Centro de Salud Villa Maria - Presupuesto
Centro de Salud Villa Maria - Presupuesto
S10
Hoja resumen
Obra
0000006
Localizacin
150143
Fecha Al
8/31/2013
Presupuesto base
001
ESTRUCTURAS
1,885,065.18
002
ARQUITECTURA
1,645,124.24
003
INSTALACIONES SANITARIAS
004
INSTALACIONES ELECTROMECANICAS
444,560.16
1,309,377.91
(CD)
S/.
5,284,127.49
COSTO DIRECTO
5,284,127.49
GASTOS GENERALES
528,412.75
UTILIDAD 10%
528,412.75
--------------------------------------
SUB TOTAL
I.G.V.
6,340,952.99
18%
1,141,371.54
--------------------------------------
TOTAL PRESUPUESTO
7,482,324.53
S/.
1,848,675.00
MATERIALES
S/.
3,157,142.68
EQUIPOS
S/.
276,351.56
SUBCONTRATOS
S/.
8/31/2013
S/.
5,282,169.24
S10
Pgina
Presupuesto
Presupuesto
0000006
FORTALECIMIENTO DE LA CAPACIDAD RESOLUTIVA DEL CENTRO MATERNO INFANTIL I-4 VILLA MARIA DEL TRIUNFO DE LA
DISA II LIMA SUR
Subpresupuesto
Cliente
Lugar
001
ESTRUCTURAS
DISA II LIMA SUR
LIMA - LIMA - VILLA MARIA DEL TRIUNFO
Item
Descripcin
01
OBRAS PROVISIONALES
Costo al
Und.
Metrado
Precio S/.
31/08/2013
Parcial S/.
19,480.89
01.01
glb
1.00
6,000.00
6,000.00
01.02
und
1.00
756.69
756.69
01.03
SERVICIOS HIGIENICOS
glb
1.00
3,600.00
3,600.00
01.04
glb
1.00
2,596.20
2,596.20
400.00
16.32
01.05
02
TRABAJOS PRELIMINARES
6,528.00
157,504.53
02.01
DESMONTAJE DE VENTANAS
m2
284.04
13.32
3,783.41
02.02
DESMONTAJE DE PUERTAS
02.03
m2
177.55
13.32
2,364.97
m2
1,931.31
4.81
02.04
9,289.60
m2
1,931.31
4.81
9,289.60
02.05
und
44.00
30.18
1,327.92
02.06
DESMONTAJE DE EQUIPOS
und
1.00
199.20
199.20
02.07
m2
264.31
13.32
3,520.61
02.08
m3
339.39
64.83
22,002.65
02.09
m3
37.46
99.55
3,729.14
02.10
m3
46.46
99.55
4,625.09
02.11
m3
419.51
118.75
49,816.81
02.12
m2
1,814.70
8.33
15,116.45
02.13
m2
296.25
10.72
3,175.80
02.14
m3
299.65
59.74
17,901.09
02.15
m3
37.46
25.49
954.86
02.16
m2
27.20
13.88
377.54
02.17
m2
1,102.88
2.11
2,327.08
02.18
glb
1.00
3,500.00
3,500.00
02.19
m2
2,898.42
1.45
03
SEGURIDAD Y SALUD
03.01
4,202.71
32,600.00
glb
1.00
3,800.00
3,800.00
03.02
und
40.00
265.00
10,600.00
03.03
glb
1.00
3,200.00
3,200.00
03.04
glb
1.00
3,000.00
3,000.00
03.05
glb
1.00
8,000.00
8,000.00
glb
1.00
4,000.00
03.06
04
MOVIMIENTO DE TIERRAS
4,000.00
228,678.27
04.01
m3
1,488.59
31.86
47,426.48
04.02
m3
277.56
36.41
10,105.96
04.03
m3
520.63
32.84
17,097.49
04.04
m3
1,619.17
12.50
20,239.63
04.05
m3
1,619.17
15.84
25,647.65
04.06
m3
1,368.25
3.02
4,132.12
04.07
m3
1,778.73
6.82
12,130.94
04.08
m2
3,732.70
14.25
53,190.98
04.09
m3
2,246.49
10.41
23,385.96
m3
2,246.49
6.82
04.10
05
05.01
15,321.06
113,088.34
m3
139.23
137.81
19,187.29
05.02
m3
258.51
141.35
36,540.39
05.03
m3
21.68
256.54
5,561.79
05.04
m2
224.37
28.62
6,421.47
05.05
m2
1,845.36
24.59
45,377.40
06
1,317,798.25
06.01
06.02
m3
kg
397.90
15,199.00
262.27
4.18
104,357.23
63,531.82
06.03
06.04
m3
86.80
256.54
22,267.67
m2
828.23
32.25
26,710.42
06.05
06.06
kg
6,099.00
4.18
25,493.82
m3
105.58
345.42
36,469.44
06.07
m2
767.83
41.54
31,895.66
06.08
kg
8,911.00
4.18
37,247.98
06.09
m3
151.00
338.66
51,137.66
06.10
m2
1,527.80
40.98
