Documentos de Académico
Documentos de Profesional
Documentos de Cultura
LEM -
41
2003
rio utcubamba
san luis
Piedra 1 "
A.Fino
PERDIDA POR LAVADO
TAMIZADO
TAMIZ
AGREGADO FINO
Mdulo de Fineza :
Mdulo de Fineza :
A.Grueso
1000.00
PESO ORIGINAL
gr
..................
1000.00
gr
% PESO
% ACUM.
RETEN.
PASA
0.00
5.50
11.70
18.90
25.50
22.00
12.10
2.50
1.80
100.00
100
94.50
82.80
63.90
38.40
16.40
4.30
1.80
0.00
17.20
36.10
61.60
100
Mdulo de Fineza :
8000.00
gr
..................
8000.00
gr
% PESO
% ACUM. % ACUM.
RETEN.
PASA
RETEN.
0.00
100.00
0
0.00
100.00
0.00
59.93
40.07
59.93
28.45
11.62
88.38
9.72
1.90
98.10
1.90
0.00
100.00
0.00
0.00
100.00
0.00
0.00
100.00
0.00
0.00
100.00
0.00
0.00
100.00
0.00
0.00
100.00
0.00
0.00
100.00
0.00
0.00
100.00
100.00
299.70
100
3.00
mf
83.60
95.70
LEM -
41
ABERTURA(m
.m.)
ARENA EN
ESTUDIO
LIMITE
INFERIOR,
ITINTEC
400,037
LIMITE
SUPERIOR,
ITINTEC
400,037
2003
100.00
90.00
80.00
% QUE70.00
PASA,ACUMULADO
3/8 "
N 4
N 8
N 16
N 30
N 50
N 100
9.500
4.750
2.360
1.180
0.600
0.300
0.150
100.00
94.50
82.80
63.90
38.40
16.40
4.30
100.00
89.00
65.00
45.00
25.00
5.00
0.00
100.00
100.00
100.00
100.00
80.00
48.00
12.00
60.00
50.00
40.00
30.00
20.00
10.00
0.00
0.100
1.000
ABERTURA ( m.m.)
ARENA EN ESTUDIO
LIMITE INFERIOR, ITINTEC 400,037
LIMITE SUPERIOR, ITINTEC 400,037
10.000
30.00
20.00
10.00
0.00
0.100
1.000
ABERTURA ( m.m.)
ARENA EN ESTUDIO
LIMITE INFERIOR, ITINTEC 400,037
LIMITE SUPERIOR, ITINTEC 400,037
10.000
10.000
10.000
LEM -
41
2003
100
% QUE PASA, ACUMULADO
TAMIZ
ABERTURA(
m.m.)
PIEDRA DE
3/4"
LIMITE
INFERIOR,
ITINTEC
400,037
LIMITE
SUPERIOR,
ITINTEC
400,037
90
80
% QUE70
PASA,ACUM ULADO
4"
3 1/2"
2 1/2"
1 1/2"
1"
3/4"
1/2 "
3/8 "
N 4
N 8
N 16
N 30
N 50
N 100
100
90
63
37.5
25
19
12.5
9.500
4.750
2.360
1.180
0.600
0.300
0.150
60
50
100.00
85.67
41.06
29.16
4.92
100
95
67
25
18
0
0
100
100
85
60
46
10
5
40
30
20
10
0
0.1
10
ABERTURA ( m.m.)
100
0.1
10
ABERTURA ( m.m.)
100
xxx Kg/cm2
x" - y"
Fino
la victoria
1.55
1.75
2.52
2.98
0.8
0.4
----------------
Grueso
3 tomas
canteras de lambayeque
1.3
1.45
2.6
0.6
0.3
1/2"
25kg/cm2
f'c=
210kg/cm2
243.575
233.15
f'cr=
245kg/cm2
246.261
237.802
f'c=
el mayor valor
210kg/cm2
f'cr=
245kg/cm2
294kg/cm2
f'cr=
294kg/cm2
3"
130
145
160
122
133
154
Aire Atrapado
0.03
0.025
0.02
0.015
0.01
0.005
0.003
0.002
N Ensayos
Menos de 15
15
20
25
>30
Factor de Incremento
ver tabla cuando no se conoce Ds
1.16
1.08
1.03
1
6"
113
124
107
119
**DISEO DE MEZCLAS**
A. REQUERIMIENTOS :
Resistencia Especifcada :
Uso
Cemento Portland Tipo :
Coeficiente de Variacin estimado :
Agregados :
Piedra Cantera :
Arena Cantera :
Caractersticas :
Humedad Natural
Absorcin (%9
Peso Especfico de Masa (gr/cm3)
Mdulo de Fineza
Tamao Max. Nominal del A. Grueso
Peso Unitario Suelto Seco
Peso Unitario Varillado
B. DOSIFICACION
210
PACASMAYO
TRES TOMAS
LA VICTORIA
ARENA
0.40
0.80
2.52
2.98
1.55
1.75
210
PIEDRA
0.30
0.70
2.6
1/2''
1.3
1.45
84
205
litros/m3
Kg. ; Aprox.
