64.00
6.00
28.00
2.00
120.00
1.00
40.00
10.00
1.00
27.00
1.00
2.00
1.00
1.00
2.00
1.00
MATERIAL
LATAS DE ZINC 12" GALVANIZADA
TUBOS DE 2" X 2" X 6 MTS
TUBOS DE 2" X 1" X 6 MTS
ROLLO MALLA GALLINERA 30 MTS
BLOQUES 10 GRIS
ROLLO DE CABLE 10
CORTINA GALLINERA
CEMENTO
FLETE
TUBOS DE 2 X 1 X 6 MTS
CAMION RELLENO MENITO
GALON FONDO
SOCKATES,BOMBILLOS, APAGADORES, BREAKERS
GASOLINA, BROCHA, ELECTRODOS,TUBOS DE AGUA,CAL, ALAMBRE
ARENA GRIS
MANO DE OBRA
TOT
PRECIO U.
209.00
260.00
142.00
550.00
3.00
560.00
80.00
60.00
700.00
220.00
600.00
220.00
250.00
480.00
270.00
13,000.00
KERS
DE AGUA,CAL, ALAMBRE
TOTAL
TOTAL
USO
13,376.00
TECHO
1,560.00
BASES QUE SOSTIENEN LAS TIJERAS
3,976.00
TIJERAS
1,100.00
CERCA GALPON
360.00
PARED DE 1 BLOQUE DE ALTO
560.00
ELECTRICIDAD DEL GALPON
3,200.00CONTROLAR TEMPERATURA DEL GALPN
600.00
PEGAR BLOQUES Y BASES
700.00
TRANSPORTAR MATERIAL
5,940.00
DONDE VAN LAS LATAS DE ZINC
600.00
RELLENAR PISO
440.00
PINTURA HERRERIA
250.00
ELECTRICIDAD GALPON
480.00
OTROS ACCESORIOS
540.00
PEGAR BLOQUES Y BASES
13,000.00