62,609.24
06.11
kg
16,343.00
4.18
68,313.74
06.12
m3
141.20
388.11
54,801.13
06.13
m2
1,875.60
41.78
78,362.57
06.14
kg
27,938.00
4.18
116,780.84
06.15
m3
164.23
292.71
48,071.76
06.16
m2
1,258.36
51.36
64,629.37
06.17
kg
22,326.00
4.18
93,322.68
06.18
m3
32.32
379.89
12,278.04
06.19
m2
155.32
58.83
9,137.48
06.20
kg
2,684.00
4.18
11,219.12
06.21
m3
168.50
288.43
48,600.46
06.22
m2
1,925.43
32.23
62,056.61
06.23
kg
11,464.00
4.18
47,919.52
06.24
und
16,039.00
2.51
40,257.89
06.25
m3
15.49
285.81
4,427.20
06.26
m2
77.00
40.72
3,135.44
06.27
kg
1,466.00
4.18
6,127.88
06.28
m3
73.57
429.42
31,592.43
06.29
m2
485.53
37.85
18,377.31
06.30
kg
6,147.00
4.18
25,694.46
06.31
m3
16.19
391.06
6,331.26
06.32
m2
37.90
37.82
1,433.38
06.33
kg
579.00
4.18
2,420.22
06.34
m2
28.00
28.09
786.52
8.00
665.34
5,322.72
07
ESTRUCTURAS METALICAS
15,914.90
07.01
TIJERAL METALICO CON PERFILES 1 1/2x1/8" Y FIERRO LISO 5/8" TIPO T-1 L=2.83m
und
07.02
VIGUETA METALICA CON PERFILES 1"X1/8" Y FIERRO LISO 1/2" TIPO VM-1/VM-2
80.40
84.24
6,772.90
44.10
13.55
597.56
63.32
50.88
3,221.72
07.03
07.04
m2
COSTO DIRECTO
1,885,065.18
GASTOS GENERALES
188,506.52
UTILIDAD 10%
188,506.52
----------------------------------------
SUB TOTAL
I.G.V.
2,262,078.22
18%
407,174.08
---------------------------------------
TOTAL PRESUPUESTO
SON :
DOS MILLONES SEISCIENTOS SESENTINUEVE MIL DOSCIENTOS CINCUENTIDOS Y 30/100 NUEVOS SOLES
2,669,252.30
S10
Pgina
Presupuesto
Presupuesto
0000006
FORTALECIMIENTO DE LA CAPACIDAD RESOLUTIVA DEL CENTRO MATERNO INFANTIL I-4 VILLA MARIA DEL TRIUNFO DE LA
DISA II LIMA SUR
Subpresupuesto
Cliente
Lugar
002
ARQUITECTURA
DISA II LIMA SUR
LIMA - LIMA - VILLA MARIA DEL TRIUNFO
Item
Descripcin
08
MUROS Y TABIQUES
Costo al
Und.
Metrado
Precio S/.
31/08/2013
Parcial S/.
231,360.85
08.01
m2
1,876.80
94.50
177,357.60
08.02
m2
975.14
55.38
54,003.25
09
REVOQUES Y ENLUCIDOS
207,421.33
09.01
m2
1,794.19
16.95
30,411.52
09.02
m2
4,165.34
18.21
75,850.84
09.03
m2
2,658.65
22.56
59,979.14
09.04
m2
265.94
25.05
6,661.80
09.05
VESTIDURA DE DERRAMES
1,704.60
14.95
25,483.77
09.06
m2
98.71
74.01
7,305.53
09.07
120.89
14.30
1,728.73
10
CIELORASOS
61,437.84
10.01
m2
2,106.93
28.06
10.02
m2
36.44
27.25
992.99
10.03
m2
46.65
28.39
1,324.39
11
11.01
PISOS Y PAVIMENTOS
59,120.46
349,436.67
CONTRAPISOS
60,309.52
11.01.01
CONTRAPISO E=42.5 mm
m2
1,596.47
23.44
37,421.26
11.01.02
CONTRAPISO E=47.6 mm
m2
805.77
25.78
20,772.75
m2
39.52
53.53
11.01.03
11.02
11.02.01
11.02.02
11.03
2,115.51
82,843.95
m2
378.31
52.93
20,023.95
m2
1,218.15
51.57
62,820.00
PISOS VINILICOS
49,500.85
11.03.01
m2
725.19
38.45
11.03.02
m2
58.72
146.01
8,573.71
11.03.03
m2
61.37
212.54
13,043.58
11.04
PISOS CEMENTO
27,883.56
57,560.61
11.04.01
m2
1,468.67
38.34
56,308.81
11.04.02
m2
28.27
44.28
1,251.80
m2
1,012.99
29.61
29,994.63
11.05.02
m2
665.43
40.23
26,770.25
11.05.03
m2
316.94
43.59
13,815.41
11.05.04
319.75
29.25
9,352.69
11.05.05
m2
127.90
32.25
4,124.78
11.05.06
m2
46.26
78.25
3,619.85
11.05.07
m2
154.18
37.82
5,831.09
208.81
27.36
11.05
11.05.01
