210 kg/cm2
f'c :
fy:
flex. :
corte. :
4200 kg/cm2
0.85
Varillas
0.9
As (cm)
8mm
0.5
3/8"
0.71
1/2"
1.29
5/8"
1.98
3/4"
2.85
0.85
a = As * fy / ( * f'c * b )
As = M / [ * fy * (d - a/2) ]
A) PREDIMENSIONADO :
A.1)PREDIMENSIONADO
1.95
LUZ LIBRE/15=
0.13
15
D elejido =
0.20 m
B) METRADO DE CARGAS
B.1) EMPUJE DEL SUELO
=
=
1.95
2000.0
34.00
Ka = Tg (45-/2)
Ps
=
Z=0 m
Z=1.95 m
0.28
1.09
m
kg/m3
P=0
P=0.25
t/m
=
=
1.95 m
1000 kg/m3
Ps
1.95
Z=0 m
P=1.09
c= 0.56
P=0.25
d= 1.09
P=0
t/m
Z=1.95 m
c= 1
Ps= 0 t/m
d= 1.95
P=1.95
M (Tn-m)
b (cm)
d(cm)
a (cm)
As (cm)
As max (cm)
As min (cm)
p = As / bd
M max (Tn-m)
Trabaja a:
1.65
100
14.0
0.75
31.80
3.60
0.23%
12.33
Traccin
0.12
100
17.5
0.04
3.20
0.18
31.80
3.60
0.01%
16.54
Traccin
8mm
3/8"
1/2"
5/8"
3/4"
Total(cm2)
5.16
3.87
USAR 1/2"@ 25
USAR 1/2"@ 35
Lecho superior
Lecho inferior
C.2.1) ACERO HORIZONTAL(Acero Negativo)
M (Tn-m)
b (cm)
d(cm)
a (cm)
As (cm)
As max (cm)
As min (cm)
p = As / bd
M max (Tn-m)
Trabaja a:
1
1
0.73
100
17.5
0.26
1.11
31.80
3.60
0.06%
16.54
Traccin
8mm
Cara interior
Cara exterior
D) DISEO POR CORTANTE
Las losa maciza se disean de tal forma que estas sean las que resistan todo la fuerza cortante
Vn Vc Vs
Vc=
Vc=
Vud=
Vu
10.75
9.14
4.91
Vs
ton
ton
ton
Vud
CUMPLE
Vc
3/8"
1/2"
5/8"
3/4"
USAR 1/2"@ 25
USAR 1/2"@ 35
Total(cm2)
5.16
D) DISEO DE CIMENTACION
D.1) PREDIMENSIONADO
tipo de suelo=
FS
n
P servicio
longitud
Ancho
SM
3.00
0.65
Arcilla Limosa
=
=
=
=
=
1.88
1.50
0.19
ton
m
m
kg/cm2
0.20 m
1.1 cm2