Kg/m3
455.56 /
872.9 /
Aire :
1+
1+
Bolsas/m3
872.90
Kg
3150
2600
=
=
=
=
0.205 m3
0.145 m3
0.336 m3
0.02 m3
--------0.705 m3
0.295 m3
742.51 Kg
0.705 =
2520 =
0.30
0.40
0.30
0.40
2%
10.72
10.295 x
-6.46
294kg/cm2
0.450
0.450
Humedad Natural
Absorcin
Peso Especfico de Masa
Mdulo de Fineza
Tamao Max. Nominal del A. Grueso
Peso Unitario Suelto Seco
Peso Unitario Varillado
0.558
=
=
=
=
205 litros
455.56
872.90
742.51
/
/
100 )
100 )
0.7
0.80
)
)
Kg
Kg
Kg
=
=
875.52 Kg
745.48 Kg
100 =
100 =
-3.49 Kg
-2.97 Kg
--------- Kg
-6.46 Kg
211.46
8. Resumen
Cemento
Agregado Fino ( Hmedo )
Agregado Grueso ( Hmedo )
Agua efectiva ( Total de Mezclado )
=
=
=
=
456 Kg
745 Kg
876 Kg
211 Litros
DOSIFICACIN EN PESO
1
Kg/cm2.
LABORATORIO
TIPO V
205
210 Kg/cm2
1.64
1.92
205
211
/
/
/
19.73
456
456
=
=
litros / bolsa
0.45
0.464
**DISEO DE MEZCLAS**
A. REQUERIMIENTOS :
Resistencia Especifcada :
Uso
Cemento Portland Tipo :
Coeficiente de Variacin estimado :
Agregados :
Piedra Cantera :
Arena Cantera :
Caractersticas :
Humedad Natural
Absorcin (%9
Peso Especfico de Masa (gr/cm3)
Mdulo de Fineza
Tamao Max. Nominal del A. Grueso
Peso Unitario Suelto Seco
Peso Unitario Varillado
B. DOSIFICACION
175
PACASMAYO
TRES TOMAS
LA VICTORIA
ARENA
0.40
0.80
2.52
2.98
1.55
1.75
175
PIEDRA
0.30
0.70
2.6
1/2''
1.3
1.45
84
205
litros/m3
Kg. ; Aprox.
Kg/m3
337.50 /
872.9 /
Aire :
1+
1+
Bolsas/m3
872.90
Kg
3150
2600
=
=
=
=
0.205 m3
0.107 m3
0.336 m3
0.02 m3
--------0.668 m3
0.332 m3
836.96 Kg
0.668 =
2520 =
0.30
0.40
0.30
0.40
2%
7.94
10.332 x
-6.84
259kg/cm2
0.450
0.607
Humedad Natural
Absorcin
Peso Especfico de Masa
Mdulo de Fineza
Tamao Max. Nominal del A. Grueso
Peso Unitario Suelto Seco
Peso Unitario Varillado
0.6074
=
=
=
=
205 litros
337.50
872.90
836.96
/
/
100 )
100 )
0.7
0.80
)
)
Kg
Kg
Kg
=
=
875.52 Kg
840.30 Kg
100 =
100 =
-3.49 Kg
-3.35 Kg
--------- Kg
-6.84 Kg
211.84
8. Resumen
Cemento
Agregado Fino ( Hmedo )
Agregado Grueso ( Hmedo )
Agua efectiva ( Total de Mezclado )
=
=
=
=
338 Kg
840 Kg
876 Kg
212 Litros
DOSIFICACIN EN PESO
1
Kg/cm2.
LABORATORIO
TIPO V
205
175 Kg/cm2
2.49
2.59
205
212
/
/
/
26.68
338
338
=
=
litros / bolsa
0.6074
0.628
f'c (kg/cm)
150
200
250
300
350
400
450
Asentamiento
co
1" a 2"
3" a 4"
6" a 7"
co
1" a 2"
3" a 4"
6" a 7"
Condicion
condiciones de exposicion
T.N.M.
Agregado
Grueso
3/8"
1/2"
3/4"
1"
1 1/2"
2"
3"
4"
3.0
4.0
volumen del
TMN
A.G.
2.40
2.60
2.80
3.00
3/8"
1/2"
3/4"
1"
0.50
0.59
0.66
0.71
0.48
0.57
0.64
0.69
0.46
0.55
0.62
0.67
0.44
0.53
0.60
0.65
1 1/2"
2"
3"
6"
0.76
0.78
0.81
0.87
0.74
0.76
0.79
0.85
0.72
0.74
0.77
0.83
0.70
0.72
0.75
0.81
1/2"
207
228
243
199
216
228
181
202
216
175
193
205
3/4"
1"
1 1/2"
concreto sin aire incorporado
190
179
166
205
193
181
216
202
190
concreto con aire incorporado
168
160
150
184
175
165
197
184
174
2"
3"
6"
154
169
178
130
145
160
113
124
142
157
166
122
133
154
107
119
260
0.45
0.5
300
0.4
325
0.45
300
>350
f'c + 98
N Ensayos
Menos de 15
15
20
25
>30
Factor de Incremento
ver tabla cuando no se conoce Ds
1.16
1.08
1.03
1