11.05.08
12
PAVIMENTOS
99,221.74
CONTRAZOCALOS
5,713.04
44,447.19
12.01
816.60
19.64
16,038.02
12.02
107.45
13.75
1,477.44
12.03
528.91
8.40
4,442.84
12.04
459.37
12.36
5,677.81
12.05
670.25
16.53
11,079.23
12.06
89.61
19.17
1,717.82
45.33
17.55
795.54
12.07
12.08
13
221.05
14.56
ZOCALOS
3,218.49
141,575.58
13.01
m2
1,709.25
66.95
114,434.29
13.02
m2
225.33
56.44
12,717.63
13.03
14
LISTELO DE CERAMICO H= 10 CM
REVESTIMIENTO DE GRADAS Y ESCALERAS
849.45
16.98
14,423.66
4,715.78
117.35
36.34
4,264.50
22.10
20.42
14.01
14.02
15
15.01
CUBIERTAS
451.28
20,812.71
m2
302.20
43.21
13,058.06
15.02
244.78
20.38
4,988.62
15.03
634.41
4.36
16
16.01
CARPINTERIA DE MADERA
2,766.03
183,629.76
PUERTAS
116,768.81
16.01.01
m2
46.20
386.95
17,877.09
16.01.02
m2
29.40
434.03
12,760.48
16.01.03
m2
13.44
137.72
1,850.96
16.01.04
m2
2.88
137.72
396.63
16.01.05
m2
3.15
386.95
1,218.89
16.01.06
m2
41.58
386.95
16,089.38
16.01.07
m2
53.76
386.95
20,802.43
16.01.08
m2
2.31
336.83
778.08
16.01.09
m2
1.79
336.83
602.93
16.01.10
m2
40.32
386.95
15,601.82
16.01.11
m2
4.20
386.95
1,625.19
16.01.12
m2
3.36
386.95
1,300.15
16.01.13
m2
6.30
386.95
2,437.79
16.01.14
m2
16.80
336.83
5,658.74
16.01.15
m2
7.56
336.83
2,546.43
16.01.16
m2
2.63
386.95
1,017.68
16.01.17
m2
3.78
386.95
1,462.67
16.01.18
m2
1.89
386.95
731.34
16.01.19
m2
3.99
417.61
1,666.26
16.01.20
m2
4.20
417.61
1,753.96
16.01.21
m2
7.56
417.61
3,157.13
16.01.22
m2
3.57
386.95
1,381.41
16.01.23
m2
5.70
386.95
2,205.62
16.01.24
2.85
386.95
1,102.81
1.92
386.95
742.94
16.01.25
16.02
m2
MUEBLES Y MOSTRADORES
66,860.95
16.02.01
14.40
809.83
11,661.55
16.02.02
33.21
597.83
19,853.93
16.02.03
und
92.00
223.60
20,571.20
16.02.04
36.65
277.49
10,170.01
16.02.05
6.55
702.94
4,604.26
17
17.01
118,901.61
118,901.61
17.01.01
m2
12.60
398.30
5,018.58
17.01.02
m2
2.10
604.22
1,268.86
17.01.03
m2
5.04
176.05
887.29
17.01.04
m2
7.56
398.30
3,011.15
17.01.05
m2
8.75
388.76
3,401.65
17.01.06
m2
2.73
717.85
1,959.73
17.01.07
m2
2.78
120.77
335.74
17.01.08
m2
1.73
122.21
211.42
17.01.09
m2
1.80
121.40
218.52
17.01.10
80.30
494.09
39,675.43
17.01.11
391.95
124.08
48,633.16
17.01.12
46.30
63.80
2,953.94
17.01.13
CANTONERA DE ALUMINIO
281.50
16.61
4,675.72
17.01.14
m2
5.28
494.09
2,608.80
17.01.15
m2
5.59
263.82
1,474.75
17.01.16
m2
9.90
259.28
2,566.87
P9
18
CERRAJERIA
24,542.41
18.01
CERRADURA TIPO A
und
23.00
96.69
2,223.87
18.02
CERRADURA TIPO B
und
10.00
104.20
1,042.00
18.03
CERRADURA TIPO C
und
56.00
99.69
5,582.64
18.04
CERRADURA TIPO D
und
8.00
73.69
589.52
18.05
CERRADURA TIPO E
und
2.00
92.72
185.44
18.06
CERRADURA TIPO F
und
42.00
92.69
3,892.98
18.07
CERRADURA TIPO G
und
1.00
59.69
59.69
18.08
CERRADURA TIPO H
und
4.00
46.69
186.76
18.09
CERRADURA TIPO I
und
8.00
49.69
397.52
18.10
CERRADURA TIPO J
und
19.00
47.69
906.11
18.11
CERRADURA TIPO K
und
2.00
63.69
127.38
18.12
und
22.00
242.91
5,344.02
18.13
und
656.00
4.64
3,043.84
und
76.00
12.64
18.14
19
19.01
960.64
95,113.45
17,197.64
19.01.01
m2
28.35
360.87
10,230.66
19.01.02
m2
11.21
361.46
4,051.97
m2
7.35
396.60
