UNIDAD DE PERFORACION

COMALCALCO

PROBLEMTICA POR CEMENTACION DE CABEZAL 20 3M


POZO PARETO 7 PMX338

LINEA DE TIEMPO
18/05
LEVANTO BOPS
13 5/8"-10M
PARA
EFECTUAR
CORTE

13/05
BAJO RIMA
PARA TR DE 9
5/8

08/05
CEMENTACIN
DE LINER 9 5/8

09/05
RECONOCE BL
9 5/8 CON
SARTA LISA Y
BNA TRICONICA
10 5/8

17/05
CEMENTACIN
DE
COMPLEMENTO
9 5/8

Antecedentes
Introduccin y cementacin de liner 9 5/8 53.5#, TAC-140, VSLIJ-II.
- Bajo liner a 5624 m, encontr resistencia intento vencer en repetidas ocasiones sin xito.
- Efectu cementacin de liner 9 5/8 con Q= 4-2 bpm PB= 900psi 3550psi, bombeo:
-12.72 m3 de bache espaciador dens. 2.10 gr/cc.
-30.84 m3 lechada dens. 2.15 gr/cc.
-15.58 m3, desplazo 3.18 m3 de espaciador dens. 2.10 gr/cc.
-55 m3 de fluido E. I. Dens. 2.05 gr/cc.
-3.18 m3 bache espaciador dens. 2.10 gr/cc.
-30.86 m3 fluido E.I. Dens. 2.05 gr/cc.

Nota:
Al terminar cementacin se levanto el stinger 1800 m y circulo por 5 minutos aproximadamente,
posterior se levanto 230 m y circulo 10 minutos.

Antecedentes
Armo y meti sarta lisa con bna. triconica 10 5/8" tipo 117, toc resistencia fca. Con 05 tons a
3162 m, de 3770 m a 3788 m bajo libre, rebajo cemento a 4004 m donde toco BL de 9 5/8" con 5
ton, saco a 3964 m donde suspendi por observar friccin de hasta 20 tons, con rotacin y
circulacin saco a 3955 m con friccin de 3-4 ton, a 3884 m con friccin de 5-10 ton, intento
continuar sacando, sin xito, por observar friccin de hasta 20 ton, levanto a 3539 m, venciendo
resistencia con rotacin y circulacin, observando arrastre de 10-20 tons, observo incremento de
la presin de 3000--3700 psi y peso de sarta de 115--95 tons, con circulacin parcial durante 1
min, abatiendo presin a la normalidad de 3700-3000 psi, levanto a superficie.
Armo y meti bna. triconica 8" tipo 117, sarta lisa + rima para TR de 9 5/8, opero misma en BL
a 4004 m durante 5 min, levanto rima 1 m arriba de la BL y circulo ciclo completo, saco a
superficie.

Concluye
cementacin
Inicia a
levantar

Detiene y
circula

Detiene y
circula

Antecedentes
Mete complemento de TR 9 5/8", equipada con TIE BACK y cople flotador de orificios a 4004 m, opero
TIE BACK reconoci BL con circulacin con observando incremento de presin de 1000 psi a 1200 psi,
perdi 3 tons de peso de sarta, desfogo presin a 0, enchufo carrera de sellos a 4020 m probo con 1000
psi, desconecto carrera de sello quedando ok.
Efecto cementacin con gastos de 2 a 8 bpm, presin mnima de 900 psi, mxima de 3000 psi:

Bombeo 8 m de bache espaciador de 2.07 gr/cc


97.57 m de lechada de amarre de cemento de 2.10 gr/cc
Desplazo con 146.75 m de lodo de emulsin inversa de 2.05 gr/cc
Limpio lineas y cabezal con 3.65 m de agua dulce

Observo acoplamiento de tapn, alcanzando una presin final de 1500 psi, verifico enchufe del TIE
BACK, descargo presin a cero, retornando 5 barriles

Nota: se observ salir 11 m de fluido de control densidad de 2.05 gr/cc contaminado de bache
espaciador ms cemento.

Antecedentes

B.L. 11
3/4

3,037
mts.

TR 13
3/8

TUBERIA

DIAMETRO

LIBRAJE

ID

LINER

9 5/8

53.5 lb/ft

8.535

LINER

11 3/4

65 lb/ft

10.682

TR

13 3/4

72 lb/ft

12.347

3,200
mts.
B.L. 9
5/8

4,004
mts.

TR 11
3/4

4,130
mts.

CAPACIDAD

CAPACIDADES
2
(8.535 ) (0.5067)= 36.91 lts/mts

CAPACIDAD

(10.682 2- 9.625 )2 (0.5067)= 10.87 lts/mts

CAPACIDAD

(12.347 - 9.625 ) (0.5067)= 30.30 lts/mts

ESPESOR DE CEMENTO
10.682 10.625 = 0.057 PG

LINER 9
5/8

5,627
mts.

