Proyecto: Sistema de Agua Potable Shambillo

Movimiento de Tierras - Tubera de Aduccin


Movimiento de Tierras
Cota

Area

Volumen

Progresiva

Perfil de
Tubera

Perfil del
Terreno

Gradiente
Hidrulica

Corte

Relleno

Corte

Relleno

0.00
20.00
22.90
30.00
33.50
170.00
180.00
200.00
220.00
220.00
260.00
300.00
340.00
420.00
700.00
780.00
920.00
980.00
1,060.00
1,080.00
1,100.00
1,340.00
1,360.00
1,380.00
1,480.00
1,520.00
1,580.00
1,620.00
1,880.00
1,980.00
2,020.00
2,060.00
2,140.00
2,160.00
2,340.00
2,360.00
2,440.00
2,480.00
2,520.00
2,540.00
2,680.00
2,800.00
2,860.00
2,880.00
2,901.18

388.81
388.71
388.23
388.20
387.70
387.02
386.01
384.51
383.01
382.86
372.45
364.45
362.45
360.05
358.65
361.85
361.15
359.95
359.55
358.75
359.55
358.35
359.55
359.95
359.45
358.65
358.35
359.55
358.25
359.75
359.35
360.35
359.55
358.95
358.05
357.55
357.15
355.15
351.15
350.15
351.55
349.15
348.85
349.65
349.44

389.94
389.94
389.97
390.01
390.09
387.85
386.61
387.37
383.71
383.71
372.80
365.52
363.01
360.64
359.60
362.56
361.35
360.34
359.84
359.10
359.82
358.89
360.15
360.53
359.90
359.26
358.67
360.36
359.18
360.57
359.58
360.64
359.88
359.24
359.00
357.94
358.28
355.47
351.88
350.52
351.75
349.77
349.44
350.04
349.78

389.11
389.03
388.23
388.20
387.70
387.22
387.18
387.10
387.03
382.86
382.57
382.29
382.02
381.47
379.54
378.98
378.02
377.61
377.05
376.92
376.78
375.12
374.99
374.85
374.16
373.88
373.47
373.19
371.40
370.71
370.44
370.16
369.61
369.47
368.23
368.09
367.54
367.27
366.99
366.85
365.89
365.06
364.64
364.51
364.36

0.62
1.23
1.74
1.81
2.39
0.83
0.60
2.86
0.70
0.85
0.35
1.07
0.56
0.59
0.95
0.71
0.20
0.39
0.29
0.35
0.27
0.54
0.60
0.58
0.45
0.61
0.32
0.81
0.93
0.82
0.23
0.29
0.33
0.29
0.95
0.39
1.13
0.32
0.73
0.37
0.20
0.62
0.59
0.39
0.34

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

18.51
4.31
12.60
7.35
220.22
7.19
34.68
35.68
0.00
23.99
28.36
32.56
45.92
215.32
66.32
63.56
17.64
27.12
6.38
6.18
96.96
11.38
11.78
51.40
21.16
27.84
22.56
225.94
87.40
20.96
10.36
24.72
6.18
111.42
13.38
60.72
28.96
20.96
10.98
39.76
49.08
36.24
9.78
7.71

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Volumen Total de Excavacin


Volumen Total de Relleno

Volumen de Relleno con material seleccionado


Volumen de Material Seleccionado

Proyecto: Sistema de Agua Potable Shambillo

miento de Tierras - Tubera de Aduccin


Volumen
Material
Seleccionado
(Cama de
Tubera)
1.00
0.15
0.36
0.18
6.83
0.50
1.00
1.00
0.00
2.00
2.00
2.00
4.00
14.00
4.00
7.00
3.00
4.00
1.00
1.00
12.00
1.00
1.00
5.00
2.00
3.00
2.00
13.00
5.00
2.00
2.00
4.00
1.00
9.00
1.00
4.00
2.00
2.00
1.00
7.00
6.00
3.00
1.00
1.06

