Está en la página 1de 3

CRONOGRAMA DE OBRA VALORIZADO

PROYECTO:
LUGAR:
FECHA:

ITEM
0 01

PARTIDAS
ESTRUCTURAS

PARCIAL

SEM 1

MES 1
SEM2 SEM 3

SEM 4

SEM 1

MES 2
SEM 2 SEM 3

SEM 4

SUB TOTAL

54,084.74
100%

0 01.01

TRABAJOS PRELIMINARES

1,971.00

1,971.00
1,971.00
100%

0 01.02

MOVIMIENTO DE TIERRAS

1,079.52

1,079.52
1,079.52

0 01.03

OBRAS DE CONCRETO SIMPLE

5,470.16
60%

0 01.03.01

FALSO PISO

2,280.60
1,368.36

0 01.03.02

0 01.04

0 01.04.01

VEREDAS

OBRAS DE CONCRETO ARMADO

ZAPATAS

40%

2,280.60
912.24
50%

3,189.56
1,594.78

1,594.78

60%

40%

14,643.70

6,410.62

6,410.62
3,846.37

0 01.04.02

DADOS DE CONCRETO

50%

3,189.56

2,564.25
100%

3,941.55

3,941.55
3,941.55
100%

0 01.04.03

CONCRETO EN ESCALERA

478.65

478.65
478.65
100%

0 01.04.04

LOSA COLABORANTE

3,812.88

3,812.88
3,812.88

0 01.05

0 01.05.01

0 01.05.02

0 01.05.03

ESTRUCTURA METALICA

BASE METALICA

COLUMNAS METALICAS

CARTELAS METLICAS

30,920.36
60%

40%

276.10

184.07
50%

50%

5,293.65
50%

5,293.65
50%

460.17

460.17

10,587.29

108.54

10,587.29

108.54

CRONOGRAMA DE OBRA VALORIZADO


PROYECTO:
LUGAR:
FECHA:

ITEM

0 01.05.04

PARTIDAS

VIGAS METALICAS

PARCIAL

SEM 1

MES 1
SEM2 SEM 3

SEM 4

SEM 1

MES 2
SEM 2 SEM 3

54.27
50%

54.27
50%

2,550.08

2,550.08

SEM 4

5,100.15

SUB TOTAL
108.54

5,100.15
100%

0 01.05.05

PLANCHA COLABORANTE

3,683.40

3,683.40
3,683.40

0 01.05.06

0 01.05.07

0 01.05.07.01

0 01.05.07.02

0 01.05.08

0 02

0 02.01

0 02.02

ESCALERA METLICA

COBERTURAS METALICAS

COBERTURAS METALICAS MODULO

COBERTURAS METALICAS ESCALERA

VARIOS

ARQUITECTURA

MUROS Y TABIQUES DE ALBAILERA

CIELORRASOS

0 02.04

0 02.05

0 02.05.01

PISOS Y PAVIMENTOS

CONTRAZOCALOS

CARPINTERIA DE MADERA

PUERTAS

60%

1,280.00

1,920.00

70%

30%

3,058.38
40%

1,310.74
60%

364.68

547.01

3,200.00

3,200.00

5,280.81

4,369.12

4,369.12

911.69

911.69
20%

30%

30%

20%

500.00

750.00

750.00

500.00

2,500.00

2,500.00

65,481.16
50%

50%

11,215.20

11,215.20
50%

22,430.39

22,430.39
50%

11,991.74

11,991.74
5,995.87

0 02.03

40%

50%

5,995.87
50%

5,739.91
50%

5,739.91
50%

683.65

683.65

11,479.81

11,479.81

1,367.30

1,367.30

2,064.05
50%

50%

1,032.03
50%

1,032.03
50%

2,064.05

2,064.05

11,010.24

CRONOGRAMA DE OBRA VALORIZADO


PROYECTO:
LUGAR:
FECHA:

ITEM
0 02.06

0 02.07

0 02.08

0 03

0 03.01

0 03.02

0 03.03

0 03.04

0 03.05

0 03.06

0 03.07

PARTIDAS
CARPINTERIA METALICA

SEM 1

MES 1
SEM2 SEM 3

SEM 4

SEM 1

MES 2
SEM 2 SEM 3

SEM 4

11,010.24

VIDRIOS, CRISTALES Y SIMILARES

PINTURAS

SUB TOTAL
11,010.24

5,505.12
50%

5,505.12
50%

991.24
50%

991.24
50%

1,577.58

1,577.58

50%

50%

515.28
50%

515.28
50%

3,350.80
50%

3,350.80
50%

19.69

19.69

1,982.48

1,982.48

3,155.15

INSTALACIONES ELECTRICAS

3,155.15

16,403.38

TUBERAS Y DUCTOS

1,030.56

CONDUCTORES

1,030.56

6,701.60

CAJAS DE PASO Y BUZONES DE REGISTRO

SALIDA PARA INTERRUPTORES Y TOMACORRIENTES

ARTEFACTO DE ILUMINACION

6,701.60

39.38

39.38
50%

50%

926.68
50%

926.68
50%

2,359.03

2,359.03

1,853.36

1,853.36

4,718.06

TABLEROS Y SUBTABLEROS

4,718.06
50%

50%

663.88

663.88

1,327.76

PRUEBAS ELECTRICAS

COSTO DIRECTO
GASTOS GENERALES
UTILIDAD
SUB TOTAL
IGV
PRESUPUESTO DE OBRA

PARCIAL

1,327.76
50%

50%

366.33

366.33

732.66

8.0%
8.0%
18.0 %
% DE INCIDENCIA

135,969.28
13,596.93
8,158.16
157,724.36
28,390.39
186,114.75

732.66

60,254.02
6,025.40
3,615.24
69,894.66
12,581.04
82,475.70
44%

75,715.26
7,571.53
4,542.92
87,829.70
15,809.35
103,639.05
56%

135,969.28
13,596.93
8,158.16
157,724.36
28,390.39
186,114.75
100%