2,915.01
m2
2.10
374.46
19.01.03
19.02
19.02.01
19.03
PUERTAS
PUERTA CRISTAL TEMPLADO 10mm TIPO P30
786.37
VENTANAS
786.37
77,129.44
19.03.01
m2
3.09
190.27
587.93
19.03.02
m2
8.64
190.27
1,643.93
19.03.03
m2
20.79
190.27
3,955.71
19.03.04
m2
1.95
190.27
371.03
19.03.05
m2
10.53
190.27
2,003.54
19.03.06
m2
11.51
190.27
2,190.01
19.03.07
m2
6.73
190.27
1,280.52
19.03.08
m2
2.16
190.27
410.98
19.03.09
m2
17.43
190.27
3,316.41
19.03.10
m2
17.55
190.27
3,339.24
19.03.11
m2
13.50
190.27
2,568.65
19.03.12
m2
57.11
190.27
10,866.32
19.03.13
19.03.14
m2
m2
32.08
12.87
190.27
190.27
6,103.86
2,448.77
19.03.15
m2
18.62
190.27
3,542.83
19.03.16
m2
14.04
190.27
2,671.39
19.03.17
m2
19.79
190.27
3,765.44
19.03.18
m2
20.48
190.27
3,896.73
19.03.19
m2
20.09
190.27
19.03.20
m2
4.32
28.49
123.08
19.03.21
m2
8.10
190.27
1,541.19
19.03.22
m2
2.00
190.27
380.54
19.03.23
m2
0.72
190.27
136.99
19.03.24
m2
2.40
190.27
456.65
19.03.25
m2
6.01
190.27
1,143.52
19.03.26
m2
0.99
380.82
377.01
19.03.27
m2
1.73
190.27
329.17
19.03.28
m2
0.45
190.27
85.62
19.03.29
m2
3.65
190.27
694.49
19.03.30
m2
1.25
190.27
237.84
19.03.31
m2
2.76
190.27
525.15
19.03.32
m2
1.82
190.27
346.29
19.03.33
m2
1.46
190.27
277.79
19.03.34
m2
6.65
190.27
1,265.30
19.03.35
m2
12.31
190.27
2,342.22
19.03.36
m2
5.40
190.27
1,027.46
19.03.37
m2
6.80
190.27
1,293.84
19.03.38
m2
8.00
190.27
1,522.16
19.03.39
m2
3.65
190.27
694.49
19.03.40
m2
1.08
190.27
205.49
19.03.41
m2
7.13
190.27
1,356.63
19.03.42
m2
1.75
190.27
332.97
19.03.43
m2
0.89
190.27
169.34
19.03.44
m2
0.86
190.27
163.63
19.03.45
m2
3.00
190.27
570.81
19.03.46
m2
1.76
190.27
334.88
19.03.47
m2
2.15
190.27
20
20.01
PINTURA
3,822.52
409.08
118,522.41
PINTURA LATEX
114,239.18
20.01.01
m2
4,421.03
10.25
45,315.56
20.01.02
m2
3,761.53
11.36
42,730.98
m2
2,190.02
11.96
26,192.64
20.01.03
20.02
20.02.01
20.03
20.03.01
21
PINTURA BARNIZ
PINTURA BARNIZ EN CONTRAZOCALOS
3,069.75
m
670.25
4.58
m2
93.13
13.03
PINTURA ESMALTE
PINTURA ESMALTE Y ANTICORROSIVO EN CARPINTERIA METALICA
3,069.75
1,213.48
VARIOS
1,213.48
43,206.65
21.01
und
39.00
13.99
545.61
21.02
und
12.00
11.99
143.88
21.03
und
117.00
19.99
2,338.83
21.04
und
76.00
83.17
6,320.92
21.05
und
5.00
111.04
555.20
21.06
77.66
201.25
15,629.08
21.07
und
2.00
3,395.21
6,790.42
21.08
m2
713.08
8.35
5,954.22
glb
und
1.00
1.00
1,600.00
3,328.49
1,600.00
3,328.49
21.09
21.10
1,645,124.24
GASTOS GENERALES
UTILIDAD 10%
164,512.42
164,512.42
----------------------------------------
SUB TOTAL
I.G.V.
1,974,149.08
18%
355,346.83
---------------------------------------
TOTAL PRESUPUESTO
2,329,495.91
SON :
DOS MILLONES TRESCIENTOS VEINTINUEVE MIL CUATROCIENTOS NOVENTICINCO Y 91/100 NUEVOS SOLES
S10
Pgina
Presupuesto
Presupuesto
0000006
Subpresupuesto
Cliente
Lugar
003
INSTALACIONES SANITARIAS
DISA II LIMA SUR
LIMA - LIMA - VILLA MARIA DEL TRIUNFO
Item
Descripcin
22
22.01
FORTALECIMIENTO DE LA CAPACIDAD RESOLUTIVA DEL CENTRO MATERNO INFANTIL I-4 VILLA MARIA DEL TRIUNFO DE LA
DISA II LIMA SUR
Costo al
Und.
Metrado
Precio S/.
31/08/2013
Parcial S/.