1,881.53
0.00
1,128.92
145.06

Hoja de Metrado
Descripcin
1.00 CAPTACIN
01 Trabajos Preliminares
Roce y limpieza del terreno
Trazo, nivelacion y replanteo
02 Movimiento de Tierras
Excavacion manual a H=0,80mt
Refine, nivel y compactacion pison manual
Relleno a mano con material propio
Eliminacion manual de material exedente
03 Obras de Concreto Simple
Enrocado de piedra F'C=175Kg/cm2
04 Obras de Concreto Armado
Concreto en muros F'=210Kg/cm2
Encofrado de muros (ambas caras)
Acero en muros
Prueba de calidad del concreto
05 Revoques y Enlucidos
Tarrajeo impermeabilizado
tarrajeo de muro exterior
06 Varios
Canastilla PVC de 2"
Rejilla Metalica de 0,20 x 0,40
Valvula compuerta brance de 2"
Compuerta metalica tipo timon de 0.60x0.60 mt
2.00 SEDIMENTADOR
01 Trabajos Preliminares
Roce y limpieza del terreno
Trazo, nivelacion y replanteo
02 Movimiento de Tierras
Excavacion manual a H=0,80mt
Relleno a mano con material propio
Eliminacion manual de material exedente
03 Obras de Concreto Simple
Solado de concreto de e=4"
04 Obras de Concreto Armado
Concreto en muros F'=210Kg/cm2
Encofrado de muros (ambas caras)
Acero en muros
Prueba de calidad del concreto
05 Redes de agua potable
Tuberia PVC SAP Clase 7,5 DE 2"
06 Revoques y Enlucidos
Tarrajeo impermeabilizado
tarrajeo de muro exterior
07 Varios
Pintura de muros ext. Latex
Suministro y colocacion de accesorios
3.00 Filtro Lento
01 Trabajos Preliminares
Roce y limpieza del terreno
Trazo, nivelacion y replanteo
02 Movimiento de Tierras
Excavacion manual a H=0,80mt
Relleno a mano con material propio
Eliminacion manual de material exedente
03 Obras de Concreto Simple
Solado de concreto de e=4"
04 Obras de Concreto Armado
Concreto en muros F'=210Kg/cm2
Encofrado de muros (ambas caras)
Acero en muros
Prueba de calidad del concreto
05 Revoques y Enlucidos
Tarrajeo impermeabilizado
tarrajeo de muro exterior
06 Redes de agua potable
Tuberia PVC SAP Clase 7,5 DE 2"
Tuberia PVC SAP Clase 7,5 DE 4"
07 Varios
Pintura de muros ext. Latex
Suministro y colocacion de accesorios
Filtro de arena
Filtro de grava
Suministro y colocacion de aliviadero
Suministro y colocacion de vertedero
4.00 Linea de Conduccion
01 Trabajos preliminares
Roce y limpieza del terreno
Trazo y replanteo
Excavacion de zanjas

