Está en la página 1de 4

Hoja de Control de Maquinaria Pesada y Mat

Obra: MEJORAMIENTO DEL JIRON SAN PEDRO CUADRAS 1 Y 2 DEL BARRIO ALTO LLAVIN
RELACION DE MAQUINARIA EMPLEADA EN OBRA (H-m)

MOTONIVELADORA GD511A - KOMATSU


CARGADOR FRONTAL WA180 - KOMATSU
TRACTOR ORUGA D6MXL - CATERPILLAR
RODILLO VIBRATORIO CA 152 - DYNAPAC
VOLQUETE DE 15M
RETROEXCAVADORA 420E - CATERPILLAR

S/.
S/.
S/.
S/.
S/.
S/.

197.00
192.00
202.00
162.00
149.00
120.00

3:30
5:00

MAQUINARIA SEGN EXPEDIENTE TCNICO


CAMION VOLQUETE 6M
CAMION VOLQUETE 12M
RODILLO LISO VIBRATORIO 101-135HP 12T
MOTONIVELADORA DE 125 HP
VOLQUETE DE 6M

PRECIO
H-m
S/. 125.00 2.00
S/. 220.00 42.00
S/. 300.00 4.00
S/. 280.00 9.76
S/. 80.00 100.00
TOTAL=

0:30
4:30
1:00

0:45

3:30

2/29/2016

2/26/2016

2/25/2016

2/24/2016

PRECIO A
TODO
COSTO

2/23/2016

MAQUINARIA UTILIZADA EN OBRA

2/22/2016

FEBRERO
TOTAL
HORAS MES

3:30
2:00 4:00
11:30
1:30 4:15
11:00
0:00
7:00 13:45
1:15
0:00
TOTAL MES=

PARCIAL
S/.
250.00
S/.
9,240.00
S/.
1,200.00
S/.
2,732.46
S/.
8,000.00
###

RELACION DE MATERIAL EMPLEADO EN OBRA (m)


FEBRERO
MATERIAL EMPLEADO EN OBRA

PRECIO
UNITARIO

TOTAL
VOLQUETES

Hoja de Control de Maquinaria Pesada y Mat

PIEDRA FRACTURADA
MATERIAL PREPARADO PARA SUB BASE

S/.
S/.

30.00
50.00

MATERIAL SEGN EXPEDIENTE TCNICO


MATERIAL GRANULAR A1A-A1B AASHTO
AFIRMADO

PRECIO
m
PARCIAL
S/. 45.00 256.00 S/. 11,520.00
S/. 45.00
81.00 S/.
3,645.00
TOTAL=
###

2/29/2016

2/26/2016

2/25/2016

2/24/2016

PRECIO
UNITARIO

2/23/2016

MATERIAL EMPLEADO EN OBRA

2/22/2016

Obra: MEJORAMIENTO DEL JIRON SAN PEDRO CUADRAS 1 Y 2 DEL BARRIO ALTO LLAVIN
TOTAL
VOLQUETES
0.00
0.00
TOTAL MES=

aria Pesada y Material para la Sub Base

DEL BARRIO ALTO LLAVINI DE LA CIUDAD DE PUNO, PROVINCIA DE PUNO - PUNO

3:45
4:45

0:30
0:40

5:00

3:30

2:30

6:20
4:00

3/19/2016

3:30
3:15

4:00

3/14/2016

3/12/2016

3/11/2016

3/8/2016

3/7/2016

2:30

3/15/2016

S/.
689.50
S/. 2,208.00
4:00
S/. 2,222.00
3:00
S/.
S/. 3,762.25 13:00
S/.
###

3/2/2016

COSTO
TOTAL MES

3/1/2016

MARZO

3:45

9:45
1:00
13:00
3:30
19:25
19:20
4:00
TOTAL MES=

TOTAL
COSTO TOTAL
HORAS MES
MES

S/.
S/.
S/.
S/.
S/.
S/.

1,920.75
2,496.00
707.00
3,145.50
2,880.67
480.00
###

TOTAL OBRA=

###

REQUERIMIENTO=

###

SALDO=

S/.

910.80

MARZO
COSTO
TOTAL MES

TOTAL
COSTO TOTAL
VOLQUETES
MES

aria Pesada y Material para la Sub Base

1.00

16.00

3/14/2016

3/12/2016

3/11/2016

2.00

3/8/2016

1.00

3/7/2016

3/4/2016

3/3/2016

S/.
S/.
S/.

3/2/2016

COSTO
TOTAL MES

3/1/2016

DEL BARRIO ALTO LLAVINI DE LA CIUDAD DE PUNO, PROVINCIA DE PUNO - PUNO


TOTAL
COSTO TOTAL
VOLQUETES
MES

3.00 S/.
1,350.00
4.00
21.00 S/. 15,750.00
TOTAL MES=
###
TOTAL OBRA=

###

REQUERIMIENTO=

###

SALDO=

S/. -1,935.00