116,346.74
APARATOS SANITARIOS
91,939.53
22.01.01
und
21.00
415.25
8,720.25
22.01.02
und
36.00
334.72
12,049.92
22.01.03
und
10.00
557.12
5,571.20
22.01.04
und
6.00
840.00
5,040.00
22.01.05
und
1.00
840.00
840.00
22.01.06
und
2.00
4,200.00
8,400.00
22.01.07
5.00
383.52
1,917.60
22.01.08
und
2.00
1,800.00
3,600.00
22.01.09
und
33.00
587.00
19,371.00
22.01.10
und
9.00
522.00
4,698.00
22.01.11
und
16.00
418.84
6,701.44
22.01.12
und
5.00
578.24
2,891.20
22.01.13
und
10.00
241.24
2,412.40
22.01.14
und
146.00
66.62
9,726.52
22.02
ACCESORIOS SANITARIOS
24,407.21
22.02.01
ESPEJO (H-1)
und
40.00
80.39
3,215.60
22.02.02
und
48.00
7.15
343.20
22.02.03
und
40.00
63.00
2,520.00
22.02.04
und
16.00
11.24
179.84
22.02.05
und
33.00
37.00
1,221.00
22.02.06
16.00
17.50
280.00
22.02.07
und
16.00
320.19
5,123.04
22.02.08
und
37.00
170.19
6,297.03
22.02.09
und
246.00
21.25
23
23.01
SISTEMA DE DESAGUE
5,227.50
134,067.09
18,572.86
23.01.01
pto
94.00
88.98
8,364.12
23.01.02
pto
36.00
125.08
4,502.88
pto
62.00
92.03
23.01.03
23.02
23.02.01
REDES COLECTORAS
5,705.86
72,669.58
301.20
62.50
18,825.00
23.02.02
301.20
44.01
13,255.81
23.02.03
301.20
5.34
1,608.41
23.02.04
301.20
31.97
9,629.36
23.02.05
619.05
19.35
11,978.62
23.02.06
27.01
21.92
592.06
23.02.07
424.59
28.61
12,147.52
23.02.08
18.00
42.62
767.16
23.02.09
und
60.00
25.00
1,500.00
23.02.10
und
6.00
25.40
152.40
23.02.11
und
2.00
26.20
52.40
23.02.12
und
40.00
26.40
1,056.00
23.02.13
und
33.00
33.48
1,104.84
23.03
7,202.29
23.03.01
pza
16.00
47.10
753.60
23.03.02
pza
36.00
45.77
1,647.72
23.03.03
pza
3.00
55.00
165.00
23.03.04
pza
14.00
85.13
1,191.82
23.03.05
pza
61.00
17.26
1,052.86
23.03.06
und
1.00
1,220.96
1,220.96
4.60
254.42
1,170.33
20,214.61
185.30
6,114.90
23.03.07
23.04
23.04.01
und
33.00
23.04.02
und
10.00
233.12
2,331.20
23.04.03
und
1.00
1,465.41
1,465.41
23.04.04
und
2.00
143.86
287.72
23.04.05
1,088.65
1.26
1,371.70
23.04.06
und
2.00
4,245.37
8,490.74
23.04.07
und
1.00
152.94
152.94
23.05
23.05.01
23.05.02
24
24.01
15,407.75
286.80
20.38
494.20
19.35
5,844.98
9,562.77
96,883.35
10,623.54
24.01.01
pto
119.00
62.51
7,438.69
24.01.02
pto
8.00
66.01
528.08
24.01.03
pto
2.00
70.92
141.84
pto
33.00
76.21
24.01.04
24.02
24.02.01
24.02.02
24.03
2,514.93
16,624.08
156.08
62.50
156.08
44.01
9,755.00
6,869.08
12,243.16
24.03.01
180.19
11.55
2,081.19
24.03.02
103.94
12.38
1,286.78
24.03.03
10.56
13.61
143.72
24.03.04
222.37
14.70
3,268.84
24.03.05
88.48
17.11
1,513.89
24.03.06
74.49
20.31
1,512.89
24.03.07
101.33
23.05
2,335.66
24.03.08
3.84
26.09
100.19
24.04
3,916.81
24.04.01
und
2.00
21.91
43.82
24.04.02
und
3.00
17.91
53.73
24.04.03
und
4.00
17.21
68.84
24.04.04
und
1.00
15.91
15.91
24.04.05
und
4.00
14.91
59.64
24.04.06
und
3.00
15.21
45.63
24.04.07
und
4.00
15.04
60.16
24.04.08
und
14.00
16.18
226.52
24.04.09
und
4.00
14.08
56.32
24.04.10
und
4.00
14.08
56.32
24.04.11
und
54.00
14.08
760.32
24.04.12
und
3.00
13.58
40.74
24.04.13
und
7.00
15.38
107.66
24.04.14
und
29.00
12.40
359.60
24.04.15
und
20.00
98.08
1,961.60
24.05
VALVULAS
8,757.55
24.05.01
pza
79.00
52.76
4,168.04
24.05.02
pza
26.00
67.00
1,742.00
24.05.03
pza
29.00
98.19
2,847.51
und
134.00
169.62
22,729.08
pza
und
1.00
1.00
238.91
6,443.06
238.91
6,443.06
24.06
24.06.01
24.06.02
24.06.03
PIEZAS VARIAS
CAJA PARA VALVULAS CON MARCO Y TAPA METALICA
VALVULA FLOTADORA DE 2 1/2"
EQUIPO DE BOMBEO 02 ELECTROBOMBAS 1.5 HP Y 02 TANQUES
HIDRONEUMATICOS 180 GLN
39,793.89
und
5.00
51.76
258.80
24.06.05
und
1.00
140.40
140.40
24.06.06
und
2.00
275.40
550.80
24.06.07
und
10.00
56.03
560.30
24.06.08
und
1.00
358.91
358.91
24.06.09
und
1.00
512.81
512.81
24.06.10
und
1.00
547.81
547.81
24.06.11
und
1.00
907.81
907.81
24.06.12
und
2.00
987.81
1,975.62
24.06.13
und
4.00
1,102.81
4,411.24
24.06.14
und
1.00
158.34
158.34
1.00
181.46
181.46
781.36
6.07
4,742.86
24.07
4,924.32
24.07.01
und
24.07.02
25
25.01
25.01.01
25.02
25.02.01
25.02.02
25.03
25.03.01
26
19,478.81
6,653.46
pto
66.00
100.81
235.85
28.57
6,738.23
115.55
34.22
3,954.12
351.40
6.07
6,653.46
10,692.35
VARIOS
2,133.00
2,133.00
77,784.17
26.01
und
8.00
1,871.66
14,973.28
26.02
und
18.00
43.07
775.26
26.03
pza
1.00
1,513.17
1,513.17
26.04
2.50
42.71
106.78
26.05
38.35
107.41
4,119.17
und
1.00
45,579.51
45,579.51
pza
1.00
211.91
211.91
26.08
und
3.00
51.76
155.28
26.09
und
1.00
140.40
140.40
26.10
und
2.00
275.40
550.80
26.11
und
14.00
56.03
784.42
26.12
und
1.00
358.91
358.91
26.13
pza
5.00
1,629.23
8,146.15
26.14
40.85
5.16
210.79
26.15
und
1.00
158.34
158.34
26.06
26.07
COSTO DIRECTO
444,560.16
GASTOS GENERALES
UTILIDAD 10%
44,456.02
44,456.02
----------------------------------------
SUB TOTAL
I.G.V.