Unidad Cantidad

Total

m2
m2

1.00
1.00

34.20
34.20

m3
m2
m3
m3

1.00
1.00
1.00
1.00

8.54
13.50
2.05
6.49

m3

1.00

1.52

m3
m2
kg
Und

1.00
1.00
1.00
1.00

16.12
43.22
226.48
2.00

m2
m2

1.00
1.00

8.00
25.85

und
und
und
und

1.00
1.00
1.00
1.00

1.00
1.00
2.00
1.00

m2
m2

1.00
1.00

33.95
11.55

m3
m2
m3

1.00
1.00
1.00

14.25
12.71
17.02

m2

1.00

20.06

m3
m2
kg
Und

1.00
1.00
1.00
1.00

6.68
44.33
198.32
2.00

ml

1.00

20.00

m2
m2

1.00
1.00

28.69
20.20

m2
und

1.00
1.00

36.32
1.00

m2
m2

1.00
1.00

39.06
39.06

m3
m3
m3

1.00
1.00
1.00

45.09
3.29
52.25

m2

1.00

30.06

m3
m2
kg
Und

1.00
1.00
1.00

19.45
142.35
975.99
2.00

m2
m2

1.00
1.00

114.97
103.00

ml
ml

1.00
1.00

29.00
7.25

m2
und
m3
m3
und
und

1.00
1.00
1.00
1.00
1.00
1.00

53.84
1.00
8.00
5.00
1.00
1.00

m2
ml
ml

1.00
1.00
1.00

960.00
320.00
320.00

Observacin

Transversal
Transversal

Long. Fondo 2
Long. Fondo 1

Long. Fondo 2
Long. Fondo 1

Longitudinal horizontal
Kilogramo

UN METRO POR LADO

Hoja de Metrado
Descripcin
Unidad Cantidad
Relleno y compactado de zanjas
ml
1.00
Refine, nivelacion fondo de zanjas
ml
1.00
Preparacion de cama de apoyo
ml
1.00
02 Redes de agua potable
Tuberia PVC SAP Clase 7,5 DE 2"
ml
1.00
Prueba hidraulica de tuberias de agua
ml
1.00
03 Varios
Suministro y colocacion de codo PVC SAP 2"
Und
1.00
5.00 Reservorio
01 Trabajos Preliminares
Roce y limpieza del terreno
m2
1.00
Trazo, nivelacion y replanteo
m2
1.00
02 Movimiento de Tierras
Excavacion manual a H=0,80mt
m3
1.00
Refine, nivelacion y compactacion pison manual
m2
1.00
Eliminacion manual de material exedente
m3
1.00
03 Obras de concreto simple
Solado de concreto cimientos corridos 1:8 cemento - hormigon
m2
1.00
04 Obras de concreto armado
Concreto en muros F'C=210Kg/cm2
m3
1.00
Encofrado y desencofrado de muros
m2
1.00
Acero de refuerzo en muros
kg
1.00
Concreto en losa cubierta F'C=210Kg/cm2
m3
1.00
Encofrado y desencofrado en losa cubierta
m2
1.00
Acero de refuerzo en losa cubierta
kg
1.00
Concreto en losa de fondo F'C=210Kg/cm2
m3
1.00
Encofrado y desencofrado de losa de fondo
m2
1.00
Acero de refuerzo en losa de fondo
kg
1.00
Concreto en caja de valvulas F'C=210Kg/cm2
m3
1.00
Encofrado y desencofrado de caja de valvulas
m2
1.00
Acero de refuerzo en caja de valvulas
kg
1.00
Concreto en tapa de inspeccion F'C=210Kg/cm2
m3
1.00
Encofrado y desencofrado en tapa de inspeccion
m2
1.00
Acero de refuerzo en tapa de inspeccion
kg
1.00
Concreto en losa removible de T. I. F'C=210Kg/cm2
m3
1.00
Encofrado y desencofrado en losa removible de T. I.
m2
1.00
Acero de refuerzo en losa removible de T. I.
kg
1.00
Prueba de calidad del concreto
Und
1.00
05 Revoques y Enlucidos
Tarrajeo impermeabilizado en muros
m2
1.00
Tarrajeo de muro exterior
m2
1.00
06 Suministro e Instalacion de Tuberias
Tuberia PVC SAP Clase 7,5 DE 2"
ml
1.00
07 Suministro e Instalacion de Accesorios y Valvulas
Canastilla PVC DE 2"
Und
1.00
Codo PVC SAP 90 * 2"
Und
1.00
Tee PVC SAP c-10 de 2"
Und
1.00
Valvula compuerta bronce de 2"
Und
1.00
08 Varios
Pintura de muros ext. Latex
m2
1.00
Escalera gato F G de 3/4"
Und
1.00
Hipoclorador
Und
1.00
6.00 Linea de Aduccion y Distribucion
01 Trabajos Preliminares
Roce y limpieza del terreno
m2
1.00
Trazo y replanteo
ml
1.00
02 Movimiento de Tierras
Excavacion de zanjas
ml
1.00
Refine, nivelacion fondo de zanjas
ml
1.00
Preparacion de cama de apoyo
ml
1.00
Relleno y compactado de zanjas
ml
1.00
03 Redes de agua potable
Tuberia PVC SAP Clase 5 DE 2"
ml
1.00
Tuberia PVC SAP Clase 5 DE 1 1/2"
ml
1.00
Tuberia PVC SAP Clase 5 DE 1"
ml
1.00
Prueba hidraulica de tuberias de agua
ml
1.00
04 Conexiones domiciliarias
Excavacion de zanjas para conexiones domiciliarias
m3
1.00
Refine y nivelacion de zanja en terreno normal
ml
1.00
Preparacion de cama de apoyo e=0.10 m
ml
1.00
Relleno y compactado de zanjas
ml
1.00
Conexiones domiciliarias de agua potable
Und
1.00
05 Suministro e Instalacion de accesorios
Valvula compuerta bronce de 2"
Und
1.00
Valvula compuerta bronce de 1 1/2"
Und
1.00
Valvula compuerta bronce de 1"
Und
1.00
Tee PVC SAP c-10 de 2" x 1"
Und
1.00
Tee PVC SAP c-10 de 2" x 1 1/2"
Und
1.00
Tee PVC SAP c-10 de 1 1/2" x 1 1/2"
Und
1.00
Tee PVC SAP c-10 de 1 1/2" x 1"
Und
1.00
Tee PVC SAP c-10 de 1" x 1"
Und
1.00
Tapon PVC SAP c-10 de 1 1/2"
Und
1.00
Tapon PVC SAP c-10 de 1"
Und
1.00

Total
320.00
320.00
320.00

Observacin

320.00
320.00

Longitudinal horizontal

4.00

21.63
21.63
18.97
17.64
22.76
31.54
3.39
77.31
307.23
1.47
11.89
59.15
2.65
2.52
79.87
0.49
3.68
37.41
0.07
2.65
3.50
0.03
2.54
6.00
4.00

Long. Fondo 1
Long. Fondo 2

40.27
37.03
10.00
1.00
3.00
3.00
5.00
22.63
1.00
1.00

1806.00
603.00
603.00
603.00
603.00
603.00
140.00
257.00
200.00
597.00
8.40
78.00
78.00
78.00
26.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00

Longitudinal horizontal
Longitudinal horizontal
Longitudinal horizontal
Longitudinal horizontal

Hoja de Metrado
Descripcin
Codo PVC SAP c-10 de 2" x 45
Cajas de valvulas de concreto
Placa recordatoria metalico de 0.40 x 0.60 m.

Unidad Cantidad
Und
1.00
Und
1.00
Und
1.00

Total
2.00
5.00
1.00

Observacin

Longitud de Tuberia de Distribucin


3.5
9.5
9.8
11.3
12.8
14.18
4
2.34
11.64
50.41
41.58
11.55
5.87
22.97
62.28
16.36
58.85
36.9
16.86
8
7.36
7.79
8.1
8.24
8.44
5.69
5.57
5.11
9.31
3.47
2.39
4.69
6.19
12.63
10.12
Total
515.79