / ) (7
)
= 13.86
CALCULANDO TIEMPO INVERTIDO
1
=
13.86/
= 0.072
= (14.67 / ) (7
)
= 102.69
CALCULANDO TIEMPO INVERTIDO
1
=
102.69/
= 0.0097
7.0 PAREDES
7.1 PAREDED TIPO I (15x20x40)
P-1
m
MEMORIA DE CALCULO
FECHA
OCT. 2015
PEGADO DE BLOQUE
PERSONAL: AUXILIAR
RENDIMIENTO: 18.75 U/h-h
CONVIRTIENDO EL RENDIMIENTO A DIAS HOMBRE
= (18.75 / ) (7
)
= 131.25
CALCULANDO TIEMPO INVERTIDO
12.5
=
131.25/
= 0.095
CURADO
PERSONAL: AUXILIAR
RENDIMIENTO: 0.7 m/d-h
CONVIRTIENDO EL RENDIMIENTO A DIAS HOMBRE
= (0.7 3 / ) (7
)
3
= 4.9
CALCULANDO TIEMPO INVERTIDO
0.01125 3
=
4.9 3 /
= 0.002295
7.0 PAREDES
7.1 PAREDED TIPO I (15x20x40)
P-1
m
MANO DE OBRA
FECHA
OCT. 2015
HERRAMIENTAS
FORMULAS GENERALES
$
=
RENDIMIENTO = SUMA DE LOS TIEMPOS EN LOS QUE SE USA CADA HERRAMIENTA
HERRAMIENTA
TIPO
MARTILLO
CINTA METRICA
MACHETE
NIVEL DE ALUMINIO
MANGUERA
LAPIZ BICOLOR
PALA
GRIFA
CORTAFRIO
ALICATE
BALDE
CUCHARA
LLANA
MANUAL
MANUAL
MANUAL
MANUAL
MANUAL
MANUAL
MANUAL
MANUAL
MANUAL
MANUAL
MANUAL
MANUAL
MANUAL
$ SIN
IVA
$6.00
$3.75
$4.65
$14
$0.65
$0.50
$6.50
$10.75
$20
$6.85
$1.99
$2
$3
VIDA UTIL
(DIA)
107.14
164.28
107.14
107.14
82.14
3.57
82.14
53.57
50
82.14
53.57
82.14
82.14
COSTO/DIA RENDIMIENTO
$0.05
$0.022
$0.043
$0.13
$0.0079
$0.14
$0.08
$0.20
$0.40
$0.083
$0.037
$0.024
$0.036
0.00409 d-h
0.01359 d-h
0.00409 d-h
0.00409 d-h
0.00409 d-h
0.01359 d-h
0.09339 d-h
0.0095 d-h
0.0095 d-h
0.0095 d-h
0.092 d-h
0.1843 d-h
0.1746 d-h