533,472.20
18%
96,025.00
---------------------------------------
TOTAL PRESUPUESTO
SON :
629,497.20
S10
Pgina
Presupuesto
Presupuesto
0000006
Subpresupuesto
Cliente
Lugar
004
INSTALACIONES ELECTROMECANICAS
DISA II LIMA SUR
LIMA - LIMA - VILLA MARIA DEL TRIUNFO
Item
Descripcin
27
INSTALACIONES ELECTRICAS
27.01
FORTALECIMIENTO DE LA CAPACIDAD RESOLUTIVA DEL CENTRO MATERNO INFANTIL I-4 VILLA MARIA DEL TRIUNFO DE LA
DISA II LIMA SUR
Costo al
Und.
Metrado
Precio S/.
31/08/2013
Parcial S/.
99,069.46
SALIDA DE ALUMBRADO
56,232.84
27.01.01
pto
439.00
96.62
42,416.18
27.01.02
pto
112.00
96.62
10,821.44
27.01.03
pto
31.00
96.62
2,995.22
27.02
27.02.01
27.03
27.03.01
28
28.01
28.01.01
28.02
28.02.01
28.02.02
28.03
28.03.01
28.03.02
28.04
28.04.01
28.05
28.05.01
28.05.02
28.06
40,924.80
pto
348.00
SALIDA DE FUERZA
pto
17.00
112.46
1,911.82
36,513.82
40,924.80
1,911.82
3,333.54
pto
42.00
79.37
3,333.54
12,253.48
pto
61.00
79.37
pto
43.00
172.37
4,841.57
7,411.91
1,562.84
pto
1.00
113.28
113.28
pto
14.00
103.54
1,449.56
pto
25.00
84.99
pto
24.00
106.81
pto
1.00
83.01
2,124.75
2,124.75
2,646.45
2,563.44
83.01
8,781.13
28.06.01
pto
1.00
28.06.02
pto
28.06.03
pto
28.07
117.60
SALIDAS DE FUERZA
151.69
151.69
104.00
79.24
8,240.96
2.00
194.24
388.48
5,811.63
28.07.01
pto
1.00
129.29
28.07.02
pto
3.00
51.58
154.74
28.07.03
pto
20.00
112.95
2,259.00
28.07.04
pto
5.00
89.93
449.65
28.07.05
pto
11.00
87.18
958.98
28.07.06
pto
1.00
63.41
63.41
28.07.07
pto
1.00
106.81
106.81
28.07.08
pto
9.00
97.82
880.38
pto
9.00
89.93
809.37
28.07.09
29
129.29
5,582.54
29.01
und
1.00
258.31
258.31
29.02
und
2.00
201.31
402.62
29.03
und
1.00
147.66
147.66
29.04
und
1.00
115.56
115.56
29.05
und
16.00
94.66
1,514.56
29.06
und
2.00
73.66
147.32
29.07
und
9.00
59.77
537.93
29.08
und
4.00
48.32
193.28
29.09
und
42.00
27.66
1,161.72
29.10
und
17.00
29.11
und
29.12
und
und
29.13
30
30.01
30.01.01
31
31.01
17.26
293.42
28.00
17.02
476.56
1.00
175.30
175.30
1.00
158.30
158.30
2,018.80
206.00
9.80
TUBERIAS
TUBERIA PVC SAP 25 mm
2,018.80
m
2,018.80
177,368.73
1,517.03
31.01.01
30.00
9.61
288.30
31.01.02
24.00
15.97
383.28
37.00
22.85
31.01.03
31.02
ALIMENTADORES Y CIRCUITOS
845.45
141,600.75
31.02.01
11.00
353.74
31.02.02
23.30
345.60
8,052.48
31.02.03
35.00
851.98
29,819.30
31.02.04
84.65
202.37
17,130.62
31.02.05
94.00
168.41
15,830.54
31.02.06
10.00
127.34
1,273.40
31.02.07
65.25
50.02
3,263.81
31.02.08
97.65
92.58
9,040.44
31.02.09
168.25
76.46
12,864.40
31.02.10
83.90
61.33
5,145.59
31.02.11
311.85
47.85
14,922.02
31.02.12
253.85
44.25
11,232.86
31.02.13
57.85
44.25
2,559.86
31.02.14
198.20
33.17
6,574.29
31.03
CANALETAS
3,891.14
34,250.95
31.03.01
22.55
110.30
2,487.27
31.03.02
15.00
94.05
1,410.75
31.03.03
41.10
105.30
4,327.83
31.03.04
19.65
96.95
1,905.07
31.03.05
66.35
73.10
4,850.19
31.03.06
182.90
65.91
12,054.94
31.03.07
und
11.00
655.90
7,214.90
32
32.01
TABLEROS Y CUCHILLAS
63,571.12
TABLEROS
58,831.70
32.01.01
T.G.G. 1-3x900A, 1-3x400A, 2-3x300A, 1-3x200A, 2-3x100A, 1-3x70A, 3-3x60A, 33x40A, 10 INT. DIF. 2x25A, TABLERO AUTOSOPORTADO
und
1.00
9,853.47
9,853.47
32.01.02
und
1.00
3,638.47
3,638.47
32.01.03
und
1.00
2,196.47
2,196.47
32.01.04
TD-1.1 1-3x60A, 1-2x30A, 7-2x20A, 2-2x15A, 10 INT. DIF. 2x25A, TABLERO 30 POLOS
und
1.00
2,001.23
2,001.23
32.01.05
TD-1.2 1-3x100A, 1-3x40A, 1-2x30A, 8-2x20A, 4-2x15A, 12 INT. DIF. 2x25A, 01 INT. DIF.