VOLUMEN TOTAL OCUPADO POR CEMENTO


0.057 * 0.5067 = 0.02 lts/mts
0.02 lts/m * 822 m = 23.74 lts

V
O
L
.

B.L. 11
3/4
TR 13
3/8
B.L. 9
5/8

TR 11
3/4

D
E
S
P
L
A
Z
A
M
I
E
N
T
O

3,037
mts.
3,200
mts.
4,004
mts.

4,130
mts.

VOLUMEN DE DESPLAZAMIENTO
(36.91 lts/mts) (3,974.71 mts)= 146,706.54 lts
146.70 m 3
922.68 bls

CIMA DE CEMENTO A 200 mts

(36.91 lts/mts) (29.29 mts)=

1,081.09 lts

(10.87 lts/mts) (967 mts)=


B.L. 11
3/4
TR 13
3/8
B.L. 9
5/8

3,037
mts.

(30.30 lts/mts) (2,837 mts)=

85,961.1 lts
_______________

3,200
mts.
4,004
mts.

10,511.29 lts

97,553.48 lts
TONELADAS DE CEMENTO
97,553.48 lts
_______________

TR 11
3/4

4,130
mts.

41.02 x 20

118.90 ton

8 m DE BACHE ESPACIADOR
(30.30 lts/mts) (200 mts)=
B.L. 11
3/4
TR 13
3/8
B.L. 9
5/8

TR 11
3/4

3,037
mts.
3,200
mts.
4,004
mts.

4,130
mts.

6,068 lts

SALDRIAN A SUPERFICIE 1,940 lts.


3
1.9 m

GRAFICO DE CEMENTACION

MESA ROTARIA

ARREGLO 13 5/8" 10K

CHAROLA ECOLLICA

EMR 10.6 M

CHAROLA
ECOLOGICA

CAMPANA
1.78 M

1.44 m

PREVENTOR ANULAR 13 5/8"- 5K CON BRIDA


INFERIOR 13 5/8"- 10K

PREVENTOR
ANULAR
HYDRIL

ARIETES 5"
1.68 M

PREVENTOR DOBLE 13 5/8"- 10K


MARCA ITS

CIEGO

VLVULA MECNICA 3 1/8" 5K R-35


10.06

0.75 m

CARRETE DE CONTROL13 5/8"- 10K


VALV. HCA COMPUERTA 3 1/8" 5K

LINEA DE MATAR
LINEA PRIMARIA

1.06 m

ARIETES 5"

PREVENTOR TIPO U13 5/8"- 10K


MARCA ITS

0.99 m

CARRETE ESPACIADOR 13 5/8"-10M R-74


NIVEL DEL TERRENO

1.00 m

CARRETE ESPACIADOR 13 5/8"-10M R-74

CONTRAPOZO DE
3 m X 4 m X 3m

3 1/8" 3K R-31

0.84 m

FMC

CABEZAL 20 3/4-3M X 13 5/8" 10K - FMC

3.00 m

0.52 m

CABEZAL 20 3/4-3M PARA TR - CAMERON

CAMERON
20" a 1000 mD

13 3/8" a 3200 mD

OPERACIN DE LAVADO
SE RETIRO CABEZAL CAMERON
20 3/4-3M Y LAVO CONTRA POZO

SE RETIRO CONJUNTO DE PREVENTORES


13 5/8 10K Y CABEZAL 13 5/8 10K

NIVEL DEL
TERRENO

9 CM

9 CM

34.5 CM

34.5
CM

17.5 CM
50 CM

TR
13 3/8

CAMERON

27 CM

TR 20"
TR
13 3/8

TR 20"

OPERACIN DE LAVADO

TR 20"
TR
13 3/8

SE BOMBEO AGUA Y BACHES LAVADORES LODO BASE AGUA DENSIDAD


1.02 GR/CC CON Q= 1 A 1.5 BPM

19/04
LIMPIA
CONTRAPOZO

22/04
LAVA CEMENTO
CON
MACARRONI DE
1.900 ENTRE
TR 9 5/8 Y TR
20

DESVIACION
PROGRAMA
COSTO
DA/OPERACIN
EXTRAS
COSTOS TOP DRIVE
EXTRAS

20/04
DA LIBRANZA A
PARETO 1

25/04
INSTAL
COLGADOR TIPO
CUAS PARA TR
9 5/8" EN
CABEZAL 13 5/8"10M

COSTOS
PERIFERICOS
EXTRAS

COSTO
DA/OPERACIN

TOP DRIVE

PERIFRICOS
(CAMPERS, LETRINAS
Y CONTROL DE
SLIDOS)

$ 327,585.84

$ 74,729.48

$ 41,978.00

TOTAL POR 25 DIAS


DE PROBLEMA
$ 1,107,333.00