2x40A, TABLERO 42 POLOS
und
1.00
2,700.23
2,700.23
32.01.06
TD-1.3 1-3x60A, 6-2x20A, 4-2x15A, 10 INT. DIF. 2x25A, 03 INT. HORARIO 16A,
TABLERO 42 POLOS
und
1.00
2,559.23
2,559.23
32.01.07
TD-1.4 1-3x40A, 6-2x20A, 4-2x15A, 10 INT. DIF. 2x25A, 01 INT. HORARIO 16A,
TABLERO 42 POLOS
und
1.00
2,236.23
2,236.23
32.01.08
TD-1.5 1-3x40A, 1-2x30A, 3-2x20A, 4-2x15A, 07 INT. DIF. 2x25A, 01 INT. DIF. 2x40A, 01
INT. HORARIO 16A, TABLERO 42 POLOS
und
1.00
1,970.23
1,970.23
32.01.09
TD-1.6 1-3x40A, 1-2x30A, 3-2x20A, 1-2x15A, 04 INT. DIF. 2x25A, 01 INT. DIF. 2x40A, 01
INT. HORARIO 16A, TABLERO 24 POLOS
und
1.00
1,418.23
1,418.23
32.01.10
und
1.00
1,130.23
1,130.23
32.01.11
und
1.00
1,323.23
1,323.23
32.01.12
und
1.00
2,124.23
2,124.23
32.01.13
und
1.00
1,276.23
1,276.23
32.01.14
TD-2.2 1-3x70A, 1-3x30A, 6-2x20A, 3-2x15A, 09 INT. DIF. 2x25A, TABLERO 24 POLOS
und
1.00
1,896.23
1,896.23
32.01.15
32.01.16
und
und
1.00
1.00
2,257.23
1,335.23
2,257.23
1,335.23
32.01.17
TE-1.1 1-3x150A, 4-2x30A, 13-2x20A, 13 INT. DIF. 2x25A, 04 INT. DIF. 2x40A, TABLERO und
42 POLOS
1.00
3,295.23
3,295.23
32.01.18
TE-1.2 1-3x60A, 13-2x20A, 13 INT. DIF. 2x25A, 01 INT. HORARIO 16A, TABLERO 30
POLOS
und
1.00
2,555.23
2,555.23
1,589.23
1,589.23
32.01.19
und
1.00
32.01.20
und
1.00
997.23
997.23
32.01.21
und
1.00
1,130.23
1,130.23
32.01.22
und
1.00
1,781.23
1,781.23
32.01.23
und
1.00
1,810.23
1,810.23
32.01.24
und
1.00
997.23
997.23
32.01.25
und
1.00
3,594.23
3,594.23
32.01.26
und
1.00
1,165.23
1,165.23
32.02
INTERRUPTORES
4,739.42
32.02.01
und
1.00
784.41
784.41
32.02.02
und
1.00
284.41
284.41
32.02.03
und
1.00
254.41
254.41
32.02.04
und
4.00
122.41
489.64
32.02.05
und
7.00
122.41
856.87
32.02.06
und
1.00
1,436.86
1,436.86
und
2.00
316.41
32.02.07
33
33.01
33.01.01
34
1,020.00
glb
1.00
1,020.00
POZOS DE TIERRA
POZO DE PUESTA A TIERRA (5 OHMS)
und
9.00
865.76
34.02
und
2.00
1,054.76
35.01
1,020.00
9,901.36
34.01
35
632.82
1,020.00
7,791.84
2,109.52
222,154.33
ARTEFACTO DE ALUMBRADO
222,154.33
35.01.01
ARTEF. P/ADOSAR BASE METALICA 0.6mm C/DIF. REJILLA MET. C/2 LAMP.
FLUORESC. 36W L=1.20m, A=0.30m
und
135.00
211.82
28,595.70
35.01.02
und
35.00
216.82
7,588.70
35.01.03
und
38.00
211.82
8,049.16
35.01.04
und
172.00
469.57
80,766.04
35.01.05
und
2.00
411.82
823.64
35.01.06
und
5.00
151.82
759.10
35.01.07
und
15.00
161.82
2,427.30
35.01.08
LUZ DE CABECERA
ARTEFACTO P/ADOSAR CUADRADO 1"X1" BASE MET. 0.6mm C/DIF. REJILLA C/2
LAMP. AH. 11W
und
25.00
281.82
7,045.50
35.01.09
und
112.00
404.82
45,339.84
35.01.10
und
16.00
91.82
1,469.12
35.01.11
und
10.00
191.82
1,918.20
35.01.12
und
46.00
211.82
9,743.72
35.01.13
und
31.00
251.82
7,806.42
35.01.14
und
2.00
2,057.78
4,115.56
35.01.15
und
2.00
3,152.78
6,305.56
35.01.16
POSTE DE Fe 80mm x3.5m C/FAROLA ESFERICA 350mm Y LAMPARA DE 70W VAPOR und
DE SODIO
9.00
1,044.53
9,400.77
36
36.01
36.01.01
36.01.02
36.02
36.02.01
217,615.56
1,063.72
pto
1.00
128.95
128.95
und
3.00
311.59
934.77
pto
21.00
470.56
20,325.57
9,881.76
36.02.02
SALIDA DE VACIO
pto
21.00
452.77
9,508.17
36.02.03
pto
2.00
467.82
935.64
36.03
36.03.01
36.04
36.04.01
36.05
606.36
pto
2.00
303.18
606.36
329.12
12.10
27.20
329.12
26,019.90
36.05.01
21.25
33.43
36.05.02
36.05.03
36.05.04
80.25
35.96
2,885.79
282.30
44.55
12,576.47
31.85
61.67
1,964.19
36.05.05
3.85
84.82
326.56
36.05.06
29.65
109.83
3,256.46
29.40
146.26
4,300.04
36.05.07
36.06
710.39
6,124.80
36.06.01
und
76.00
39.02
2,965.52
36.06.02
und
7.00
41.80
292.60
36.06.03
und
2.00
44.30
88.60
36.06.04
und
7.00
56.30
394.10
36.06.05
und
20.00
35.29
705.80
36.06.06
und
3.00
39.45
118.35
36.06.07
und
2.00
48.55
97.10
36.06.08
und
10.00
74.45
744.50
36.06.09
und
5.00
44.27
221.35
36.06.10
und
6.00
43.60
261.60
36.06.11
und
4.00
58.82
235.28
36.07
36.07.01
36.08
VALVULAS (GASES)
VALVULA ESFERICA DE BRONCE DE 1/2" (AIRE/GAS)
223.34
pza
2.00
111.67
223.34
6,635.90
36.08.01
pza
2.00
126.43
252.86
36.08.02
pza
1.00
145.19
145.19
36.08.03
pza
1.00
217.05
217.05
36.08.04
pza
1.00
217.55
217.55
36.08.05
pza
1.00
598.31
598.31
36.08.06
und
10.00
240.19
2,401.90
und
8.00
350.38
36.08.07
36.09
CENTRALES
2,803.04
154,774.45
36.09.01
und
1.00
23,388.21
23,388.21
36.09.02
und
1.00
71,396.81
71,396.81
36.09.03
und
1.00
28,953.21
28,953.21
36.09.04
und
1.00
18,302.28
18,302.28
36.09.05
und
1.00
11,602.28
11,602.28
und
1.00
1,131.66
1,131.66
und
15.00
62.67
940.05
glb
1.00
572.35
572.35
572.35
36.09.06
36.10
36.10.01
36.11
36.11.01
37
37.01
37.01.01
37.01.02
940.05
EQUIPOS ESPECIALES
272,630.80
AIRE ACONDICIONADO
SUMINISTRO E INST DUCTERIA DE FE GALV AIRE
SUMINISTRO E INST AISLAMIENTO TERMICO DE DUCTOS -LANA DE VIDRIO Y FOIL
DE ALUMINIO
62,065.70
kg
577.48
16.00
9,239.68
m2
99.57
71.27
7,096.35
37.01.03
PG2
1,201.00
1.86
2,233.86
37.01.04
PG2
768.00
2.03
1,559.04
37.01.05
und
3.00
8,432.67
25,298.01
und
1.00
7,632.67
7,632.67
37.01.06
37.01.07
und
1.00
1,656.92
1,656.92
37.01.08
und
1.00
1,656.92
1,656.92
37.01.09
und
1.00
1,656.92
1,656.92
37.01.10
und
1.00
1,386.92
1,386.92
37.01.11
und
3.00
356.92
1,070.76
37.01.12
pto
4.00
194.24
776.96
37.01.13
m2
11.44
69.99
37.02
37.02.01
37.03
37.03.01
37.04
37.04.01
37.04.02
38
38.01
GRUPOS ELECTROGENOS
GRUPO ELECTROGENO DE 160 KW (INC. TABLERO DE TRANSF.)
800.69
95,626.39
und
1.00
95,626.39
ASCENSORES
95,626.39
105,685.93
und
1.00
105,685.93
und
1.00
4,826.39
und
1.00
4,426.39
EQUIPOS ESPECIALES
105,685.93
9,252.78
SUB ESTACION
4,826.39
4,426.39
201,931.39
glb
COSTO DIRECTO
1.00
201,931.39
201,931.39
1,309,377.91
GASTOS GENERALES
130,937.79
UTILIDAD 10%
130,937.79
----------------------------------------
SUB TOTAL
I.G.V.
1,571,253.49
18%
282,825.63
---------------------------------------
TOTAL PRESUPUESTO
SON :
1,854,079.12